Академический Документы
Профессиональный Документы
Культура Документы
The proposed material list for compressor packages are noted. However, full
described bill of material showing item numbers, description, quantities,
2 manufacturer & COO including controller, receiver tank
& air dryer is yet to be submitted.
Proposed material for scroll compressor Models S08-10A & S08-8A are noted.
3 However, contractor is to provide capacity calculation for system pressure
drop and flow verification along with the material submittal.
System providers shall highlight the maximum intake air condition since the
offered capacity measured at Standard Temperature and Pressure "STP" in order
4 to coordinate with the supplied air condition to the room.
Proposed material for pre-filter Model CF0012G %" B is not adequate since the
5 contractor did not support the selection with the data sheet for the same.
Page 1 of 4
FJ Trading and Engineering Company LLC
Technical Submital Hot Water Storage Tanks
Clear spare parts list for 2-years is required as per QCS and the same is to be
8 enclosed with the submittal.
Page 2 of 4
FJ Trading and Engineering Company LLC
Technical Submital Hot Water Storage Tanks
Ref: CPC07d/TS/KEO/BTCC/1494
Reply
Page 3 of 4
FJ Trading and Engineering Company LLC
Technical Submital Hot Water Storage Tanks
Page 4 of 4