Вы находитесь на странице: 1из 93

HARGA BAHAN

NO JENIS BAHAN SATUAN


Rp.

BAHAN AGREGAT KASAR, BAHAN


PEREKAT DAN BAHAN JADINYA
Pasir Urug m3 70,000.00
Sirtu m3 150,000.00
Pasir Pasang m3 240,000.00
Pasir Beton m3 250,000.00
Batu Pecah Mesin 1/2 m3 250,000.00
Batu Pecah Mesin 2/3 m3 250,000.00
Batu Pecah Mesin 3/5 m3 250,000.00
Batu Pecah Mesin 5/7 m3 250,000.00
Batu Belah Pondasi m3 175,000.00
Batu Tempel Hitam m2 80,000.00
Bata merah kelas I bh 500.00
Inter Blok Natural 6 cm m2 25,000.00
Paving Blok natural 8 cm m2 28,000.00
Paving Blok Warna 6 cm m2 30,000.00
Kanstin Paving Blok m1 30,000.00
Glass Block m2 15,000.00
Semen PC Tiga Roda / 50 kg zak 40,000.00
Semen Putih kg 3,500.00
Semen warna kg 3,500.00
Aspal (ESO) 1 Drum 150 kg kg 8,000.00

BAHAN FINISHING :
LABURAN , PENGISI DAN ALATNYA
Plamir Tembok Ex. Paragon kg 18,000.00
Cat Tembok Sanlex kg 5,100.00
Rool Cat Tembok bh 15,000.00
Kape Tembok bh 5,000.00
Kape Kayu bh 5,000.00
Soligneum 1 Blek 5 ltr 12,000.00
Kwas 3 " bh 7,500.00
Otem (Pewarna Plitur) bks 1,000.00
Spirtus ltr 2,500.00
Bahan Plitur Kripik (Sirlak India) kg 6,000.00
Dempul Halus/ Infra (Wood Filler)/Impra kg 21,500.00
Terpentin ltr 2,000.00
Tiner ltr 18,000.00
Ampelas lbr 2,500.00
Dempul Kayu Cap Kucing kg 9,500.00
Dempul Kayu Avian kg 6,000.00
Meni Kayu/ Besi kg 20,000.00
Sincromat kg 60,000.00
Cat Kayu pinoguar kg 24,000.00
Cat Besi Seiv kg 60,000.00
Cat Kayu Avian kg 45,000.00
Cat Besi Duco Danaglos / ICI kg 130,000.00
Lem Kayu Putih (Fox) kg 8,500.00
Lem Kayu Kuning (AIBON) kg 14,000.00

BAHAN KAYU BERIKUT BAHAN JADINYA


Kayu Terentang m3 310,000.00
Kayu Balok Borneo Super m3 1,700,000.00
Kayu papan Borneo Super m3 1,700,000.00
Kayu kaso 5/7 Borneo Super m3 1,700,000.00
HARGA BAHAN
NO JENIS BAHAN SATUAN
Rp.
Kayu 5/10 kayu awet kls I m3 1,700,000.00
Kayu Awet Kls I m3 1,250,000.00
Kayu KAMPER m3 3,600,000.00
Kayu Balok Rasamala m3 2,100,000.00
Kayu papan Rasamala m3 2,100,000.00
Kayu Balok Kamper Medan (Kruing) m3 1,600,000.00
Kayu Papan Kamper Medan (Kruing) m3 1,600,000.00
Kayu Balok Kamper Banjar m3 2,100,000.00
Kayu Papan Kamper Banjar m3 2,100,000.00
Kayu Balok Kamper Samarinda m3 5,500,000.00
Kayu Papan Kamper Samarinda m3 5,500,000.00
Kayu Jati jabar m3 7,000,000.00
Dolken 5 s/d 7 bt 7,000.00
Dolken 7 s/d 10 / kaso 4/6 untuk stootwork bt 11,500.00
List Profil kamper 1 cm m1 1,000.00
List Profil kamper 2 cm (45x45) m1 2,750.00
Kayu Reng 2/3 Borneo Super m1 1,500.00
Kayu Reng 3/4 Borneo Super m1 3,000.00
kayu ulin m3 1,650,000.00

BAHAN PENUTUP RANGKA PLAPON


Bahan Plapon Eternit 4 mm lbr 42,500.00
Kalsiboard lbr 38,000.00
List Kayu 4 / 4 btng 18,000.00
List Kayu 5 / 5 btng 27,000.00
Gypsum 9 mm lbr 75,000.00

BAHAN KAYU LAPIS


Triplek 3 mm 120 x 240 lbr 33,000.00
Triplek 4 mm 120 x 240 lbr 39,000.00
Triplek 6 mm 120 x 240 lbr 42,000.00
Multiplek 12 mm 120 x 240 lbr 112,500.00
Multiplek 12 mm ukuran pintu lbr 236,250.00
Teak Wood 4 mm 120 x240 lbr 75,000.00
Formika lbr 69,000.00

BAHAN LANTAI DAN PELAPIS DINDING


Keramik lantai 20 x 20 Putih Polos "MULIA" m2 45,000.00
Keramik dinding 20 x 25 Putih Polos "MULIA" m2 48,000.00
Keramik 30X30 Putih Polos "MULIA" m2 46,000.00
Lantai Pear Stone m2 89,000.00
Floor Hardener Ferofax sekualitas Metaltop kg 60,000.00

G. BAHAN SALURAN AIR KOTOR / BERSIH


Grafel U 20 cm m' 20,000.00
Grafel U 30 cm m' 30,000.00
Buis Beton dia. 20 cm ( 1 m ) m' 45,000.00
Buis Beton dia.30 cm (1 m ) m' 60,000.00

BAHAN LOGAM DAN BAHAN JADINYA


Besi Beton U-24 Rata-rata kg 14,000.00
Pagar BRC T.120 Lengkap Tiang m1 132,000.00
Pagar BRC T.175 Lengkap Tiang m1 612,500.00
Besi Canal kg 14,000.00
Besi Siku L kg 14,000.00
Besi IWF DN SII kg 14,000.00
Besi HWF kg 14,000.00
Besi plat kg 14,000.00
Kawat Beton kg 19,500.00
HARGA BAHAN
NO JENIS BAHAN SATUAN
Rp.
Kawat Duri kg 12,500.00
Seng plat BJLS 28 ( lebar = 90 cm ) m1 35,000.00
Seng Glb BJLS 28 lbr 20,500.00
Ram kawat m2 35,000.00

BAHAN KACA
Kaca polos 3 mm (ASAHI) m2 57,000.00
Kaca polos 5 mm (ASAHI) m2 65,000.00
Cermin m2 89,000.00

BAHAN PAKU DAN MUR BAUT


Paku biasa kg 15,000.00
Paku hak Pj. 15 cm bh 6,000.00

BAHAN PERPIPAAN
Pipa GIP Medium B dia. 1/2" bt 17,000.00
Pipa GIP Medium B dia. 3/4" bt 23,000.00
Pipa GIP Medium B dia. 1" bt 25,000.00
Pipa GIP Medium B dia. 1 1/2" bt 43,000.00
Pipa GIP Medium B dia. 2" bt 60,000.00
Pipa PVC MASPION ABU dia. 2" (AW) bt 75,000.00
Pipa PVC MASPION ABU dia. 3" (AW) bt 140,000.00
Pipa PVC MASPION ABU dia. 4" (AW) bt 230,000.00
Grefel beton 1/2 dia. 30 cm m1 30,000.00

BAHAN SANITAIR DAN PERPIPAAN


Stop Kran 3/4 " KIT bh 75,000.00
Stop Kran 1 1/2 " KIT bh 125,000.00
Kran bebek Sun Ei 1/2 " bh 85,000.00
Floor drain bh 20,000.00
Wastafel Lengkap Toto Type L 34 bh 350,000.00
Closet Jongkok Standard Putih Poslin INA unit 125,000.00
closet duduk ex toto unit 1,050,000.00
kran air 1/2" bh 37,300.00
shower unit 250,000.00
kichensink unit 250,000.00

BAHAN PENUTUP ATAP


Genteng Palentong bh 1,000.00
Wuwung Genteng bh 18,500.00
Atap genteng Morando glazur bh 2,000.00
Wuwung Genteng morando glazur bh 4,000.00
Genteng Ex KIA (11 bh ) m2 58,685.00

BAHAN ELEKTRIKAL
Saklar Broko Tunggal Standard (1Phase) bh 16,000.00
Saklar Broko Seri Standard (1 Phase) bh 16,000.00
Stop Kontak Broko Standard (1 Phase) bh 9,000.00
Lampu Neon TL Philip 1 X 36 W Type TKI bh 17,500.00
Pentanahan Penangkal Petir lengkap bak kontrol ttk 900,000.00
pipa kabel bt 8,000.00
Kabel NYY 2 X 2,5 mm Prima m1 4,000.00
Kabel NYY 3 X 2,5 mm Prima M1 5,000.00
HARGA BAHAN
NO JENIS BAHAN SATUAN
Rp.
BAHAN ALAT PENGGANTUNG DAN KUNCI
Kunci 2 Slaag bh 75,000.00
Kunci KM Bulat ALPA bh 75,000.00
Espanyolet/Slot Tanam bh 30,000.00
Hak Angin Kait Jendela Biasa ( Kait ) bh 15,000.00
Engsel Pintu Arch Standard bh 6,000.00
Engsel Jendela Arch bh 4,000.00
Pasang roda type 61. K/ N ex Henderson bh 65,000.00

BAHAN PENGHISAP AIR SUMUR DALAM


Mesin Pompa Air 400 W - Sanyo unit 650,000.00

BAHAN PENAMPUNG AIR


Tangki Air Fiber Glass 0.5 m3 ( Pinguinl ) bh 1,200,000.00
Tangki Air Fiber Glass 2000 liter ( Pinguinl ) bh 1,900,000.00
Bak km Fiber 50 X 50 bh 125,000.00
ANALISA HARGA SATUAN PEKERJAAN

HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

II PEKERJAAN TANAH

1 1 m3 Mengerjakan Galian Tanah Biasa Sedalam 1 meter - 26,800.00 26,800.00

2 1 m3 Mengerjakan Galian Tanah Biasa Sedalam 2 meter - 32,940.00 32,940.00

3 1 m3 Mengerjakan Galian Tanah Biasa Sedalam 3 meter - 39,184.00 39,184.00


Tenaga
Pekerja 1.0500 OH 34,000.00 35,700.00
Mandor 0.0670 OH 52,000.00 3,484.00

4 1 m3 Mengerjakan Galian Tanah Keras Sedalam 1 meter - 35,664.00 35,664.00


Tenaga
Pekerja 1.0000 OH 34,000.00 34,000.00
Mandor 0.0320 OH 52,000.00 1,664.00

5 1 m3 Mengerjakan Galian Tanah Cadas Sedalam 1 meter - 54,120.00 54,120.00


Tenaga
Pekerja 1.5000 OH 34,000.00 51,000.00
Mandor 0.0600 OH 52,000.00 3,120.00

6 1 m3 Pekerjaan Mengerjakan Galian Tanah Lumpur Sedalam 1 meter - 43,140.00 43,140.00


Tenaga
Pekerja 1.2000 OH 34,000.00 40,800.00
Mandor 0.0450 OH 52,000.00 2,340.00

7 1 m2 Pekerjaan Stripping tanah tebing setinggi 1 m - 1,960.00 1,960.00

8 1 m3 Pembuangan Tanah sejauh 15 m - 11,740.00 11,740.00

9 1 m3 Urugan Tanah Kembali - 8,933.33 8,933.33


Cat. Mengurug Kembali 1 m3 Galian Tanah dihitung dari 1/3 kali indeks Pekerjaan Galian Tanah
1 m3 Urugan Tanah Kembali Galian Tanah Biasa Maksimal keadalaman 1 m'

10 1 m3 Memadatan tanah (Per 20 cm) - 19,600.00 19,600.00

11 1 m3 Pekerjaan Urugan Pasir 66,000.00 10,720.00 76,720.00

Analisa Harga Satuan


Halaman 5
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

12 1 m3 Pekerjaan Urugan Tanah 50,400.00 10,720.00 61,120.00

13 1 m3 Urugan Sirtu padat untuk peninggian Lantai Bangunan 56,400.00 9,800.00 66,200.00
Bahan
Sirtu 1.2000 m3 47,000.00 56,400.00
Tenaga
Pekerja 0.2500 OH 34,000.00 8,500.00
Mandor 0.0250 OH 52,000.00 1,300.00

III PEKERJAAN PONDASI

14 1 m3 Pasangan Batu Kosong (Aanstamping) 149,760.00 45,786.00 195,546.00

15 1 m3 Pasangan Pondasi Batu Belah, Campuran 1 Pc : 3Ps 455,850.00 88,050.00 543,900.00

16 1 m3 Pasangan Pondasi Batu Belah, Campuran 1 Pc : 5Ps 374,608.00 88,050.00 462,658.00

17 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah 2,039,500.00 148,410.00 2,187,910.00
Bahan
Batu Belah 15 cm/ 20 cm 0.4800 m3 105,000.00 50,400.00
Semen Portland 194.0000 Kg 1,340.00 259,960.00
Pasir Beton 0.3120 m3 154,000.00 48,048.00
Kerikil 0.4680 m3 214,000.00 100,152.00
Besi Beton 126.0000 kg 12,240.00 1,542,240.00
Kawat Beton 1.8000 kg 21,500.00 38,700.00
Tenaga
Pekerja 3.0000 OH 34,000.00 102,000.00
Tukang Batu 0.8500 OH 39,500.00 33,575.00
Kepala Tukang 0.0850 OH 47,000.00 3,995.00
Mandor 0.1700 OH 52,000.00 8,840.00

Analisa Harga Satuan


Halaman 6
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

18 1 m3 Pasangan Pondasi Sumuran, diameter 100 cm 455,410.00 123,148.00 578,558.00


Bahan
Batu Belah 15 cm/ 20 cm 0.4500 m3 105,000.00 47,250.00
Semen Portland 194.0000 Kg 1,340.00 259,960.00
Pasir Beton 0.3120 m3 154,000.00 48,048.00
Kerikil 0.4680 m3 214,000.00 100,152.00
Tenaga
Pekerja 2.4000 OH 34,000.00 81,600.00
Tukang Batu 0.8000 OH 39,500.00 31,600.00
Kepala Tukang 0.0800 OH 47,000.00 3,760.00
Mandor 0.1190 OH 52,000.00 6,188.00

IV PEKERJAAN DINDING

19 1 m2 Pasangan dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1Pc : 3Ps 62,635.80 15,400.00 78,035.80
Bahan
Bata merah 70.0000 bh 550.00 38,500.00
Semen Portland 14.3700 Kg 1,340.00 19,255.80
Pasir Pasang 0.0400 m3 122,000.00 4,880.00
Tenaga
Pekerja 0.3000 OH 34,000.00 10,200.00
Tukang Batu 0.1000 OH 39,500.00 3,950.00
Kepala Tukang 0.0100 OH 47,000.00 470.00
Mandor 0.0150 OH 52,000.00 780.00

20 1 m2 Pasangan dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1Pc : 5Ps 56,961.20 15,400.00 72,361.20

21 1 m2 Pasangan dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC:3Ps 150,164.00 15,400.00 165,564.00
Bahan
Terawang (roster) 30.0000 bh 4,250.00 127,500.00
Semen Portland 14.0000 Kg 1,340.00 18,760.00
Pasir Pasang 0.0320 m3 122,000.00 3,904.00
Tenaga
Pekerja 0.3000 OH 34,000.00 10,200.00
Tukang Batu 0.1000 OH 39,500.00 3,950.00
Kepala Tukang 0.0100 OH 47,000.00 470.00
Mandor 0.0150 OH 52,000.00 780.00

