Вы находитесь на странице: 1из 21

Document No.

6706/04/132 Issue Date 22/08/2011

PLANNING AND TECHNICAL SERVICES DIRECTORATE


Materials Engineering

Recommended Audit Testing Frequency


for Pavement and Concrete Material

This document is owned and authorised by the Manager Materials Engineering.

The Testing and Calibration Services Manager is the delegated custodian.

All comments for revision should be submitted to the delegated custodian.

Authorisation

As the owner of this Procedure, I authorise it for issue and use

………………………………………………….
MANAGER MATERIALS ENGINEERING

Date ….../….../…..

All controlled Copies shall be marked accordingly.

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 1 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
CONTENTS

1. PURPOSE .................................................................................................... 3

2. SCOPE

3. REFERENCES ............................................................................................. 3

4. DEFINITIONS .............................................................................................. 3

5. PROCEDURE .............................................................................................. 6
5.1 Recommended Auditing Frequency ........................................................ 7
Embankment ....................................................................................... 7
Pavements .......................................................................................... 7
Bituminous Surfacings ...................................................................... 10
Drainage ........................................................................................... 13
Bridge Works .................................................................................... 13
Pavement Markings .......................................................................... 15
6. Audit Request Forms .............................................................................. 16

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 2 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
1. PURPOSE

The Main Roads Management System requires that Quality Assurance procedures be
implemented, to ensure that all products supplied to road or bridge construction projects
are of suitable quality for acceptance. In addition to the Contractor’s quality control
testing and on-site inspection by Main Roads personnel, audit testing (or “additional
testing” as defined in the General Conditions of Contract) is a further means of
establishing that the products supplied conform to specification. Such auditing also
provides assurance that the processes being followed are suitable. The audit levels
recommended in this document are targeted to suit the management of risk and set the
minimum levels required to give the Superintendent or Principal the necessary assurance
that the product is satisfactory.

The Superintendent should be aware of the risks involved in reducing the frequency of
auditing for a particular project and should exercise his/her judgement and experience in
doing so.

2. SCOPE

The audit testing frequency in this standard applies to all aspects of pavement
construction and concrete materials. Audit levels are given for the following:

 Start of a process and after a non-conformance has been issued


 When the process is under control.

2. REFERENCES

AS/NZS ISO 9000:2000 Quality systems


AS/NZS ISO 8402 Quality management and quality assurance -
Vocabulary

4. DEFINITIONS

Quality Assurance (AS/NZS ISO 8402:1994):


Quality Assurance (QA) is all the planned and systematic activities (inspection)
implemented within the quality system and demonstrated as needed, to provide adequate
confidence that the entity (product) will fulfil the requirements for quality.

Inspection
Inspection is an activity such as measuring, examining, testing or gauging one or more
characteristics of a product and comparing the results with specified requirements in
order to establish whether conformity is achieved for each characteristic.

Road Categories:
Type F FREEWAYS and URBAN HIGHWAYS
Type H HIGHWAYS
Type M MAIN ROADS

Note: A road may be varied in category for the purposes of audit to increase or reduce the
frequency of audit to suit the management of risk and quality requirements of a particular project.

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 3 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
Initial
The number of audits to be carried out on consecutive lots at the start of each process
within a contract.

Note: Lots in the initial audits will count towards the required number of lots under the
normal auditing scheme.

Tightened
The number of audits to be carried out on consecutive lots when a Non Conformance
Report (NCR) has been raised on the process or product.

Note: The Superintendent should take into account the reason for the NCR and the risk
involved when initiating the tightened audit schedule.

Normal
The percentage of lots to be audited when the process is in control and has been
validated through the initial or tightened audit process.

Note: The Superintendent may initiate an audit at any time to check the process and
product or to check a suspect process or product.

Corporately Tested
Testing, to determine the characteristics of materials such as bitumen, bituminous
emulsions, crushed rock etc. may require lead times of several weeks for the completion
of testing. In these circumstances it is often not viable to perform audit testing during the
award period of a Contract and deliver results within a time frame that will enable
appropriate action to be taken if a non compliance is detected. As these materials are
often manufactured under controlled processes, by a relatively small number of
producers, it is preferable to test these materials under a Corporate audit regime.
Materials Engineering Branch will manage the sampling and testing of these materials
and then disseminate the results to Superintendents. Thereafter, the Superintendents
will be able to request additional tests on these materials if they perceive a risk to a
specific Contract.

