UNIT KEJURUTERAAN AWAM
CAWANGAN PELAKSANAAN DAN PENYELENGGARAAN PROJEK
KEMENTERIAN KESEJAHTERAAN BANDAR, PERUMAHAN DAN
KERAJAAN TEMPATAN
MEREKABENTUK, MEMBINA DAN MENYIAPKAN 1000
UNIT RUMAH PANGSA 5 TINGKAT SERTA KERJA-KERJA
YANG BERKAITAN DENGANNYA BAGI PROGRAM
PERUMAHAN RAKYAT (PPR) Di SANDAKAN, SABAH.
NEED STATEMENT
FOR
DESIGN AND BUILD WORKS
Civil Engineering Requirements For Buildings ProjectsCIVIL WORKS.
MEREKABENTUK, MEMBINA DAN MENYIAPKAN 1000 UNIT RUMAH PANGSA
5 TINGKAT SERTA KERJA-KERJA YANG BERKAITAN DENGANNYA BAGI
PROGRAM PERUMAHAN RAKYAT (PPR) DI SANDAKAN, SABAH.
CONTENTS PAGE
A. GENERAL
1.0 Scope of Works A-2
2.0 — Special Requirements A-2
3.0 Design criteria A-3
4.0 Standard and Codes of Practice A-4
5.0 Independent Checker A-4
6.0 Soil Investigation A-6
7.0 Anti-Termite Treatment A-6
8.0 — Work Outside Boundary A-7
9.0 Environmental Impact Assessment (EIA) A-8
10.0 Materials and Workmanship A-8
11.0 Contractor's Proposal A-8
12.0 Samples A-9
13.0 Compliance to Rules and Regulations A-9
14.0 Sufficiency of Proposal A-10
15.0 Standard Specification A-10
16.0 Material Testing Laboratory and Staff At
17.0 Supervision, Inspection and Test Att
18.0 Covering up of Works A-12
19.0 Submittals A-12
20.0 Quality Assurance Plan A-13
21.0 Familiarisation with Site and Local Condition A-13
22.0 Obligation of Contractor and Consultant on Safety on
Site and Adjoining Properties A-14
23.0 As-Built Drawings A-14
24.0 Routine Maintenance Activities During Defect Liability Period A - 14
B. CIVIL WORKS.
Bt EARTHWORK
1.0 General B1-2
2.0 Site Clearing and Earthworks B1-2
3.0 Turfing Bi-4
4.0 Earth Retaining Structures BI-4
5.0 Cross-section and Slope Stability Bi-4
MEREKABENTUK, MEMBINA DAN MENYIAPKAN 1000 UNIT RUMAH PANGSA 5 TINGKAT SERTA KERJA-
KERJA YANG BERKAITAN DENGANNYA BAG] PROGRAM PERUMAHAN RAKYAT (PPR) DI SANDAKAN,
SABAH.CONTENTS
CIVIL WORKS
GEOTECHNICAL WORKS
General
Excavation
Filling and Embankment
Ground Treatment
Retaining Structures
Slope Drainage System
Foundation (Applicable for all civil works)
Geotechnical Design Requirements
Instrumentation
DRAINAGE SYSTEM
General
Design Consideration
Surface Water Drainage Works
Slope Drainage System
ROAD WORKS
General
Design Consideration
Sufficiency of Proposal
Removal and Relocation / Protection of Utility Services
and Others
Works under Water
Survey, Subsurface Exploration and Design Requirements
Roads Design Criteria
Pavement
Intersection and Access
‘Temporary Control Devices and Signs
Carriageway Marking
Guardrails (if required)
Humps (If required)
Temporary Works or Diversions
Traffic Control Devices
Slopes
Central Rubbish Collection Area
Landscaping
PAGE
B2-9
B3-2
B3-2
B3-3
B3-3
RANKL
OOCOODOHMOROUK
FERKKELRERLLLE PEEL
3
MEREKABENTUK, MEMBINA DAN MENYIAPKAN 1000 UNIT RUMAH PANGSA 5 TINGKAT SERTA KERJA
KERJA YANG BERKAITAN DENGANNYA BAGI PROGRAM PERUMAHAN RAKYAT (PPR) DI SANDAKAN,
SABAH,