PLANILLA DE METRADOS

PROYECTO : MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO


DEL CENTRO POBLADO LOS ANGELES Y ANEXOS,

DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO-MOQUEGUA


COMPONENTE : REDES DE ALCANTARILLADO SECTOR RURAL
UBICACION AGUAS MUERTAS

FECHA OCTUBRE 2018

BZ. 01 BZ. 02
N de Bz.
Long. Alt. Diametro
Pend. Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom. Tipo de Suelo de Tipo de corte
% Corregida m.
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m) Tub.
1 2

TRAMO CARRETERA LOS ANGELES - ESTUQUIÑA


BZ63 BZ64 28.00 1,553.97 1,552.77 1.20 1,553.79 1,552.43 1.36 -0.970% 28.002 1.28 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ64 BZ65 45.00 1,553.79 1,552.43 1.36 1,553.16 1,551.83 1.33 -1.450% 45.004 1.35 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ65 BZ66 72.50 1,553.16 1,551.83 1.33 1,550.53 1,549.33 1.20 -3.500% 72.543 1.27 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ66 BZ67 72.50 1,550.53 1,549.33 1.20 1,547.91 1,546.71 1.20 -3.540% 72.547 1.20 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ67 BZ68 28.00 1,547.91 1,546.71 1.20 1,547.02 1,545.82 1.20 -3.920% 28.014 1.20 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ68 BZ69 37.54 1,547.02 1,545.82 1.20 1,545.53 1,544.33 1.20 -4.470% 37.570 1.20 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ69 BZ70 35.12 1,545.53 1,544.33 1.20 1,543.80 1,542.60 1.20 -6.980% 35.163 1.20 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ70 BZ71 80.01 1,543.80 1,542.60 1.20 1,538.33 1,537.13 1.20 -6.330% 80.197 1.20 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ71 BZ72 46.47 1,538.33 1,537.13 1.20 1,535.45 1,533.85 1.60 -7.06% 46.586 1.40 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ72 BZ73 33.53 1,535.45 1,533.85 1.60 1,533.75 1,532.55 1.20 -3.88% 33.555 1.40 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ73 BZ74 33.43 1,533.75 1,532.55 1.20 1,532.30 1,531.10 1.20 -4.34% 33.461 1.20 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ74 BZ75 50.00 1,532.30 1,531.10 1.20 1,530.64 1,529.44 1.20 -3.32% 50.028 1.20 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ75 BZ76 21.00 1,530.64 1,529.44 1.20 1,530.07 1,528.87 1.20 -2.71% 21.008 1.20 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ76 BZ77 48.00 1,530.07 1,528.87 1.20 1,528.20 1,527.00 1.20 -3.90% 48.036 1.20 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ77 BZ78 53.50 1,528.20 1,527.00 1.20 1,525.31 1,524.11 1.20 -5.40% 53.578 1.20 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ78 BZ79 26.00 1,525.31 1,524.11 1.20 1,523.88 1,522.68 1.20 -5.50% 26.039 1.20 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ79 BZ80 40.01 1,523.88 1,522.68 1.20 1,522.55 1,520.15 2.40 -6.34% 40.090 1.80 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ80 BZ81 68.00 1,522.55 1,520.15 2.40 1,521.41 1,519.41 2.00 -1.08% 68.004 2.20 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ81 BZ82 30.00 1,521.41 1,519.41 2.00 1,520.15 1,518.95 1.20 -1.55% 30.004 1.60 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ82 BZ83 35.00 1,520.15 1,518.95 1.20 1,518.13 1,516.93 1.20 -5.76% 35.058 1.20 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ83 BZ84 22.00 1,518.13 1,516.93 1.20 1,516.36 1,515.16 1.20 -8.04% 22.071 1.20 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ84 BZ85 68.68 1,516.36 1,515.16 1.20 1,510.76 1,509.06 1.70 -8.88% 68.950 1.45 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ85 BZ86 61.32 1,510.76 1,509.06 1.70 1,509.33 1,507.83 1.50 -2.01% 61.332 1.60 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ86 BZ87 60.00 1,509.33 1,507.83 1.50 1,510.85 1,507.35 3.50 -0.80% 60.002 2.50 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ87 BZ88 36.00 1,510.85 1,507.35 3.50 1,510.83 1,507.03 3.80 -0.89% 36.001 3.65 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ88 BZ89 35.00 1,510.83 1,507.03 3.80 1,510.03 1,506.73 3.30 -0.86% 35.001 3.55 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ89 BZ90 55.00 1,510.03 1,506.73 3.30 1,508.67 1,506.17 2.50 -1.02% 55.003 2.90 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ90 BZ91 20.00 1,508.67 1,506.17 2.50 1,508.17 1,505.97 2.20 -1.00% 20.001 2.35 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ91 BZ92 22.00 1,508.17 1,505.97 2.20 1,507.62 1,505.77 1.85 -0.91% 22.001 2.02 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ92 BZ93 22.00 1,507.62 1,505.77 1.85 1,507.04 1,505.34 1.70 -1.96% 22.004 1.77 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ93 BZ94 78.20 1,507.04 1,505.34 1.70 1,505.06 1,502.41 2.65 -3.74% 78.255 2.17 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ94 BZ95 80.00 1,505.06 1,502.41 2.65 1,502.94 1,501.61 1.33 -1.00% 80.004 1.99 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
Página 1
PLANILLA DE METRADOS
PROYECTO : MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO
DEL CENTRO POBLADO LOS ANGELES Y ANEXOS,

DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO-MOQUEGUA


COMPONENTE : REDES DE ALCANTARILLADO SECTOR RURAL
UBICACION AGUAS MUERTAS

FECHA OCTUBRE 2018

BZ. 01 BZ. 02
N de Bz.
Long. Alt. Diametro
Pend. Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom. Tipo de Suelo de Tipo de corte
% Corregida m.
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m) Tub.
1 2

BZ95 BZ96 20.09 1,502.94 1,501.61 1.33 1,502.20 1,500.85 1.35 -3.81% 20.105 1.34 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ96 BZ97 74.91 1,502.20 1,500.85 1.35 1,498.34 1,497.14 1.20 -4.95% 75.002 1.27 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ97 BZ98 20.00 1,498.34 1,497.14 1.20 1,497.29 1,496.09 1.20 -5.25% 20.028 1.20 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ98 BZ99 71.24 1,497.29 1,496.09 1.20 1,493.33 1,492.13 1.20 -5.56% 71.350 1.20 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ99 BZ100 58.25 1,493.33 1,492.13 1.20 1,487.65 1,486.39 1.26 -9.85% 58.532 1.23 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE
BZ100 BZ60(B) 45.51 1,487.65 1,486.39 1.26 1,483.75 1,481.45 2.30 -10.85% 45.777 1.78 GRAVAS LIMOSAS 200mm PAV. FLEXIBLE

BZ. 01 BZ. 02
N de Bz.
Long. Alt. Diametro
Pendiente Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom. Tipo de Suelo de Tipo de corte
% Corregida m.
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m) Tub.
1 2

1,735.91

Página 2
PLANILLA DE METRADOS
PROYECTO : MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO
DEL CENTRO POBLADO LOS ANGELES Y ANEXOS,

DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO-MOQUEGUA


COMPONENTE : REDES DE ALCANTARILLADO SECTOR RURAL
UBICACION AGUAS MUERTAS

FECHA OCTUBRE 2018

BZ. 01 BZ. 02 EXCAVA


N de Bz.
EXCAVACION T. COMPACTO C/MAQUINARIA
Long. Alt. Tipo
Pend. Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom. de
% Corregida m. 1.50 2.00 2.50 3.00 3.50
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m) Excav.
1 2
m m m m m
TRAMO CARRETERA LOS ANGELES - ESTUQUIÑA
BZ63 BZ64 28.00 1,553.97 1,552.77 1.20 1,553.79 1,552.43 1.36 -0.970% 28.002 1.28 MAQUINARIA
BZ64 BZ65 45.00 1,553.79 1,552.43 1.36 1,553.16 1,551.83 1.33 -1.450% 45.004 1.35 MAQUINARIA
BZ65 BZ66 72.50 1,553.16 1,551.83 1.33 1,550.53 1,549.33 1.20 -3.500% 72.543 1.27 MAQUINARIA
BZ66 BZ67 72.50 1,550.53 1,549.33 1.20 1,547.91 1,546.71 1.20 -3.540% 72.547 1.20 MAQUINARIA
BZ67 BZ68 28.00 1,547.91 1,546.71 1.20 1,547.02 1,545.82 1.20 -3.920% 28.014 1.20 MAQUINARIA
BZ68 BZ69 37.54 1,547.02 1,545.82 1.20 1,545.53 1,544.33 1.20 -4.470% 37.570 1.20 MAQUINARIA
BZ69 BZ70 35.12 1,545.53 1,544.33 1.20 1,543.80 1,542.60 1.20 -6.980% 35.163 1.20 MAQUINARIA
BZ70 BZ71 80.01 1,543.80 1,542.60 1.20 1,538.33 1,537.13 1.20 -6.330% 80.197 1.20 MAQUINARIA
BZ71 BZ72 46.47 1,538.33 1,537.13 1.20 1,535.45 1,533.85 1.60 -7.06% 46.586 1.40 MAQUINARIA
BZ72 BZ73 33.53 1,535.45 1,533.85 1.60 1,533.75 1,532.55 1.20 -3.88% 33.555 1.40 MAQUINARIA
BZ73 BZ74 33.43 1,533.75 1,532.55 1.20 1,532.30 1,531.10 1.20 -4.34% 33.461 1.20 MAQUINARIA
BZ74 BZ75 50.00 1,532.30 1,531.10 1.20 1,530.64 1,529.44 1.20 -3.32% 50.028 1.20 MAQUINARIA
BZ75 BZ76 21.00 1,530.64 1,529.44 1.20 1,530.07 1,528.87 1.20 -2.71% 21.008 1.20 MAQUINARIA
BZ76 BZ77 48.00 1,530.07 1,528.87 1.20 1,528.20 1,527.00 1.20 -3.90% 48.036 1.20 MAQUINARIA
BZ77 BZ78 53.50 1,528.20 1,527.00 1.20 1,525.31 1,524.11 1.20 -5.40% 53.578 1.20 MAQUINARIA
BZ78 BZ79 26.00 1,525.31 1,524.11 1.20 1,523.88 1,522.68 1.20 -5.50% 26.039 1.20 MAQUINARIA
BZ79 BZ80 40.01 1,523.88 1,522.68 1.20 1,522.55 1,520.15 2.40 -6.34% 40.090 1.80 MAQUINARIA
BZ80 BZ81 68.00 1,522.55 1,520.15 2.40 1,521.41 1,519.41 2.00 -1.08% 68.004 2.20 MAQUINARIA
BZ81 BZ82 30.00 1,521.41 1,519.41 2.00 1,520.15 1,518.95 1.20 -1.55% 30.004 1.60 MAQUINARIA
BZ82 BZ83 35.00 1,520.15 1,518.95 1.20 1,518.13 1,516.93 1.20 -5.76% 35.058 1.20 MAQUINARIA
BZ83 BZ84 22.00 1,518.13 1,516.93 1.20 1,516.36 1,515.16 1.20 -8.04% 22.071 1.20 MAQUINARIA
BZ84 BZ85 68.68 1,516.36 1,515.16 1.20 1,510.76 1,509.06 1.70 -8.88% 68.950 1.45 MAQUINARIA
BZ85 BZ86 61.32 1,510.76 1,509.06 1.70 1,509.33 1,507.83 1.50 -2.01% 61.332 1.60 MAQUINARIA
BZ86 BZ87 60.00 1,509.33 1,507.83 1.50 1,510.85 1,507.35 3.50 -0.80% 60.002 2.50 MAQUINARIA
BZ87 BZ88 36.00 1,510.85 1,507.35 3.50 1,510.83 1,507.03 3.80 -0.89% 36.001 3.65 MAQUINARIA
BZ88 BZ89 35.00 1,510.83 1,507.03 3.80 1,510.03 1,506.73 3.30 -0.86% 35.001 3.55 MAQUINARIA
BZ89 BZ90 55.00 1,510.03 1,506.73 3.30 1,508.67 1,506.17 2.50 -1.02% 55.003 2.90 MAQUINARIA
BZ90 BZ91 20.00 1,508.67 1,506.17 2.50 1,508.17 1,505.97 2.20 -1.00% 20.001 2.35 MAQUINARIA
BZ91 BZ92 22.00 1,508.17 1,505.97 2.20 1,507.62 1,505.77 1.85 -0.91% 22.001 2.02 MAQUINARIA
BZ92 BZ93 22.00 1,507.62 1,505.77 1.85 1,507.04 1,505.34 1.70 -1.96% 22.004 1.77 MAQUINARIA
BZ93 BZ94 78.20 1,507.04 1,505.34 1.70 1,505.06 1,502.41 2.65 -3.74% 78.255 2.17 MAQUINARIA
BZ94 BZ95 80.00 1,505.06 1,502.41 2.65 1,502.94 1,501.61 1.33 -1.00% 80.004 1.99 MAQUINARIA
Página 3
PLANILLA DE METRADOS
PROYECTO : MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO
DEL CENTRO POBLADO LOS ANGELES Y ANEXOS,

DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO-MOQUEGUA


COMPONENTE : REDES DE ALCANTARILLADO SECTOR RURAL
UBICACION AGUAS MUERTAS

FECHA OCTUBRE 2018

BZ. 01 BZ. 02 EXCAVA


N de Bz.
EXCAVACION T. COMPACTO C/MAQUINARIA
Long. Alt. Tipo
Pend. Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom. de
% Corregida m. 1.50 2.00 2.50 3.00 3.50
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m) Excav.
1 2
m m m m m
BZ95 BZ96 20.09 1,502.94 1,501.61 1.33 1,502.20 1,500.85 1.35 -3.81% 20.105 1.34 MAQUINARIA
BZ96 BZ97 74.91 1,502.20 1,500.85 1.35 1,498.34 1,497.14 1.20 -4.95% 75.002 1.27 MAQUINARIA
BZ97 BZ98 20.00 1,498.34 1,497.14 1.20 1,497.29 1,496.09 1.20 -5.25% 20.028 1.20 MAQUINARIA
BZ98 BZ99 71.24 1,497.29 1,496.09 1.20 1,493.33 1,492.13 1.20 -5.56% 71.350 1.20 MAQUINARIA
BZ99 BZ100 58.25 1,493.33 1,492.13 1.20 1,487.65 1,486.39 1.26 -9.85% 58.532 1.23 MAQUINARIA
BZ100 BZ60(B) 45.51 1,487.65 1,486.39 1.26 1,483.75 1,481.45 2.30 -10.85% 45.777 1.78 MAQUINARIA

BZ. 01 BZ. 02 EXCAVA


N de Bz.
EXCAVACION T. COMPACTO C/MAQUINARIA
Long. Alt. Tipo
Pendiente Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom. de
% Corregida m. 1.50 2.00 2.50 3.00 3.50
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m) Excav.
1 2
m m m m m

1,735.91 - - - - -

Página 4
PLANILLA DE METRADOS
PROYECTO : MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO
DEL CENTRO POBLADO LOS ANGELES Y ANEXOS,

DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO-MOQUEGUA


COMPONENTE : REDES DE ALCANTARILLADO SECTOR RURAL
UBICACION AGUAS MUERTAS

FECHA OCTUBRE 2018

BZ. 01 BZ. 02 EXCAVACION


N de Bz.
EXCAVACION T. COMPACTO C/MAQUINARIA EXCAVACION PAV FLEXIBLE C/MAQUINARIA
Long. Alt.
Pend. Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m. 4.50 1.50 2.00 2.50 3.00 3.50 4.00
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
m m m m m m m
TRAMO CARRETERA LOS ANGELES - ESTUQUIÑA
BZ63 BZ64 28.00 1,553.97 1,552.77 1.20 1,553.79 1,552.43 1.36 -0.970% 28.002 1.28 28.00
BZ64 BZ65 45.00 1,553.79 1,552.43 1.36 1,553.16 1,551.83 1.33 -1.450% 45.004 1.35 45.00
BZ65 BZ66 72.50 1,553.16 1,551.83 1.33 1,550.53 1,549.33 1.20 -3.500% 72.543 1.27 72.54
BZ66 BZ67 72.50 1,550.53 1,549.33 1.20 1,547.91 1,546.71 1.20 -3.540% 72.547 1.20 72.55
BZ67 BZ68 28.00 1,547.91 1,546.71 1.20 1,547.02 1,545.82 1.20 -3.920% 28.014 1.20 28.01
BZ68 BZ69 37.54 1,547.02 1,545.82 1.20 1,545.53 1,544.33 1.20 -4.470% 37.570 1.20 37.57
BZ69 BZ70 35.12 1,545.53 1,544.33 1.20 1,543.80 1,542.60 1.20 -6.980% 35.163 1.20 35.16
BZ70 BZ71 80.01 1,543.80 1,542.60 1.20 1,538.33 1,537.13 1.20 -6.330% 80.197 1.20 80.20
BZ71 BZ72 46.47 1,538.33 1,537.13 1.20 1,535.45 1,533.85 1.60 -7.06% 46.586 1.40 46.59
BZ72 BZ73 33.53 1,535.45 1,533.85 1.60 1,533.75 1,532.55 1.20 -3.88% 33.555 1.40 33.56
BZ73 BZ74 33.43 1,533.75 1,532.55 1.20 1,532.30 1,531.10 1.20 -4.34% 33.461 1.20 33.46
BZ74 BZ75 50.00 1,532.30 1,531.10 1.20 1,530.64 1,529.44 1.20 -3.32% 50.028 1.20 50.03
BZ75 BZ76 21.00 1,530.64 1,529.44 1.20 1,530.07 1,528.87 1.20 -2.71% 21.008 1.20 21.01
BZ76 BZ77 48.00 1,530.07 1,528.87 1.20 1,528.20 1,527.00 1.20 -3.90% 48.036 1.20 48.04
BZ77 BZ78 53.50 1,528.20 1,527.00 1.20 1,525.31 1,524.11 1.20 -5.40% 53.578 1.20 53.58
BZ78 BZ79 26.00 1,525.31 1,524.11 1.20 1,523.88 1,522.68 1.20 -5.50% 26.039 1.20 26.04
BZ79 BZ80 40.01 1,523.88 1,522.68 1.20 1,522.55 1,520.15 2.40 -6.34% 40.090 1.80 40.09
BZ80 BZ81 68.00 1,522.55 1,520.15 2.40 1,521.41 1,519.41 2.00 -1.08% 68.004 2.20 68.00
BZ81 BZ82 30.00 1,521.41 1,519.41 2.00 1,520.15 1,518.95 1.20 -1.55% 30.004 1.60 30.00
BZ82 BZ83 35.00 1,520.15 1,518.95 1.20 1,518.13 1,516.93 1.20 -5.76% 35.058 1.20 35.06
BZ83 BZ84 22.00 1,518.13 1,516.93 1.20 1,516.36 1,515.16 1.20 -8.04% 22.071 1.20 22.07
BZ84 BZ85 68.68 1,516.36 1,515.16 1.20 1,510.76 1,509.06 1.70 -8.88% 68.950 1.45 68.95
BZ85 BZ86 61.32 1,510.76 1,509.06 1.70 1,509.33 1,507.83 1.50 -2.01% 61.332 1.60 61.33
BZ86 BZ87 60.00 1,509.33 1,507.83 1.50 1,510.85 1,507.35 3.50 -0.80% 60.002 2.50 60.00
BZ87 BZ88 36.00 1,510.85 1,507.35 3.50 1,510.83 1,507.03 3.80 -0.89% 36.001 3.65 36.00
BZ88 BZ89 35.00 1,510.83 1,507.03 3.80 1,510.03 1,506.73 3.30 -0.86% 35.001 3.55 35.00
BZ89 BZ90 55.00 1,510.03 1,506.73 3.30 1,508.67 1,506.17 2.50 -1.02% 55.003 2.90 55.00
BZ90 BZ91 20.00 1,508.67 1,506.17 2.50 1,508.17 1,505.97 2.20 -1.00% 20.001 2.35 20.00
BZ91 BZ92 22.00 1,508.17 1,505.97 2.20 1,507.62 1,505.77 1.85 -0.91% 22.001 2.02 22.00
BZ92 BZ93 22.00 1,507.62 1,505.77 1.85 1,507.04 1,505.34 1.70 -1.96% 22.004 1.77 22.00
BZ93 BZ94 78.20 1,507.04 1,505.34 1.70 1,505.06 1,502.41 2.65 -3.74% 78.255 2.17 78.25
BZ94 BZ95 80.00 1,505.06 1,502.41 2.65 1,502.94 1,501.61 1.33 -1.00% 80.004 1.99 80.00
Página 5
PLANILLA DE METRADOS
PROYECTO : MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO
DEL CENTRO POBLADO LOS ANGELES Y ANEXOS,

DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO-MOQUEGUA


COMPONENTE : REDES DE ALCANTARILLADO SECTOR RURAL
UBICACION AGUAS MUERTAS

FECHA OCTUBRE 2018

BZ. 01 BZ. 02 EXCAVACION


N de Bz.
EXCAVACION T. COMPACTO C/MAQUINARIA EXCAVACION PAV FLEXIBLE C/MAQUINARIA
Long. Alt.
Pend. Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m. 4.50 1.50 2.00 2.50 3.00 3.50 4.00
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
m m m m m m m
BZ95 BZ96 20.09 1,502.94 1,501.61 1.33 1,502.20 1,500.85 1.35 -3.81% 20.105 1.34 20.10
BZ96 BZ97 74.91 1,502.20 1,500.85 1.35 1,498.34 1,497.14 1.20 -4.95% 75.002 1.27 75.00
BZ97 BZ98 20.00 1,498.34 1,497.14 1.20 1,497.29 1,496.09 1.20 -5.25% 20.028 1.20 20.03
BZ98 BZ99 71.24 1,497.29 1,496.09 1.20 1,493.33 1,492.13 1.20 -5.56% 71.350 1.20 71.35
BZ99 BZ100 58.25 1,493.33 1,492.13 1.20 1,487.65 1,486.39 1.26 -9.85% 58.532 1.23 58.53
BZ100 BZ60(B) 45.51 1,487.65 1,486.39 1.26 1,483.75 1,481.45 2.30 -10.85% 45.777 1.78 45.78

BZ. 01 BZ. 02 EXCAVACION


N de Bz.
EXCAVACION T. COMPACTO C/MAQUINARIA EXCAVACION PAV FLEXIBLE C/MAQUINARIA
Long. Alt.
Pendiente Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m. 4.50 1.50 2.00 2.50 3.00 3.50 4.00
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
m m m m m m m

1,735.91 - 1,082.43 279.21 248.26 55.00 - 71.00

Página 6
PLANILLA DE METRADOS
PROYECTO : MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO
DEL CENTRO POBLADO LOS ANGELES Y ANEXOS,

DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO-MOQUEGUA


COMPONENTE : REDES DE ALCANTARILLADO SECTOR RURAL
UBICACION AGUAS MUERTAS

FECHA OCTUBRE 2018

BZ. 01 EXCAVACION
BZ. 02
CAMA Y
N de Bz.
EXCAVACION PAV FLEXIBLE C/MAQUINARIA S/CAMA Tub 200 mm. Pav flexible
Long. Alt.
Pend. Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m. 4.50 h=0.10 - 0.30 1.50 2.00 2.50 3.00
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
m m m m m m
TRAMO CARRETERA LOS ANGELES - ESTUQUIÑA
BZ63 BZ64 28.00 1,553.97 1,552.77 1.20 1,553.79 1,552.43 1.36 -0.970% 28.002 1.28 28.00 28.00
BZ64 BZ65 45.00 1,553.79 1,552.43 1.36 1,553.16 1,551.83 1.33 -1.450% 45.004 1.35 45.00 45.00
BZ65 BZ66 72.50 1,553.16 1,551.83 1.33 1,550.53 1,549.33 1.20 -3.500% 72.543 1.27 72.54 72.54
BZ66 BZ67 72.50 1,550.53 1,549.33 1.20 1,547.91 1,546.71 1.20 -3.540% 72.547 1.20 72.55 72.55
BZ67 BZ68 28.00 1,547.91 1,546.71 1.20 1,547.02 1,545.82 1.20 -3.920% 28.014 1.20 28.01 28.01
BZ68 BZ69 37.54 1,547.02 1,545.82 1.20 1,545.53 1,544.33 1.20 -4.470% 37.570 1.20 37.57 37.57
BZ69 BZ70 35.12 1,545.53 1,544.33 1.20 1,543.80 1,542.60 1.20 -6.980% 35.163 1.20 35.16 35.16
BZ70 BZ71 80.01 1,543.80 1,542.60 1.20 1,538.33 1,537.13 1.20 -6.330% 80.197 1.20 80.20 80.20
BZ71 BZ72 46.47 1,538.33 1,537.13 1.20 1,535.45 1,533.85 1.60 -7.06% 46.586 1.40 46.59 46.59
BZ72 BZ73 33.53 1,535.45 1,533.85 1.60 1,533.75 1,532.55 1.20 -3.88% 33.555 1.40 33.56 33.56
BZ73 BZ74 33.43 1,533.75 1,532.55 1.20 1,532.30 1,531.10 1.20 -4.34% 33.461 1.20 33.46 33.46
BZ74 BZ75 50.00 1,532.30 1,531.10 1.20 1,530.64 1,529.44 1.20 -3.32% 50.028 1.20 50.03 50.03
BZ75 BZ76 21.00 1,530.64 1,529.44 1.20 1,530.07 1,528.87 1.20 -2.71% 21.008 1.20 21.01 21.01
BZ76 BZ77 48.00 1,530.07 1,528.87 1.20 1,528.20 1,527.00 1.20 -3.90% 48.036 1.20 48.04 48.04
BZ77 BZ78 53.50 1,528.20 1,527.00 1.20 1,525.31 1,524.11 1.20 -5.40% 53.578 1.20 53.58 53.58
BZ78 BZ79 26.00 1,525.31 1,524.11 1.20 1,523.88 1,522.68 1.20 -5.50% 26.039 1.20 26.04 26.04
BZ79 BZ80 40.01 1,523.88 1,522.68 1.20 1,522.55 1,520.15 2.40 -6.34% 40.090 1.80 40.09 40.09
BZ80 BZ81 68.00 1,522.55 1,520.15 2.40 1,521.41 1,519.41 2.00 -1.08% 68.004 2.20 68.00 68.00
BZ81 BZ82 30.00 1,521.41 1,519.41 2.00 1,520.15 1,518.95 1.20 -1.55% 30.004 1.60 30.00 30.00
BZ82 BZ83 35.00 1,520.15 1,518.95 1.20 1,518.13 1,516.93 1.20 -5.76% 35.058 1.20 35.06 35.06
BZ83 BZ84 22.00 1,518.13 1,516.93 1.20 1,516.36 1,515.16 1.20 -8.04% 22.071 1.20 22.07 22.07
BZ84 BZ85 68.68 1,516.36 1,515.16 1.20 1,510.76 1,509.06 1.70 -8.88% 68.950 1.45 68.95 68.95
BZ85 BZ86 61.32 1,510.76 1,509.06 1.70 1,509.33 1,507.83 1.50 -2.01% 61.332 1.60 61.33 61.33
BZ86 BZ87 60.00 1,509.33 1,507.83 1.50 1,510.85 1,507.35 3.50 -0.80% 60.002 2.50 60.00 60.00
BZ87 BZ88 36.00 1,510.85 1,507.35 3.50 1,510.83 1,507.03 3.80 -0.89% 36.001 3.65 36.00
BZ88 BZ89 35.00 1,510.83 1,507.03 3.80 1,510.03 1,506.73 3.30 -0.86% 35.001 3.55 35.00
BZ89 BZ90 55.00 1,510.03 1,506.73 3.30 1,508.67 1,506.17 2.50 -1.02% 55.003 2.90 55.00 55.00
BZ90 BZ91 20.00 1,508.67 1,506.17 2.50 1,508.17 1,505.97 2.20 -1.00% 20.001 2.35 20.00 20.00
BZ91 BZ92 22.00 1,508.17 1,505.97 2.20 1,507.62 1,505.77 1.85 -0.91% 22.001 2.02 22.00 22.00
BZ92 BZ93 22.00 1,507.62 1,505.77 1.85 1,507.04 1,505.34 1.70 -1.96% 22.004 1.77 22.00 22.00
BZ93 BZ94 78.20 1,507.04 1,505.34 1.70 1,505.06 1,502.41 2.65 -3.74% 78.255 2.17 78.25 78.25
BZ94 BZ95 80.00 1,505.06 1,502.41 2.65 1,502.94 1,501.61 1.33 -1.00% 80.004 1.99 80.00 80.00
Página 7
PLANILLA DE METRADOS
PROYECTO : MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO
DEL CENTRO POBLADO LOS ANGELES Y ANEXOS,

DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO-MOQUEGUA


COMPONENTE : REDES DE ALCANTARILLADO SECTOR RURAL
UBICACION AGUAS MUERTAS

FECHA OCTUBRE 2018

BZ. 01 EXCAVACION
BZ. 02
CAMA Y
N de Bz.
EXCAVACION PAV FLEXIBLE C/MAQUINARIA S/CAMA Tub 200 mm. Pav flexible
Long. Alt.
Pend. Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m. 4.50 h=0.10 - 0.30 1.50 2.00 2.50 3.00
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
m m m m m m
BZ95 BZ96 20.09 1,502.94 1,501.61 1.33 1,502.20 1,500.85 1.35 -3.81% 20.105 1.34 20.10 20.10
BZ96 BZ97 74.91 1,502.20 1,500.85 1.35 1,498.34 1,497.14 1.20 -4.95% 75.002 1.27 75.00 75.00
BZ97 BZ98 20.00 1,498.34 1,497.14 1.20 1,497.29 1,496.09 1.20 -5.25% 20.028 1.20 20.03 20.03
BZ98 BZ99 71.24 1,497.29 1,496.09 1.20 1,493.33 1,492.13 1.20 -5.56% 71.350 1.20 71.35 71.35
BZ99 BZ100 58.25 1,493.33 1,492.13 1.20 1,487.65 1,486.39 1.26 -9.85% 58.532 1.23 58.53 58.53
BZ100 BZ60(B) 45.51 1,487.65 1,486.39 1.26 1,483.75 1,481.45 2.30 -10.85% 45.777 1.78 45.78 45.78

BZ. 01 EXCAVACION
BZ. 02 CAMA Y
N de Bz.
EXCAVACION PAV FLEXIBLE C/MAQUINARIA S/CAMA Tub 200 mm. Pav flexible
Long. Alt.
Pendiente Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m. 4.50 h=0.10 - 0.30 1.50 2.00 2.50 3.00
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
m m m m m m

1,735.91 - 1,735.91 1,082.43 279.21 248.26 55.00

Página 8
PLANILLA DE METRADOS
PROYECTO : MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO
DEL CENTRO POBLADO LOS ANGELES Y ANEXOS,

DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO-MOQUEGUA


COMPONENTE : REDES DE ALCANTARILLADO SECTOR RURAL
UBICACION AGUAS MUERTAS

FECHA OCTUBRE 2018

BZ. 01 BZ. 02 Pavimento


N de Bz.
Tub 200 mm. Pav flexible Acarreo Eliminacion mat. Corte de Pav.
Long. Alt. Tuberia Excedente
Pend. Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m. 3.50 4.00 4.50 Flexible
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
m m m m m m2
TRAMO CARRETERA LOS ANGELES - ESTUQUIÑA
BZ63 BZ64 28.00 1,553.97 1,552.77 1.20 1,553.79 1,552.43 1.36 -0.970% 28.002 1.28 28.00 28.00 22.40
BZ64 BZ65 45.00 1,553.79 1,552.43 1.36 1,553.16 1,551.83 1.33 -1.450% 45.004 1.35 45.00 45.00 36.00
BZ65 BZ66 72.50 1,553.16 1,551.83 1.33 1,550.53 1,549.33 1.20 -3.500% 72.543 1.27 72.54 72.54 58.03
BZ66 BZ67 72.50 1,550.53 1,549.33 1.20 1,547.91 1,546.71 1.20 -3.540% 72.547 1.20 72.55 72.55 58.04
BZ67 BZ68 28.00 1,547.91 1,546.71 1.20 1,547.02 1,545.82 1.20 -3.920% 28.014 1.20 28.01 28.01 22.41
BZ68 BZ69 37.54 1,547.02 1,545.82 1.20 1,545.53 1,544.33 1.20 -4.470% 37.570 1.20 37.57 37.57 30.06
BZ69 BZ70 35.12 1,545.53 1,544.33 1.20 1,543.80 1,542.60 1.20 -6.980% 35.163 1.20 35.16 35.16 28.13
BZ70 BZ71 80.01 1,543.80 1,542.60 1.20 1,538.33 1,537.13 1.20 -6.330% 80.197 1.20 80.20 80.20 64.16
BZ71 BZ72 46.47 1,538.33 1,537.13 1.20 1,535.45 1,533.85 1.60 -7.06% 46.586 1.40 46.59 46.59 37.27
BZ72 BZ73 33.53 1,535.45 1,533.85 1.60 1,533.75 1,532.55 1.20 -3.88% 33.555 1.40 33.56 33.56 26.84
BZ73 BZ74 33.43 1,533.75 1,532.55 1.20 1,532.30 1,531.10 1.20 -4.34% 33.461 1.20 33.46 33.46 26.77
BZ74 BZ75 50.00 1,532.30 1,531.10 1.20 1,530.64 1,529.44 1.20 -3.32% 50.028 1.20 50.03 50.03 40.02
BZ75 BZ76 21.00 1,530.64 1,529.44 1.20 1,530.07 1,528.87 1.20 -2.71% 21.008 1.20 21.01 21.01 16.81
BZ76 BZ77 48.00 1,530.07 1,528.87 1.20 1,528.20 1,527.00 1.20 -3.90% 48.036 1.20 48.04 48.04 38.43
BZ77 BZ78 53.50 1,528.20 1,527.00 1.20 1,525.31 1,524.11 1.20 -5.40% 53.578 1.20 53.58 53.58 42.86
BZ78 BZ79 26.00 1,525.31 1,524.11 1.20 1,523.88 1,522.68 1.20 -5.50% 26.039 1.20 26.04 26.04 20.83
BZ79 BZ80 40.01 1,523.88 1,522.68 1.20 1,522.55 1,520.15 2.40 -6.34% 40.090 1.80 40.09 40.09 32.07
BZ80 BZ81 68.00 1,522.55 1,520.15 2.40 1,521.41 1,519.41 2.00 -1.08% 68.004 2.20 68.00 68.00 54.40
BZ81 BZ82 30.00 1,521.41 1,519.41 2.00 1,520.15 1,518.95 1.20 -1.55% 30.004 1.60 30.00 30.00 24.00
BZ82 BZ83 35.00 1,520.15 1,518.95 1.20 1,518.13 1,516.93 1.20 -5.76% 35.058 1.20 35.06 35.06 28.05
BZ83 BZ84 22.00 1,518.13 1,516.93 1.20 1,516.36 1,515.16 1.20 -8.04% 22.071 1.20 22.07 22.07 17.66
BZ84 BZ85 68.68 1,516.36 1,515.16 1.20 1,510.76 1,509.06 1.70 -8.88% 68.950 1.45 68.95 68.95 55.16
BZ85 BZ86 61.32 1,510.76 1,509.06 1.70 1,509.33 1,507.83 1.50 -2.01% 61.332 1.60 61.33 61.33 49.07
BZ86 BZ87 60.00 1,509.33 1,507.83 1.50 1,510.85 1,507.35 3.50 -0.80% 60.002 2.50 60.00 60.00 48.00
BZ87 BZ88 36.00 1,510.85 1,507.35 3.50 1,510.83 1,507.03 3.80 -0.89% 36.001 3.65 36.00 36.00 36.00 50.40
BZ88 BZ89 35.00 1,510.83 1,507.03 3.80 1,510.03 1,506.73 3.30 -0.86% 35.001 3.55 35.00 35.00 35.00 49.00
BZ89 BZ90 55.00 1,510.03 1,506.73 3.30 1,508.67 1,506.17 2.50 -1.02% 55.003 2.90 55.00 55.00 66.00
BZ90 BZ91 20.00 1,508.67 1,506.17 2.50 1,508.17 1,505.97 2.20 -1.00% 20.001 2.35 20.00 20.00 16.00
BZ91 BZ92 22.00 1,508.17 1,505.97 2.20 1,507.62 1,505.77 1.85 -0.91% 22.001 2.02 22.00 22.00 17.60
BZ92 BZ93 22.00 1,507.62 1,505.77 1.85 1,507.04 1,505.34 1.70 -1.96% 22.004 1.77 22.00 22.00 17.60
BZ93 BZ94 78.20 1,507.04 1,505.34 1.70 1,505.06 1,502.41 2.65 -3.74% 78.255 2.17 78.25 78.25 62.60
BZ94 BZ95 80.00 1,505.06 1,502.41 2.65 1,502.94 1,501.61 1.33 -1.00% 80.004 1.99 80.00 80.00 64.00
Página 9
PLANILLA DE METRADOS
PROYECTO : MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO
DEL CENTRO POBLADO LOS ANGELES Y ANEXOS,

DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO-MOQUEGUA


COMPONENTE : REDES DE ALCANTARILLADO SECTOR RURAL
UBICACION AGUAS MUERTAS

FECHA OCTUBRE 2018

BZ. 01 BZ. 02 Pavimento


N de Bz.
Tub 200 mm. Pav flexible Acarreo Eliminacion mat. Corte de Pav.
Long. Alt. Tuberia Excedente
Pend. Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m. 3.50 4.00 4.50 Flexible
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
m m m m m m2
BZ95 BZ96 20.09 1,502.94 1,501.61 1.33 1,502.20 1,500.85 1.35 -3.81% 20.105 1.34 20.10 20.10 14.07
BZ96 BZ97 74.91 1,502.20 1,500.85 1.35 1,498.34 1,497.14 1.20 -4.95% 75.002 1.27 75.00 75.00 52.50
BZ97 BZ98 20.00 1,498.34 1,497.14 1.20 1,497.29 1,496.09 1.20 -5.25% 20.028 1.20 20.03 20.03 14.02
BZ98 BZ99 71.24 1,497.29 1,496.09 1.20 1,493.33 1,492.13 1.20 -5.56% 71.350 1.20 71.35 71.35 49.94
BZ99 BZ100 58.25 1,493.33 1,492.13 1.20 1,487.65 1,486.39 1.26 -9.85% 58.532 1.23 58.53 58.53 40.97
BZ100 BZ60(B) 45.51 1,487.65 1,486.39 1.26 1,483.75 1,481.45 2.30 -10.85% 45.777 1.78 45.78 45.78 32.04

BZ. 01 BZ. 02 Pavimento


N de Bz.
Tub 200 mm. Pav flexible Acarreo Eliminacion mat. Corte de Pav.
Long. Alt. Tuberia Excedente
Pendiente Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m. 3.50 4.00 4.50 Flexible
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
m m m m m m2

1,735.91 - 71.00 - 1,735.91 1,735.91 1,424.25

Página 10
PLANILLA DE METRADOS
PROYECTO : MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO
DEL CENTRO POBLADO LOS ANGELES Y ANEXOS,

DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO-MOQUEGUA


COMPONENTE : REDES DE ALCANTARILLADO SECTOR RURAL
UBICACION AGUAS MUERTAS

FECHA OCTUBRE 2018

BZ. 01 BZ. 02 Pavimento


Suministro de
N de Bz. Conteo
Corte de Pav. Repos. de Pav. Tuberia
Long. Alt.
Pend. Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m. Rigido Flexible Rigido 200 Hasta Hasta
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
m2 m2 m2 mm 1.50 2.00
TRAMO CARRETERA LOS ANGELES - ESTUQUIÑA
BZ63 BZ64 28.00 1,553.97 1,552.77 1.20 1,553.79 1,552.43 1.36 -0.970% 28.002 1.28 22.40 28.00 1.00
BZ64 BZ65 45.00 1,553.79 1,552.43 1.36 1,553.16 1,551.83 1.33 -1.450% 45.004 1.35 36.00 45.00 1.00
BZ65 BZ66 72.50 1,553.16 1,551.83 1.33 1,550.53 1,549.33 1.20 -3.500% 72.543 1.27 58.03 72.54 1.00
BZ66 BZ67 72.50 1,550.53 1,549.33 1.20 1,547.91 1,546.71 1.20 -3.540% 72.547 1.20 58.04 72.55 1.00
BZ67 BZ68 28.00 1,547.91 1,546.71 1.20 1,547.02 1,545.82 1.20 -3.920% 28.014 1.20 22.41 28.01 1.00
BZ68 BZ69 37.54 1,547.02 1,545.82 1.20 1,545.53 1,544.33 1.20 -4.470% 37.570 1.20 30.06 37.57 1.00
BZ69 BZ70 35.12 1,545.53 1,544.33 1.20 1,543.80 1,542.60 1.20 -6.980% 35.163 1.20 28.13 35.16 1.00
BZ70 BZ71 80.01 1,543.80 1,542.60 1.20 1,538.33 1,537.13 1.20 -6.330% 80.197 1.20 64.16 80.20 1.00
BZ71 BZ72 46.47 1,538.33 1,537.13 1.20 1,535.45 1,533.85 1.60 -7.06% 46.586 1.40 37.27 46.59
BZ72 BZ73 33.53 1,535.45 1,533.85 1.60 1,533.75 1,532.55 1.20 -3.88% 33.555 1.40 26.84 33.56 1.00
BZ73 BZ74 33.43 1,533.75 1,532.55 1.20 1,532.30 1,531.10 1.20 -4.34% 33.461 1.20 26.77 33.46 1.00
BZ74 BZ75 50.00 1,532.30 1,531.10 1.20 1,530.64 1,529.44 1.20 -3.32% 50.028 1.20 40.02 50.03 1.00
BZ75 BZ76 21.00 1,530.64 1,529.44 1.20 1,530.07 1,528.87 1.20 -2.71% 21.008 1.20 16.81 21.01 1.00
BZ76 BZ77 48.00 1,530.07 1,528.87 1.20 1,528.20 1,527.00 1.20 -3.90% 48.036 1.20 38.43 48.04 1.00
BZ77 BZ78 53.50 1,528.20 1,527.00 1.20 1,525.31 1,524.11 1.20 -5.40% 53.578 1.20 42.86 53.58 1.00
BZ78 BZ79 26.00 1,525.31 1,524.11 1.20 1,523.88 1,522.68 1.20 -5.50% 26.039 1.20 20.83 26.04 1.00
BZ79 BZ80 40.01 1,523.88 1,522.68 1.20 1,522.55 1,520.15 2.40 -6.34% 40.090 1.80 32.07 40.09 1.00
BZ80 BZ81 68.00 1,522.55 1,520.15 2.40 1,521.41 1,519.41 2.00 -1.08% 68.004 2.20 54.40 68.00
BZ81 BZ82 30.00 1,521.41 1,519.41 2.00 1,520.15 1,518.95 1.20 -1.55% 30.004 1.60 24.00 30.00 1.00
BZ82 BZ83 35.00 1,520.15 1,518.95 1.20 1,518.13 1,516.93 1.20 -5.76% 35.058 1.20 28.05 35.06 1.00
BZ83 BZ84 22.00 1,518.13 1,516.93 1.20 1,516.36 1,515.16 1.20 -8.04% 22.071 1.20 17.66 22.07
BZ84 BZ85 68.68 1,516.36 1,515.16 1.20 1,510.76 1,509.06 1.70 -8.88% 68.950 1.45 55.16 68.95
BZ85 BZ86 61.32 1,510.76 1,509.06 1.70 1,509.33 1,507.83 1.50 -2.01% 61.332 1.60 49.07 61.33 1.00
BZ86 BZ87 60.00 1,509.33 1,507.83 1.50 1,510.85 1,507.35 3.50 -0.80% 60.002 2.50 48.00 60.00 1.00
BZ87 BZ88 36.00 1,510.85 1,507.35 3.50 1,510.83 1,507.03 3.80 -0.89% 36.001 3.65 50.40 36.00
BZ88 BZ89 35.00 1,510.83 1,507.03 3.80 1,510.03 1,506.73 3.30 -0.86% 35.001 3.55 49.00 35.00
BZ89 BZ90 55.00 1,510.03 1,506.73 3.30 1,508.67 1,506.17 2.50 -1.02% 55.003 2.90 66.00 55.00
BZ90 BZ91 20.00 1,508.67 1,506.17 2.50 1,508.17 1,505.97 2.20 -1.00% 20.001 2.35 16.00 20.00
BZ91 BZ92 22.00 1,508.17 1,505.97 2.20 1,507.62 1,505.77 1.85 -0.91% 22.001 2.02 17.60 22.00
BZ92 BZ93 22.00 1,507.62 1,505.77 1.85 1,507.04 1,505.34 1.70 -1.96% 22.004 1.77 17.60 22.00 1.00
BZ93 BZ94 78.20 1,507.04 1,505.34 1.70 1,505.06 1,502.41 2.65 -3.74% 78.255 2.17 62.60 78.25 1.00
BZ94 BZ95 80.00 1,505.06 1,502.41 2.65 1,502.94 1,501.61 1.33 -1.00% 80.004 1.99 64.00 80.00
Página 11
PLANILLA DE METRADOS
PROYECTO : MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO
DEL CENTRO POBLADO LOS ANGELES Y ANEXOS,

DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO-MOQUEGUA


COMPONENTE : REDES DE ALCANTARILLADO SECTOR RURAL
UBICACION AGUAS MUERTAS

FECHA OCTUBRE 2018

BZ. 01 BZ. 02 Pavimento


Suministro de
N de Bz. Conteo
Corte de Pav. Repos. de Pav. Tuberia
Long. Alt.
Pend. Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m. Rigido Flexible Rigido 200 Hasta Hasta
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
m2 m2 m2 mm 1.50 2.00
BZ95 BZ96 20.09 1,502.94 1,501.61 1.33 1,502.20 1,500.85 1.35 -3.81% 20.105 1.34 14.07 20.10 1.00
BZ96 BZ97 74.91 1,502.20 1,500.85 1.35 1,498.34 1,497.14 1.20 -4.95% 75.002 1.27 52.50 75.00 1.00
BZ97 BZ98 20.00 1,498.34 1,497.14 1.20 1,497.29 1,496.09 1.20 -5.25% 20.028 1.20 14.02 20.03
BZ98 BZ99 71.24 1,497.29 1,496.09 1.20 1,493.33 1,492.13 1.20 -5.56% 71.350 1.20 49.94 71.35 1.00
BZ99 BZ100 58.25 1,493.33 1,492.13 1.20 1,487.65 1,486.39 1.26 -9.85% 58.532 1.23 40.97 58.53
BZ100 BZ60(B) 45.51 1,487.65 1,486.39 1.26 1,483.75 1,481.45 2.30 -10.85% 45.777 1.78 32.04 45.78 1.00

