Вы находитесь на странице: 1из 9
“Lam passionate about getting results and thrive on new challenges, irrespective of difficulties Skills, Expertise, and Years of Experience Project Management postions «at various organizations ‘over Id years experience ‘across all the BP Business Streams ‘out 027 years total experience. Contributed asa team player and team leader with good Anovledge of people management and organizational skills combined ‘with extensive knowledge and experience at oil & gas, chemicals ‘and minerals industries. Career progression from mechanical construction engineer to resident engineer, construction manager and project manager has developed the ability to manage project from conception o sanction, through design, construction, commissioning and handover to Operational ABROAD EXPERIENCE TOTAL 18 YEARS A Credit of 18 years of experience in Petroleum refinery Projects and ‘S years in Drilling projects in Middle East Countries ‘SAUDIARABIA, QATAR ‘and KUWAIT. 1 Years experiences in ONGC, RIL, ‘and Gujarat Fertilizer in India. Shivakumar Krishnan Mobile No. +91 9789775380 Mobile No. +91 8838886055 Permanent address 27 Velayutham colony 1 Street, Saligramam Chennai 600093, India Present Position SENIOR DIRECTOR (PROJECTS) SENDAN INTERNATIONAL CO LTD From MAY 2016 Until Now. Previous Position SENIOR PROJECT MANAGER, RELIANCE INDUSTRIES Ltd J3 PROJECT, JAMNAGAR GUJARAT, INDIA OIL/GAS INDUSTRIES 20 YEARS Maintenance of Petrochemical & Petroleum Refinery Industries 7 YEARS © Attended ISO: 9001-2008 QMS Awareness training on Quality Management Modules and ISO Standards Document Controlling Process. ‘© Participated workshop training on effective material management PMIC (Production Management and Inventory control) ‘© Acted as team lead and got recognition by Senior Management in achieving Operational Excellence to meet driving Cost Control projects in Logistics (Purchase, RMA Recovery and Inventory Optimization) ‘© Consistently reduced Purchase costs for the IT Products by improving operational efficiencies. ‘© Awarded three times increment & promotion for the effective work carried out in replenishing an effective controlling system on material management. ‘© Post Graduate Diploma in Computer Applications ‘© Excellent Skills on Ms-Excel (Advance Level) with 35 WPM typing speed. ‘* Trained on Computer System Troubleshooting (Hardware Faults). ‘© Certified trainer (MCSE/CCNA) on System Networking '* Accounting Packages _: Basic skills on Tally, Peach Tree ‘+ ERP Packages + Basic Skills on Oracle, SAP ‘© Email Application +: Ms-Outlook Express & Lotus Note PERSONAL DETAILS Date of birth 5* May 1964 Fathers name Mr. M. Krishnan Passport No. & Validity 6972522 ‘valid up to 2021 Nationality Indian Language known English, Tamil Marital status Married Driving License (Kuwait) Valid up to 2017 India References 1. Dr. Thiruvengadam Ravi, BE, M.sc, PhD 9003169766 Associate Professor, Anna University, Chennai. 2Selvaraj Ebinezer BE,M.E., 9998215693 Manager contracts Reliance Industries Lid Overseas Reference : PRABIL SATHYAN 00966 0556738835 Project Leader KSA Faris Shammari 00965- 66324359 Drilling Superintendant KGOC Kuwait Career Brief, (Last 4 Positions) Worked as a Director of Projects from April 2016 fo till now Handled 8 shutdowns, each was 2 months duration Handling EPC for QUINCH improvement system in Petrokemya, Olifin IL Duration of this Projet is 16 months Designing., planning, scheduling and budgetting project with weightages application. Developed from conceptual design. feed and detailed design for this project. ‘Analyzing Baseline valne and earned values. Keeping the work progress in line with Level 2and Level 4 ‘Well maintaining the activity plan according to the schedules. QMD planning and maintaining of QMS in entre project cycle. Fabrication activites for shutdowns. Fabricated skids for placing top cover of HO Reactor: Given ‘raining for the technicians for the sensitive jobs, like Lip sea cutting and Welding job forthe top and bottom side of the reactor Lid. Given mock test for the fabricators with special grinding machine on lip seal cutting Fabricated grid walk away platform enable to perform work forthe people working on the reactor valuation of scopes, supervised hydro jetting, Cleaning, Replacement of Catalyst and Thermocouples in BO reactor. Organized action plans and sequence of activities in Turnaround projects. ‘Measure the progress by DPR and Monthly report otimated in Tumaround and shutdowns for the petroleum refinery projects ‘The following listed activities has been estimated and