Lots
A lot is any quantity of material or portion of construction all of which has been
produced by essentially the same process that is subject only to random variation and
can therefore be accepted as being of a homogeneous quality.

Examples of lots:

1. The size of the lot is usually limited to the material produced in one day or one
shift using the same process, materials and equipment in the same conditions. It is
normally judged on the basis of visual field inspection of the submitted product and on
knowledge of the consistency or otherwise of the production or construction process.

A lot could be defined as the quantity of rock base produced during one shift of a
crushing process, on condition that the source rock or the actual crushing process was
not altered during the shift in any way that would significantly change the quality of the
material.

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 4 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
2. Field data from concrete testing has shown that there is often a large day-to-day
component of variability in concrete compressive strength, therefore a lot size is defined
as not more than a single day's production.

The following points should be noted:

 Concrete supplied from different batching plants should be treated as separate


lots.

 When different classes of concrete (eg. N40, S50 etc.) are supplied to a job, each
class should be treated as a separate lot.

 Where it is suspected or known that a truck-load of concrete has been treated


differently (water added, left standing for a prolonged time) in some manner then
it should be treated as a single lot.

3. Lot sizes may vary according to circumstances and the reasons for sampling and
testing.

For example a production batch of bitumen may be 2000 tonnes and this may be
sampled as one lot for the purpose of establishing if this material has been produced to
specification. If a tanker load of bitumen is drawn from this batch and transported to a
road site it may be subject to heating and contamination and should be sampled as a
separate lot to establish that this load conforms to specification at the point of delivery to
the works.

Similarly a large production stockpile of aggregate at a quarry may be a single lot from
the viewpoint of establishing conformance with general material properties such as Los
Angeles, Wet and Dry Strength etc.; provided adequate process control has been
exercised. If material is carted from this stockpile to roadside stockpiles for sealing, then
variations due to handling may occur and this material should be sampled as a separate
lot to establish properties such as Particle Size Distribution and Average Least
Dimension.

4. For audit testing of embankment foundation, embankment construction,


subgrade, sub-base and basecourse a lot is generally one day’s continuous
production, provided that the material and compaction process is uniform. This
applies equally to both naturally occurring and manufactured materials. However if
material comes from more than one source then sections constructed from each
source material should be treated as a separate lot.

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 5 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
5. PROCEDURE

Superintendents responsible for organizing audits within the Metropolitan area should
contact the Quality Systems Manager, at Materials Engineering and for rural areas the
Regional Materials Manager in the appropriate Region. These personnel will assist in the
audit planning if necessary and will arrange for auditing to be performed as required. To
facilitate this process proforma audit request forms are attached to this Standard.

5.1 Recommended Auditing Frequency

The minimum frequency of testing to determine the conformance of Products and


Processes with specified characteristics shall be as follows:

PROCESS QUALITY VERIFICATION RECOMMENDED


REQUIREMENT AUDITING FREQUENCY
INITIAL or NORMAL
TIGHTENED % of Lots to be
Number of Lots Tested
to be Tested
F H M F H M

ROADWORKS

Embankment
FOR CONTROL OF COMPACTION:
Foundation
End Product Specification:
 Dry Density Ratio (WA 134.1) 3 2 1 5 3 2
Contractor's Developed Method Spec:
 Dry Density Ratio (WA 134.1) N/A 2 1 N/A 5 3
 Moisture Content (WA 110.1 or 110.2) N/A 2 1 N/A 5 3
 Optimum Moisture Content N/A 2 1 N/A 5 3
(WA 133.1 or WA 133.2) (The mean value of
these OMCs shall be taken to represent each
material of constant quality)
Principal's Method Spec:
 Particle Size Distribution (WA 115.2) N/A 2 1 N/A 3 2
 Moisture Content (WA 110.1 or WA
N/A 2 1 N/A 5 3
110.2)
Embankment FOR CONTROL OF IMPORTED MATERIAL
* (UNDER 2M LOW (L), OVER 2M HIGH
(H))

 Particle Size Distribution (WA 115.2) L 3 2 1 5 3 2


and Linear Shrinkage (WA 123.1)
H 3 2 1 10 5 3
FOR CONTROL OF COMPACTION

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 6 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
PROCESS QUALITY VERIFICATION RECOMMENDED
REQUIREMENT AUDITING FREQUENCY
End Product Specification:
 Dry Density Ratio (WA 134.1) L 3 2 1 5 3 2
H 4 3 2 10 7 5
Contractor's Developed Method Spec:
 Dry Density Ratio (WA 134.1) L N/A 2 1 N/A 5 3
H N/A 3 2 N/A 7 5

* Note: The risks associated with high embankment failure are greater than those of a low
embankment. The 2m height is only a suggested value for distinguishing between high
and low embankments.

