1 General
Excavation in foundation for
structures (Retaining structure,
3.02
drain and Cross Drainage)
(SS-907)
i Pipe Culvert Cum. 23 from quantity sheet 65.18
ii Slab Culvert (2m span) Cum. 1 from quantity sheet 274.75
iii Slab Culvert (4m span) Cum. 4 from quantity sheet 298.82
iv. Slab Culvert (6m span) Cum. 3 from quantity sheet 451.41
v Drains Cum. 1 from quantity sheet 6613.32
Cum. Total =
Backfilling to Retaining
structures, foundation pits etc.
3.04 from excavated materials
including compaction, all
complete. (SS/SP-908)
Supply, fabrication,
assembling and fixing in
positions of gabion boxes /
mattresses, of hexagonal mesh
type 100mm X 120mm, with
5.12 mesh wire 10 swg, selvedge
wire 8 swg, binding wire 12
swg and supply, transport and
filling stone all complete as
per specification (SS/SP-
2401)
Quantity Remarks
1499.14
274.75
1195.29
1354.22
6613.32
10936.72
455.50
133.43
543.28
754.30
1886.51
103.32
15.76
92.55
111.41
55.20
1369.09
1747.33
Quantity Remarks
11311.30
11311.30
95.75
531.00
480.79
18694.39
19801.93
317.28
47.38
212.72
209.07
36.80
2956.18
3779.43
Quantity Remarks
1474.43
1474.43
12.43
116.33
130.94
1670.92
1930.62
1.069
7.497
9.561
186.294
204.421
Quantity Remarks
472.57
129.68
565.29
496.19
6663.34
8327.07
7073.51
7073.51
27508.11
27508.11
287.50
Quantity Remarks
241.50
13.50
48.00
49.50
352.50
483.00
112.54
463.20
426.00
1484.74
104.07
21.10
86.85
79.87
291.89
Description of Works Nos. Length (m) Breadth (m) Height (m) Quantity
1. Earth Excavation
i) Head Wall 1 3.00 1.80 1.50 8.10
ii) Catch pit 1 3.54 3.54 1.68 21.02
iii) Pipe portion 1 10.93 1.20 2.09 27.38
iv) Stone soling portion -
a) Catchpit 1 3.54 3.54 0.15 1.88
b) Below Head wall 1 3.00 1.80 0.15 0.81
v) PCC lining -
a) Catchpit 1 3.54 3.54 0.10 1.25
b) Below Head wall 1 3.00 1.80 0.10 0.54
vi) Gabion Works U/S & D/S -
a) U/S Protection 1 3.00 1.00 0.50 1.50
b) D/S Protection 1 3.00 3.00 0.30 2.70
65.18
7. Gabion Works
i) U/S Protection works 1 3.00 1.00 1.00 3.00
ii)D/S Protection 1 3.00 3.00 0.50 4.50
2 3.00 1.00 0.50 3.00
10.50
1.68 m
12.50 m
Units
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
m³
rm
m³
m³
m³
m³
m2
m2
Mark a6
Mark a7
Mark s1
Mark s2
Mark s3
Mark a1
Mark a2
Mark a3
Mark a4
Mark a5
Units Remarks
m³
m³
m³ L=(2S+2E)/2, B=F1
m³
m³
m³
m³
m³
m³ L=(2S+2E)/2, B=F1
m³
m³
m³ L=(2S+2E)/2, B=F1
m³
m³
m³
m³
m³
m³
m³ L=S+2*(A-T1)
m³
Prepared By: Checked By: Approved By:
m³
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg.
m² P=(2*T+2*T2)*W
m² P=2*(S+2*A1)+2*W
m²
m²
m²
m²
m3
m³ H=75%of total
m³
m³
m³
m³
m³
m2
m2
m2
Mark a6
Mark a7
Mark s1
Mark s2
Mark s3
Mark a1
Mark a2
Mark a3
Mark a4
Mark a5
Units Remarks
m³
m³
m³ L=(2S+2E)/2, B=F1
m³
m³
m³
m³
m³
m³ L=(2S+2E)/2, B=F1
m³
m³
m³ L=(2S+2E)/2, B=F1
m³
m³
m³
m³
m³
m³
m³ L=S+2*(A-T1)
m³
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg.
m² P=(2*T+2*T2)*W
m² P=2*(S+2*A1)+2*W
m²
m²
m²
m²
m3
m³ H=75%of total
m³
m³
m³
m³
m³
m2
m2
m2
Mark a6
Mark a7
Mark s1
Mark s2
Mark s3
Mark a1
Mark a2
Mark a3
Mark a4
Mark a5
Units Remarks
m³
m³
m³ L=(2S+2E)/2, B=F1
m³
m³
m³
m³
m³
m³ L=(2S+2E)/2, B=F1
m³
m³
m³ L=(2S+2E)/2, B=F1
m³
m³
m³
m³
m³
m³
m³ L=S+2*(A-T1)
m³
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg.
m² P=(2*T+2*T2)*W
m² P=2*(S+2*A1)+2*W
m²
m²
m²
m²
m3
m³ H=75%of total
m³
m³
m³
m³
m³
m2
m2
m2