BZ. 01 BZ. 02 Pavimento


N de Bz.
Corte de Pav. Repos. de Pav.
Long. Alt.
Pendiente Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m. Rigido Flexible Rigido 200 Hasta Hasta
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
m2 m2 m2 mm 1.50 2.00

1,735.91 - 1,424.25 - 1,735.91 21.00 5.00

Página 12
PLANILLA DE METRADOS
PROYECTO : MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO
DEL CENTRO POBLADO LOS ANGELES Y ANEXOS,

DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO-MOQUEGUA


COMPONENTE : REDES DE ALCANTARILLADO SECTOR RURAL
UBICACION AGUAS MUERTAS

FECHA OCTUBRE 2018

BZ. 01 BZ. 02
N de Bz. Conteo de Buzones
Long. Alt.
Pend. Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m. Hasta Hasta Hasta Hasta Hasta Dados de concreto
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
Caida de
2.50 3.50 4.00 4.50 5.50 Dado
Bz.
TRAMO CARRETERA LOS ANGELES - ESTUQUIÑA
BZ63 BZ64 28.00 1,553.97 1,552.77 1.20 1,553.79 1,552.43 1.36 -0.970% 28.002 1.28 1.00
BZ64 BZ65 45.00 1,553.79 1,552.43 1.36 1,553.16 1,551.83 1.33 -1.450% 45.004 1.35 2.00
BZ65 BZ66 72.50 1,553.16 1,551.83 1.33 1,550.53 1,549.33 1.20 -3.500% 72.543 1.27 2.00
BZ66 BZ67 72.50 1,550.53 1,549.33 1.20 1,547.91 1,546.71 1.20 -3.540% 72.547 1.20 2.00
BZ67 BZ68 28.00 1,547.91 1,546.71 1.20 1,547.02 1,545.82 1.20 -3.920% 28.014 1.20 2.00
BZ68 BZ69 37.54 1,547.02 1,545.82 1.20 1,545.53 1,544.33 1.20 -4.470% 37.570 1.20 2.00
BZ69 BZ70 35.12 1,545.53 1,544.33 1.20 1,543.80 1,542.60 1.20 -6.980% 35.163 1.20 2.00
BZ70 BZ71 80.01 1,543.80 1,542.60 1.20 1,538.33 1,537.13 1.20 -6.330% 80.197 1.20 2.00
BZ71 BZ72 46.47 1,538.33 1,537.13 1.20 1,535.45 1,533.85 1.60 -7.06% 46.586 1.40 2.00
BZ72 BZ73 33.53 1,535.45 1,533.85 1.60 1,533.75 1,532.55 1.20 -3.88% 33.555 1.40 2.00
BZ73 BZ74 33.43 1,533.75 1,532.55 1.20 1,532.30 1,531.10 1.20 -4.34% 33.461 1.20 2.00
BZ74 BZ75 50.00 1,532.30 1,531.10 1.20 1,530.64 1,529.44 1.20 -3.32% 50.028 1.20 2.00
BZ75 BZ76 21.00 1,530.64 1,529.44 1.20 1,530.07 1,528.87 1.20 -2.71% 21.008 1.20 2.00
BZ76 BZ77 48.00 1,530.07 1,528.87 1.20 1,528.20 1,527.00 1.20 -3.90% 48.036 1.20 2.00
BZ77 BZ78 53.50 1,528.20 1,527.00 1.20 1,525.31 1,524.11 1.20 -5.40% 53.578 1.20 2.00
BZ78 BZ79 26.00 1,525.31 1,524.11 1.20 1,523.88 1,522.68 1.20 -5.50% 26.039 1.20 2.00
BZ79 BZ80 40.01 1,523.88 1,522.68 1.20 1,522.55 1,520.15 2.40 -6.34% 40.090 1.80 2.00
BZ80 BZ81 68.00 1,522.55 1,520.15 2.40 1,521.41 1,519.41 2.00 -1.08% 68.004 2.20 1.00 2.00
BZ81 BZ82 30.00 1,521.41 1,519.41 2.00 1,520.15 1,518.95 1.20 -1.55% 30.004 1.60 2.00
BZ82 BZ83 35.00 1,520.15 1,518.95 1.20 1,518.13 1,516.93 1.20 -5.76% 35.058 1.20 2.00
BZ83 BZ84 22.00 1,518.13 1,516.93 1.20 1,516.36 1,515.16 1.20 -8.04% 22.071 1.20 2.00
BZ84 BZ85 68.68 1,516.36 1,515.16 1.20 1,510.76 1,509.06 1.70 -8.88% 68.950 1.45 2.00
BZ85 BZ86 61.32 1,510.76 1,509.06 1.70 1,509.33 1,507.83 1.50 -2.01% 61.332 1.60 2.00
BZ86 BZ87 60.00 1,509.33 1,507.83 1.50 1,510.85 1,507.35 3.50 -0.80% 60.002 2.50 2.00
BZ87 BZ88 36.00 1,510.85 1,507.35 3.50 1,510.83 1,507.03 3.80 -0.89% 36.001 3.65 1.00 2.00
BZ88 BZ89 35.00 1,510.83 1,507.03 3.80 1,510.03 1,506.73 3.30 -0.86% 35.001 3.55 1.00 2.00
BZ89 BZ90 55.00 1,510.03 1,506.73 3.30 1,508.67 1,506.17 2.50 -1.02% 55.003 2.90 1.00 2.00
BZ90 BZ91 20.00 1,508.67 1,506.17 2.50 1,508.17 1,505.97 2.20 -1.00% 20.001 2.35 1.00 2.00
BZ91 BZ92 22.00 1,508.17 1,505.97 2.20 1,507.62 1,505.77 1.85 -0.91% 22.001 2.02 1.00 2.00
BZ92 BZ93 22.00 1,507.62 1,505.77 1.85 1,507.04 1,505.34 1.70 -1.96% 22.004 1.77 2.00
BZ93 BZ94 78.20 1,507.04 1,505.34 1.70 1,505.06 1,502.41 2.65 -3.74% 78.255 2.17 2.00
BZ94 BZ95 80.00 1,505.06 1,502.41 2.65 1,502.94 1,501.61 1.33 -1.00% 80.004 1.99 1.00 2.00
Página 13
PLANILLA DE METRADOS
PROYECTO : MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO
DEL CENTRO POBLADO LOS ANGELES Y ANEXOS,

DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO-MOQUEGUA


COMPONENTE : REDES DE ALCANTARILLADO SECTOR RURAL
UBICACION AGUAS MUERTAS

FECHA OCTUBRE 2018

BZ. 01 BZ. 02
N de Bz. Conteo de Buzones
Long. Alt.
Pend. Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m. Hasta Hasta Hasta Hasta Hasta Dados de concreto
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
Caida de
2.50 3.50 4.00 4.50 5.50 Dado
Bz.
BZ95 BZ96 20.09 1,502.94 1,501.61 1.33 1,502.20 1,500.85 1.35 -3.81% 20.105 1.34 2.00
BZ96 BZ97 74.91 1,502.20 1,500.85 1.35 1,498.34 1,497.14 1.20 -4.95% 75.002 1.27 2.00
BZ97 BZ98 20.00 1,498.34 1,497.14 1.20 1,497.29 1,496.09 1.20 -5.25% 20.028 1.20 2.00
BZ98 BZ99 71.24 1,497.29 1,496.09 1.20 1,493.33 1,492.13 1.20 -5.56% 71.350 1.20 2.00
BZ99 BZ100 58.25 1,493.33 1,492.13 1.20 1,487.65 1,486.39 1.26 -9.85% 58.532 1.23 2.00
BZ100 BZ60(B) 45.51 1,487.65 1,486.39 1.26 1,483.75 1,481.45 2.30 -10.85% 45.777 1.78 2.00

BZ. 01 BZ. 02
N de Bz.
Long. Alt.
Pendiente Long.
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m. Hasta Hasta Hasta Hasta Hasta Dados de concreto
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
Caida de
2.50 3.50 4.50 1.50 5.50 Dado
Bz.