22 1 m2 Pasangan dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC:4Ps 146,510.00 15,400.00 161,910.00
Bahan
Terawang (roster) 30.0000 bh 4,250.00 127,500.00
Semen Portland 11.0000 Kg 1,340.00 14,740.00
Pasir Pasang 0.0350 m3 122,000.00 4,270.00
Tenaga
Pekerja 0.3000 OH 34,000.00 10,200.00
Tukang Batu 0.1000 OH 39,500.00 3,950.00
Kepala Tukang 0.0100 OH 47,000.00 470.00
Mandor 0.0150 OH 52,000.00 780.00

V PEKERJAAN PELESTERAN

23 1 m2 Plesteran Dinding 1Pc : 3Ps tebal 15 mm 13,225.84 17,610.00 30,835.84

Analisa Harga Satuan


Halaman 7
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

24 1 m2 Plesteran Dinding 1Pc : 5Ps tebal 15 mm 10,118.56 17,610.00 27,728.56

25 1 m2 Plesteran Dinding 1Pc : 3Ps tebal 20 mm 17,675.12 18,356.00 36,031.12


Bahan
Semen Portland 10.3680 Kg 1,340.00 13,893.12
Pasir Pasang 0.0310 m3 122,000.00 3,782.00
Tenaga
Pekerja 0.2600 OH 34,000.00 8,840.00
Tukang Batu 0.2000 OH 39,500.00 7,900.00
Kepala Tukang 0.0200 OH 47,000.00 940.00
Mandor 0.0130 OH 52,000.00 676.00

26 1 m2 Plesteran Dinding 1Pc : 5Ps tebal 20 mm 13,532.08 23,584.00 37,116.08


Bahan
Semen Portland 6.9120 Kg 1,340.00 9,262.08
Pasir Pasang 0.0350 m3 122,000.00 4,270.00
Tenaga
Pekerja 0.4000 OH 34,000.00 13,600.00
Tukang Batu 0.2000 OH 39,500.00 7,900.00
Kepala Tukang 0.0200 OH 47,000.00 940.00
Mandor 0.0220 OH 52,000.00 1,144.00

27 1 m2 Plesteran Berapen 1Pc : 5Ps, tebal 15 mm 10,118.56 8,805.00 18,923.56

28 1 m2 Plesteran Skoning 1Pc : 2Ps, Lebar 10 mm 2,256.00 20,608.00 22,864.00


Bahan
Semen Portland 0.5000 Kg 1,340.00 670.00
Pasir Pasang 0.0130 m3 122,000.00 1,586.00
Tenaga
Pekerja 0.0800 OH 34,000.00 2,720.00
Tukang Batu 0.4000 OH 39,500.00 15,800.00
Kepala Tukang 0.0400 OH 47,000.00 1,880.00
Mandor 0.0040 OH 52,000.00 208.00

29 1 m2 Pelesteran Ciprat 1 Pc : 2 Ps 6,520.80 15,400.00 21,920.80

Analisa Harga Satuan


Halaman 8
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

30 1 m2 Pelesteran Siar Pasangan Dinding Bata Merah (= 20 m') 4,164.72 8,805.00 12,969.72

31 1 m2 Pelesteran Siar Pasangan Dinding con Block ekspose (= 8 m') 2,144.00 4,109.00 6,253.00
Bahan
Semen Portland 1.6000 Kg 1,340.00 2,144.00
Tenaga
Pekerja 0.0700 OH 34,000.00 2,380.00
Tukang Batu 0.0350 OH 39,500.00 1,382.50
Kepala Tukang 0.0035 OH 47,000.00 164.50
Mandor 0.0035 OH 52,000.00 182.00

32 1 m2 Acian 4,355.00 11,740.00 16,095.00


Bahan
Semen Portland 3.2500 Kg 1,340.00 4,355.00
Tenaga
Pekerja 0.2000 OH 34,000.00 6,800.00
Tukang Batu 0.1000 OH 39,500.00 3,950.00
Kepala Tukang 0.0100 OH 47,000.00 470.00
Mandor 0.0100 OH 52,000.00 520.00

VI PEKERJAAN KAYU

33 1m3 Pasang Kusen Pintu dan Jendela, Kayu Kelas II Atau Kelas III 3,277,750.00 1,051,200.00 4,328,950.00
Bahan
Kayu Balok Kelas II Atau Kelas III 1.2000 m3 2,685,000.00 3,222,000.00
Paku 10 Cm 1.2500 Kg 19,000.00 23,750.00
Lem Kayu 1.0000 Kg 32,000.00 32,000.00
Tenaga
Pekerja 6.0000 OH 34,000.00 204,000.00
Tukang Kayu 18.0000 OH 41,500.00 747,000.00
Kepala Tukang 1.8000 OH 47,000.00 84,600.00
Mandor 0.3000 OH 52,000.00 15,600.00

34 1m3 Pasang Kusen Pintu dan Jendela Kayu Lanan 7,123,200.00 1,051,200.00 8,174,400.00

35 1m2 Pasang Pintu Panel Kayu Lanan 298,240.00 175,200.00 473,440.00

Analisa Harga Satuan


Halaman 9
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

36 1m2 Pasang Pintu dan Jendela Kaca Kayu Lanan 178,944.00 140,160.00 319,104.00

37 1m2 Pasang Pintu Kayu Lapis (Plywood) rangkap, rangka tertutup kayu borneo (lebar sampai 90 cm) 262,620.00 122,640.00 385,260.00

38 1m2 Pasang Pintu Kayu Lapis (Plywood) rangkap, rangka tertutup kayu lanan (lebar sampai 90 cm) 290,620.00 122,640.00 413,260.00
Bahan
Papan Kayu Lanan 0.0250 m3 7,056,000.00 176,400.00
Paku Biasa 1 cm - 2.5 cm 0.0300 Kg 24,000.00 720.00
Lem Kayu 0.5000 Kg 32,000.00 16,000.00
Plywood tebal 4mm (90x220) cm 1.0000 lbr 97,500.00 97,500.00
Tenaga
Pekerja 0.7000 OH 34,000.00 23,800.00
Tukang Kayu 2.1000 OH 41,500.00 87,150.00
Kepala Tukang 0.2100 OH 47,000.00 9,870.00
Mandor 0.0350 OH 52,000.00 1,820.00

39 1m2 Pasang Pintu Kayu Lapis (Plywood) rangkap, rangka tertutup kayu lokal (lebar sampai 90 cm) 186,720.00 122,640.00 309,360.00
Bahan
Papan Kayu lokal 0.0250 m3 2,900,000.00 72,500.00
Paku Biasa 1 cm - 2.5 cm 0.0300 Kg 24,000.00 720.00
Lem Kayu 0.5000 Kg 32,000.00 16,000.00
Plywood tebal 4mm (90x220) cm 1.0000 lbr 97,500.00 97,500.00
Tenaga
Pekerja 0.7000 OH 34,000.00 23,800.00
Tukang Kayu 2.1000 OH 41,500.00 87,150.00
Kepala Tukang 0.2100 OH 47,000.00 9,870.00
Mandor 0.0350 OH 52,000.00 1,820.00

40 1m2 Pasang Pintu Kayu Lapis (Plywood) rangkap, rangka tertutup kayu lokal (lebar sampai 90 cm) dilapis Alumi 205,296.00 122,640.00 327,936.00
Bahan
Papan Kayu lokal 0.0250 m3 2,900,000.00 72,500.00
Paku Biasa 1 cm - 2.5 cm 0.0300 Kg 24,000.00 720.00
Lem Kayu 0.5000 Kg 32,000.00 16,000.00
Plywood tebal 4mm (90x220) cm 1.0000 lbr 97,500.00 97,500.00
Aluminium 1.0800 lbr 17,200.00 18,576.00
Tenaga
Pekerja 0.7000 OH 34,000.00 23,800.00
Tukang Kayu 2.1000 OH 41,500.00 87,150.00
Kepala Tukang 0.2100 OH 47,000.00 9,870.00
Mandor 0.0350 OH 52,000.00 1,820.00

41 1m2 Pasang Pintu Plywood Rangkap, rangka ekspose Kayu Lanan 294,853.60 140,160.00 435,013.60

Analisa Harga Satuan


Halaman 10
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

42 1m2 Pasang Pintu Plywood Rangkap, rangka ekspose Kayu Borneo 266,181.60 140,160.00 406,341.60
Bahan
Papan Kayu Borneo 0.0256 m3 5,936,000.00 151,961.60
Paku Biasa 1 cm - 2.5 cm 0.0300 Kg 24,000.00 720.00
Lem Kayu 0.5000 Ltr 32,000.00 16,000.00
Plywood tebal 4mm (90x220) cm 1.0000 lbr 97,500.00 97,500.00
Tenaga
Pekerja 0.8000 OH 34,000.00 27,200.00
Tukang Kayu 2.4000 OH 41,500.00 99,600.00
Kepala Tukang 0.2400 OH 47,000.00 11,280.00
Mandor 0.0400 OH 52,000.00 2,080.00

43 1m2 Pasang Pintu Teakwood Rangkap, rangka ekspose Kayu Lanan 271,720.00 140,160.00 411,880.00
Bahan
Papan Kayu Lanan 0.0250 m3 7,056,000.00 176,400.00
Paku Biasa 1 cm - 2.5 cm 0.0300 Kg 24,000.00 720.00
Lem Kayu 0.3000 Kg 32,000.00 9,600.00
Teakwood tebal 4 mm ukuran (90x220) cm 1.0000 lbr 85,000.00 85,000.00
Tenaga
Pekerja 0.8000 OH 34,000.00 27,200.00
Tukang Kayu 2.4000 OH 41,500.00 99,600.00
Kepala Tukang 0.2400 OH 47,000.00 11,280.00
Mandor 0.0400 OH 52,000.00 2,080.00

44 1m2 Pasang Pintu Teakwood Rangkap, rangka ekspose Kayu Borneo 243,720.00 140,160.00 383,880.00
Bahan
Papan Kayu Borneo 0.0250 m3 5,936,000.00 148,400.00
Paku Biasa 1 cm - 2.5 cm 0.0300 Kg 24,000.00 720.00
Lem Kayu 0.3000 Ltr 32,000.00 9,600.00
Teakwood tebal 4 mm ukuran (90x220) cm 1.0000 lbr 85,000.00 85,000.00
Tenaga
Pekerja 0.8000 OH 34,000.00 27,200.00
Tukang Kayu 2.4000 OH 41,500.00 99,600.00
Kepala Tukang 0.2400 OH 47,000.00 11,280.00
Mandor 0.0400 OH 52,000.00 2,080.00

45 1m3 Pasang Konstruksi Kuda - kuda Kayu Lanan 7,093,500.00 700,800.00 7,794,300.00

46 1m3 Pasang Konstruksi Kuda - kuda Kayu kls II (Lokal) 3,517,400.00 700,800.00 4,218,200.00
Bahan
Balok Kayu kls II 1.1000 m3 2,685,000.00 2,953,500.00
Besi Strip tebal 5 mm 15.0000 Kg 30,500.00 457,500.00
Paku 12 cm 5.6000 Kg 19,000.00 106,400.00
Tenaga
Pekerja 4.0000 OH 34,000.00 136,000.00
Tukang Kayu 12.0000 OH 41,500.00 498,000.00
Kepala Tukang 1.2000 OH 47,000.00 56,400.00
Mandor 0.2000 OH 52,000.00 10,400.00

47 1m3 Pasang Konstruksi Gordeng, Kayu Lanan 7,044,100.00 420,480.00 7,464,580.00

Analisa Harga Satuan


Halaman 11
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

48 1m3 Pasang Konstruksi Gordeng, Kayu Kelas II (Lokal) 3,468,000.00 420,480.00 3,888,480.00
Bahan
Balok Kayu Kelas II 1.1000 m3 2,685,000.00 2,953,500.00
Besi Strip Tebal 5 mm 15.0000 Kg 30,500.00 457,500.00
Paku 12 cm 3.0000 Kg 19,000.00 57,000.00
Tenaga
Pekerja 2.4000 OH 34,000.00 81,600.00
Tukang Kayu 7.2000 OH 41,500.00 298,800.00
Kepala Tukang 0.7200 OH 47,000.00 33,840.00
Mandor 0.1200 OH 52,000.00 6,240.00

49 1m2 Pasang Rangka Atap Genteng Keramik Kayu Kelas II 62,330.00 8,280.00 70,610.00
Bahan
Kaso 5/7 cm Kayu Kelas II 0.0140 m3 3,650,000.00 51,100.00
Reng 2/3 cm Kayu Kelas II 0.0036 m3 1,800,000.00 6,480.00
Paku Biasa 5 cm dan 10 cm 0.2500 Kg 19,000.00 4,750.00
Tenaga
Pekerja 0.1000 OH 34,000.00 3,400.00
Tukang Kayu 0.1000 OH 41,500.00 4,150.00
Kepala Tukang 0.0100 OH 47,000.00 470.00
Mandor 0.0050 OH 52,000.00 260.00

50 1m2 Pasang Rangka Atap Genteng Keramik Kayu Lanan 62,330.00 8,280.00 70,610.00
Bahan
Kaso 5/7 cm (Lanan) 0.0140 m3 3,650,000.00 51,100.00
Reng 2/3 cm (Lanan) 0.0036 m3 1,800,000.00 6,480.00
Paku Biasa 5 cm dan 10 cm 0.2500 Kg 19,000.00 4,750.00
Tenaga
Pekerja 0.1000 OH 34,000.00 3,400.00
Tukang Kayu 0.1000 OH 41,500.00 4,150.00
Kepala Tukang 0.0100 OH 47,000.00 470.00
Mandor 0.0050 OH 52,000.00 260.00

51 1m2 Pasang Rangka Atap Genteng Beton Kayu Kelas II 31,206.00 8,280.00 39,486.00
Bahan
Kaso 5/7 cm Kayu Kelas II 0.0140 m3 1,540,000.00 21,560.00
Reng 2/3 cm Kayu Kelas II 0.0036 m3 1,360,000.00 4,896.00
Paku Biasa 5 cm dan 10 cm 0.2500 Kg 19,000.00 4,750.00
Tenaga
Pekerja 0.1000 OH 34,000.00 3,400.00
Tukang Kayu 0.1000 OH 41,500.00 4,150.00
Kepala Tukang 0.0100 OH 47,000.00 470.00
Mandor 0.0050 OH 52,000.00 260.00

52 1m2 Pasang Rangka Atap Sirap Beton Kayu Lanan 983,240.00 9,936.00 993,176.00
Bahan
Kayu Lanan 0.1650 m3 5,936,000.00 979,440.00
Paku Biasa 5 cm dan 10 cm 0.2000 Kg 19,000.00 3,800.00
Tenaga
Pekerja 0.1200 OH 34,000.00 4,080.00
Tukang Kayu 0.1200 OH 41,500.00 4,980.00
Kepala Tukang 0.0120 OH 47,000.00 564.00
Mandor 0.0060 OH 52,000.00 312.00

53 1m' Pasang Lisplank ( 3 x 20 )cm Kayu Lanan 78,104.80 12,900.00 91,004.80

Analisa Harga Satuan


Halaman 12
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

54 1m' Pasang Lisplank ( 3 x 30 )cm Kayu lanan 78,566.00 12,900.00 91,466.00

55 1m' Pasang Lisplank ( 3 x 30 )cm Kayu klas II 32,850.00 12,900.00 45,750.00


Bahan
Papan Kayu klas II 0.0110 m3 2,900,000.00 31,900.00
Paku Biasa 5 dan 7 cm 0.0500 Kg 19,000.00 950.00
Tenaga
Pekerja 0.1000 OH 34,000.00 3,400.00
Tukang Kayu 0.2000 OH 41,500.00 8,300.00
Kepala Tukang 0.0200 OH 47,000.00 940.00
Mandor 0.0050 OH 52,000.00 260.00

