Вы находитесь на странице: 1из 3

ARIEL HERNANDEZ MALIBIRAN

PRC License 0101028


B.S. Civil Engineering
Profession: Planning Engineer/Scheduler
Contact Information:
Mobile No.: +639060510116/+639195989953
Email Address: ah_malibiran@yahoo.com
Permanent Address: Malad, Calapan City

PROFESSIONAL HIGHLIGHTS :

1. FAST Consortium Ltd


Riyadh, KSA

 Project: Riyadh Metro Project Package 3 (Lines 4, 5 & 6)


Position: Scheduler (October 11, 2014 to October 10, 2017)

Duties & Responsibilities:


1. Assisting the line lead schedulers in preparing & updating Master & Working
Schedules.
2. Schedule control/checking using Acumen Fuse prior to handing the updated
schedules of Lines 4, 5 & 6 to Project Management Office.
3. Prepares Key Performance Indexes and Schedule Variance reports for Master Schedule &
Working/Target Schedule for CJV reporting.
4. Assist the Schedule Manager in preparing reports and other planning/scheduling
related requirements of CJV and PMO/PMG.

2. Arabtec Saudi Arabia LTD


Jeddah, KSA

 Project: Saudi Arabia National Guard Housing Project – 5000 Villas - Al Hasa,
KSA
Position: Planning Engineer (February 25, 2012 to August 23, 2014)

Duties & Responsibilities:


1. Daily progress monitoring and reporting of actual accomplishment on site.
2. Prepares Weekly and Monthly Progress Reports for main contractor/consultant
submission.
3. Prepares productivity reports for labor.
4. Assist the Sr. Planning Engineer in preparing reports and other planning related
requirements of the company, project management, main contractor and
consultant.

 Project: Head Office Project Tendering


Position: Planning Engineer (March 14, 2011 to February 24, 2012)

Projects Tendered:
1. King Faisal Specialist Hospital & Research Center, Jeddah KSA
A multi-million joint-venture project tendered which includes site development
and all building works for the King Faisal Hospital located at Jeddah KSA on 1095
days duration.
2. SAEI Jet Propulsion Center, Jeddah KSA
A multi-million project tendered for complete construction of Saudia Aerospace
Engineering Industries Jet Propulsion Center (60000m2) at the King Abdul Aziz
International Airport (KAIA) in Jeddah, Saudi Arabia on 730 days duration.
3. SAEI Aircraft Maintenance Hangars, Jeddah KSA
A multi-billion project tendered which includes all building works and site
development for the Saudia Aerospace Engineering Industries - SAEI Aircraft
Maintenance, Repair and Operation (MRO) facility at the King Abdul Aziz
International Airport (KAIA) in Jeddah, Saudi Arabia on 900 days duration.
4. MITCO Office Building, Jeddah KSA
A project tendered for the construction of nine-level office building on 3266 m2
area located at Jeddah, KSA on 12 months duration.

Duties & Responsibilities:


1. Prepares proposed contract schedule and labor histograms.
2. Coordinates with site planning engineers for obtaining data required by the
management.

 Project: Princess Nora University - Married Junior Staff Housings, Riyadh


KSA
Position: Planning Engineer (January 17, 2011 to March 13, 2011)

Duties & Responsibilities (project 95% completed at the time of joining):


1. Gathers information for the preparation of weekly & monthly reports.

3. Arabtec Construction L.L.C.


PO Box 3399, Dubai, U.A.E.

 Project: Arabtec Living Division Projects


Position: Planning Engineer (May 5, 2007 to May 2, 2010)

Projects Handled:
1. National Housing – 1209 Villas at Al Barsha South First Phase II
Construction of 1202 Villas at Al Barsha South First Phase II, owned by Mohammad
Bin Rashid Housing Establishments amounting to more than one and a half billion
dirham with contract duration of forty two calendar months.

2. Arabian Ranches Development, District 8 – 68 No. Equestrian Villas


Construction of 68 units of luxurious Equestrian Villas at Arabian Ranches
Development District 8, owned by EMAAR Properties PJSC amounting to more than
a half billion dirham, with contract duration of thirty two calendar months.