1,735.91 3.00 3.00 1.00 - - - 75.00

Página 14
PLANILLA DE METRADOS
PROYECTO : MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO
DEL CENTRO POBLADO LOS ANGELES Y ANEXOS,

DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO-MOQUEGUA


COMPONENTE : REDES DE ALCANTARILLADO SECTOR RURAL
UBICACION AGUAS MUERTAS

FECHA OCTUBRE 2018

BZ. 01 BZ. 02
N de Bz. Limpieza
Long. Alt. Final de obra
Pend. Long. P/Tuberia
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m.
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
m2
TRAMO CARRETERA LOS ANGELES - ESTUQUIÑA
BZ63 BZ64 28.00 1,553.97 1,552.77 1.20 1,553.79 1,552.43 1.36 -0.970% 28.002 1.28 19.60
BZ64 BZ65 45.00 1,553.79 1,552.43 1.36 1,553.16 1,551.83 1.33 -1.450% 45.004 1.35 31.50
BZ65 BZ66 72.50 1,553.16 1,551.83 1.33 1,550.53 1,549.33 1.20 -3.500% 72.543 1.27 50.78
BZ66 BZ67 72.50 1,550.53 1,549.33 1.20 1,547.91 1,546.71 1.20 -3.540% 72.547 1.20 50.78
BZ67 BZ68 28.00 1,547.91 1,546.71 1.20 1,547.02 1,545.82 1.20 -3.920% 28.014 1.20 19.61
BZ68 BZ69 37.54 1,547.02 1,545.82 1.20 1,545.53 1,544.33 1.20 -4.470% 37.570 1.20 26.30
BZ69 BZ70 35.12 1,545.53 1,544.33 1.20 1,543.80 1,542.60 1.20 -6.980% 35.163 1.20 24.61
BZ70 BZ71 80.01 1,543.80 1,542.60 1.20 1,538.33 1,537.13 1.20 -6.330% 80.197 1.20 56.14
BZ71 BZ72 46.47 1,538.33 1,537.13 1.20 1,535.45 1,533.85 1.60 -7.06% 46.586 1.40 32.61
BZ72 BZ73 33.53 1,535.45 1,533.85 1.60 1,533.75 1,532.55 1.20 -3.88% 33.555 1.40 23.49
BZ73 BZ74 33.43 1,533.75 1,532.55 1.20 1,532.30 1,531.10 1.20 -4.34% 33.461 1.20 23.42
BZ74 BZ75 50.00 1,532.30 1,531.10 1.20 1,530.64 1,529.44 1.20 -3.32% 50.028 1.20 35.02
BZ75 BZ76 21.00 1,530.64 1,529.44 1.20 1,530.07 1,528.87 1.20 -2.71% 21.008 1.20 14.71
BZ76 BZ77 48.00 1,530.07 1,528.87 1.20 1,528.20 1,527.00 1.20 -3.90% 48.036 1.20 33.63
BZ77 BZ78 53.50 1,528.20 1,527.00 1.20 1,525.31 1,524.11 1.20 -5.40% 53.578 1.20 37.50
BZ78 BZ79 26.00 1,525.31 1,524.11 1.20 1,523.88 1,522.68 1.20 -5.50% 26.039 1.20 18.23
BZ79 BZ80 40.01 1,523.88 1,522.68 1.20 1,522.55 1,520.15 2.40 -6.34% 40.090 1.80 28.06
BZ80 BZ81 68.00 1,522.55 1,520.15 2.40 1,521.41 1,519.41 2.00 -1.08% 68.004 2.20 47.60
BZ81 BZ82 30.00 1,521.41 1,519.41 2.00 1,520.15 1,518.95 1.20 -1.55% 30.004 1.60 21.00
BZ82 BZ83 35.00 1,520.15 1,518.95 1.20 1,518.13 1,516.93 1.20 -5.76% 35.058 1.20 24.54
BZ83 BZ84 22.00 1,518.13 1,516.93 1.20 1,516.36 1,515.16 1.20 -8.04% 22.071 1.20 15.45
BZ84 BZ85 68.68 1,516.36 1,515.16 1.20 1,510.76 1,509.06 1.70 -8.88% 68.950 1.45 48.27
BZ85 BZ86 61.32 1,510.76 1,509.06 1.70 1,509.33 1,507.83 1.50 -2.01% 61.332 1.60 42.93
BZ86 BZ87 60.00 1,509.33 1,507.83 1.50 1,510.85 1,507.35 3.50 -0.80% 60.002 2.50 42.00
BZ87 BZ88 36.00 1,510.85 1,507.35 3.50 1,510.83 1,507.03 3.80 -0.89% 36.001 3.65 50.40
BZ88 BZ89 35.00 1,510.83 1,507.03 3.80 1,510.03 1,506.73 3.30 -0.86% 35.001 3.55 49.00
BZ89 BZ90 55.00 1,510.03 1,506.73 3.30 1,508.67 1,506.17 2.50 -1.02% 55.003 2.90 66.00
BZ90 BZ91 20.00 1,508.67 1,506.17 2.50 1,508.17 1,505.97 2.20 -1.00% 20.001 2.35 14.00
BZ91 BZ92 22.00 1,508.17 1,505.97 2.20 1,507.62 1,505.77 1.85 -0.91% 22.001 2.02 15.40
BZ92 BZ93 22.00 1,507.62 1,505.77 1.85 1,507.04 1,505.34 1.70 -1.96% 22.004 1.77 15.40
BZ93 BZ94 78.20 1,507.04 1,505.34 1.70 1,505.06 1,502.41 2.65 -3.74% 78.255 2.17 54.78
BZ94 BZ95 80.00 1,505.06 1,502.41 2.65 1,502.94 1,501.61 1.33 -1.00% 80.004 1.99 56.00
Página 15
PLANILLA DE METRADOS
PROYECTO : MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO
DEL CENTRO POBLADO LOS ANGELES Y ANEXOS,

DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO-MOQUEGUA


COMPONENTE : REDES DE ALCANTARILLADO SECTOR RURAL
UBICACION AGUAS MUERTAS

FECHA OCTUBRE 2018

BZ. 01 BZ. 02
N de Bz. Limpieza
Long. Alt. Final de obra
Pend. Long. P/Tuberia
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m.
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
m2
BZ95 BZ96 20.09 1,502.94 1,501.61 1.33 1,502.20 1,500.85 1.35 -3.81% 20.105 1.34 14.07
BZ96 BZ97 74.91 1,502.20 1,500.85 1.35 1,498.34 1,497.14 1.20 -4.95% 75.002 1.27 52.50
BZ97 BZ98 20.00 1,498.34 1,497.14 1.20 1,497.29 1,496.09 1.20 -5.25% 20.028 1.20 14.02
BZ98 BZ99 71.24 1,497.29 1,496.09 1.20 1,493.33 1,492.13 1.20 -5.56% 71.350 1.20 49.94
BZ99 BZ100 58.25 1,493.33 1,492.13 1.20 1,487.65 1,486.39 1.26 -9.85% 58.532 1.23 40.97
BZ100 BZ60(B) 45.51 1,487.65 1,486.39 1.26 1,483.75 1,481.45 2.30 -10.85% 45.777 1.78 32.04

BZ. 01 BZ. 02
N de Bz. Limpieza
Long. Alt. Final de obra
Pendiente Long. P/Tuberia
N° Parcial Cota Cota Altura Cota Cota Altura Prom.
% Corregida m.
m. Tapa (m) Fondo (m) (m) Tapa (m) Fondo (m) (m) (m)
1 2
m2

1,735.91 1,292.34

Página 16
MUNICIPALIDAD PROVINCIAL MARISCAL NIETO
GERENCIA DE INFRAESTRUCTURA PUBLICA
SUB GERENCIA DE ESTUDIOS DE INVERSION

HOJA DE RESUMEN DE METRADOS


: “MEJORAMIENTO E INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO C.P.
PROYECTO LOS ANGELES, DISTRITO DE MOQUEGUA, PROVINCIA MARISCAL NIETO - MOQUEGUA”

COMPONEN: RED COLECTOR RURAL AGUAS MUERTAS


SECTOR : LOS ANGELES - RURAL
UBICACIÓN : C.P. LOS ANGELES - DISTRITO MOQUEGUA - PROVINCIA MCAL NIETO - DEPARTAMENTO MOQUEGUA
FECHA : FEBRERO DEL 2016