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 7 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
PROCESS QUALITY VERIFICATION RECOMMENDED
REQUIREMENT AUDITING FREQUENCY
INITIAL or NORMAL
TIGHTENED % of Lots to be
No of Lots to be Tested
Tested
F H M F H M

Embankment FOR CONTROL OF COMPACTION


(continued)
 Moisture Content (WA 110.1 or WA
N/A 2 1 N/A 5 3
110.2) L
H N/A 3 2 N/A 7 5

 Optimum Moisture Content L N/A 2 1 5 3


(WA 133.1 or WA 133.2) H N/A 3 2 N/A 7 5
(The mean value of these OMCs
shall be taken to represent each
material of constant quality)

Principal's Method Spec:


 Particle Size Distribution (WA 115.2) L N/A 2 1 N/A 3 2
H N/A 2 1 N/A 3 2

 Moisture Content (WA 110.1 L N/A 2 1 N/A 5 3


or WA 110.2)
H N/A 3 2 N/A 7 5
Subgrade FOR CONTROL OR ASSESSMENT OF
MATERIAL
 Particle Size Distribution (WA 115.2) and 3 2 1 10 5 3
Linear Shrinkage (WA 123.1)

 California Bearing Ratio Remoulded 3 2 1 7 4 3


Specimens (WA 141.1)
FOR CONTROL OF COMPACTION
End Product Specification:
 Dry Density Ratio (WA 134.1) 3 2 1 7 5 3
Principle Method Spec:
 Particle Size Distribution (WA 115.2) N/A 2 1 N/A 5 3
 Moisture Content (WA 110.1 or WA N/A 2 1 N/A 5 3
110.2)

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 8 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
PROCESS QUALITY VERIFICATION RECOMMENDED
REQUIREMENT AUDITING FREQUENCY
INITIAL or NORMAL
TIGHTENED % of Lots to be
Number of Lots Tested
to be Tested
F H M F H M
Sub-Base FOR CONTROL OF IMPORTED MATERIAL
General
 Particle Size Distribution (WA 115.1) 3 2 1 7 5 3
 Maximum Dry Compressive Strength 3 2 1 7 5 3
(WA 140.1)
 Liquid Limit (WA 120.2) 3 2 1 7 5 3
 Plasticity Index (WA 122.1) 3 2 1 7 5 3
 Linear Shrinkage (WA 123.1) 3 2 1 7 5 3
 California Bearing Ratio Remoulded 1 1 1 5 3 2
Specimens (WA 141.1)
Limestone (Additional Tests)
 Calcium Carbonate (WA 915.1) 3 2 1 5 3 2
 California Bearing Ratio Remoulded 1 1 1 5 3 2
specimens (WA 141.1)
 Los Angeles Abrasion (WA 220.1) CORPORATELY TESTED
Recycled Crushed Concrete (Additional
Tests)

 Impurities 3 2 1 7 5 3

FOR CONTROL OF COMPACTION:

 Dry Density Ratio (WA 134.1) 3 2 1 7 5 3


 Dry Back (Moisture Ratio WA 136.1) 3 2 1 7 5 3
Basecourse FOR CONTROL OF IMPORTED MATERIAL
General (Laterite, natural gravel,
limestone, rockbase)
 Particle Size Distribution (WA 115.1) 3 2 1 10 7 5
 Liquid Limit (WA 120.2) 3 2 1 10 7 5
 Plasticity Index (WA 122.1) 3 2 1 10 7 5
 Linear Shrinkage (WA 123.1) 3 2 1 10 7 5
 Maximum Dry Compressive Strength 3 2 1 10 7 5
(WA 140.1)
 Dust Ratio (Contract) 3 2 1 10 7 5
 Soaked California Bearing Ratio 2 2 1 5 3 2
Remoulded Specimens (WA 141.1)

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 9 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
PROCESS QUALITY VERIFICATION RECOMMENDED
REQUIREMENT AUDITING FREQUENCY
INITIAL or NORMAL
TIGHTENED % of Lots to be
Number of Lots Tested
to be Tested
F H M F H M
Basecourse  Los Angeles abrasion (WA 220.1) CORPORATELY TESTED
(continued) (Limestone, Rockbase only)

 Calcium Carbonate (WA 915.1) 3 2 1 5 3 2


(Limestone only)