56 1m' Pasang Calsiplank GRC (0,8 x 20) cm 17,450.00 12,900.00 30,350.00


Bahan
Papan calsiplank 1.1000 btg 15,000.00 16,500.00
Paku Biasa 5 dan 7 cm 0.0500 Kg 19,000.00 950.00
Tenaga
Pekerja 0.1000 OH 34,000.00 3,400.00
Tukang Kayu 0.2000 OH 41,500.00 8,300.00
Kepala Tukang 0.0200 OH 47,000.00 940.00
Mandor 0.0050 OH 52,000.00 260.00

57 1m2 Pasang Rangka Dinding Pemisah (60 x 120) cm Kayu Kelas II atau III 169,058.00 26,306.00 195,364.00
Bahan
Balok Kayu Kelas II atau III 0.0280 m3 5,936,000.00 166,208.00
Paku Biasa 5 dan 7 cm 0.1500 Kg 19,000.00 2,850.00
Tenaga
Pekerja 0.1500 OH 34,000.00 5,100.00
Tukang Kayu 0.4500 OH 41,500.00 18,675.00
Kepala Tukang 0.0450 OH 47,000.00 2,115.00
Mandor 0.0080 OH 52,000.00 416.00

58 1m2 Pasang Rangka Dinding Pemisah Kayu Lanan (60 x 120) cm Kayu Lanan 169,058.00 26,306.00 195,364.00

59 1m2 Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Lanan 248,131.33 29,790.00 277,921.33

60 1m2 Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Lanan 258,881.33 35,040.00 293,921.33

Analisa Harga Satuan


Halaman 13
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

VII PEKERJAAN BETON ( SNI 7394 : 2008 )

CATATAN
Bobot isi pasir beton 1,400 kg/m3
Bobot isi kerikil 1,350 kg/m3
Bukling factor pasir = 20 %

61 1 m3 Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 584,930.00 72,594.50 657,524.50
Bahan
Semen Portland 247.0000 Kg 1,340.00 330,980.00
Pasir Beton 869.0000 Kg 110.00 95,590.00
Kerikil (Masimal 30 mm) 999.0000 Kg 158.52 158,360.00
Air 215.0000 Ltr - -
Tenaga
Pekerja 1.6500 OH 34,000.00 56,100.00
Tukang Batu 0.2750 OH 39,500.00 10,862.50
Kepala Tukang 0.0280 OH 47,000.00 1,316.00
Mandor 0.0830 OH 52,000.00 4,316.00

62 1 m3 Membuat beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 621,120.74 72,594.50 693,715.24
Bahan
Semen Portland 276.0000 Kg 1,340.00 369,840.00
Pasir Beton 826.0000 Kg 110.00 90,860.00
Kerikil (Masimal 30 mm) 1,012.0000 Kg 158.52 160,420.74
Air 215.0000 Ltr - -
Tenaga
Pekerja 1.6500 OH 34,000.00 56,100.00
Tukang Batu 0.2750 OH 39,500.00 10,862.50
Kepala Tukang 0.0280 OH 47,000.00 1,316.00
Mandor 0.0830 OH 52,000.00 4,316.00

63 1 m3 Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 649,763.33 72,594.50 722,357.83
Bahan
Semen Portland 299.0000 Kg 1,340.00 400,660.00
Pasir Beton 799.0000 Kg 110.00 87,890.00
Kerikil (Masimal 30 mm) 1,017.0000 Kg 158.52 161,213.33
Air 215.0000 Ltr - -
Tenaga
Pekerja 1.6500 OH 34,000.00 56,100.00
Tukang Batu 0.2750 OH 39,500.00 10,862.50
Kepala Tukang 0.0280 OH 47,000.00 1,316.00
Mandor 0.0830 OH 52,000.00 4,316.00

64 1 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 569,228.52 49,952.00 619,180.52
Bahan
Semen Portland 230.0000 Kg 1,340.00 308,200.00
Pasir Beton 893.0000 Kg 110.00 98,230.00
Kerikil (Masimal 30 mm) 1,027.0000 Kg 158.52 162,798.52
Air 200.0000 Ltr - -
Tenaga
Pekerja 1.2000 OH 34,000.00 40,800.00
Tukang Batu 0.2000 OH 39,500.00 7,900.00
Kepala Tukang 0.0200 OH 47,000.00 940.00
Mandor 0.0060 OH 52,000.00 312.00

65 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 683,555.56 72,594.50 756,150.06
Bahan
Semen Portland 326.0000 Kg 1,340.00 436,840.00
Pasir Beton 760.0000 Kg 110.00 83,600.00
Kerikil (Masimal 30 mm) 1,029.0000 Kg 158.52 163,115.56

Analisa Harga Satuan


Halaman 14
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

Air 215.0000 Ltr - -


Tenaga
Pekerja 1.6500 OH 34,000.00 56,100.00
Tukang Batu 0.2750 OH 39,500.00 10,862.50
Kepala Tukang 0.0280 OH 47,000.00 1,316.00
Mandor 0.0830 OH 52,000.00 4,316.00

Analisa Harga Satuan


Halaman 15
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

66 1 m3 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 715,522.59 72,594.50 788,117.09
Bahan
Semen Portland 352.0000 Kg 1,340.00 471,680.00
Pasir Beton 731.0000 Kg 110.00 80,410.00
Kerikil (Masimal 30 mm) 1,031.0000 Kg 158.52 163,432.59
Air 215.0000 Ltr - -
Tenaga
Pekerja 1.6500 OH 34,000.00 56,100.00
Tukang Batu 0.2750 OH 39,500.00 10,862.50
Kepala Tukang 0.0280 OH 47,000.00 1,316.00
Mandor 0.0830 OH 52,000.00 4,316.00

67 1 m3 Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 739,888.89 72,594.50 812,483.39
Bahan
Semen Portland 371.0000 Kg 1,340.00 497,140.00
Pasir Beton 698.0000 Kg 110.00 76,780.00
Kerikil (Masimal 30 mm) 1,047.0000 Kg 158.52 165,968.89
Air 215.0000 Ltr - -
Tenaga
Pekerja 1.6500 OH 34,000.00 56,100.00
Tukang Batu 0.2750 OH 39,500.00 10,862.50
Kepala Tukang 0.0280 OH 47,000.00 1,316.00
Mandor 0.0830 OH 52,000.00 4,316.00

68 1 m3 Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 755,380.74 72,594.50 827,975.24
Bahan
Semen Portland 384.0000 Kg 1,340.00 514,560.00
Pasir Beton 692.0000 Kg 110.00 76,120.00
Kerikil (Masimal 30 mm) 1,039.0000 Kg 158.52 164,700.74
Air 215.0000 Ltr - -
Tenaga
Pekerja 1.6500 OH 34,000.00 56,100.00
Tukang Batu 0.2750 OH 39,500.00 10,862.50
Kepala Tukang 0.0280 OH 47,000.00 1,316.00
Mandor 0.0830 OH 52,000.00 4,316.00

69 1 m3 Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53 781,920.00 72,594.50 854,514.50
Bahan
Semen Portland 406.0000 Kg 1,340.00 544,040.00
Pasir Beton 684.0000 Kg 110.00 75,240.00
Kerikil (Masimal 30 mm) 1,026.0000 Kg 158.52 162,640.00
Air 215.0000 Ltr - -
Tenaga
Pekerja 1.6500 OH 34,000.00 56,100.00
Tukang Batu 0.2750 OH 39,500.00 10,862.50
Kepala Tukang 0.0280 OH 47,000.00 1,316.00
Mandor 0.0830 OH 52,000.00 4,316.00

70 1 m3 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 790,177.41 72,594.50 862,771.91
Bahan
Semen Portland 413.0000 Kg 1,340.00 553,420.00
Pasir Beton 681.0000 Kg 110.00 74,910.00
Kerikil (Masimal 30 mm) 1,021.0000 Kg 158.52 161,847.41
Air 215.0000 Ltr - -
Tenaga
Pekerja 1.6500 OH 34,000.00 56,100.00
Tukang Batu 0.2750 OH 39,500.00 10,862.50
Kepala Tukang 0.0280 OH 47,000.00 1,316.00
Mandor 0.0830 OH 52,000.00 4,316.00

Analisa Harga Satuan


Halaman 16
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

71 1 m3 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49 821,429.63 92,330.00 913,759.63
Bahan
Semen Portland 439.0000 Kg 1,340.00 588,260.00
Pasir Beton 670.0000 Kg 110.00 73,700.00
Kerikil (Masimal 30 mm) 1,006.0000 Kg 158.52 159,469.63
Air 215.0000 Ltr - -
Tenaga
Pekerja 2.1000 OH 34,000.00 71,400.00
Tukang Batu 0.3500 OH 39,500.00 13,825.00
Kepala Tukang 0.0350 OH 47,000.00 1,645.00
Mandor 0.1050 OH 52,000.00 5,460.00

72 1 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 832,208.52 92,330.00 924,538.52
Bahan
Semen Portland 448.0000 Kg 1,340.00 600,320.00
Pasir Beton 667.0000 Kg 110.00 73,370.00
Kerikil (Masimal 30 mm) 1,000.0000 Kg 158.52 158,518.52
Air 215.0000 Ltr - -
Tenaga
Pekerja 2.1000 OH 34,000.00 71,400.00
Tukang Batu 0.3500 OH 39,500.00 13,825.00
Kepala Tukang 0.0350 OH 47,000.00 1,645.00
Mandor 0.1050 OH 52,000.00 5,460.00

73 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 13,174.50 582.20 13,756.70
10 Kg Pembesian dengan Besi Polos atau Besi Ulir 131,745.00 5,822.00 137,567.00

74 1 Kg Pembesian Kabel presstressed polos/strands 13,067.00 416.60 13,483.60


10 Kg Pembesian Kabel presstressed polos/strands 130,670.00 4,166.00 134,836.00
Bahan
Besi Beton ( Polos / Ulir ) 10.5000 Kg 12,240.00 128,520.00
Kawat Beton 0.1000 Kg 21,500.00 2,150.00
Tenaga
Perkerja 0.0500 OH 34,000.00 1,700.00
Tukang Besi 0.0500 OH 41,500.00 2,075.00
Kepala Tukang 0.0050 OH 47,000.00 235.00
Mandor 0.0030 OH 52,000.00 156.00

75 1 Kg Jaring kawat baja/wire mesh 13,315.00 2,033.50 15,348.50


Bahan
Jaring Kawat Beton/wiremesh dilas 1.0200 Kg 12,000.00 12,240.00
Kawat Beton 0.0500 Kg 21,500.00 1,075.00
Tenaga
Perkerja 0.0250 OH 34,000.00 850.00
Tukang Besi 0.0250 OH 41,500.00 1,037.50
Kepala Tukang 0.0020 OH 47,000.00 94.00
Mandor 0.0010 OH 52,000.00 52.00

76 1 m2 Pasang Bekisting untuk Pondasi 52,000.00 31,044.00 83,044.00

Analisa Harga Satuan


Halaman 17
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

77 1 m2 Pasang Bekisting untuk Sloof 57,750.00 31,044.00 88,794.00

78 1 m2 Pasang Bekisting untuk Kolom (Menggunakan Plywood) 142,955.00 39,402.00 182,357.00

79 1 m2 Pasang Bekisting untuk Balok (Menggunakan Plywood) 147,881.00 39,402.00 187,283.00

80 1 m2 Pasang Bekisting untuk Lantai (Menggunakan Plywood) 202,955.00 38,742.00 241,697.00

81 1 m2 Pasang Bekisting untuk Dinding 156,243.06 38,742.00 194,985.06


Bahan
Kayu Kelas III (Papan Terentang) 0.0300 m3 1,150,000.00 34,500.00
Paku Biasa 5 - 12 Cm 0.4000 Kg 19,000.00 7,600.00
Minyak Bekisting 0.2000 Ltr 3,000.00 600.00
Balok Kayu Kelas II (Stoot) 0.0200 m3 1,642,000.00 32,840.00
Plywood 9mm 0.3500 lbr 97,500.00 34,125.00
Dolken Kayu Galam Ø 8 - 10 / 4m 3.0000 btg 15,000.00 45,000.00
Formite/penjaga jarak bekisting/spacer 4.0000 bh 394.51 1,578.06
Tenaga
Perkerja 0.6600 OH 34,000.00 22,440.00
Tukang Batu 0.3300 OH 39,500.00 13,035.00
Kepala Tukang 0.0330 OH 47,000.00 1,551.00
Mandor 0.0330 OH 52,000.00 1,716.00

Analisa Harga Satuan


Halaman 18
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

82 1 m2 Pasang Bekisting untuk Tangga 131,305.00 38,742.00 170,047.00


Bahan
Kayu Kelas III (Papan Terentang) 0.0300 m3 1,150,000.00 34,500.00
Paku Biasa 5 - 12 Cm 0.4000 Kg 19,000.00 7,600.00
Minyak Bekisting 0.1500 Ltr 3,000.00 450.00
Balok Kayu Kelas II (Stoot) 0.0150 m3 1,642,000.00 24,630.00
Plywood 9mm 0.3500 lbr 97,500.00 34,125.00
Dolken Kayu Galam Ø 8 - 10 / 4m 2.0000 btg 15,000.00 30,000.00
Tenaga
Perkerja 0.6600 OH 34,000.00 22,440.00
Tukang Batu 0.3300 OH 39,500.00 13,035.00
Kepala Tukang 0.0330 OH 47,000.00 1,551.00
Mandor 0.0330 OH 52,000.00 1,716.00

83 1 m2 Jembatan untuk pengecoran beton 49,260.00 7,726.00 56,986.00


Bahan
Kayu Kelas III (Papan Terentang) 0.0264 m3 1,150,000.00 30,360.00
Paku Biasa 5 - 12 Cm 0.6000 Kg 19,000.00 11,400.00
Dolken Kayu Galam Ø 8 - 10 / 4m 0.5000 btg 15,000.00 7,500.00
Tenaga
Perkerja 0.1500 OH 34,000.00 5,100.00
Tukang Batu 0.0500 OH 39,500.00 1,975.00
Kepala Tukang 0.0050 OH 47,000.00 235.00
Mandor 0.0080 OH 52,000.00 416.00

84 1 m3 Pekerjaan Sloof Beton ukuran 15x20 cm (4Æ12, Æ 8-200) K.175 3,071,078.59 575,007.87 3,646,086.46
1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1.0000 m3 683,555.56 72,594.50 683,555.56 72,594.50
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 152.0000 kg 13,174.50 582.20 2,002,524.00 88,494.40
1 m2 Pasang Bekisting untuk Sloof (2x pakai / 50%) 13.3333 m2 28,875.00 31,044.00 384,999.04 413,918.97

85 1 m3 Pekerjaan Beton Kolom Praktis ukuran 11x11 cm (4Æ10, Æ 6-200) K.175 3,362,876.82 878,681.46 4,241,558.28
1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1.0000 m3 683,555.56 72,594.50 683,555.56 72,594.50
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 154.0496 kg 13,174.50 582.20 2,029,526.46 89,687.68
1 m2 Pasang Bekisting untuk Kolom (4x pakai / 25%) 18.1818 m2 35,738.75 39,402.00 649,794.80 716,399.28

86 1 m3 Pekerjaan Kolom Beton ukuran 20x20 cm (4Æ12, Æ 8-150) K.175 3,812,616.06 935,738.30 4,748,354.36
1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1.0000 m3 683,555.56 72,594.50 683,555.56 72,594.50
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 129.0000 kg 13,174.50 582.20 1,699,510.50 75,103.80
1 m2 Pasang Bekisting untuk Kolom (2x pakai / 50%) 20.0000 m2 71,477.50 39,402.00 1,429,550.00 788,040.00

