SHORE PILE DRAWING, planing , layout , BOQ , QUOTE , TENDER , WORK WORDER , WORK START DATE
top down const
VR WORK PROGRAAMME AND DELAY REGISTER
VR WORK COST ESTIMATE
TSO EXTENSION STATUS , G.LEVEL INFO
STAFF PROJECTION
ERP , MATERIAL CODE , ERP RIGHT , ERP RUN
GUEST HOUSE ELECTRIC BILL , GAS BILL , POLICY
SITE SURVEY FOR AAI
LOGISTIC PLAN ??
INF BUDGET
MAIN BUDGET
CASH FLOW
PENDING P.C PAYMENT LIST
ELECTRICAL AND PLUMBING STATUS
PAINTING IN M.S PIPE??
WEIGH BRIDGE CONST??
CEMENT GODOWN CONST??
HUTMENT CONST. POLICY ? AND WOR START ??
Sales store porta ??
p.c bill tracker ??
md cabin modification work ??
work scheme of footpath at nort west corner.
pending ramp flooring at tso
pending grill fixing by anup at north boundary plantation.
branding frame completion work
tso light post fixing
water line at road
drawing status
Work order approval sequence
myvan scheduling
final construction phasing
final work prog
final staff flow…..per sqft staff cost based on that.
height details of 7 tower
safety of existing office while excavating tower 2
final landscape dwg.
MONTHLY CONTRACTOR REQUIREMENT SCHEDULE
DWG STATUS , TIMELINE
TOWER CRANE PLANING
BORE WELL
BOQ OF SALE
BOQ OF REHAB
CONTRACTOR FINALIZATION
FIRST BLOCK HANDOVER PLANING.
DBR FROM CONSULTANTS JW , MEP
JUMPING SCAF , SAFETY SCREEN PLANING
SCHEDULE OF STRUC , FINISHING ACTIVITY WITH QTY
OUT LOOK IN ASUS
It was discussed that to work out the cost impact of providing lift or
passenger hoist for customer visit to sample flat @ 9th floor.
It was discussed that delivery of Structural drawings needs to be speed
up. ARG Sir, RM Sir & SKD sir will discuss the same at HO how it can be
faster.
It was discussed that sample floor will be done @ 9th Floor (1st
typical) level. Management will give decision on how many show flats
to be prepared.
ARG sir insisted to use Rebar CAD software for preparation of BBS. But
both contractor's are submitting BBS in excel sheet for checking.
Hence it was concluded that Contractor's will submit the BBS in Rebar
CAD as per instructions of ARG sir.
It was discussed that Commercial Team of Mumbai will search for local
RMC supplier with reference of Dhirraj sir.
It was discussed that MLC will submit total reconciliation statement up
to 9th floor level. From 1st Typical floor Reconciliation statement will
be submitted with every bill. In case reconciliation statement not
submitted by MLC, their RA bill will not be accepted.
It was discussed & finalised that internal wall of Rehab-2 will have
putty finish plaster with 3 coats ( 1 coat coarse & 2 coat fine) approx.
2-3mm thk.
It was discussed & finalized that Safety net provision should be done
over foot path & 18.3M DP road for safety of pedestrians.