Bitumen Stabilised Limestone


Basecourse
(Additional Tests)
 Particle Size Distribution & Bitumen 1 1 1 7 5 3
Content (WA 730.1) 
 Bitumen Dispersion (WA 717.1)  3 2 1 7 5 3
( Construction delivery lot)
Ferricrete (Additional Tests)
 Crushing Test Value (WA 223.1) 3 2 1 5 3 2

FOR CONTROL OF STRENGTH


 Dry Density Ratio (WA 134.1) 4 3 2 10 7 5
 Dry Back (Moisture Ratio WA 136.1) 4 3 2 10 7 5
 CLEGG (Draft WA327.1) 4 3 2 10 7 5

BITUMINOUS SURFACING

Prime, FOR CONTROL OF BINDER AND


Primerseal, Seal RELATED MATERIALS:
Rubberised Seal
Bitumen Emulsion Binder
and Asphalt
 Full Suite of Tests (AS 1160) CORPORATELY TESTED
(A lot in this case is defined as a production batch)

 Particle Charge (AS 2341.22)  3 2 1 7 5 3


 Residue (AS 2341.23)  3 2 1 7 5 3
 Setting Time (AS 2341.29)  3 2 1 7 5 3
( Construction delivery lot)
Bitumen:
 Full Suite of Tests (AS 2008)
CORPORATELY TESTED
(A lot in this case is defined as a production batch)

 Viscosity @ 60ºC (AS 2341.2)  4 3 2 5 3 2


( Construction delivery lot)

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 10 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
PROCESS QUALITY VERIFICATION RECOMMENDED
REQUIREMENT AUDITING FREQUENCY
INITIAL or NORMAL
TIGHTENED % of Lots to be
Number of Lots Tested
to be Tested
F H M F H M

Prime, Cutter:
Primerseal, Seal,
Rubberised Seal  Distillation (ASTM D86) )
and Asphalt CORPORATELY TESTED
(continued)  Flashpoint (AS 2106) )
 Viscosity (AS 2341.2) )
 Density (AS 2341.7) )
CORPORATELY TESTED
 Water Content (AS 2341.9) )
 Percentage Aromatics (ASTM D1319)
)

Cutback Bitumen

 Viscosity @ 60 ºC (AS 2341.2) 4 3 2 10 7 5


 Density @ 25 ºC (AS 2341.7) 4 3 2 10 7 5

Adhesion Agent:

 Tests to (AS 1672) 1 1 1 - - -

FOR CONTROL OF APPLICATION

 Sprayed Binder Application Rate (WA CORPORATELY TESTED


340.1)

Primerseal, FOR CONTROL OF AGGREGATE


Seal, MATERIALS
Rubberised Seal
Aggregate:
and Asphalt
 Particle Size Distribution (WA 210.1) 3 2 1 7 5 3
 Average Least Dimension (WA 215.1) 3 2 1 7 5 3
 Flakiness Index (WA 216.1) 3 2 1 7 5 3
 Moisture Content (WA 212.1 or 212.2) 1 1 1 5 3 2
 LA Abrasion (WA 220.1) )
 Unsound Particles (AS 1141.30) )
 Water Absorption (AS 1141.5/6) ) CORPORATELY TESTED

 Pendulum Friction Test (AS 1141.40/42)


)
 Resistance to Stripping (AS 1141.50) )
 Stone Coating (WA 756.2) )

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 11 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
PROCESS QUALITY VERIFICATION RECOMMENDED
REQUIREMENT AUDITING FREQUENCY
INITIAL or NORMAL
TIGHTENED % of Lots to be
Number of Lots Tested
to be Tested
F H M F H M

Primerseal,  Wet Strength and Wet/Dry Strength )


Seal, Variation (AS 1141.22) ) CORPORATELY TESTED
Rubberised Seal
and Asphalt  Colour (WA 250.1) )
(continued)
Rubber Granules:
 Particle Size Distribution (WA 236.1)
)
CORPORATELY TESTED
 Bulk Density (WA 235.1) )
 Steel Content (WA 237.1) )
Asphalt FOR CONTROL OF MATERIALS

Bitumen

 Viscosity @ 60C (as 2341.2)  3 2 1 5 3 2


( Plant Bitumen delivery lot)
Mineral Filler:
CORPORATELY TESTED
 Particle Size Distribution (AS 2357)

Laterite Aggregate:

 Crushing and Cracking (WA 223.1) 2 1 1 5 3 2


 Pendulum Friction Test (AS 1141.40/42) 2 1 1 5 3 2

FOR CONTROL OF ASPHALT


PRODUCTION

 Particle Size Distribution & Bitumen 4 3 2 10 7 5


Content
(WA 730.1)
 Uniform Coating of Binder (AS 2891.11) 1 1 1 5 3 2
 Stability and flow of Asphalt 4 3 2 10 7 5
Marshall Method (WA 731.1)
 Maximum Dry Density of Asphalt 4 3 2 10 7 5
Rice Method (WA 732.2)
 Bulk Density & Air Void Content of 4 3 2 10 7 5
Asphalt (WA 733.1)

CONTROL OF COMPACTION:

 Percent Marshall Density (Contract) 4 3 2 10 7 5

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 12 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
PROCESS QUALITY VERIFICATION RECOMMENDED
REQUIREMENT AUDITING FREQUENCY

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 13 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
PROCESS QUALITY VERIFICATION RECOMMENDED
REQUIREMENT AUDITING FREQUENCY
INITIAL or NORMAL
TIGHTENED % of Lots to be
Number of Lots Tested
to be Tested
F H M F H M

DRAINAGE

Foundation FOR CONTROL OF COMPACTION


Bedding
for CSP RCP,
Box Culverts, Principal’s Method Spec:
Ducts,
Manholes, Gullies,
Catchpits and  Moisture Content (WA 110.1 or WA 3 2 1 7 5 3
Drainage Sumps 110.2)
 Optimum moisture Content (OMC) 3 2 1 7 5 3
(WA 133.1 or WA 133.2)
(The mean value of these OMCs shall be
taken to represent each material of
constant quality)

BRIDGEWORKS

Bridge FOR CONTROL OF COMPACTION


Foundations
 Perth Sand Penetrometer (AS 1289.6.3.3) 7 5 3 10 7 5
as per Clause ______ of the Technical
Specification
Structural FOR CONTROL OF CONCRETE
Concrete PRODUCTION

 Cement )
CORPORATELY TESTED
 Water (WA 910.1) )
 Particle Size Distribution (AS 1141.11) 1 in 5 pours
(Fine and Coarse)

Fine Aggregate (Concrete)

 Clay & Fine silt (settlement method) )


(AS 1141.33) )
 Organic Impurities other than Sugar ) CORPORATELY TESTED
(AS 1141.34) )
 Water absorption (AS 1141.5) )

Coarse Aggregate (Concrete)

 Water Absorption (AS 1141.5)

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 14 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
PROCESS QUALITY VERIFICATION RECOMMENDED
REQUIREMENT AUDITING FREQUENCY

PROCESS QUALITY VERIFICATION RECOMMENDED


REQUIREMENT AUDITING FREQUENCY
INITIAL or NORMAL
TIGHTENED % of Lots to be
Number of Lots Tested
to be Tested
F H M F H M

Structural
FOR CONTROL OF STRENGTH
Concrete
(continued)
Consistency (Slump Test) (AS 1012 part 3.1) For on-site batch plants it is
and Strength (AS 1012 part 8.1 & 9) for the recommended that the % of
following: Lots to be tested is increased by
(Testing during initial and tightened testing a factor of 3.
shall include a seven day determination of
compressive strength)
 Structural Concrete 4 4 4 10 10 10

Concrete Trial Mixes

 Particle Size Distribution (AS 1141.11) 1 1 1 - - -


(Fine and Coarse Aggregate)
 Consistency (Slump Test) 1 1 1 - - -
(AS 1012 part 3.1)
 Strength (AS 1012 part 8.1 & 9) 1 1 1 - - -
Reinforced Earth
FOR CONTROL OF MATERIALS
Backfill
 Particle Size Distribution (WA 115.1) 1 1 1 5 3 2
 Resistivity (AS 1289.4.4.1) 1 1 1 - - -
 pH (AS 1289.4.3.1) 1 1 1 - - -
 Dissolved Salts (WA 910.1) 1 1 1 - - -

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 15 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
PROCESS QUALITY VERIFICATION REQUIREMENT RECOMMENDED AUDITING
FREQUENCY
INITIAL or NORMAL
TIGHTENED % of Lots to be
Number of Lots Tested
to be Tested
F H F H F H

PAVEMENT MARKINGS

Paint FOR CONTROL OF MATERIAL

Paint (AS 4049.3.1 or 4049.1 )

 Full Suite CORPORATELY TESTED


(A lot in this case is defined as a production batch)