87 1 m3 Pekerjaan Kolom Beton ukuran 20x25 cm (6Æ12, Æ 8-150) K.175 3,869,034.72 865,744.91 4,734,779.62
1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1.0000 m3 683,555.56 72,594.50 683,555.56 72,594.50
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 144.1333 kg 13,174.50 582.20 1,898,884.16 83,914.41
1 m2 Pasang Bekisting untuk Kolom (2x pakai / 50%) 18.0000 m2 71,477.50 39,402.00 1,286,595.00 709,236.00

88 1 m3 Pekerjaan Kolom Beton ukuran 30x30 cm (8Æ14, Æ 10-150) K.175 3,586,022.54 684,101.55 4,270,124.09
1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1.0000 m3 683,555.56 72,594.50 683,555.56 72,594.50
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 147.9704 kg 13,174.50 582.20 1,949,436.03 86,148.37
1 m2 Pasang Bekisting untuk Kolom (2x pakai / 50%) 13.3333 m2 71,477.50 39,402.00 953,030.95 525,358.69

88 1 m3 Pekerjaan Balok Lintel Beton ukuran 11x11 cm (4Æ10, Æ 6-200) K.175 3,721,360.55 1,236,881.10 4,958,241.65
1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1.0000 m3 683,555.56 72,594.50 683,555.56 72,594.50
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 154.0496 kg 13,174.50 582.20 2,029,526.46 89,687.68
1 m2 Pasang Bekisting untuk Balok (4x pakai / 25%) 27.2727 m2 36,970.25 39,402.00 1,008,278.54 1,074,598.93

89 1 m3 Pekerjaan Ring Balok Beton ukuran 11x15 cm (4Æ10, Æ 6-200) K.175 3,710,650.19 893,060.58 4,603,710.76
1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1.0000 m3 683,555.56 72,594.50 683,555.56 72,594.50
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 178.7475 kg 13,174.50 582.20 2,354,908.94 104,066.79
1 m2 Pasang Bekisting untuk Balok (4x pakai / 25%) 18.1818 m2 36,970.25 39,402.00 672,185.69 716,399.28

Analisa Harga Satuan


Halaman 19
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

90 1 m3 Pekerjaan Ring Balok Beton ukuran 15x20 cm (4Æ12, Æ 8-150) K.175 4,188,036.11 889,926.47 5,077,962.58
1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1.0000 m3 683,555.56 72,594.50 683,555.56 72,594.50
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 163.1111 kg 13,174.50 582.20 2,148,907.19 94,963.28
1 m2 Pasang Bekisting untuk Balok (2x pakai / 50%) 18.3333 m2 73,940.50 39,402.00 1,355,573.37 722,368.69

Analisa Harga Satuan


Halaman 20
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

91 1 m3 Pekerjaan Balok Beton ukuran 15x25 cm (6Æ12, Æ 8-150) K.175 4,403,349.66 863,307.02 5,266,656.68
1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1.0000 m3 683,555.56 72,594.50 683,555.56 72,594.50
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 185.0667 kg 13,174.50 582.20 2,438,161.24 107,745.83
1 m2 Pasang Bekisting untuk Balok (2x pakai / 50%) 17.3333 m2 73,940.50 39,402.00 1,281,632.87 682,966.69

92 1 m3 Pekerjaan Balok Beton ukuran 20x30 cm (8Æ12, Æ 8-150) K.175 4,146,378.66 707,413.25 4,853,791.91
1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1.0000 m3 683,555.56 72,594.50 683,555.56 72,594.50
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 188.0111 kg 13,174.50 582.20 2,476,952.24 109,460.06
1 m2 Pasang Bekisting untuk Balok (2x pakai / 50%) 13.3333 m2 73,940.50 39,402.00 985,870.87 525,358.69

93 1 m3 Pekerjaan Plat Beton Tebal 12 cm (Æ10 -200 2 Lapis) K.175 3,763,432.76 456,807.09 4,220,239.85
1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1.0000 m3 683,555.56 72,594.50 683,555.56 72,594.50
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 105.4000 kg 13,174.50 582.20 1,388,592.30 61,363.88
1 m2 Pasang Bekisting untuk Plat 8.3333 m2 202,955.00 38,742.00 1,691,284.90 322,848.71

94 1 m3 Pekerjaan Plat Beton Tebal 10 cm (Æ10 -200 2 Lapis) K.175 4,346,743.56 532,207.30 4,878,950.86
1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1.0000 m3 683,555.56 72,594.50 683,555.56 72,594.50
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 124.0000 kg 13,174.50 582.20 1,633,638.00 72,192.80
1 m2 Pasang Bekisting untuk Plat 10.0000 m2 202,955.00 38,742.00 2,029,550.00 387,420.00

95 1 m3 Pekerjaan Plat Beton Tebal 8 cm (Æ10 -100, 1 Lapis) K.175 3,891,969.43 642,598.45 4,534,567.88
1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1.0000 m3 683,555.56 72,594.50 683,555.56 72,594.50
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 147.2500 kg 13,174.50 582.20 1,939,945.13 85,728.95
1 m2 Pasang Bekisting untuk Plat (2x pakai / 50%) 12.5000 m2 101,477.50 38,742.00 1,268,468.75 484,275.00

96 1 m3 Pekerjaan Plat Beton Tebal 6 cm (Æ8 -100, 1 Lapis) K.175 4,043,621.04 792,041.14 4,835,662.19
1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1.0000 m3 683,555.56 72,594.50 683,555.56 72,594.50
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 126.6667 kg 13,174.50 582.20 1,668,770.44 73,745.35
1 m2 Pasang Bekisting untuk Plat (2x pakai / 50%) 16.6667 m2 101,477.50 38,742.00 1,691,295.05 645,701.29

CATATAN : PEKERJAAN BETON ( Belum ada Gambar Detailnya )

97 1 m3 Membuat Pondasi Beton Bertulang ( 150 Kg + bekisting ) 2,942,615.00 314,681.50 3,257,296.50

98 1 m3 Membuat sloof beton bertulang (200 kg besi + bekisting) 3,691,940.00 355,699.50 4,047,639.50
Bahan
Kayu Kelas III 0.2700 m3 1,150,000.00 310,500.00
Paku Biasa 5 - 12 Cm 2.0000 Kg 19,000.00 38,000.00
Minyak Bekisting 0.6000 Ltr 3,000.00 1,800.00
Besi Beton Polos 210.0000 Kg 12,240.00 2,570,400.00
Kawat Beton 3.0000 Kg 21,500.00 64,500.00
Semen Portland 336.0000 Kg 1,340.00 450,240.00
Pasir Beton 0.5400 m3 154,000.00 83,160.00
Koral Beton 0.8100 m3 214,000.00 173,340.00
Tenaga
Perkerja 5.6500 OH 34,000.00 192,100.00
Tukang Batu 0.2750 OH 39,500.00 10,862.50
Tukang Kayu 1.5600 OH 41,500.00 64,740.00
Tukang Besi 1.4000 OH 41,500.00 58,100.00
Kepala Tukang 0.3230 OH 47,000.00 15,181.00
Mandor 0.2830 OH 52,000.00 14,716.00

Analisa Harga Satuan


Halaman 21
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

99 1 m3 Membuat kolom beton bertulang (300 kg besi + bekisting) 6,088,640.00 443,484.50 6,532,124.50
Bahan
Kayu Kelas III 0.4000 m3 1,150,000.00 460,000.00
Paku Biasa 5 - 12 Cm 4.0000 Kg 19,000.00 76,000.00
Minyak Bekisting 2.0000 Ltr 3,000.00 6,000.00
Besi Beton Polos 315.0000 Kg 12,240.00 3,855,600.00
Kawat Beton 4.5000 Kg 21,500.00 96,750.00
Semen Portland 336.0000 Kg 1,340.00 450,240.00
Pasir Beton 0.5400 m3 154,000.00 83,160.00
Koral Beton 0.8100 m3 214,000.00 173,340.00
Kayu Kelas II 0.1500 m3 1,642,000.00 246,300.00
Plywood 9 mm 3.5000 lbr 97,500.00 341,250.00
Dolken kayu galam, φ (8-10) cm, panjang 4 m 20.0000 btg 15,000.00 300,000.00
Tenaga
Perkerja 7.0500 OH 34,000.00 239,700.00
Tukang Batu 0.2750 OH 39,500.00 10,862.50
Tukang Kayu 1.6500 OH 41,500.00 68,475.00
Tukang Besi 2.1000 OH 41,500.00 87,150.00
Kepala Tukang 0.4030 OH 47,000.00 18,941.00
Mandor 0.3530 OH 52,000.00 18,356.00

100 1 m3 Membuat Balok beton bertulang (200 kg besi + bekisting) 4,518,120.00 385,524.50 4,903,644.50
Bahan
Kayu Kelas III 0.3200 m3 1,150,000.00 368,000.00
Paku Biasa 5 - 12 Cm 3.2000 Kg 19,000.00 60,800.00
Minyak Bekisting 1.6000 Ltr 3,000.00 4,800.00
Besi Beton Polos 210.0000 Kg 12,240.00 2,570,400.00
Kawat Beton 3.0000 Kg 21,500.00 64,500.00
Semen Portland 336.0000 Kg 1,340.00 450,240.00
Pasir Beton 0.5400 m3 154,000.00 83,160.00
Koral Beton 0.8100 m3 214,000.00 173,340.00
Kayu Kelas II 0.1400 m3 1,642,000.00 229,880.00
Plywood 9 mm 2.8000 lbr 97,500.00 273,000.00
Dolken kayu galam, φ (8-10) cm, panjang 4 m 16.0000 btg 15,000.00 240,000.00
Tenaga
Perkerja 6.3500 OH 34,000.00 215,900.00
Tukang Batu 0.2750 OH 39,500.00 10,862.50
Tukang Kayu 1.6500 OH 41,500.00 68,475.00
Tukang Besi 1.4000 OH 41,500.00 58,100.00
Kepala Tukang 0.3330 OH 47,000.00 15,651.00
Mandor 0.3180 OH 52,000.00 16,536.00

101 1 m3 Membuat plat beton bertulang (150 kg besi + bekisting) 4,066,555.00 314,822.50 4,381,377.50
Bahan
Kayu Kelas III 0.3200 m3 1,150,000.00 368,000.00
Paku Biasa 5 - 12 Cm 3.2000 Kg 19,000.00 60,800.00
Minyak Bekisting 1.6000 Ltr 3,000.00 4,800.00
Besi Beton Polos 157.5000 Kg 12,240.00 1,927,800.00
Kawat Beton 2.2500 Kg 21,500.00 48,375.00
Semen Portland 336.0000 Kg 1,340.00 450,240.00
Pasir Beton 0.5400 m3 154,000.00 83,160.00
Koral Beton 0.8100 m3 214,000.00 173,340.00
Kayu Kelas II 0.1200 m3 1,642,000.00 197,040.00
Plywood 9 mm 2.8000 lbr 97,500.00 273,000.00
Dolken kayu galam, φ (8-10) cm, panjang 4 m 32.0000 btg 15,000.00 480,000.00
Tenaga
Perkerja 5.3000 OH 34,000.00 180,200.00
Tukang Batu 0.2750 OH 39,500.00 10,862.50
Tukang Kayu 1.3000 OH 41,500.00 53,950.00
Tukang Besi 1.0500 OH 41,500.00 43,575.00

Analisa Harga Satuan


Halaman 22
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

Kepala Tukang 0.2650 OH 47,000.00 12,455.00


Mandor 0.2650 OH 52,000.00 13,780.00

Analisa Harga Satuan


Halaman 23
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

102 1 m3 Membuat Dinding beton bertulang (150 kg besi + bekisting) 3,920,235.00 314,681.50 4,234,916.50
Bahan
Kayu Kelas III 0.2400 m3 1,150,000.00 276,000.00
Paku Biasa 5 - 12 Cm 3.2000 Kg 19,000.00 60,800.00
Minyak Bekisting 1.6000 Ltr 3,000.00 4,800.00
Besi Beton Polos 157.5000 Kg 12,240.00 1,927,800.00
Kawat Beton 2.2500 Kg 21,500.00 48,375.00
Semen Portland 336.0000 Kg 1,340.00 450,240.00
Pasir Beton 0.5400 m3 154,000.00 83,160.00
Koral Beton 0.8100 m3 214,000.00 173,340.00
Kayu Kelas II 0.1600 m3 1,642,000.00 262,720.00
Plywood 9 mm 2.8000 lbr 97,500.00 273,000.00
Dolken kayu galam, φ (8-10) cm, panjang 4 m 24.0000 btg 15,000.00 360,000.00
Tenaga
Perkerja 5.3000 OH 34,000.00 180,200.00
Tukang Batu 0.2750 OH 39,500.00 10,862.50
Tukang Kayu 1.3000 OH 41,500.00 53,950.00
Tukang Besi 1.0500 OH 41,500.00 43,575.00
Kepala Tukang 0.2620 OH 47,000.00 12,314.00
Mandor 0.2650 OH 52,000.00 13,780.00

103 1 m3 Membuat Dinding beton bertulang (200 kg besi + bekisting) 4,315,900.00 355,699.50 4,671,599.50
Bahan
Kayu Kelas III 0.2500 m3 1,150,000.00 287,500.00
Paku Biasa 5 - 12 Cm 3.0000 Kg 19,000.00 57,000.00
Minyak Bekisting 1.2000 Ltr 3,000.00 3,600.00
Besi Beton Polos 210.0000 Kg 12,240.00 2,570,400.00
Kawat Beton 3.0000 Kg 21,500.00 64,500.00
Semen Portland 336.0000 Kg 1,340.00 450,240.00
Pasir Beton 0.5400 m3 154,000.00 83,160.00
Koral Beton 0.8100 m3 214,000.00 173,340.00
Kayu Kelas II 0.1050 m3 1,642,000.00 172,410.00
Plywood 9 mm 2.5000 lbr 97,500.00 243,750.00
Dolken kayu galam, φ (8-10) cm, panjang 4 m 14.0000 btg 15,000.00 210,000.00
Tenaga
Perkerja 5.6500 OH 34,000.00 192,100.00
Tukang Batu 0.2750 OH 39,500.00 10,862.50
Tukang Kayu 1.5600 OH 41,500.00 64,740.00
Tukang Besi 1.4000 OH 41,500.00 58,100.00
Kepala Tukang 0.3230 OH 47,000.00 15,181.00
Mandor 0.2830 OH 52,000.00 14,716.00

104 1 M' kolom praktis beton bertulang (11 x 11) cm 48,387.50 9,320.00 57,707.50
Bahan
Kayu Kelas III 0.0020 m3 1,150,000.00 2,300.00
Paku Biasa 5 - 12 Cm 0.0100 Kg 19,000.00 190.00
Besi Beton Polos 3.0000 Kg 12,240.00 36,720.00
Kawat Beton 0.0450 Kg 21,500.00 967.50
Semen Portland 4.0000 Kg 1,340.00 5,360.00
Pasir Beton 0.0060 m3 154,000.00 924.00
Koral Beton 0.0090 m3 214,000.00 1,926.00
Tenaga
Perkerja 0.1800 OH 34,000.00 6,120.00
Tukang Batu 0.0200 OH 39,500.00 790.00
Tukang Kayu 0.0200 OH 41,500.00 830.00
Tukang Besi 0.0200 OH 41,500.00 830.00
Kepala Tukang 0.0060 OH 47,000.00 282.00
Mandor 0.0090 OH 52,000.00 468.00

