TO CALCULATE THE TOTAL VOLUME OF THE METAL

Vmetal  0.785    
 OD12  ID12 ( MD  L)  OD22  ID22  
V-the volume ,m3
π/4=0.785
OD1-outsiade diameter of the drill pipe ,m
ID1-inside diameter of the drill pipe ,m
MD- the measurement of the depth,m
L-the length of the column,m
OD2- outside diameter of the drill collors ,m
ID2-inside diameter of the drill collors ,m

TO CALCULATE THE MEASUREMENT DEPTH

MD  Hcasing.shoe  HTVD  Hcasing.shoe2  ( b) 2

 
a  TVD  MD m
TVD - true vertical depth ,m
MD- the measurment of the depth for the casing shoe ,m
c  ( a) 2  ( b ) 2 m
b - the divation of the well is given ,m

TO CALCULATE THE VOLUME OF DRILLING MUD

Vd.m  0.785   OD2  ID2 L   OD2  ID2 L


V- The volume, m3
π/4=0.785
d-drilling
m-mud
OD- Outside diameter ,m
ID-Inside diameter,m
L-The length of the column of a mud,m

TO CALCULATE THE PEROID OF TIME FOR THE CIRCULATION MUD

Vd.m  Vmetal
T 
Q
T -the time ,hour
Vd.m- the volume of the drillimg mud ,m3
Vmetal- the volume of the metal , m3
Q- the flow rate of the pump, m3
TO CALCULATE THE AMOUNT OF THE SLURRY CEMENT

Vslurry.cemet  0.785   IDcasing 2   ODproduction 2  Hcasing.shoe  Hc

... 
 0.785   Dbit
 2   ODproduction2  HTVD  Hc
..
 
 0.785  IDproduction.casing 2 hc.plug

v - the volune of the slurry cement ,m3
Dbit- the diameter of the bit .m
OD- outside diameter of the production tube ,m
ID- inside diameter of the casing,m
Hcsing.shoe- is the height of the casing to shoe ,m
Hc- is the height of a cement .m
H.TVD- is the true vertical depth ,m
h.c.plug- is the height of the cement plug, usually (15....30)m

TO CALCULATE DENSITY FOR THE REQUIRED (NEED) DRILLING


MUD
Pf  ΔP
ρd.m.need 
g HTVD

P.f- is the formatiom pressure ,MPa


ΔP- is the change in preuure,MPa
g- is the accleration due gravity ,m/s2
H.TVD- is the true vertical depth ,m
TO CALCULATE THE MASS Of CLAY


ρclay  ρd.m  ρw 
Mclay 
ρclay  ρw

ρ .clay- is the density of the clay, kg/m3


ρ.d.m- is the density of drilling mud, kg/m3
ρ.w- is the density of the water. usually 1000 kg/m3

TO CALCULATE THE VOLUME Of THE WATER


ρclay  ρd.m
Vwater  Vd.m
ρclay  ρw

ρ .clay- is the density of the clay, kg/m3


ρ.d.m- is the density of drilling mud, kg/m3
ρ.w- is the density of the water. usually 1000 kg/m3
V.d.m- is the volume of drilling mud ,m3

TO CALCULATE THE MASS OF THE BRITE(MASS OF WEIGHTING


AGENT )


ρclay  ρd.m.need  ρd.m 
Mbrite  Vd.m
ρbrite  ρd.m.need

ρ .clay- is the density of the clay, kg/m3


ρ.d.m- is the density of drilling mud, kg/m3
ρ.w- is the density of the water. usually 1000 kg/m3
V.d.m- is the volume of drilling mud ,m3
ρ.d.m.need- is the density of drilling mud what we nend.kg/m3
ρbrite- is the density of the brite and usually is constant to 4000 kg/m3

TO CALCLUTE THE DENSITY OF FLUIF WHAT WE NEED TO KILL


THW WELL

Pf
ρk.f  ks 
g H

P.f- is the formation preuure MPa


k.s - is the safety coefficient ,(1.1....1.4)
g- is the gravitatinal accleration (9.81 m/s2)
H- the depth of the well
TO CALCULATE THE FORMATIOM PRESSURE

Pf  ka ρw  HTVD

k.a-is the (IAFP) is the index abnormal formation pressure, usually it is


1.18
ρ.w- is the density of water ,kg/m3
H.TVD-is the true vertical depth of the well ,m