executed successfully under my supervision Repair works of Reformer column internals and pigtail piping, grinding, gouging and welding of Shel plates and batfte plates, Replacement of flanged valves and welded valves, Replacement of Monel piping, Repair works of internals of Reactor columns and Exchanger. Repair and Replacement of Botiom plate, shell segments, and roof plate for the oilfchemicals storage tank. Preparing Presentations in power point for the construction and maintenance of Oiligas storage tank for company. Reliance Industries Ltd, J8 Project Worked as a Senior Project Manager on Contractual basis for J3 Gasification of Plant. Assisted with Linde Intemational for Designing an air separation unit, Cold Box units 182 Installation of 43 MVA Compressor units 2 and installation of Cold box units 2 numbers Fabricati of steel structures for Pipe Racks compliance fo the DIN and ASME Codes and Standards, Fabrication and Erection of Spools all systems in process piping systems. Piping Construction was followed by the API standards and achieved the higher quality. Site management with good exposures in Quality Management Systems ISO 9001-2000. Good knowledge in Basic Design, FEED Engineering and Detail Engineering, Conceptual Studies, (Contractual Evaluation and Tendering studies with strong procurement skills. April 2016 tillnow Director projects MED Projects and EPC Projects Oct 2014-2016 Senior Project Manager Field development of HPL. / HT Gas condensate field (Appraise | Select / Define)process piping, equipment, Educational Qualification: BE Mechanical ei iletea Iie fete oro 0x1 -2014 Additional Qualification Post Graduate in Production Engineering. Post Graduate Diploma in MS Project at GNUT. Jan 2009 - 2010 Computer Knowledge Knowledge of using MS Project, Primavera, Project Management. P.3, version 3.1. & P-6V7 Windows OS, Ms office2003/2010 & ‘AutoCAD (Basic) ‘Oct 2006 - 2009 ‘SPECIALISED SKILLS Project Management, comprehensive problem solving abilities, initiative with an excellent leadership, Good Verbal and Written Communicating skills, Ability to meet ‘the deailine under pressure, Diplomatic dealings and ability to take ‘a prompt and right decision, Reviewing of Engineering Drawings, June 2003-2005 Good knowledge of Design, Fabrication and Construction Works, Organizing Man Power Planning Execution of Project as per schedule, ‘May2005 - 2006 July 2001 - June 2003, Professional Overview Project Manager FKS Shuwayer, Contracting company EPC Contractor Joint Operations, Wafra , KUWAIT. Construction of flow line Piping from well head to header line for Sub centers Project value 50M USD. Projet Manager Istllation of Seam Generator and its Piping and support structures for Water Injection Facts, as lange scale Pilot Project, Project Manager Construction of trunk line Piping from SUG gathering centre fo MGC for Major Project Division, EPC Turnkey Contracts, Project value €173M Project Engineer GS DAEWOO, EPC Contractor for Construction of ETHYLEN GAS PRODUCTION PLANT For Qatar Gas, Ras Laffan, Senior Engineer, NSH Corporation for Gulf arabi Paraffin Lab at Jubail Industrial Complex, Petrochemical plant. Saudi Arabia. Responsible for Mechanical works involved in Construction of plant. Erection of high pressured Vertical columns, Reactors, Knockout drums, Heaters, Compressor . Rotary Equipment Pumps drives. Fabrication and erection steel pipe racks. Structural Engineer at HADEED STEELS & IRON LTD for the Expansion project - Handled Fabrication and erection of steel structures and walk way platforms, Insiallation of handrails. Up gradation of EOT crane from 35 tons to 80 tons in Hot mill area Insiallation of Gant ral, Installation of heat protection Insulation sheets in hot mill area & slab turnover section, Erection of Slab turnover device, Scarffing machine and Dust Hopper with flair assembly related PNEUMATIC DCS Control systems, Ata Glance: 20 years of successful working experience in Construction of Petrochemical and Refinery plants, Pipeline construction, process piping, Cross country pipe line, for transportation and distribution. Erection and alignment of rotary and static Equipment Had an Excellent knowledge of Field Engineering in Petrochemical Plant & Oi/Gas Sector. ‘More than 10 years worked as a senior project manager have established and achieved through the following skills / knowledge and responsibilities. Provided strong and decisive project leadership established an execution frame work with the quality, HSE schedule and profitability ofthe project execution.

Вам также может понравиться