Вы находитесь на странице: 1из 9

Date Trainer Trainees Levels/Phases S.N.

3
4

Amruta Rane, Sheel Sampat, 5


17.06.2017 Nudrat Maab Ahmad Rahul Kadam, Rahul Process Cycle
Ushir,Siddhanth Nair, 6

1
Amruta Rane, Sheel Sampat,
24.06.2017 Sufiyan Sayyed Rahul Kadam, Rahul Special Scenarios
Ushir,Atul Kale

2
Ushir,Atul Kale

3
4

Amruta Rane, Sheel Sampat, 2


01.07.2017 Sufiyan Sayyed Rahul Kadam, Rahul Ushir, Configuration
Atul Kale

Amruta Rane, Sheel Sampat,


08.07.2017 Nudrat Maab Ahmad Rahul Kadam, Rahul Implementation Training
Ushir,Atul Kale,Pratik Soikar
3

4
5
6
7

Amruta Rane, Sheel Sampat,


Rahul Kadam, Rahul
Ushir,Siddhanth Nair,Atul
Kale, Pratik Soikar, Sufiyan Material Requirement
15.07.2017 Nudrat Maab Ahmad Sayyed, Ishtiyaque 1
Planning
Khan,Mohd. Kabir,Dayaram
Dharkar,Ajith
Ravi,Shivkumar Tiwari,
Pankaj Tikekar
Amruta Rane, Sheel Sampat,
Rahul Kadam, Rahul
Ushir,Siddhanth Nair,Atul
Kale, Pratik Soikar, Sufiyan Material Requirement
15.07.2017 Nudrat Maab Ahmad Sayyed, Ishtiyaque 1
Planning
Khan,Mohd. Kabir,Dayaram
Dharkar,Ajith
Ravi,Shivkumar Tiwari,
Pankaj Tikekar
Topics Detail

Maintenance

BOM
Reports
Where Used List
Summarized BOM
BOM comparison
Maintenance
List of Resources
Resource
Standard Value Key
Formula
Recipe Maintenance
Production Version Maintenance
Cost Estimate
Product Cost Planning Cost Marking
Cost Release
Demand Planning Maintenance
MRP Run
Stock Requirement List
Material Planning Purchase Requisitions
Planned Orders
MRP List
Planned Order to Process Order
Process Order Maintenance
Material Staging
Shop Floor Control
Goods Issuance
Confirmation
Goods Receipt
Stock Overview
Stock Report
Reports
Opening Closing
Document List
Order Creation
Order BOM
MRP run
Production order
Goods Issuance(Manual and Back flush)
MTO cycle
Confirmations
Goods receipt(Manual and auto)
Techo
Variance calculation
Order settlement
Master configuration at item level and BOM level
By-Product and Co-Product
By-Product and Co-Product
Execution
Study Case on Boamer Client and Nocil Study Case on Boamer Client and Nocil
Overview of Strategies'. Overview of Startegeis.
BOM
Master Relate Configuration Resource/Work center
Routing and Production version

MRP Related configuration All Plant Parameters.

Order Type Creation


Order Type Dependent Parameter
Shop Floor Configuration Order Type Scheduling Parameter
Availability Check Control
Confirmation Parameter
ASAP Methodology
AGILE Methodology
Overview on the Basic of an implementation p
Project Team Structure
Project Plan Schedules and different phases.
AS-Is document
BBP
User Manuals
Documentation
Functional Specification
FRICE objects overview
Configuration document
BOM upload tool and templates
Resource/Work center upload tool and templates
Readiness
Recipe and Routing Upload tools and template
Demand /Production Plan upload tool and template
LSMW Creation and data upload
SAP Query Creation and maintenance
General System Landscape Overview on system structure(development, quality, production,)
Transport Request processing Overview on Workbench and customizing request
Creation,
Release
Import

Detail Explanation on MRP views, Planning


Strategies, Demand maintaince,
Implementation consideration, Process
Definition, Study Case Jyothy and Hamilton.
Detail Explanation on MRP views, Planning
Strategies, Demand maintaince,
Implementation consideration, Process
Definition, Study Case Jyothy and Hamilton.
T-Code

CS01,CS02,CS03

CS11,CS12
CS15
CS13

CRc1/CRc2/CRc3,
CR05

C201/C202/C203
C223
CK11N,CK12N,CK13N
CK24
CK24
MD61,MD62,MD63,MD75,MD79
MD01,MD02,MD03,MD50,MDBT
MD04
ME5A
COOISPI
MD05
COR7
COR2
MF60
MIGO(MB1A)
COR6N
MIGO(MB31)
MMBE
MB52
MB5B
MB51
VA01, VA02,VA03
CS61,CS62,CS63
MD01,MD02,MD03,MD50,MDBT
CO01,CO02,CO03,
MB1A,MIGO,CO15,CO11
CO15,CO11
MB31,MIGO,CO11N,CO15
CO02
KKS2
KO88
, quality, production,)