Analisa Harga Satuan


Halaman 24
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

105 1 M' Ring Balok beton bertulang (10 x 15) cm 60,935.00 15,390.50 76,325.50
Bahan
Kayu kelas III 0.0030 m3 1,150,000.00 3,450.00
Paku Biasa 5 - 12 Cm 0.0200 Kg 19,000.00 380.00
Besi Beton Polos 3.6000 Kg 12,240.00 44,064.00
Kawat Beton 0.0500 Kg 21,500.00 1,075.00
Semen Portland 5.5000 Kg 1,340.00 7,370.00
Pasir Beton 0.0090 m3 154,000.00 1,386.00
Koral Beton 0.0150 m3 214,000.00 3,210.00
Tenaga
Perkerja 0.2970 OH 34,000.00 10,098.00
Tukang Batu 0.0330 OH 39,500.00 1,303.50
Tukang Kayu 0.0330 OH 41,500.00 1,369.50
Tukang Besi 0.0330 OH 41,500.00 1,369.50
Kepala Tukang 0.0100 OH 47,000.00 470.00
Mandor 0.0150 OH 52,000.00 780.00

VIII PEKERJAAN PENTUP ATAP

106 1m2 Pasang Atap Genteng Palentong Kecil 45,000.00 9,004.50 54,004.50

107 1m' Pasang Genteng Bubung Palentong 32,124.00 22,944.00 55,068.00

108 1m' Pasang Genteng Bubung Palentong Besar 28,624.00 22,944.00 51,568.00

109 1m2 Pasang Atap Genteng Metal 117,020.00 11,472.00 128,492.00

110 1m2 Pasang Atap Sirap 169,800.00 17,610.00 187,410.00


Bahan
Atap sirap 5 mm 60.000 lbr 2,750.00 165,000.00
Paku Biasa ½" - 1" 0.200 Kg 24,000.00 4,800.00
Tenaga
Perkerja 0.166 OH 34,000.00 5,644.00
Tukang Kayu 0.250 OH 41,500.00 10,375.00
Kepala Tukang 0.025 OH 47,000.00 1,175.00
Mandor 0.008 OH 52,000.00 416.00

Analisa Harga Satuan


Halaman 25
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

111 1m' Pasang Nok Genteng Beton 205,326.00 23,880.00 229,206.00


Bahan
Genteng Beton 3.500 bh 49,000.00 171,500.00
Paku Biasa 2" - 5" 0.050 Kg 19,000.00 950.00
Semen PC 10.800 Kg 1,340.00 14,472.00
Pasir Pasang 0.032 m3 122,000.00 3,904.00
Semen Warna 1.000 Kg 14,500.00 14,500.00
Tenaga
Perkerja 0.400 OH 34,000.00 13,600.00
Tukang Kayu 0.200 OH 41,500.00 8,300.00
Kepala Tukang 0.020 OH 47,000.00 940.00
Mandor 0.020 OH 52,000.00 1,040.00

112 1m' Pasang Nok Genteng Metal 53,900.00 16,106.00 70,006.00


Bahan
Nok Genteng Metal 1.100 lbr 49,000.00 53,900.00
Paku Biasa 1/2" - 1" 0.050 Kg 24,000.00
Tenaga
Perkerja 0.250 OH 34,000.00 8,500.00
Tukang Kayu 0.150 OH 41,500.00 6,225.00
Kepala Tukang 0.015 OH 47,000.00 705.00
Mandor 0.013 OH 52,000.00 676.00

113 1m' Pasang Atap Nok Seng 10,260.00 4,103.00 14,363.00

IX PEKERJAAN LANGIT - LANGIT

114 1 m2 Pas. Rangka Plapond Kayu Lokal Kelas II (Hanya Rangka) 37,620.00 18,021.00 55,641.00
Bahan
Kayu Lokal Kelas II 0.0210 m3 1,540,000.00 32,340.00
Paku 0.2200 kg 24,000.00 5,280.00
Tenaga
Perkerja 0.1875 org 34,000.00 6,375.00
Tukang Kayu 0.2250 org 41,500.00 9,337.50
Kepala Tukang 0.0375 org 47,000.00 1,762.50
Mandor 0.0105 org 52,000.00 546.00

115 1 m2 Pas. Rangka Plapond Besi Hollow (Hanya Rangka) 59,250.00 17,650.00 76,900.00
Bahan
Skrup 1" 25.0000 bh 240.00 6,000.00
Hollow 20/40 mm 0.2500 btg 30,000.00 7,500.00
Hollow 40/40 mm 0.6250 btg 46,000.00 28,750.00
Penggantungan 2.0000 bh 8,500.00 17,000.00
Tenaga
Perkerja 0.3000 org 34,000.00 10,200.00
Tukang Kayu 0.1500 org 41,500.00 6,225.00
Kepala Tukang 0.0150 org 47,000.00 705.00
Mandor 0.0100 org 52,000.00 520.00

116 1 m2 Pas. Langit-langit gypsum board ukuran (1200x2400x9) mm 27,938.00 5,970.00 33,908.00
Bahan
Gypsum Board 0.3640 Lbr 69,500.00 25,298.00
Paku Skrup 0.1100 kg 24,000.00 2,640.00
Tenaga
Perkerja 0.1000 OH 34,000.00 3,400.00
Tukang Kayu 0.0500 OH 41,500.00 2,075.00
Kepala Tukang 0.0050 OH 47,000.00 235.00
Mandor 0.0050 OH 52,000.00 260.00

Analisa Harga Satuan


Halaman 26
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

117 1 m2 langit-langit dari GRC Internal tebal 4 mm 24,480.00 5,970.00 30,450.00


Bahan
GRC internal 0.3640 Lbr 60,000.00 21,840.00
Paku Skrup 0.1100 kg 24,000.00 2,640.00
Tenaga
Perkerja 0.1000 OH 34,000.00 3,400.00
Tukang Kayu 0.0500 OH 41,500.00 2,075.00
Kepala Tukang 0.0050 OH 47,000.00 235.00
Mandor 0.0050 OH 52,000.00 260.00

118 1 m' Pas. List Plapond gypsum board profil 10,455.00 4,968.00 15,423.00
Bahan
List Gypsum profil 1.0500 m' 9,000.00 9,450.00
Tepung gypsum 0.1500 kg 6,700.00 1,005.00
Tenaga
Perkerja 0.0600 OH 34,000.00 2,040.00
Tukang Kayu 0.0600 OH 41,500.00 2,490.00
Kepala Tukang 0.0060 OH 47,000.00 282.00
Mandor 0.0030 OH 52,000.00 156.00

119 1 m2 List Langit - langit Kayu Profil 4,965.00 4,166.00 9,131.00

X PEKERJAAN SANITASI

120 Memasang 1 buah Kloset Duduk / Monoblok 1,131,000.00 164,017.00 1,295,017.00

121 Memasang 1 buah Kloset Jongkok Porselen 254,260.00 172,070.00 426,330.00

122 Memasang 1 buah Urinoir 2,349,260.00 83,400.00 2,432,660.00

Analisa Harga Satuan


Halaman 27
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

123 Memasang 1 buah Wastafel 681,260.00 103,525.00 784,785.00

124 Memasang 1 buah Bak Mandi Fiberglass, volume 0.30 m3 258,420.00 198,950.00 457,370.00

125 Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm 280,317.50 72,864.50 353,182.00
Bahan
Bata merah 0.2500 m3 550.00 137.50
Semen Portland 77.0000 Kg 1,340.00 103,180.00
Pasir Pasang 0.1300 m3 122,000.00 15,860.00
Batu Kerikil 0.0200 m3 214,000.00 4,280.00
Besi Beton 2.6000 m3 55,000.00 143,000.00
Pasir Beton 0.0900 m3 154,000.00 13,860.00
Tenaga
Perkerja 1.4200 OH 34,000.00 48,280.00
Tukang Batu 0.4730 OH 39,500.00 18,683.50
Kepala Tukang 0.0470 OH 47,000.00 2,209.00
Mandor 0.0710 OH 52,000.00 3,692.00

126 Memasang 1 m' Pipa PVC tipe AW Ø ½" 7,517.50 3,969.60 11,487.10

127 Memasang 1 m' Pipa PVC tipe AW Ø ¾" 10,075.00 3,969.60 14,044.60

128 Memasang 1 m' Pipa PVC tipe AW Ø 1" 10,230.00 3,969.60 14,199.60

Analisa Harga Satuan


Halaman 28
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

129 Memasang 1 m' Pipa PVC tipe D Ø 2½" 22,823.75 3,969.60 26,793.35
Bahan
Pipa PVC tipe D Ø 2½" 1.2000 m' 14,725.00 17,670.00
Perlengkapan 35% Harga Pipa 5,153.75 5,153.75
Tenaga
Perkerja 0.0360 OH 34,000.00 1,224.00
Tukang Batu 0.0600 OH 39,500.00 2,370.00
Kepala Tukang 0.0060 OH 47,000.00 282.00
Mandor 0.0018 OH 52,000.00 93.60

130 Memasang 1 m' Pipa PVC tipe D Ø 4" 47,817.50 8,934.20 56,751.70
Bahan
Pipa PVC tipe D Ø 4" 1.2000 m' 30,850.00 37,020.00
Perlengkapan 35% Harga Pipa 10,797.50 10,797.50
Tenaga
Perkerja 0.0810 OH 34,000.00 2,754.00
Tukang Batu 0.1350 OH 39,500.00 5,332.50
Kepala Tukang 0.0135 OH 47,000.00 634.50
Mandor 0.0041 OH 52,000.00 213.20

131 Memasang 1 bh Kran Ø ¾" atau ½" 81,592.50 5,020.00 86,612.50

132 Memasang 1 bh Floor Drain 55,000.00 5,020.00 60,020.00

XI PEKERJAAN BESI DAN ALLUMINIUM

133 1 M' Kusen Alumunium 103,000.00 3,342.80 106,342.80


Bahan
Profil alumunium 1.1000 m' 92,600.00 101,860.00
Sealent 0.0600 tube 19,000.00 1,140.00
Tenaga
Perkerja 0.0430 OH 34,000.00 1,462.00
Tukang Khusus Alumunium 0.0430 OH 36,500.00 1,569.50
Kepala Tukang 0.0043 OH 47,000.00 202.10
Mandor 0.0021 OH 52,000.00 109.20

134 1 Unit Pasang Pintu PVC KM/WC lengkap Accessories 220,000.00 84,480.40 304,480.40
Bahan
Pintu PVC lengkap Accessories 1.0000 unit 220,000.00 220,000.00
Tenaga
Perkerja 1.0500 OH 34,000.00 35,700.00
Tukang Kayu 1.0500 OH 41,500.00 43,575.00
Kepala Tukang 0.1050 OH 47,000.00 4,935.00
Mandor 0.0052 OH 52,000.00 270.40

Analisa Harga Satuan


Halaman 29
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

135 1 m' Pasang Talang Datar/Jurai , Seng BJLS 28 lebar 90 cm 157,779.50 25,095.00 182,874.50

136 1 m' Pasang Talang ½ Lingkaran Ø 15 cm, Seng BJLS 28 Lebar 45 cm 48,047.00 19,376.00 67,423.00

XII PEKERJAAN KUNCI DAN KACA

137 1 Buah Pasang Kunci Tanam Antik 108,000.00 29,916.00 137,916.00

138 1 Buah Pasang Kunci Tanam Biasa 42,000.00 21,820.00 63,820.00

139 1 Buah Pasang Kunci Slot 30,500.00 9,972.00 40,472.00


Bahan
Kunci Slot 1.0000 Bh 30,500.00 30,500.00
Tenaga
Pekerja 0.0200 OH 34,000.00 680.00
Tukang Kayu 0.2000 OH 41,500.00 8,300.00
Kepala Tukang 0.0200 OH 47,000.00 940.00
Mandor 0.0010 OH 52,000.00 52.00

140 1 Buah Pasang Engsel Pintu 18,000.00 7,479.00 25,479.00

141 1 Buah Pasang Engsel Angin Untuk Pintu 12,500.00 10,440.00 22,940.00

142 1 Buah Pasang Engsel Jendela 8,000.00 7,479.00 15,479.00

Analisa Harga Satuan


Halaman 30
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

Bahan
Engsel Jendela 1.0000 Bh 8,000.00 8,000.00
Tenaga
Pekerja 0.0150 OH 34,000.00 510.00
Tukang Kayu 0.1500 OH 41,500.00 6,225.00
Kepala Tukang 0.0150 OH 47,000.00 705.00
Mandor 0.0008 OH 52,000.00 39.00

143 1 Buah Pasang Kait angin 12,500.00 7,479.00 19,979.00

144 1 Buah Door Closer 300,000.00 24,930.00 324,930.00


Bahan
Door Closer 1.0000 Bh 300,000.00 300,000.00
Tenaga
Pekerja 0.0500 OH 34,000.00 1,700.00
Tukang Kayu 0.5000 OH 41,500.00 20,750.00
Kepala Tukang 0.0500 OH 47,000.00 2,350.00
Mandor 0.0025 OH 52,000.00 130.00

145 1 Buah Pegangan Pintu/ Door Holder 215,000.00 24,930.00 239,930.00


Bahan
Door Holder 1.0000 Bh 215,000.00 215,000.00
Tenaga
Pekerja 0.0500 OH 34,000.00 1,700.00
Tukang Kayu 0.5000 OH 41,500.00 20,750.00
Kepala Tukang 0.0500 OH 47,000.00 2,350.00
Mandor 0.0025 OH 52,000.00 130.00

146 1 Buah Door Stop 310,000.00 4,986.00 314,986.00


Bahan
Door Stop 1.0000 Bh 310,000.00 310,000.00
Tenaga
Pekerja 0.0100 OH 34,000.00 340.00
Tukang Kayu 0.1000 OH 41,500.00 4,150.00
Kepala Tukang 0.0100 OH 47,000.00 470.00
Mandor 0.0005 OH 52,000.00 26.00

147 1 Buah Pasang Kaca tebal 3 mm 97,350.00 7,479.00 104,829.00

148 1 Buah Pasang Kaca tebal 5 mm 129,800.00 7,479.00 137,279.00


Bahan
Kaca Polos 1.1000 m2 118,000.00 129,800.00
Tenaga
Perkerja 0.0150 OH 34,000.00 510.00
Tukang Kayu 0.1500 OH 41,500.00 6,225.00
Kepala Tukang 0.0150 OH 47,000.00 705.00
Mandor 0.0008 OH 52,000.00 39.00

149 1 Buah Pasang Kaca riben tebal 5 mm 129,800.00 12,871.00 142,671.00

Analisa Harga Satuan


Halaman 31
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

XIII PEKERJAAN PENUTUP LANTAI DAN DINDING

150 1 m2 Pasang Lantai Keramik 30 x 30 cm 80,640.00 41,090.00 121,730.00

151 1 m2 Pasang Lantai Keramik 30 x 30 cm (Corak) 83,640.00 41,090.00 124,730.00


Bahan
Ubin Keramik 30 x 30 cm 11.8700 bh 3,622.58 43,000.00
Semen Portland 10.0000 Kg 1,340.00 13,400.00
Pasir Pasang 0.0450 m3 122,000.00 5,490.00
Semen Warna 1.5000 Kg 14,500.00 21,750.00
Tenaga
Perkerja 0.7000 OH 34,000.00 23,800.00
Tukang Batu 0.3500 OH 39,500.00 13,825.00
Kepala Tukang 0.0350 OH 47,000.00 1,645.00
Mandor 0.0350 OH 52,000.00 1,820.00

