TECHNICAL NOTES:

01. CONSIDERING ALLOWABLE BEARING CAPACITY OF SOIL = 1.5 KSF 07. MINIMUM CURING TIME:
AS PER SOIL TEST REPORT A. COLUMN - 21 DAYS
B. ROOF/BEAM 21 DAYS
02. CYLINDER CRUSHING STRENGTH AT 28 DAY'S, f'c = 2800 PSI. C. BRICK WORK, PLASTER 10 DAYS

03. NORMAL CONCRETE MIX PROPORTION = 1: 1.5: 3 08. BRICKS TO BE SOAKED IN WATER AT LEAST FOR 24 HOURS
(CEMENT: SAND: BRICK CHIPS) BEFORE USE.

04. AGGREGATE: 09. PROVIDE MORTAR BLOCK CEMENT : SAND (1:1)


A. COARSE AGGREGATES: 34" DOWN WELL GRADED BEST
QUALITY WASHED 1ST CLASS BRICK CHIPS. 10. PROVIDE CHAIR OF 38
PANEL TO KEEP THE TOP BARS IN EXACT POSITION.
B. FINE AGGREGATES: WASHED SYLHET SAND (F.M = 2.5) 50%
WASHED LOCAL SAND (F.M = 1.5) 50%
AND BEAMS ARE TO BE ENDED.
05. YIELD STRENGTH OF M.S. DEFORMED BAR:
fy = 60,000 PSI 12. ALL KIND OF SAND TO BE SCREEN & WASHED BEFORE USE.

06. SHUTTER OPENING:(MINIMUM TIME) 13. SCREEN BRICK CHIPS FOR LEAN CONCRETE & KEEP
A. COLUMN-48 HOURS FROM CASTING TIME UNDER WET MOIST CONDITION AT LEAST FOR 12 HOURS.
B. BEAM SIDE 72 HOURS
C. BEAM/SLAB -21 DAYS (BOTTOM) 14. SPRAYING WATER BY HOSE PIPE OVER STACKED BRICK
UP TO 20'-0" SPAN & FOR ABOVE 28 DAYS CHIPS DURING CASTING OF LEAN CONCRETE.

DESIGN/ DEVELOPER: PROJECT NAME : ARCHITECT: STRUCTURAL ENGINEER: DETAILING BY:


NO REVISION DATE
PROPERTY DEVELOPMENT LTD. STRUCTURAL DRAWING OF HATABO RFL Deputy Manager: Design Manager (D&P): Executive (D&P):

DEPOT SHED, SALMA AKTER NASRULLAH AL MAHMOOD MD. RAFIQUL ISLAM 01


PRAN-RFL CENTER AT RUPGANJ, NARAYANGANJ. 02
105, Pragoti Saroni, Middle Badda, Dhaka-1212. PLUMBING ENGINEER: CHECKED BY: FIT TO SCALE 03 TECHNICAL NOTES
Phone: 09613737777, Fax:+88-02-8837464 Deputy Manager: Deputy Chief Engineer (D&P): 04
E-mail : pdl14@prangroup.com BEJOYA KANAN BARUA KH. MOBINUR RAHMAN 05
11-03-2019 06