FAULTY TRANSFORMER REPORT

PART-1: Reporting of Faulty Transformer


To be filled by PRI/ service teams in case of Transformer observed abnormal in
reference to commissioning protocol, maintenance protocol or Grid fault.

1. Transformer / Site Data:


State: MH Rating :
Site: BHAMBARWADI Tr. Sr. No :
Loc No & WEC Serial No.: MDBH-02,481076 Tr. Make
Customer: MAHANAGER DEVELAPOR Mfg. Test report Date :

Name of SS & Feeder no.: Transformer Erection Date:


BHAMBARWADI S/S , FEEDER-03
Line/ Circuit no.:(In case
more than one circuit Transformer Comm. Date:
pl.mention circuit no )
Name of the VCB yard Failure Date & Time
No of WEC connected in 18 SAP Defect Report No
line:
Climate Condition heavy rain & WIND Transformer type

2. Stage of Failure:
No Stage Observation Remarks
Immediate during Charging/
a energizing
After charging but within 24
b Hours
Fault after 24 hours less than
c 6 months within one month
Operation more than 6
d months

3.Events at WEC level


a D.O. /HG Fuse blown? yes If yes Which Phase & Amps
b Condition of L.A’s? OK If damaged which Phase LA
WEC Fault prior to failure on Fault Status:
c the day of transformer (Main status: sub status)
failure

No of fault tripping recorded No of Grid related fault


d in last 24 hrs in WEC 0 recorded in WEC in last 24 hrs

No of fault tripping recorded No of Grid related fault


e in 1 recorded in WEC in last 15
last 15 days in WEC days

3.2 At internal VCB level


Whether Internal VCB
a tripped at If yes, which type of fault?
the time of transformer fail?

No of Earth faults recorded No of Over current faults


b in recorded in last 15 days in
last 15 days in Internal VCB Internal VCB

3.3 At Substation level


Whether SS VCB tripped at
a the yes If yes, which type of fault?
time of transformer fail?

No of Earth faults recorded No of Over current faults


b in 1 recorded in last 15 days in SS
last 15 days in SSl VCB VCB

4. Sequential steps taken to identify the transformer fault:


4.1 At Substation & external lines level

Sr.No. Starting from first steps till last step of troubleshooting.

a
b
c
d

4.2 At Internal VCB & Lines level


Sr.No. Starting from first steps till last step of troubleshooting.

a During line petroling found at VCB yard one LA faulty


b Than one pin insulator near at loc PPL-09 also PPL-09 Transformer R & Y ph main line incoming
Jump burned.
c After pin insulator and jump replaced during charging line tripped and then checked through
visually transformer blackish oil obsrved.
d

4.3 At WEC & DP yard level


Sr.No. Starting from first steps till last step of troubleshooting.
a
b
c
d

5. Physical observations at WEC/ Transformer:

NO Physical Observation Observation Description


a Transformer LT Cable & Termination OK
b Transformer HT Bushing & Termination OK
Transformer Breather / PRV / Explosion vent
c operated Or in normal stage blackish oil fell down from PRV
d Off Load Tap Changer in position & locked OK
Transformer Main Tank & Accessories,
e Temperature indicator , Welding joint , Flange OK
joint , cooling fince Assembly etc
f Oil Leakage observed from bottom site
g Oil color & Burning smell Blakish & Burning Smell Observed
Oil/ Winding Temperature if recorded in SCADA
h or at indicator (In case connected with Temp Sensor)
WEC & Transformer Earthing connection.
i (Loose, Theft or Any abnormality…) OK

j Remarks

6. Insulation Resistance test (Megger)


!!! IMPORTANT PRECAUTION:
Transformer is to be grounded. Ensure discharge the winding after each measurement.
Engineer has to take his position and ensure all the connection done perfectly
Ambient Temperature: 24°C

No/ Insulation Value in Test Certificate Commissioning


item Mega-ohm readings readings
1 HV- LV
2 HV - Earth
3 LV - Earth
Wind World (India) Ltd;
Survey-33, Bhimpore, Daman (UT)
Phone : +91 260 2220644
Fax : +91 260 2220068

950 KVA
1593776
vijai

8/30/2017

8/30/2017

18/09/2017,17:30

COROGATED

Remarks

"R ,Y, B"


NO

1
EF/ OC

Employee
details (Optional)

Employee
details (Optional)

Employee
details (Optional)

tion Description
OK
OK
fell down from PRV

OK

OK

from bottom site


rning Smell Observed

OK

At the time of
checking Today
240M ohm
310M ohm
110M ohm