3. National Housing – 325 Villas at Oud Al Muteena Phase II


Construction of 325 Villas at Oud Al Muteena Phase II, owned by Mohammad Bin
Rashid Housing Establishments, amounting to more than a half billion dirham with
contract duration of twenty five calendar months.

4. Mohammad Bin Rashid Housing – 940 Villas at Oud Al Muteena


Construction of 940 Villas at Oud Al Muteena, owned by Mohammad Bin Rashid
Housing Establishments amounting to more than one and a half billion dirham, with
contract duration of thirty calendar months.

Duties & Responsibilities:


1. Preparation, submission and updating of the project Baseline Program.
2. Initiation/responding to all planning/time related correspondence to
Engineers/Subcontractors.
3. Preparation and issue of necessary reports (weekly, monthly) to Head Office and/or
Consultant and Client.
4. Attend all site coordination meetings with the Engineer/Subcontractors.
5. Preparation of the project As Built Programme and closeout schedules.
6. Liaison, preparation and issue of all time impact programmes to substantiate/support
claims (if applicable) at the post construction stage.

4. Makati Development Corporation


10F Ayala-Life FGU Center, Madrigal Business Park
Ayala-Alabang, Muntinlupa City, Philippines

 Project: Verdana Homes Mamplasan Land Development & Housing Project


Position: Planner / Scheduler (April 28, 2005 to March 26, 2007)

Duties & Responsibilities


1. Identifies each major construction activity, its relationship with other activities
and all other necessary support;
2. Correlates the activity list with contract documents and schedule of values;
3. Solicits and confirms all information from the best combination of resources,
incorporating it into a plan and submitted on time;
4. Monitors actual progress with the schedule, assessing its impact, gives cause &
effect relationship and necessary corrections;
5. Monitors the implementation of plans and maintains all document relative to
good and bad performance of all parties in a manner that is complete, correct
and well correlated;
6. Supervise & coordinate with project Cost Engineer in the processing & control
of change orders and cost reports.

Other Duties & Responsibilities


1. Prepares estimates of various works required in the project;
2. Consolidates & evaluates accomplishments and cost reports vis-à-vis budget;
3. Prepares subcontractors progress billings and accomplishment report;
4. Determines actual project accomplishment & prepares billing statements to
client;
5. Purchase requisition of all materials thru SAP.

COMPUTER LITERACIES:
• Primavera 6.8
• Tilos (Time Location System)
• Microsoft Project
• Acumen Fuse
• AutoCAD
• Revit Architecture/Structure/MEP
• Staad Pro
• Staad RCDC
• MS Office (MS Excel, MS Word, MS Power Point)

TRAININGS/SEMINARS ATTENDED:
• Tilos 8 (November 16 - 20, 2014)
Fast Consortium Riyadh, KSA

• Primavera 6.0 (July 28 - 30, 2010)


Stanford IT Learning, Makati

• Primavera Enterprise / Primavera 6.0 (November 17 - 20, 2008)


Engineering Management Office, Arabtec Living Division Projects, Dubai, UAE

• Business English Intermediate Level (February 4, 2008 – March 16, 2008)


British Council, Dubai, UAE

• Occupational Health and Safety


Verdana Homes Mamplasan, Brgy Loma, Biñan, Laguna

• Construction Works, Planning, Execution & Control (September 16 – 19, 2002)


DTI - Construction Manpower Development Foundation
Bo. Salawag, Dasmariñas, Cavite

ELIGIBILITIES:
• Civil Engineer Licensure Examination (November 20-21, 2004)
Professional Regulation Commission

• Career Service Professional (October 12, 2003)


Civil Service Commission

• Career Service Sub-Professional (October 20, 2002)


Civil Service Commission

EDUCATION:
• College (June 1999 - Mar 2004):
BS Civil Engineering
Divine Word College of Calapan
Calapan City, Oriental Mindoro
(Calapan City Government Scholar)

Вам также может понравиться