152 1 m2 Pasang Lantai Keramik 40 x 40 cm 88,140.00 41,090.00 129,230.00


Bahan
Ubin Keramik 40 x 40 cm 6.2500 bh 7,600.00 47,500.00
Semen Portland 10.0000 Kg 1,340.00 13,400.00
Pasir Pasang 0.0450 m3 122,000.00 5,490.00
Semen Warna 1.5000 Kg 14,500.00 21,750.00
Tenaga
Perkerja 0.7000 OH 34,000.00 23,800.00
Tukang Batu 0.3500 OH 39,500.00 13,825.00
Kepala Tukang 0.0350 OH 47,000.00 1,645.00
Mandor 0.0350 OH 52,000.00 1,820.00

153 1 m2 Pasang Lantai Keramik 20 x 20 cm Anti Slip 90,416.00 41,090.00 131,506.00


Bahan
Ubin Keramik 26.5000 bh 1,792.45 47,500.00
Semen Portland 10.4000 Kg 1,340.00 13,936.00
Pasir Pasang 0.0450 m3 122,000.00 5,490.00
Semen Warna 1.6200 Kg 14,500.00 23,490.00
Tenaga
Perkerja 0.7000 OH 34,000.00 23,800.00
Tukang Batu 0.3500 OH 39,500.00 13,825.00
Kepala Tukang 0.0350 OH 47,000.00 1,645.00
Mandor 0.0350 OH 52,000.00 1,820.00

154 1 m2 Pasang Dinding Keramik 20 x 25 cm (KIA) 101,388.00 52,830.00 154,218.00


Bahan
Keramik 20 x 25 cm 20.0000 Bh 2,930.00 58,600.00
Semen Portland 9.3000 Kg 1,340.00 12,462.00
Pasir Pasang 0.0180 m3 122,000.00 2,196.00
Semen Warna 1.9400 Kg 14,500.00 28,130.00
Tenaga
Perkerja 0.9000 OH 34,000.00 30,600.00
Tukang Batu 0.4500 OH 39,500.00 17,775.00
Kepala Tukang 0.0450 OH 47,000.00 2,115.00
Mandor 0.0450 OH 52,000.00 2,340.00

155 1 m2 Pasang Dinding Keramik 25 x 40 cm (KIA) 102,788.00 52,830.00 155,618.00


Bahan
Keramik 25 x 40 cm 10.0000 Bh 6,000.00 60,000.00
Semen Portland 9.3000 Kg 1,340.00 12,462.00
Pasir Pasang 0.0180 m3 122,000.00 2,196.00
Semen Warna 1.9400 Kg 14,500.00 28,130.00
Tenaga
Perkerja 0.9000 OH 34,000.00 30,600.00

Analisa Harga Satuan


Halaman 32
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

Tukang Batu 0.4500 OH 39,500.00 17,775.00


Kepala Tukang 0.0450 OH 47,000.00 2,115.00
Mandor 0.0450 OH 52,000.00 2,340.00

Analisa Harga Satuan


Halaman 33
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

156 1 m2 Pasang Dinding batu Hitam uk.20x40 cm 151,940.00 41,090.00 193,030.00


Bahan
Batu Tempel Hitam 1.1000 m2 112,000.00 123,200.00
Semen Portland (PC) 11.7500 Kg 1,340.00 15,745.00
Pasir Pasang 0.0350 m3 122,000.00 4,270.00
Vernsi 0.1000 kg 84,000.00 8,400.00
Kwas 3" 0.0500 bh 6,500.00 325.00
Tenaga
Perkerja 0.7000 OH 34,000.00 23,800.00
Tukang Batu 0.3500 OH 39,500.00 13,825.00
Kepala Tukang 0.0350 OH 47,000.00 1,645.00
Mandor 0.0350 OH 52,000.00 1,820.00

157 1 m2 Pasangan Glass Block 616,562.90 25,690.10 642,253.00


Bahan

158 1 m' Saluran Grevel Beton 1/2 DIA.20 CM + Pasangan 142,609.76 9,450.00 152,059.76
Bahan
Galian tanah 0.1500 m3 26,800.00 4,020.00
Grevel beton 20 cm 1.0000 bh 38,500.00 38,500.00
Pas.bata + Plesteran 1.0000 m' 100,089.76 100,089.76
Tenaga
Upah kerja 1.0000 ls 9,450.00 9,450.00

159 1 M2 Pasangan Paving Block Natural 6 & 8 CM 79,393.60 32,581.00 111,974.60


Bahan
Paving block natural 6 & 8 cm 1.0100 m2 63,360.00 63,993.60
Pasir beton 0.1000 m3 154,000.00 15,400.00
Tenaga
Perkerja 0.2500 org 34,000.00 8,500.00
Tukang Batu 0.5000 org 39,500.00 19,750.00
Kepala Tukang 0.0250 org 47,000.00 1,175.00
Mandor 0.0030 org 52,000.00 156.00
Peralatan 1.0000 lot 3,000.00 3,000.00

XIV PEKERJAAN PENGECATAN

160 1 m2 Mengecatan Bidang Kayu Lama 24,040.00 5,975.00 30,015.00

161 1 m2 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup 35,930.00 3,165.50 39,095.50

Analisa Harga Satuan


Halaman 34
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

162 1 m2 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup 41,420.00 7,055.50 48,475.50

163 1 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 12,820.00 3,720.60 16,540.60

164 1 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 7,020.00 3,720.60 10,740.60
Bahan
Cat Tembok (Metrolite) 0.2600 Kg 27,000.00 7,020.00
Tenaga
Perkerja 0.0200 OH 34,000.00 680.00
Tukang Cat 0.0630 OH 41,500.00 2,614.50
Kepala Tukang 0.0063 OH 47,000.00 296.10
Mandor 0.0025 OH 52,000.00 130.00

165 1 m2 Pengecatan Tembok Lama ( 2 Lapis Cat Penutup ) 7,020.00 3,720.60 10,740.60
Bahan
Cat Tembok (Metrolite) 0.2600 Kg 27,000.00 7,020.00
Tenaga
Perkerja 0.0200 OH 34,000.00 680.00
Tukang Cat 0.0630 OH 41,500.00 2,614.50
Kepala Tukang 0.0063 OH 47,000.00 296.10
Mandor 0.0025 OH 52,000.00 130.00

XIV PEKERJAAN INSTALASI LISTRIK

166 1 Bh Titik Lampu Lengkap TL 20 Wat 85,000.00 4,954.50 89,954.50


Bahan
Titik Lampu Komplit 1.0000 titik 85,000.00 85,000.00
Tenaga
Tukang Listrik 0.0630 OH 41,500.00 2,614.50
Mandor 0.0450 OH 52,000.00 2,340.00

167 1 Bh Titik Sakelar Single 16,000.00 4,954.50 20,954.50


Bahan
Sakelar single 1.0000 Bh 16,000.00 16,000.00
Tenaga
Tukang Listrik 0.0630 OH 41,500.00 2,614.50
Mandor 0.0450 OH 52,000.00 2,340.00

168 1 Bh Titik Sakelar Doubel 20,000.00 4,954.50 24,954.50


Bahan
Sakelar Doubel 1.0000 Bh 20,000.00 20,000.00
Tenaga
Tukang Listrik 0.0630 OH 41,500.00 2,614.50
Mandor 0.0450 OH 52,000.00 2,340.00

169 1 M Pasang Kabel NYM 3 x 2 1/2 11,940.00 4,954.50 16,894.50


Bahan
Kabel NYM 3 x 2 1/2 1.0000 m' 11,940.00 11,940.00
Tenaga
Tukang Listrik 0.0630 OH 41,500.00 2,614.50
Mandor 0.0450 OH 52,000.00 2,340.00

Analisa Harga Satuan


Halaman 35
HARGA HARGA
SATUAN SATUAN JUMLAH BAHAN JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN
BAHAN UPAH
Rp. Rp. Rp. Rp. Rp.
A B C D E F G=(CXE) H = (C X F ) I=(G+H)

170 1 Bh Box MCB 366,000.00 4,954.50 370,954.50


Bahan
Bok MCB 1.0000 Bh 366,000.00 366,000.00
Tenaga
Tukang Listrik 0.0630 OH 41,500.00 2,614.50
Mandor 0.0450 OH 52,000.00 2,340.00

171 1 Bh Titik Stop Kontak 15,000.00 4,954.50 19,954.50


Bahan
Stop Kontak 1.0000 Bh 15,000.00 15,000.00
Tenaga
Tukang Listrik 0.0630 OH 41,500.00 2,614.50
Mandor 0.0450 OH 52,000.00 2,340.00

172 1 Bh Pipa Arde - 4,954.50 4,954.50


Bahan
Pipa Arde P.3 m 1.0000 Bh - -
Tenaga
Tukang Listrik 0.0630 OH 41,500.00 2,614.50
Mandor 0.0450 OH 52,000.00 2,340.00

173 1 Bh Pasangan Lampu 55,000.00 4,954.50 59,954.50


Bahan
Lampu XL 14 watt (Philips) 1.0000 Bh 55,000.00 55,000.00
Dudukan Lampu 1.0000 Bh
Tenaga
Tukang Listrik 0.0630 OH 41,500.00 2,614.50
Mandor 0.0450 OH 52,000.00 2,340.00

KUNINGAN, JANUARI 2012

Analisa Harga Satuan


Halaman 36
1
2
4
5

#REF! 6
7
174
175
176
182
183
189

218
224
225
231
232

238
239
245
246

Analisa Harga Satuan


Halaman 37
5

#REF! 6
7
254
255
263

273
274
293
302
303
313
314
324

Analisa Harga Satuan


Halaman 38
5

#REF! 6
7

325
326

360
370

371
372
373
382

Analisa Harga Satuan


Halaman 39
5

#REF! 6
7
383
392

478
487

659
668

Analisa Harga Satuan


Halaman 40
5

#REF! 6
7
669
678

710
711

731
778
779

Analisa Harga Satuan


Halaman 41
5

#REF! 6
7
806
807
870
881

905
906

Analisa Harga Satuan


Halaman 42
5

#REF! 6
7

1029
1039

1059
1060

Analisa Harga Satuan


Halaman 43
5

#REF! 6
7

1 3000
0.0006 1666.6666667
5000000

1221
1230

Analisa Harga Satuan


Halaman 44
5

#REF! 6
7
1250

1283
1293
1316
1326
1327
1339

Analisa Harga Satuan


Halaman 45
5

#REF! 6
7
1370
1371

0.6207142857
0.0880176211

Analisa Harga Satuan


Halaman 46
5

#REF! 6
7

1611
1620

1664
1674

Analisa Harga Satuan


Halaman 47
5

#REF! 6
7
1675
1685
1686
1699
1700
1713
1714
1727

Analisa Harga Satuan


Halaman 48
5

#REF! 6
7

33.333333333
1 0.7 1.4285714286
23.333333333

82.6446280992 51322.855142

#REF!

82.6446280992 59994.72397

60.6060606061 75961.227604

Analisa Harga Satuan


Halaman 49
5

#REF! 6
7

1757

Analisa Harga Satuan


Halaman 50
5

#REF! 6
7

1974
1975
1976
1984
2003
2013
2025
2035
2298
2307

Analisa Harga Satuan


Halaman 51
5

#REF! 6
7

2374
2383
2413
2414

Analisa Harga Satuan


Halaman 52
5

#REF! 6
7

1256
70
1326

2610
2619
2665
2666
2667
2676
2677
2687
2700
2711

Analisa Harga Satuan


Halaman 53
5

#REF! 6
7
2712
2723
2735 0.6 0.6 0.9 0.324
2744

2931
2940
2941
2950
2951
2960

Analisa Harga Satuan


Halaman 54
5

#REF! 6
7

3033
3042
3043
3051
3072
3073

Analisa Harga Satuan


Halaman 55
5

#REF! 6
7
3238
3249
3262
3273
3286
3287
3288
3296
3297
3305

3324
3332
3342
3350

Analisa Harga Satuan


Halaman 56
5

#REF! 6
7

3360
3368

3423
3431

3432
3440

Analisa Harga Satuan


Halaman 57
5

#REF! 6
7
3504
3505
4009
4020

0.2 1
0.25 20
0.05

Analisa Harga Satuan


Halaman 58
5

#REF! 6
7

4329

4338

4429
4430
4490
4500
4501
4512

Analisa Harga Satuan


Halaman 59
5

#REF! 6
7
4526
4538
4580
4590

Analisa Harga Satuan


Halaman 60
HARGA SATUAN UPAH

HARGA UPAH
NO. JENIS UPAH SATUAN
Rp.
1 2 3 4

1 Perkerja / Buruh tak terlatih 34,000.00 Org/Hr


2 Buruh terlatih 36,500.00 Org/Hr
3 Tukang Batu 39,500.00 Org/Hr
4 Tukang Besi 41,500.00 Org/Hr
5 Tukang Besi Konstruksi 49,500.00 Org/Hr
6 Tukang Cat 41,500.00 Org/Hr
7 Tukang Gali 34,500.00 Org/Hr
8 Tukang Kayu 41,500.00 Org/Hr
9 Tukang Listrik 41,500.00 Org/Hr
10 Tukang Las 43,000.00 Org/Hr
11 Kepala Tukang 47,000.00 Org/Hr
12 Mandor 52,000.00 Org/Hr
13 Operator kurang terlatih 50,000.00 Org/Hr
14 Operator terlatih 53,000.00 Org/Hr
15 Supir truk 44,500.00 Org/Hr
16 Pembantu supir 36,000.00 Org/Hr
17 Tukang plituran 42,500.00 Org/Hr
#REF!

32,200.00
33,000.00
37,500.00
39,500.00
47,250.00
39,500.00
33,000.00
39,500.00
39,500.00
41,000.00
44,500.00
49,500.00
47,850.00
50,600.00
42,350.00
34,100.00
39,500.00
HARGA SATUAN BAHAN

HARGA BAHAN
NO JENIS BAHAN SATUAN
Rp.
1 2 3 4

1 Aluminium foil @60 m 430,000.00 rol


2 Bak mandi fiber glass oval 120 ltr 219,000.00 bh
3 Bata merah 550.00 bh
4 Batu belah uk. 15-20 cm 105,000.00 m³
5 Batu candi 112,000.00 m²
6 Rooster bata Uk. 12 x 22 untuk gapura (biasa) 4,250.00 bh
7 Besi beton/Baja tulangan beton 12,240.00 kg
8 Besi U / langko kuda-kuda 30,500.00 kg
9 Besi Hollow 40/40 mm 46,000.00 btg
10 Cat luar EMCO LUX warna sedang 61,000.00 kg
11 Cat meni Emco 32,000.00 kg
12 Cat tembok Metrolit 27,000.00 kg
13 Vernis / coating 84,000.00 kg
14 Closet duduk TOTO/INA 870,000.00 bh
15 Closet jongkok porselin merk INA / TOTO (putih) 245,000.00 bh
16 Engsel jendela nylon 8,000.00 bh
17 Engsel pintu nylon 18,000.00 bh
18 Genteng Natural Nok Bulat 3,500.00 bh
19 Genteng pres jatiwangi tipe Plentong Natural 1,800.00 bh
20 Grevel beton dia 1/2 dia. 20 cm 38,500.00 m'
21 Kabel NYM 3 x 2 1/2 - 50 m' 597,000.00 rol
22 Kaca polos tebal 3 mm 88,500.00 m²
23 Kaca polos tebal 5 mm 118,000.00 m²
24 Kait Angin 12,500.00 bh
25 Kawat beton 21,500.00 kg
26 Kayu dolken dia. 10 cm 15,000.00 btg
27 Kayu lokal kelas II 2,685,000.00 m³
28 Kayu lanan 5,936,000.00 m³
29 Kayu Stoot bekisting 1,642,000.00 m³
30 Kayu Usuk 5/7 lanan 3,650,000.00 m³
31 Kayu Reng 2/3 Lanan 1,800,000.00 m³
32 Kayu kaso 5/7 kelas II 1,540,000.00 m³
33 Kayu Reng 2/3 kelas II 1,360,000.00 m³
34 Keramik dinding 20/25 motif (KIA) 58,600.00 m²
35 Keramik dinding 25/40 motif (KIA) 60,000.00 m²
36 Keramik 20/20 anti slip 47,500.00 m²
37 Keramik Lantai 30/30 motif sekw. Mulia 43,000.00 m²
38 Keramik Lantai 30/30 putih sekw. Mulia 40,000.00 m²
39 Keramik Lantai 40/40 putih sekw. KIA 47,500.00 m²
40 Krikil beton (split) uk. 2-3 cm 214,000.00 m³
41 Kran dia. 1/2'' SAN''EI 81,500.00 bh
42 Kunci tanam besar merk Viali 108,000.00 bh
43 Kunci tanam sedang Js Itali 42,000.00 bh
44 kwas 3" 6,500.00 bh
45 Langko kuda-kuda 30,500.00 bh
46 Lem kayu fox 32,000.00 kg
47 List kayu profil 3 x 3 cm 18,000.00 btg
48 Minyak Bekisting 3,000.00 ltr
49 Paku biasa 1'' 24,000.00 kg
50 Paku biasa 2' - 5'' 19,000.00 kg
51 Paku Seng 24,700.00 kg
52 Paku skrup 1'' 240.00 bh

