Вы находитесь на странице: 1из 109
UNIT KEJURUTERAAN AWAM CAWANGAN PELAKSANAAN DAN PENYELENGGARAAN PROJEK KEMENTERIAN KESEJAHTERAAN BANDAR, PERUMAHAN DAN KERAJAAN TEMPATAN MEREKABENTUK, MEMBINA DAN MENYIAPKAN 1000 UNIT RUMAH PANGSA 5 TINGKAT SERTA KERJA-KERJA YANG BERKAITAN DENGANNYA BAGI PROGRAM PERUMAHAN RAKYAT (PPR) Di SANDAKAN, SABAH. NEED STATEMENT FOR DESIGN AND BUILD WORKS Civil Engineering Requirements For Buildings Projects CIVIL WORKS. MEREKABENTUK, MEMBINA DAN MENYIAPKAN 1000 UNIT RUMAH PANGSA 5 TINGKAT SERTA KERJA-KERJA YANG BERKAITAN DENGANNYA BAGI PROGRAM PERUMAHAN RAKYAT (PPR) DI SANDAKAN, SABAH. CONTENTS PAGE A. GENERAL 1.0 Scope of Works A-2 2.0 — Special Requirements A-2 3.0 Design criteria A-3 4.0 Standard and Codes of Practice A-4 5.0 Independent Checker A-4 6.0 Soil Investigation A-6 7.0 Anti-Termite Treatment A-6 8.0 — Work Outside Boundary A-7 9.0 Environmental Impact Assessment (EIA) A-8 10.0 Materials and Workmanship A-8 11.0 Contractor's Proposal A-8 12.0 Samples A-9 13.0 Compliance to Rules and Regulations A-9 14.0 Sufficiency of Proposal A-10 15.0 Standard Specification A-10 16.0 Material Testing Laboratory and Staff At 17.0 Supervision, Inspection and Test Att 18.0 Covering up of Works A-12 19.0 Submittals A-12 20.0 Quality Assurance Plan A-13 21.0 Familiarisation with Site and Local Condition A-13 22.0 Obligation of Contractor and Consultant on Safety on Site and Adjoining Properties A-14 23.0 As-Built Drawings A-14 24.0 Routine Maintenance Activities During Defect Liability Period A - 14 B. CIVIL WORKS. Bt EARTHWORK 1.0 General B1-2 2.0 Site Clearing and Earthworks B1-2 3.0 Turfing Bi-4 4.0 Earth Retaining Structures BI-4 5.0 Cross-section and Slope Stability Bi-4 MEREKABENTUK, MEMBINA DAN MENYIAPKAN 1000 UNIT RUMAH PANGSA 5 TINGKAT SERTA KERJA- KERJA YANG BERKAITAN DENGANNYA BAG] PROGRAM PERUMAHAN RAKYAT (PPR) DI SANDAKAN, SABAH. CONTENTS CIVIL WORKS GEOTECHNICAL WORKS General Excavation Filling and Embankment Ground Treatment Retaining Structures Slope Drainage System Foundation (Applicable for all civil works) Geotechnical Design Requirements Instrumentation DRAINAGE SYSTEM General Design Consideration Surface Water Drainage Works Slope Drainage System ROAD WORKS General Design Consideration Sufficiency of Proposal Removal and Relocation / Protection of Utility Services and Others Works under Water Survey, Subsurface Exploration and Design Requirements Roads Design Criteria Pavement Intersection and Access ‘Temporary Control Devices and Signs Carriageway Marking Guardrails (if required) Humps (If required) Temporary Works or Diversions Traffic Control Devices Slopes Central Rubbish Collection Area Landscaping PAGE B2-9 B3-2 B3-2 B3-3 B3-3 RANKL OOCOODOHMOROUK FERKKELRERLLLE PEEL 3 MEREKABENTUK, MEMBINA DAN MENYIAPKAN 1000 UNIT RUMAH PANGSA 5 TINGKAT SERTA KERJA KERJA YANG BERKAITAN DENGANNYA BAGI PROGRAM PERUMAHAN RAKYAT (PPR) DI SANDAKAN, SABAH,

Вам также может понравиться