 Consistency (AS 1580.214.1)  1 1 1 10 7 5


 Pigment content (AS 1580.302.1)  1 1 1 10 7 5
( Construction delivery lot)
Field assessment ( 1 test/product/brand/type)
 Retroreflectivity (AS 4049.3.1 water based
only) CORPORATELY TESTED
 Wear (AS 4049.3.1 Appendix H, or
AS 4049.1 Appendix F)
 Luminance (AS 4049.1 Appendix F)
Thermoplastic FOR CONTROL OF MATERIAL
 Full Suite (AS 4049.2) CORPORATELY TESTED
(A lot in this case is defined as a production batch)

 Binder content (AS 4049.2 E4) 1 1 1 10 7 5


( Construction delivery lot)
Field assessment (1 test/product/brand/type)
 Retroreflectivity (AS 4049.1)) CORPORATELY TESTED
 Wear (AS 4049.1)
 Luminance (AS 4049.1)
Glass Beads FOR CONTROL OF MATERIALS
 Full Suite (AS 2009) CORPORATELY TESTED
(A lot in this case is defined as a production batch)

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 16 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
MAIN ROADS Western Australia

FACSIMILE TRANSMISSION
TO Attn.

FAX No.:

COMPLIANCE VERIFICATION REQUEST

Contract No Contract Title

Site Contact Contact Phone No

Request Verification Date Time


Date

CATEGORY OF VERIFICATION REQUIRED

PAVEMENT MATERIALS
Embankment NMDM Testing
Foundation
Embankment Maximum Dry Density Testing
Construction
Subgrade Material Properties
Sub-base Other
Base Please specify:
………………………………

………………………………

DETAILS

Lot Identification No:


Field Description:
Chainage:
Carriageway:
Width:
‘k’ Factor:
Specification: Rc >=
Parallel Test Yes No

Comments
:

# Tests
Required:

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 17 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
DIRECT TEST REPORT TO:
Address: Facsimile No:

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 18 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
MAIN ROADS Western Australia

FACSIMILE TRANSMISSION

TO Attn.

FAX No.:

COMPLIANCE VERIFICATION REQUEST

Contract No Contract Title

Site Contact Contact Phone No

Request Verification Date Time


Date

CATEGORY OF VERIFICATION REQUIRED

SURFACING MATERIALS

MATERIALS Bitumen - Class 170 / 320 / PMB Polymer Type ……………….


(Delete as applicable)
Cutback Bitumen - Type of Cutter used: MC / SC / Flux
Specified Blend ratio ………… : …………….

Bit Emulsion – Specified Grade ………………..


Dilution Ratio ……………… (if applicable)

Aggregate - Intended Use - Sealing / Asphalt

Cutters – Medium Curing / Slow Curing / Flux

ASPHALT Plant Mix Conformance - Asphalt Suppliers Plant @…………..………


…………………………………………………………………………….
Bulk Density - Section / Lot Details (Please complete all details)
Time Required on Site:
………………….. A.M / P.M
Lot Boundaries: ……………………….. Chainage (m) / SLK
Carriageway: ……………………………….... (please use destination name)
Lane Position (if applicable) …………………. (left / right / middle)
Mix Type Laid ………………………. Date Laid ……………………..

Note: If a Plant Mix Conformance test has not been performed by


Pavements Engineering please supply a NATA endorsed mix
conformance test report, from the Asphalt Supplier, for the mix to be
tested.

Other tests (please specify) ……………………………………………………………………


COMMENTS:
____________________________________________________________

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 19 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
_________________________________________________________________
____________

DIRECT TEST REPORT TO:


Address: Facsimile No:

MAIN ROADS Western Australia

FACSIMILE TRANSMISSION

TO: Attn.

Fax
No.

COMPLIANCE VERIFICATION REQUEST

Contract No Contract Title

Site Contact Contact Phone No

Request Verification Date Time


Date

Job Start Time: Duration Of Job:

Specified Mix Strength Agg. Size Super Plast.


Slump

Job Location:

Structure:

Location In Structure:

Is Special Access Required? YES NO


--------------------------------------------------------------------------------------------------------------------

CATEGORY OF VERIFICATION REQUESTED

CONCRETE

CONCRETE Slump Compressive Strength

No. of cylinders required: For testing @ age (days)

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 20 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011
Comments/ Other Tests Required:

DIRECT TEST REPORT TO:


Address: Facsimile No:

MAIN ROADS Western Australia Recommended Audit Testing Frequency Page 21 of 21


TRIM: 04/12335-02 for Pavement and Concrete Material
Document No. 6706/04/132 – 22/08/2011