Halaman : 93
HARGA BAHAN
NO JENIS BAHAN SATUAN
Rp.
1 2 3 4

53 Panel Box Zekering / MCB 366,000.00 unit


54 Papan borneo / MC 5,936,000.00 m³
55 Papan gipsum (plapond) 9 mm 69,500.00 lbr
56 Papan Lanan 7,056,000.00 m³
57 Papan kayu lokal kelas II (mahoni) 2,900,000.00 m³
58 Papan terentang (Perancah/Acuan beton) 1,150,000.00 m³
59 Paping blok/conblok T = 6 cm 1,760.00 bh
60 Papan Calsiplank GRC (0,8x20)cm 45,000.00 btg
61 Pasir beton 154,000.00 m³

Halaman : 93
HARGA BAHAN
NO JENIS BAHAN SATUAN
Rp.
1 2 3 4

62 Pasir pasang 122,000.00 m³


63 Pasir urug/ timbunan 55,000.00 m³
64 Plamir kayu tawon kensai 22,000.00 kg
65 Plamour tembok Viny paint 31,000.00 kg
66 Semen adepsip (Gip) 6,700.00 kg
67 Semen Portlan (PC) (50 kg) 67,000.00 zax
68 Semen Warna 14,500.00 kg
69 Seng Plat 0,3 (lebar = 55 cm) 31,000.00 lbr
70 Seng Plat 0,3 (lebar = 90 cm) 42,500.00 lbr
71 Sirtu tidak tersaring 47,000.00 m³
72 Tanah urug / bahan timbuhan tindihan 42,000.00 m³
73 Teakwood 0,9 x 2,2 x 3 mm ukuran pintu 85,000.00 lbr
74 Wastafel lengkap 600,000.00 bh
75 Lampu TL 20 watt komplit 85,000.00 bh
76 Lampu SL 14 watt (Philip) 55,000.00 bh
77 Besi Pipa dia. 6" Medium 2,422,800.00 btg
78 Pipa Paralon / PVC dia. 1/2" wavin type AW 19,400.00 btg
79 Pipa Paralon / PVC dia. 3/4" wavin type AW 26,000.00 btg
80 Pipa Paralon / PVC dia. 1" wavin type AW 26,400.00 btg
81 Pipe paralon / PVC dia. 2 1/2" wavin type D 58,900.00 btg
82 Pipa paralon /PVC dia. 4" wavin type D 123,400.00 btg
83 Lem PVC 8,200.00 tube
84 Seal Tape 3,700.00 bh
85 Plafond GRC Internal 4mm 60,000.00 lbr
86 Polywood 1.20 x 2 .40 cm 97,500.00 lbr
87 Kusen Alumunium 4" 92,600.00 m'
88 Daun pintu rangka alumunium natural kaca bening 5 mm 1,525,000.00 m²
89 Daun jendela natural kaca bening 5 mm 732,000.00 m²
90 Atap metal 111,000.00 m²
91 List gypsum 7 cm 18,000.00 m'
92 Pintu Fiber KM/WC 220,000.00 bh
93 Floor drain stainless 55,000.00 bh
94 Glass block 20 x 20 cm 24,500.00 bh
95 Rooster keramik 20/20 33,600.00 bh
96 Baja ringan 167,500.00 m²
97 Genting metal untuk konstruksi baja ringan 110,000.00 bh
98 Genting bubungan metal untuk konstruksi baja ringan 49,000.00 bh
99 Wiremesh di las 12,000.00 kg
100 Kunci Door Holder 215,000.00 bh
101 Kunci Door Stop 310,000.00 bh
102 Kunci Door Closer 300,000.00 bh
103 Urinoir (lengkap) 1,800,000.00 unit
104 Atap sirap 5 mm 165,000.00 ikat
105 Saklar single (broco) 16,000.00 bh
106 Saklar doble (broco) 20,000.00 bh
107 Stop kontak 15,000.00 bh

Halaman : 93
430,000.00
219,000.00
540.00
96,000.00
112,000.00
4,250.00
12,100.00
26,000.00
46,000.00
54,900.00
32,000.00
25,000.00
68,000.00
870,000.00
150,000.00
7,000.00
17,500.00
3,250.00
1,200.00
27,000.00
420,000.00
43,000.00
67,000.00
12,500.00
21,000.00
14,600.00
2,684,000.00
5,936,000.00
1,500,000.00
3,561,000.00
1,543,000.00
1,540,000.00
1,320,000.00
58,560.00
59,000.00
42,500.00
40,200.00
30,500.00
39,000.00
185,000.00
81,500.00
103,000.00
39,800.00
6,500.00
24,400.00
32,000.00
18,000.00
3,000.00
24,000.00
19,000.00
24,700.00
240.00

Halaman : 93
366,000.00
5,936,000.00
63,000.00
7,056,000.00
2,900,000.00
1,037,000.00
1,200.00
45,000.00
154,000.00

Halaman : 93
120,000.00
55,000.00
22,000.00
30,500.00
6,000.00
64,000.00
14,000.00
30,500.00
40,000.00
47,000.00
42,000.00
81,000.00
608,000.00
61,000.00
54,900.00
2,202,600.00
17,700.00
23,650.00
24,000.00
53,550.00
112,200.00
-
2,900.00
58,000.00
84,000.00
76,000.00
1,525,000.00
732,000.00
111,000.00
18,000.00
220,000.00
55,000.00
22,400.00
33,600.00
167,500.00
110,000.00
49,000.00
12,000.00
215,000.00
310,000.00
300,000.00
1,800,000.00
165,000.00
12,000.00
15,500.00
12,000.00

Halaman : 93
RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUMAH TINGGAL TYPE 58 M2
TAHUN 2016

HARGA SATUAN JUMLAH


NO. URAIAN VOLUME
Rp. Rp.
1 2 3 4 5

I PEKERJAAN PERSIAPAN

1 Pekerjaan Pengukuran kembali (site) & Pemasangan Bouwplank 1.00 ls 500,000.00 500,000.00

2 Pembuatan gudang kerja / Direksikeet 1.00 ls 3,000,000.00 3,000,000.00

3 Pembuatan Stegger dari Bambu 1.00 ls 500,000.00 500,000.00

Jumlah 4,000,000.00

II PEKERJAAN TANAH

1 Pek. Galian tanah biasa max kedalaman 1 m' 83.58 m³ 26,800.00 2,239,944.00

2 Pek. Urugan tanah kembali bekas galian dipadatkan (Per 20 cm) 28.36 m³ 8,933.33 253,331.47

3 Pek. Pemadatan tanah Per 20 cm 18.90 m³ 19,600.00 370,440.00

Jumlah 2,863,715.47

III PEKERJAAN PONDASI

1 Pek. Urugan pasir dibawah pondasi 5.56 m³ 76,720.00 426,870.08

2 Pasangan Batu kosong (Aanstamping) 12.02 m³ 195,546.00 2,349,876.28

3 Pasangan Pondasi batu belah camp.1 Pc : 5Psr 24.51 m³ 462,658.00 11,339,747.58

Jumlah 14,116,493.94

IV PEKERJAAN BETON

1 Pas. Sloof beton bertulang uk. 15x20 cm (K.75)

- Adukan beton (175) 2.93 m³ 756,150.06 2,214,007.36

- Pembesian 445.06 kg 13,756.70 6,122,501.88

- Bekisting (2 x pakai) 39.04 m² 88,794.00 3,466,509.09

2 Pas. Kolom beton bertulang uk. 15x20 cm (K.175)

- Adukan beton (175) 1.52 m³ 756,150.06 1,150,104.23

- Pembesian 231.19 kg 13,756.70 3,180,438.99

- Bekisting (2 x pakai) 20.28 m² 88,794.00 1,800,737.82

3 Pas. Ring Balok beton bertulang uk. 15x20 cm (K.175)

- Adukan beton (175) 1.41 m³ 756,150.06 1,066,171.58

- Pembesian 229.99 kg 13,756.70 3,163,857.36

- Bekisting (2 x pakai) 25.85 m² 88,794.00 2,295,320.73

Jumlah 24,459,649.04

Hal : 69
HARGA SATUAN JUMLAH
NO. URAIAN VOLUME
Rp. Rp.
1 2 3 4 5

V PEKERJAAN DINDING

1 Pas. Dinding bata merah uk(5 x 11 x 22) cm tebal ½ bata, camp.1Pc : 3Ps 7.20 m² 78,035.80 561,857.76

2 Pas. Dinding bata merah uk(5 x 11 x 22) cm tebal ½ bata, camp.1Pc : 5Ps 158.71 m² 72,361.20 11,484,373.69

3 Pek. Plesteran dinding 1Pc : 3Ps tebal 15 mm 14.40 m² 30,835.84 444,036.10

4 Pek. Plesteran dinding 1Pc : 5Ps tebal 15 mm 317.42 m² 27,728.56 8,801,544.06

5 Pekerjaan Acian pada plesteran 331.82 m² 16,095.00 5,340,610.71

6 Pasangan Dinding keramik uk.20x25 cm (KM/WC) 14.40 m² 154,218.00 2,220,739.20

Jumlah 28,853,161.51

VI PEKERJAAN KUSEN PINTU, JENDELA, DAUN PINTU, dan DAUN JENDELA

1 Pasang Kusen pintu dan jendela kayu lanan 0.69 m³ 8,174,400.00 5,607,638.40

2 Pasang Daun pintu panel kayu lanan 18.86 m² 473,440.00 8,928,131.52

3 Pemasangan Pintu PVC KM/WC lengkap accessories 1.00 unit 304,480.40 304,480.40

Jumlah 14,840,250.32

VII PEKERJAAN KONSTRUKSI ATAP DAN PENUTUP ATAP

1 Pasang Konstruksi Kuda - kuda Kayu Lanan 1.78 m³ 7,794,300.00 13,905,031.20

2 Pasang Konstruksi Gordeng, Ikatan angin, Ikatan gempa Kayu Lanan 1.81 m³ 7,464,580.00 13,525,818.96

3 Pasang Rangka Atap Kayu Lanan 173.59 m² 70,610.00 12,257,189.90

4 Pasang Lisplank ( 3 x 30 )cm Kayu lanan 44.00 m' 91,466.00 4,024,504.00

Jumlah 43,712,544.06

Hal : 70
HARGA SATUAN JUMLAH
NO. URAIAN VOLUME
Rp. Rp.
1 2 3 4 5

VIII PEKERJAAN PLAPOND


1 Pemasangan rangka plapond Kayu Kls II (Hanya Rangka) 104.00 m² 55,641.00 5,786,664.00

2 Pemasangan plapond dari GRC tebal 4 mm 104.00 m² 30,450.00 3,166,800.00

3 Pemasangan list plapond kayu profil 85.00 m' 9,131.00 776,135.00

Jumlah 9,729,599.00

IX PEKERJAAN PENUTUP LANTAI

1 Pek. Urugan pasir dibawah lantai 3.15 m³ 76,720.00 241,668.00

2 Pasang Lantai Keramik uk.20 x 20 cm Anti Slip KM/WC 1.50 m² 131,506.00 197,259.00

3 Pasang Lantai Keramik uk.30 x 30 cm (polos) 61.50 m² 121,730.00 7,486,395.00

Jumlah 7,925,322.00

X PEKERJAAN SANITASI

1 Pemasangan kloset jongkok porselen 1.00 unit 426,330.00 426,330.00

2 Pasang bak mandi fiberglass vol. 0,03 m³ 1.00 bh 457,370.00 457,370.00

3 Memasang Pipa PVC tipe AW Ø ½" 21.00 m' 11,487.10 241,229.10

4 Memasang Pipa PVC tipe D Ø 2½" 21.00 m' 26,793.35 562,660.35

5 Memasang 1 m' Pipa PVC tipe D Ø 4" 21.00 m' 56,751.70 1,191,785.70

6 Memasang Kran Ø ¾" atau ½" 5.00 bh 86,612.50 433,062.50

7 Memasang Floor Drain 1.00 bh 60,020.00 60,020.00

8 Memasang Septic tank 3.75 m³ berikut rembesan unit 1,750,000.00 -

9 Pengadaan air bersih (sumur gali, water turn, pompa) lengkap dengan accesories ls 5,500,000.00 -

Jumlah 3,372,457.65

Hal : 71
HARGA SATUAN JUMLAH
NO. URAIAN VOLUME
Rp. Rp.
1 2 3 4 5

XI PEKERJAAN KUNCI DAN KACA

1 Pasang Kunci Tanam Biasa 6.00 bh 63,820.00 382,920.00

2 Pasang Engsel Pintu 18.00 bh 25,479.00 458,622.00

3 Pasang Engsel Jendela 28.00 bh 15,479.00 433,412.00

5 Pasang Kait angin 14.00 bh 19,979.00 279,706.00

6 Pasang Kunci Selot pintu dan jendela 14.00 bh 40,472.00 566,608.00

8 Pasang Kaca tebal 5 mm 14.42 m² 137,279.00 1,979,563.18

Jumlah 4,100,831.18

XII PEKERJAAN INSTALASI LISTRIK

1 Biaya Pasang Baru termasuk Instalasi dari PLN (900 watt) 1.00 Ls 3,000,000.00 3,000,000.00

2 Biaya Penambahan daya dari PLN Ls 750,000.00 -

3 Pemasangan Box MCB 1.00 unit 370,954.50 370,954.50

4 Pemasangan kabel listrik m' 16,894.50 -

5 Pemasangan titik lampu TL 25 watt (kumplit) ttk 89,954.50 -

6 Pemasangan lampu XL 14 watt (Philips) 9.00 bh 59,954.50 539,590.50

7 Pemasangan stop kontak 5.00 bh 19,954.50 99,772.50

8 Pemasangan saklar single 2.00 bh 20,954.50 41,909.00

9 Pemasangan saklar double 3.00 bh 24,954.50 74,863.50

10 Pemasangan instalasi anti petir (Arde) Ls 2,500,000.00 -

Jumlah 4,127,090.00

XIII PEKERJAAN PENGECATAN

1 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penu 150.02 m² 39,095.50 5,864,911.43

2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 317.42 m² 16,540.60 5,250,284.17

