* Doubler added if deck thickness is below the min. thickness for the selected eye piece
EYE PIECE SWL MIN. DECK THICKNESS DOUBLER THICKNESS
10 T 8 mm 14 ~ 16 mm
20 T 10 mm 16 ~ 19 mm
30 T 13 mm 20 ~ 22 mm
40 T 15 mm 25 ~ 28 mm
# Leg length and backing bar thickness required for selected eye piece
Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)
From production to
transportation/transverser/st Swinging
Panel Line 5T/10T Direct on plate No No Assembly
orage (WT<20T) (Panel Hazard
Size < 12mx9m)
Falling item
from high Assembly/
Sub-assembly T-bars shifting 3T Direct on Face plate No No
ground Erection
hazard
Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)
Falling item
Flange Brackets direct for on-
Single eye-piece to centre of from high Assembly/
Sub-assembly boards ( Eg. U16 brackets) 3T/5T No No
Face plate ground Erection
(WT<5T)
hazard
Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)
2/3 1/3
Crane
No
Assembly / 10T,15T,25T Swinging
Erection
Block shifting Using one crane c.g No (Yes, If block > Erection
30T,40T 30° - 45° Hazard
150 ton)
x = 3 - 6.5 m
Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)
a
Crane 1 or Crane 2
Crane 1
View A
30° - 45°
b c.g
No
Assembly / 10T,15T,25T Swinging
Erection
Block shifting Using two cranes No (Yes, If block > Erection
30T,40T Hazard
150 ton)
Crane 2 b
Note :
a>9m
b = 4 - 8 m (depend on the block)
Normal usage length of wire ----> 6 , 10 m
No
Assembly / 10T,15T,25T Swinging
Erection
Block shifting / Overturning U-shape blocks No (Yes, If block > Erection
30T,40T Hazard
150 ton)
No
Assembly / 10T,15T,25T Swinging
Erection
Block shifting / Overturning Double bottom blocks No (Yes, If block > Erection
30T,40T Hazard
150 ton)
Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)
No
Assembly / 10T,15T,25T Swinging
Erection
Block shifting / Overturning L-shape blocks No (Yes, If block > Erection
30T,40T Hazard
150 ton)
No
Assembly / 10T,15T,25T Open-hull blocks Swinging
Erection
Block shifting / Overturning No (Yes, If block > Erection
30T,40T (with 3 side bulkheads) Hazard
150 ton)
No
Assembly / 10T,15T,25T Open-hull blocks Swinging
Erection
Block shifting / Overturning No (Yes, If block > Erection
30T,40T (with 4 side bulkheads) Hazard
150 ton)
Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)
Assembly / Swinging
Erection
Block shifting / Overturning 10T,15T Panel blocks No No Erection
Hazard
Support
No
Assembly / 10T,15T,25T Swinging
Erection
Block shifting U-shape blocks No (Yes, If block > Erection
30T,40T Hazard
150 ton)
Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)
No
Assembly / 10T,15T,25T Swinging
Erection
Block shifting L-shape blocks No (Yes, If block > Erection
30T,40T Hazard
150 ton)
Support
Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)
# Please refer to front cover for welding leg length and backing bar detail
Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)
# Please refer to front cover for welding leg length and backing bar detail
# Please refer to front cover for welding leg length and backing bar detail
# Please refer to front cover for welding leg length and backing bar detail
Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)
# Please refer to front cover for welding leg length and backing bar detail
# Please refer to front cover for welding leg length and backing bar detail
Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)
# Please refer to front cover for welding leg length and backing bar detail
Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)
t < 15mm
15 mm
DOUBLER ADDED IF
DECK t < 15 mm
Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)
Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)
Assembly / Swinging
Erection
Block shifting > 50T For heavy lifting blocks Yes Yes Erection
Hazard
APPENDIX II :