ITEM DESCRIPCION UND. METRADO


03 RED COLECTOR RURAL AGUAS MUERTAS - EMPALME ESTUQUIÑA.
03.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
03.01.01 OBRAS PRELIMINARES
03.01.01.01 TRAZO, NIVELACION Y REPLANTEO INICIAL m 1,735.91
03.01.01.02 TRAZO, NIVEL Y REPLANTEO DURANTE EJECUCION DE OBRA m 1,735.91
03.01.02 DEMOLICIONES
03.01.02.01 ROTURA DE PAVIMENTO ASFALTICO C/EQUIPO m2 1,424.25
03.01.03 SEÑALIZACION TEMPORAL DE SEGURIDAD
03.01.03.01 CERCO DE MALLA DE SEGURIDAD H=1.00M. m 1,735.91
03.01.03.02 TRANQUERA DE MADERA 1.20mX1.10m PARA DESVIO DE TRANSITO und PONER
03.01.03.03 CONO DE FIBRA DE VIDRIO FOSFORECENTE P/SEÑALIZACION und PONER
03.01.03.04 PUENTE PEATONALES PROVICIONALES. und PONER
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION DE ZANJAS
03.02.01.01 EXCAVACION DE ZANJA MANUAL T.COMPACTO. HASTA 1.50m P/TUB D=200mm m -
03.02.01.02 EXCAVACION DE ZANJA MANUAL T.COMPACTO. HASTA 2.50m P/TUB D=200mm m -
03.02.01.03 EXCAVACION DE ZANJA C/MAQUINA T.COMPACTO HASTA 1.50m P/TUB D=200mm - PAV m 1,082.43
03.02.01.04 EXCAVACION DE ZANJA C/MAQUINA T.COMPACTO HASTA 2.00m P/TUB D=200mm - PAV m 279.21
03.02.01.05 EXCAVACION DE ZANJA C/MAQUINA T.COMPACTO HASTA 2.50m P/TUB D=200mm - PAV m 248.26
03.02.01.06 EXCAVACION DE ZANJA C/MAQUINA T.COMPACTO HASTA 3.00m P/TUB D=200mm - PAV m 55.00
03.02.01.07 EXCAVACION DE ZANJA C/MAQUINA T.COMPACTO HASTA 4.00m P/TUB D=200mm - PAV m -
03.02.01.08 ENTIBADO DE ZANJAS DESDE 3.00M HASTA 3.50M m -
03.02.01.09 ENTIBADO DE ZANJAS DESDE 3.00M HASTA 4.00M m 71.00
03.02.01.10 ENTIBADO DE ZANJAS DESDE 3.00M HASTA 4.50M m -
03.02.02 REFINES DE ZANJA
03.02.02.02 REFINE Y NIVELACION DE ZANJAS T.N. P/TUB D=200mm m 1,735.91
03.02.03 CAMA - SOBRECAMA EN ZANJA
03.02.03.01 CAMA DE APOYO A=0.80m m 1,735.91
03.02.03.02 SOBRE-CAMA DE APOYO A=0.80m m 1,735.91
03.02.04 RELLENOS DE ZANJAS APISONADO CON MATERIAL DE PROPIO
03.02.04.01 RELLENO COMPACTADO DE ZANJA CON MATERIAL PROPIO HASTA 1.50m P/TUB D=20 m Err:509
03.02.04.02 RELLENO COMPACTADO DE ZANJA CON MATERIAL PROPIO HASTA 2.50m P/TUB D=20 m Err:509
03.02.04.03 RELLENO COMPACTADO DE ZANJA CON MATERIAL PROPIO HASTA 1.50m P/TUB D=200 m 1,082.43
03.02.04.04 RELLENO COMPACTADO DE ZANJA CON MATERIAL PROPIO HASTA 2.00m P/TUB D=200 m 279.21
03.02.04.05 RELLENO COMPACTADO DE ZANJA CON MATERIAL PROPIO HASTA 2.50m P/TUB D=200 m 248.26
03.02.04.06 RELLENO COMPACTADO DE ZANJA CON MATERIAL PROPIO HASTA 3.00m P/TUB D=200 m 55.00
03.02.04.07 RELLENO COMPACTADO DE ZANJA CON MATERIAL PROPIO HASTA 4.00m P/TUB D=200 m -
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE
03.02.05.01 ACOPIO DE MATERIAL PARA ELIMINACION C/MINICARGADOR D=30 M. DIST. PROM. m3 161.23
03.02.05.02 ELIMINACION DE MATERIAL EXCEDENTE D=5 KM m3 161.23

Página 17
ITEM DESCRIPCION UND. METRADO
03.03 SUMINISTRO E INSTALACIÓN DE TUBERIA
03.03.01 TUBERIA PVC UF DN 200MM + 3% DESP ISO 4435 S-20 m 1,735.91
03.03.02 ACARREO DE TUBERIA DE Ø DIFERENTES A BORDE DE ZANJA. m 1,735.91
03.03.03 PRUEBA HIDRAULICA A ZANJA ABIERTA P/TUB DESAGUE DN 160 A 250MM m 1,735.91
03.04 BUZONES DE DESAGUE
03.04.01 BUZON TIPO I T. COMPACTO HASTA 1.50 M. und 21.00
03.04.02 BUZON TIPO I T. COMPACTO HASTA 2.00 M. und 5.00
03.04.03 BUZON TIPO I T. COMPACTO HASTA 2.50 M. und 3.00
03.04.04 BUZON TIPO I T. COMPACTO HASTA 3.00 M. und Err:509
03.04.05 BUZON TIPO I T. COMPACTO HASTA 4.00 M. und 1.00
03.04.06 DADO DE CONCRETO F'C=175 KG/CM2 0.60 x 0.60 ANCLAJE und 75.00
03.04.07 PERFORACION DE FUSTE DE BUZON P/EMPALME Y DADO DE ANCLAJE und 75.00
03.05 REPOSICION DE PAVIMENTOS
03.05.01 REPOSICION DE PAVIMENTO FLEXIBLE
03.05.01.01 BASE GRANULAR E= 0.20 M. m2 1,424.25
03.05.01.02 IMPRIMACION CON ASFALT0 DILUIDO m2 1,424.25
03.05.01.03 MEZCLA ASFALTICA m2 1,424.25
03.06 OTROS
03.06.01 DESBROCE Y LIMPIEZA DE TERRENO ANCHO = 1.50 M m -
03.07 COSTOS AMBIENTALES
03.07.01 LIMPIEZA FINAL DE OBRA m2 1,292.34

Página 18
MUNICIPALIDAD PROVINCIAL MARISCAL NIETO
SUB-GERENCIA DE ESTUDIOS DE INVERSIONES

RESUMEN DE PLANILLA DE METRADOS


PROYECTO : AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y
ALCANTARILLADO CENTRO POBLADO LOS ANGELES
COMPONENTE : REDES DE ALCANTARILLADO
FECHA : MAYO 2016
UBICACION : MOQUEGUA

EXCAVACION

MANUAL EQUIPO CON MAQUINARIA TUB. 200@250 CON MAQUINARI


SECTOR
160mm 160mm 200-250mm 1.20 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.50 1.80 2.00

1.5 2.0 1.5 1.0 1.5 2.0 2.5 m m m m m m m m m m m

RURAL AGUAS MUERTAS - - - Err:509 Err:509 Err:509 Err:509 Err:509 - - - - - - 1,082.43 248.26 55.00 -

TOTAL - - - Err:509 Err:509 Err:509 Err:509 Err:509 - - - - - - ### 248.26 55.00 -


PROYECTO

COMPONENTE
FECHA
UBICACION

Relleno de Zanja con Mat. De Prestamo


CAMA Y S/CAMA
CON MAQUINARIA TUB. 315 Tub. 160 Tub. 200 - 250 mm
SECTOR
2.50 2.80 h=0.10 - 0.30 h=0.10-0.40 1.50 2.00 2.50 1.20 1.50 2.00 2.50 3.00 3.50 4.00 4.50

m m 0.60 0.70 0.70 m m m m m m m m m m m

RURAL AGUAS MUERTAS - Err:509 Err:509 1,735.91 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

TOTAL - Err:509 Err:509 1,735.91 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
PROYECTO

COMPONENTE
FECHA
UBICACION

. De Prestamo Relleno de Zanja con Mat. Propio

Tub. De 315mm Tub. 160 Tub. 200 - 250 mm


SECTOR
5.50 1.80 2.00 2.50 2.80 1.50 2.00 2.50 1.20 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.50

m m m m m m m m m m m m m m m m m

RURAL AGUAS MUERTAS Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - -

TOTAL Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - -
PROYECTO

COMPONENTE
FECHA
UBICACION

Acarreo y Eliminacion Pavimento


Suministro de Tuberia
suelo malo suelo bueno Total Esponj Corte de Pav. Repos. de Pav.
SECTOR
Tierra Pav. Tierra Pav. Tierra Pav. Flexible Rigido Flexible Rigido 160 200 250 315 Bzta.

m3 m3 m3 m3 m3 m3 m3 m2 m2 m2 m2 mm mm mm mm 1.00

RURAL AGUAS MUERTAS 1,735.91 Err:509 Err:509 1,735.91 Err:509 Err:509 520.77 1,424.25 - 1,424.25 - Err:509 1,735.91 Err:509 Err:509 Err:509

TOTAL 1,735.91 Err:509 Err:509 1,735.91 1,424.25 - 1,424.25 - Err:509 1,735.91 Err:509 Err:509 Err:509
ELIMINACION ESTUQUIÑA Err:509

TOTAL ELIMINACION Err:509


PROYECTO

COMPONENTE
FECHA
UBICACION

Conteo de Buzones Dados de concreto


Accesorios para Tub de: Sum. Tub Corte d
N de
SECTOR conexiones
Hasta Hasta Hasta Hasta Hasta Hasta Hasta Hasta Hasta 160 200 250 315 160 Flexible
Caida Dado
de Bz.
1.20 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.50 und und und und und m m2

RURAL AGUAS MUERTAS Err:509 21.00 5.00 3.00 Err:509 3.00 1.00 - - - 75.00 49.00 - 49.00 - - 366.43 97.88

TOTAL Err:509 21.00 5.00 3.00 Err:509 3.00 1.00 - - - 75.00 49.00 - 49.00 - - 366.43 97.88
PROYECTO

COMPONENTE
FECHA
UBICACION

Conexiones Domiciliarias
Limpieza Limpieza
Corte de Pav. Repos. de Pav. Excavacion Relleno Final de obra Final de obra
Cama de P/Tuberia P/Conex.
SECTOR Eliminacion
Apoyo
Rigido Flexible Rigido Manual Equipo Maq. Mat. Propio Mat.Prest.

m2 m2 m2 m m m m m3 m3 m3 m2 m2

RURAL AGUAS MUERTAS - 92.51 - 366.43 - - 366.43 366.43 366.43 366.43 1,292.34 353.87

TOTAL - 92.51 - 366.43 - - 366.43 366.43 366.43 366.43 1,292.34 353.87


TOTAL ELIMINACION ESTUQUIÑA 25% 458.04
PROYECTO

COMPONENTE
FECHA
UBICACION

Entibado
Desbroce
SECTOR
3.5 4

m m m

RURAL AGUAS MUERTAS - - 71.00

TOTAL - - 71.00