Comments Resolution Sheet

PROJECT NAME: 1X80 TPH BOILER FOR INDIAN OIL CORPORATION LIMITED
FOUNDATION LAYOUT &RCC DETAILS FOR FLY ASH& BED AS H SILO(03-BMH-SILO-101) &
DESIGN CALCULATION OF BED ASH SILO SUPPORTING STRUCTURE& FOUNDATION
DTI064-IOC-SEE-H-02-0012 REV 1
REVISION: R1
CIVIL COMMENTS
STEAG'S REPLY ON
S. No. STEAG COMMENTS DATED: - 03.08.2018 03.08.2018
DTI064-IOC-SEE-H-02-0012 REV 1 & DTI064-IOC-CEE-B-02-0003 R1
We found design calculation is not commensurate with the size of the footings proposed in the drawing
1 as shown in Appendix- C. Open

Check for bearing pressure for load cases considered as well as submitted unnecessary for the zero forces
2 which shall be avoided. Forces are not tallied with the submitted Staad INPUT support reactions. Please Open
submit bearing capacity check for the worst loadings only for design of foundation.

Net safe bearing capacity alllowed are allowed up to 23.8 t/m^2 against permissble bearing capacity of 24
3 t/m^2. Open

We suggest to avoid negative in gross bearing pressure as shown in calculation to avoid calculation of
4 percentage of contact area and concerened modification. Open

We suggest to provide 4.0m x4.0m size of foundation of 850 mm depth with all the foundations with
reinforcement tor 16 @125 c/c to and bottom both ways as economic and safe size of foundation at levels
5 as proposed in the above drawing subjecetdcto compliance of above comments to be approved in cat A Open
FOR THE FOUNDATION DRAWING

Note:-Drawing is approved up to(-)0.5m level of column.


Subjected to resubmission of design documents incorporating our comments and drawings. Site
construction may be done considering foundation details as sujggested in our comments and column size Open
shall be followed as proposed by designer.