3 Pengecatan plapond dengan cat tembok 104.00 m² 10,740.60 1,117,022.40

4 Mengecatan Bidang Kayu Lama m² 30,015.00 -

5 Pengecatan Tembok Lama (2 Lapis Cat Penutup) m² 10,740.60 -

Jumlah 12,232,218.00

XIV PEKERJAAN LAIN LAIN

1 Pengadaan alat pemadam kebakaran bh 1,250,000.00 -

2 Biaya pemberesan dan penyelesaian 1.00 Ls 500,000.00 500,000.00

Hal : 72
HARGA SATUAN JUMLAH
NO. URAIAN VOLUME
Rp. Rp.
1 2 3 4 5

Jumlah 500,000.00

REKAPITULASI
RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUMAH TINGGAL TYPE 58 M2
TAHUN 2016

NAMA KEGIATAN :
LOKASI :

NO. URAIAN JUMLAH

1 2 3
I PEKERJAAN PERSIAPAN 4,000,000.00
II PEKERJAAN TANAH 2,863,715.47
III PEKERJAAN PONDASI 14,116,493.94
IV PEKERJAAN BETON 24,459,649.04
V PEKERJAAN DINDING 28,853,161.51
VI PEKERJAAN KUSEN PINTU, JENDELA, DAUN PINTU, dan DAUN JENDELA 14,840,250.32
VII PEKERJAAN KONSTRUKSI ATAP DAN PENUTUP ATAP 43,712,544.06
VIII PEKERJAAN PLAPOND 9,729,599.00
IX PEKERJAAN PENUTUP LANTAI 7,925,322.00
X PEKERJAAN SANITASI 3,372,457.65
XI PEKERJAAN KUNCI DAN KACA 4,100,831.18
XII PEKERJAAN INSTALASI LISTRIK 4,127,090.00
XIII PEKERJAAN PENGECATAN 12,232,218.00
XIV PEKERJAAN LAIN LAIN 500,000.00
-

JUMLAH I 174,833,332.17
DIBULATKAN 174,833,000.00

TERBILANG : ( SERATUS TUJUH PULUH EMPAT JUTA DELAPAN RATUS TIGA PULUH TIGA RIBU RUPIAH )

Hal : 73
RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUMAH TINGGAL TYPE 58 M2
TAHUN 2016

BOBOT POS TINGKAT PELAKSANAAN


PEKERJAAN POS
NO. URAIAN VOLUME TERHADAP PEKERJAAN

SELESAI
PEKERJAAN
1 2 3 4 5

I PEKERJAAN PERSIAPAN

1 Pekerjaan Pengukuran kembali (site) & Pemasangan Bouwplank 1.00 ls 0.286

2 Pembuatan gudang kerja / Direksikeet 1.00 ls 1.716

3 Pembuatan Stegger dari Bambu 1.00 ls 0.286

Jumlah 2.29

II PEKERJAAN TANAH

1 Pek. Galian tanah biasa max kedalaman 1 m' 83.58 m³ 1.281

2 Pek. Urugan tanah kembali bekas galian dipadatkan (Per 20 cm) 28.36 m³ 0.145

3 Pek. Pemadatan tanah Per 20 cm 18.90 m³ 0.212


Jumlah 1.64

III PEKERJAAN PONDASI

1 Pek. Urugan pasir dibawah pondasi 5.56 m³ 0.244

2 Pasangan Batu kosong (Aanstamping) 12.02 m³ 1.344

3 Pasangan Pondasi batu belah camp.1 Pc : 5Psr 24.51 m³ 6.486

Jumlah 8.07

IV PEKERJAAN BETON

1 Pas. Sloof beton bertulang uk. 15x20 cm (K.75)

- Adukan beton (175) 2.93 m³ 1.266

- Pembesian 445.06 kg 3.502

- Bekisting (2 x pakai) 39.04 m² 1.983

2 Pas. Kolom beton bertulang uk. 15x20 cm (K.175)

- Adukan beton (175) 1.52 m³ 0.658

- Pembesian 231.19 kg 1.819

- Bekisting (2 x pakai) 20.28 m² 1.030

3 Pas. Ring Balok beton bertulang uk. 15x20 cm (K.175)

- Adukan beton (175) 1.41 m³ 0.610


- Pembesian 229.99 kg 1.810

- Bekisting (2 x pakai) 25.85 m² 1.313

Jumlah 13.99

V PEKERJAAN DINDING

1 Pas. Dinding bata merah uk(5 x 11 x 22) cm tebal ½ bata, camp.1Pc : 3Ps 7.20 m² 0.321

2 Pas. Dinding bata merah uk(5 x 11 x 22) cm tebal ½ bata, camp.1Pc : 5Ps 158.71 m² 6.569

3 Pek. Plesteran dinding 1Pc : 3Ps tebal 15 mm 14.40 m² 0.254

4 Pek. Plesteran dinding 1Pc : 5Ps tebal 15 mm 317.42 m² 5.034

5 Pekerjaan Acian pada plesteran 331.82 m² 3.055

6 Pasangan Dinding keramik uk.20x25 cm (KM/WC) 14.40 m² 1.270

Jumlah 16.50

VI PEKERJAAN KUSEN PINTU, JENDELA, DAUN PINTU, dan DAUN JENDELA

1 Pasang Kusen pintu dan jendela kayu lanan 0.69 m³ 3.207

2 Pasang Daun pintu panel kayu lanan 18.86 m² 5.107

3 Pemasangan Pintu PVC KM/WC lengkap accessories 1.00 unit 0.174

Jumlah 8.49
VII PEKERJAAN KONSTRUKSI ATAP DAN PENUTUP ATAP

1 Pasang Konstruksi Kuda - kuda Kayu Lanan 1.78 m³ 7.953

2 Pasang Konstruksi Gordeng, Ikatan angin, Ikatan gempa Kayu Lanan 1.81 m³ 7.736

3 Pasang Rangka Atap Kayu Lanan 173.59 m² 7.011

4 Pasang Lisplank ( 3 x 30 )cm Kayu lanan 44.00 m' 2.302

Jumlah 25.00

VIII PEKERJAAN PLAPOND

1 Pemasangan rangka plapond Kayu Kls II (Hanya Rangka) 104.00 m² 3.310

2 Pemasangan plapond dari GRC tebal 4 mm 104.00 m² 1.811

3 Pemasangan list plapond kayu profil 85.00 m' 0.444

Jumlah 5.57

IX PEKERJAAN PENUTUP LANTAI

1 Pek. Urugan pasir dibawah lantai 3.15 m³ 0.138

2 Pasang Lantai Keramik uk.20 x 20 cm Anti Slip KM/WC 1.50 m² 0.113

3 Pasang Lantai Keramik uk.30 x 30 cm (polos) 61.50 m² 4.282

Jumlah 4.53
X PEKERJAAN SANITASI

1 Pemasangan kloset jongkok porselen 1.00 unit 0.244

2 Pasang bak mandi fiberglass vol. 0,03 m³ 1.00 bh 0.262

3 Memasang Pipa PVC tipe AW Ø ½" 21.00 m' 0.138

4 Memasang Pipa PVC tipe D Ø 2½" 21.00 m' 0.322

5 Memasang 1 m' Pipa PVC tipe D Ø 4" 21.00 m' 0.682

6 Memasang Kran Ø ¾" atau ½" 5.00 bh 0.248

7 Memasang Floor Drain 1.00 bh 0.034

8 Memasang Septic tank 3.75 m³ berikut rembesan unit

9 Pengadaan air bersih (sumur gali, water turn, pompa) lengkap dengan accesories ls

Jumlah 1.93

XI PEKERJAAN KUNCI DAN KACA

1 Pasang Kunci Tanam Biasa 6.00 bh 0.219

2 Pasang Engsel Pintu 18.00 bh 0.262

3 Pasang Engsel Jendela 28.00 bh 0.248

5 Pasang Kait angin 14.00 bh 0.160

6 Pasang Kunci Selot pintu dan jendela 14.00 bh 0.324

8 Pasang Kaca tebal 5 mm 14.42 m² 1.132


Jumlah 2.35

XII PEKERJAAN INSTALASI LISTRIK

1 Biaya Pasang Baru termasuk Instalasi dari PLN (900 watt) 1.00 Ls 1.716

3 Pemasangan Box MCB 1.00 unit 0.212

6 Pemasangan lampu XL 14 watt (Philips) 9.00 bh 0.309

7 Pemasangan stop kontak 5.00 bh 0.057

8 Pemasangan saklar single 2.00 bh 0.024

9 Pemasangan saklar double 3.00 bh 0.043

Jumlah 2.36

XIII PEKERJAAN PENGECATAN

1 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Pe 150.02 m² 3.355

2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 317.42 m² 3.003

3 Pengecatan plapond dengan cat tembok 104.00 m² 0.639

Jumlah 7.00

XIV PEKERJAAN LAIN LAIN

1 Pengadaan alat pemadam kebakaran bh


2 Biaya pemberesan dan penyelesaian 1.00 Ls 0.286

Jumlah 0.29

REKAPITULASI
RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUMAH TINGGAL TYPE 58 M2
TAHUN 2016

NAMA KEGIATAN :
LOKASI :

BOBOT POS TINGKAT PELAKSANAAN


PEKERJAAN POS
TERHADAP PEKERJAAN
NO. URAIAN
SELESAI
PEKERJAAN

1 2
I PEKERJAAN PERSIAPAN 2.288
II PEKERJAAN TANAH 1.638
III PEKERJAAN PONDASI 8.074
IV PEKERJAAN BETON 13.990
V PEKERJAAN DINDING 16.503
VI PEKERJAAN KUSEN PINTU, JENDELA, DAUN PINTU, dan DAUN JENDELA 8.488
VII PEKERJAAN KONSTRUKSI ATAP DAN PENUTUP ATAP 25.002
VIII PEKERJAAN PLAPOND 5.565
IX PEKERJAAN PENUTUP LANTAI 4.533
X PEKERJAAN SANITASI 1.929
XI PEKERJAAN KUNCI DAN KACA 2.346
XII PEKERJAAN INSTALASI LISTRIK 2.361
XIII PEKERJAAN PENGECATAN 6.997
XIV PEKERJAAN LAIN LAIN 0.29

JUMLAH I 100.00
DIBULATKAN

TERBILANG : ( SERATUS TUJUH PULUH EMPAT JUTA DELAPAN RATUS TIGA PULUH TIGA RIBU RUPIAH )
NGKAT PELAKSANAAN HARGA SATUAN JUMLAH

BOBOT

Rp. Rp.
6 4 5

500,000.00 500,000.00

3,000,000.00 3,000,000.00

500,000.00 500,000.00

4,000,000.00

26,800.00 2,239,944.00

8,933.33 253,331.47

19,600.00 370,440.00
2,863,715.47

76,720.00 426,870.08

195,546.00 2,349,876.28

462,658.00 11,339,747.58

14,116,493.94

756,150.06 2,214,007.36

13,756.70 6,122,501.88

88,794.00 3,466,509.09

756,150.06 1,150,104.23

13,756.70 3,180,438.99

88,794.00 1,800,737.82

756,150.06 1,066,171.58
13,756.70 3,163,857.36

88,794.00 2,295,320.73

24,459,649.04

78,035.80 561,857.76

72,361.20 11,484,373.69

30,835.84 444,036.10

27,728.56 8,801,544.06

16,095.00 5,340,610.71

154,218.00 2,220,739.20

28,853,161.51

8,174,400.00 5,607,638.40

473,440.00 8,928,131.52

304,480.40 304,480.40

14,840,250.32
7,794,300.00 13,905,031.20

7,464,580.00 13,525,818.96

70,610.00 12,257,189.90

91,466.00 4,024,504.00

43,712,544.06

55,641.00 5,786,664.00 72.80

30,450.00 3,166,800.00

9,131.00 776,135.00

9,729,599.00

76,720.00 241,668.00

131,506.00 197,259.00

121,730.00 7,486,395.00

7,925,322.00
426,330.00 426,330.00

457,370.00 457,370.00

11,487.10 241,229.10

26,793.35 562,660.35

56,751.70 1,191,785.70

86,612.50 433,062.50

60,020.00 60,020.00

1,750,000.00 -

5,500,000.00 -

3,372,457.65

63,820.00 382,920.00

25,479.00 458,622.00

15,479.00 433,412.00

19,979.00 279,706.00

40,472.00 566,608.00

137,279.00 1,979,563.18
4,100,831.18

3,000,000.00 3,000,000.00

370,954.50 370,954.50

59,954.50 539,590.50

19,954.50 99,772.50

20,954.50 41,909.00

24,954.50 74,863.50

4,127,090.00

39,095.50 5,864,911.43

16,540.60 5,250,284.17

10,740.60 1,117,022.40

12,232,218.00

1,250,000.00 -
500,000.00 500,000.00

500,000.00

NGKAT PELAKSANAAN JUMLAH

BOBOT

Rp.
3
4,000,000.00
2,863,715.47
14,116,493.94
24,459,649.04
28,853,161.51
14,840,250.32
43,712,544.06
9,729,599.00
7,925,322.00
3,372,457.65
4,100,831.18
4,127,090.00
12,232,218.00
500,000.00
-

174,833,332.17
174,833,000.00
TIME SCHEDULE
PEMBANGUNAN RUMAH TINGGAL TYPE 61 M2

No URAIAN PEKERJAAN BOBOT MG 1 MG 2 MG 3 MG 4 MG 5 MG 6

I PERSIAPAN 1.81 0.90 0.90


II PEKERJAAN TANAH & PONDASI 2.97 1.5 1.5
III PEKERJAAN STRUKTUR 11.82 3.94 3.94 3.94
IV PEKERJAAN ATAP 13.78 6.89
V PEKERJAAN LANTAI 7.48
VI PEKERJAAN DINDING 20.49 5.1 5.10 5.10
VII PEKERJAAN PLAFOND 2.92
VIII PEKERJAAN KUSEN, PINTU, & JENDELA 9.59 4.80
IX PEKERJAAN PENGECATAN 2.98
X PEKERJAAN LISTRIK 2.07
XI PEKERJAAN PERPIPAAN & SANITAIR 5.83 2.92
XII Pekerjaan Lain-lain 18.26

JUMLAH BOBOT 100.00


RENCANA MINGGUAN 2.39 4.40 4.85 9.06 20.73 5.10
RENCANA KOMULATIF MINGGUAN 0 2.39 6.78 11.63 20.69 41.42 46.52
PRESTASI MINGGUAN
PRESTASI FISIK KOMULATIF 0
KECEPATAN / KELAMBATAN

Menyetujui
TYPE 61 M2

MG 7 MG 8 MG 9 MG 10 MG 11 MG12 MG13 MG14 MG 15 MG16

6.89
3.7 3.74

5.10
1.50 1.5
4.80
1.5 1.5
1.0 1.00
2.92
9.131 9.13

5.10 11.69 3.74 5.24 2.95 1.50 1.04 3.92 9.13 9.1
51.62 63.31 67.05 72.29 75.24 76.74 77.77 81.69 90.8 100

Dibuat Oleh,
Tim Perencana

ADE SUPRIATNA
XII TGB 3
No URAIAN PEKERJAAN BOBOT

Chart
0 PEKERJAAN PERSIAPAN, GALIAN DAN URUGAN 4.65
0 PEKERJAAN PONDASI DAN BETON 23.48
0 PEKERJAAN PASANGAN DAN PLESTERAN 8.28
0 PEKERJAAN LANTAI DAN DINDING 2.40
1 PEKERJAAN ATAP 21.26
I PEKERJAAN PLAFON 7.23
II PEKERJAAN KUSEN PINTU DAN JENDELA 8.53
PEKERJAAN PERLENGKAPAN PINTU DAN
III JENDELA 3.63
IV PEKERJAAN SANITAIR 1.00
V PEKERJAAN INSTALASI AIR 4.99
VI PEKERJAAN INSTALASI LISTRIK 4.49
VII PEKERJAAN PENGECATAN 9.50
VIII PEKERJAAN PEMBERSIHAN 0.56
Chart Title