Vmetal 0.785
OD12 ID12 ( MD L) OD22 ID22
V-the volume ,m3
π/4=0.785
OD1-outsiade diameter of the drill pipe ,m
ID1-inside diameter of the drill pipe ,m
MD- the measurement of the depth,m
L-the length of the column,m
OD2- outside diameter of the drill collors ,m
ID2-inside diameter of the drill collors ,m
a TVD MD m
TVD - true vertical depth ,m
MD- the measurment of the depth for the casing shoe ,m
c ( a) 2 ( b ) 2 m
b - the divation of the well is given ,m
Vd.m Vmetal
T
Q
T -the time ,hour
Vd.m- the volume of the drillimg mud ,m3
Vmetal- the volume of the metal , m3
Q- the flow rate of the pump, m3
TO CALCULATE THE AMOUNT OF THE SLURRY CEMENT
...
0.785 Dbit
2 ODproduction2 HTVD Hc
..
0.785 IDproduction.casing 2 hc.plug
v - the volune of the slurry cement ,m3
Dbit- the diameter of the bit .m
OD- outside diameter of the production tube ,m
ID- inside diameter of the casing,m
Hcsing.shoe- is the height of the casing to shoe ,m
Hc- is the height of a cement .m
H.TVD- is the true vertical depth ,m
h.c.plug- is the height of the cement plug, usually (15....30)m
ρclay ρd.m ρw
Mclay
ρclay ρw
ρclay ρd.m.need ρd.m
Mbrite Vd.m
ρbrite ρd.m.need
Pf
ρk.f ks
g H
Pf ka ρw HTVD