Area de terreno Movimiento d

FRENTE 6.90 Descripcion


FONDO 14.00 Zapata
AREA M2 96.60 Cimiento
Base Escalera
Area en m2. Relleno Zapata
Zapatas m2 21.24 Cisterna
Cimientos m2 24.15
Base Escalera m2 0.98 Concre
Sobre Cimiento m2 12.89 Descripcion
Falso Piso m2 76.96 Solado
Cisterna m2 1.54 Zapata
Cimiento
Base Escalera
Sobre Cimiento
Falso Piso
Movimiento de Tierras
Und Area m2 Fondo Volumen Esponjamiento
m3 21.24 1.40 29.74 38.66
m3 24.15 1.20 28.98 37.68
m3 0.98 1.00 0.98 1.27
m3 21.24 0.80 16.99
m3 1.54 2.35 3.62 4.70

Concretos
Und Area m2 Fondo Volumen
m3 21.24 0.10 2.12
m3 21.24 0.50 10.62
m3 24.15 0.80 19.32
m3 0.98 1.00 0.98
m3 12.89 0.35 4.51
m3 76.96 0.10 7.70
Tipo de Ladrillo Para Muro
Elemento Largo Ancho Alto Jun. Hor. Jun. Vert. m3 x Und
KING KONG 0.24 0.13 0.09 0.015 0.015 0.002808
PANDERETA 0.23 0.12 0.1 0.015 0.015 0.00276

Cantidad de Ladrillo en Muro x Tipo


MURO NIVEL ml Altura m2 N° ladr. Vol: Muro
PORTANTE 1 30.70 2.85 87.50 3268 11.37
PORTANTE 2
PORTANTE 3
PORTANTE 4
TABIQUERIA 1 24.40 2.85 69.54 2468 8.34
TABIQUERIA 2
TABIQUERIA 3
TABIQUERIA 4

Tipo de Ladrillo Para Techo


Elemento Largo Ancho Alto Vigueta m3 x Und
Tipo 1 0.30 0.30 0.12 0.10 0.0108
Tipo 2 0.30 0.30 0.15 0.10 0.0135

Tipo de Ladrillo Para Techo


Losa m2 Altura N° Ladri. Vol: Techo Vol: Ladr. Vol: Conc
Losa N° 1 59.7711 0.2 498.0925 11.95422 6.7242488 5.2299713
Losa N° 2 65.8216 0.2 548.51333 13.16432 7.40493 5.75939
o Cantidad de Ladrillo en Muro Alfeizer
Vol: Ladr. Vol: Mort MURO NIVEL ml Altura m2
9.18 2.20 PORTANTE 1 1.40 1.00 1.4
TABIQUERIA 1 3.20 1.00 3.2

TABIQUERIA 1 1.60 2.00 3.2

6.81 1.53
drillo en Muro Alfeizer
N° Ladr. Vol: Muro Vol: Ladr.
49.689441
113.57587
113.57587
calculo de acero para parrilla
ELEMENTO ACERO PESO LONG. UND LONG.TOTAL KG.UND
ZAPATAS 01 1/2¨ 0.994 1.2 5 6 5.964
1/2¨ 0.994 0.9 6 5.4 5.3676
ZAPATAS 02 1/2¨ 0.994 1.5 5 7.5 7.455
1/2¨ 0.994 0.9 8 7.2 7.1568
ZAPATAS 03 1/2¨ 0.994 0.9 5 4.5 4.473
1/2¨ 0.994 0.9 5 4.5 4.473
ZAPATAS 04 1/2¨ 0.994 0.9 7 6.3 6.2622
1/2¨ 0.994 1.3 5 6.5 6.461
ZAPATAS 05 1/2¨ 0.994 1.5 7 10.5 10.437
1/2¨ 0.994 1.3 8 10.4 10.3376
ZAPATAS 06 1/2¨ 0.994 1.2 7 8.4 8.3496
1/2¨ 0.994 1.3 6 7.8 7.7532
ZAPATAS 07 1/2¨ 0.994 1.2 8 9.6 9.5424
1/2¨ 0.994 1.5 6 9 8.946
ZAPATAS 08 1/2¨ 0.994 1.5 8 12 11.928
1/2¨ 0.994 1.5 8 12 11.928
ZAPATAS 09 1/2¨ 0.994 0.9 8 7.2 7.1568
1/2¨ 0.994 1.5 5 7.5 7.455

CALCULO DE ACERO PARA COLUMNA


ELEMENTO ACEROS PESO LONG UND LONG TOTAL KG.UND
COLUM .01 5/8¨ 1.552 4.6 4
3/8¨ 0.56 1.08 26
COLUM .02 5/8¨ 1.552 4.6 4
1/2¨ 0.994 4.6 2
3/8¨ 0.56 1.08 26
COLUM. 03 5/8¨ 1.552 4.6 6
3/8¨ 0.56 1.08 26

CALCULO DE ACERO PARA VIGAS


VIGA ELEMENTO ACEROS PESO LONG UND LONG TOTAL
VARILLA 1/2¨ 0.994
VIGA N°01 ESTRIBO 1/4¨ 0.222
REFUERZO 1/2¨ 0.994
VARILLA 1/2¨ 0.994
VIGA N°2 ESTRIBO 1/4¨ 0.222
REFUERZO 1/2¨ 0.994
VARILLA 1/2¨ 0.994
VIGA N°3 ESTRIBO 1/4¨ 0.222
REFUERZO 1/2¨ 0.994
VARILLA 1/2¨ 0.994
VIGA N°4 ESTRIBO 1/4¨ 0.222
REFUERZO 1/2¨ 0.994
VARILLA 1/2¨ 0.994
VIGA N°5 ESTRIBO 1/4¨ 0.222
REFUERZO 1/2¨ 0.994
VARILLA 1/2¨ 0.994
VIGA N°6 ESTRIBO 1/4¨ 0.222
REFUERZO 1/2¨ 0.994
N°ZAPATAS TOTAL KG
2 11.928
2 10.7352
2 14.91
2 14.3136
2 8.946
2 8.946
2 12.5244
2 12.922
2 20.874
2 20.6752
2 16.6992
2 15.5064
1 9.5424
1 8.946
1 11.928
1 11.928
1 7.1568
1 7.455
TOTAL 225.9362
ALAMBRE 11.29681

N°COLUM TOTAL KG

TOTAL
ALAMBRE

TOTAL KG N°VIGAS TOTAL


TOTAL
ALAMBRE
OE.2 ESTRUCTURAS
MOVIMIENTO DE TIERRAS

PARTIDA: 03.02.00 EXCAVACION DE ZANJA:CIMIENTOS


GRAFICO DESCRIPCION
EJE: A-A,B-B,C-C y entre EJES :1-1,5-5

RELLENOS

ELIMINACION DEL MATERIAL EXCEDENTE


unidad M3
Cantidad Largo Ancho alto metrado parcial