Diagnosis Report (DR)


VIBRATION ANALYSIS
Intelligenc e in As s et Health
Co llec t/Entry: 02/12/2019 Analys is : 02/12/2019 Nº: 00000460

Plant: COCA-COLA BEVERAGES - PHILIPPINES - ILOILO


Equipment Location
AUXILIARY -> WATER TREATMENT -> RAW WATER PUMP NO. 1, TO ACCELATOR -> ACCELATOR MOTOR

Diagnosis
Element Failures Det ec t ed Co mpo nent spec if ic at io n Po sit io n
COUPLE MISALIGNMENT DRIVE END
BASE STRUCTURAL LOOSENESS DRIVE END

Spectrum used for diagnosis Tendency Curve

Prognosis
Rec o mmended
Recommended action int ervent io n t ime

THE VIBRATION LEVEL INCREASED AT 1 X MACHINE SPEED FREQUENCY IN AXIAL DIRECTION. IT IS NORMALLY CAUSED 3 Week(s)
ANGULAR MISALIGMENT, THIS SYMPTOMS MAY ALSO INDICATE COUPLING PROBLEMS AS WELL. CHECK THE BASE FOR
DETERIORATED GROUNDING, OR LOOSE HOLD-DOWN BOLTS AT THE BASE. INSPECT COUPLING CONDITION, PERFORM A LASER
ALIGMENT AND GIVE A FEEDBACK TO SEMEQ BEFORE THE NEXT VIBRATION MEASURMENTS ARE TAKEN

Analysed by: THIAGO EDUARDO TEIXEIRA Appro ved by: ALEXANDRE DA COSTA PAES

For cus t ome r us e only


PS M/W.O . Interventio n Date Time s pent o n interventio n Equipment do wntime Pe rs on re s pons ible for inte rve ntion

- - - - -

Feedbac k Repo rt (FR)


01. Was the found defect the same as the diagnosed defect? ()Yes ()No, there was no defect ()No, not match.
02. Is the specification of the defective component completly correct? ()Yes ()No
03. Was the indicated position of the defective component correct? ()Yes ()No
04. Was any other intervention performed, in addition to the recommended intervention? ()No ()Yes

Def ec t t ype c lassif ic at io n agreed bet ween SEMEQ/COCA-COLA BEVERAGES - PHILIPPINES - ILOILO

()Success ()Imprecision ()Virtual Defect

Classif ic at io n
analysis agreed
by:
PHILIPPINES - ILOILO S EM EQ

IT.01.03 * FO R030 04/05/19 9 8