Вы находитесь на странице: 1из 1

Inspection Plan

Date : 8 Nov 2018


Area : Sipirok
Time : 8: 30 ~ finish
No.&Name Team Position Inspection Location Ramarks
Enviro Enviro Engineer 1. R18 Tunnel Inspection the rock support rectification
Quality Civil Supervisor
Quality Civil Supervisor 2. Construction of Warehouse Inspection the environment and H&S
Quality Civil Supervisor
1. Inspection rock support rectification
3. Consntruction of Expl. Gallery Dam (L/S)
2. Inspection for drainage

4. Construction of Laboratory Inspection the environment and H&S

5. Cosntruction of Water Tank Inspection the environment and H&S

6. Geological Drilling Hole at Dam Area Inspection the environment and H&S

7. Cosntruction fo Camp A Inspection the environment and H&S