INSPECTION AND TESTING PLAN

MOTOR CONTROL CENTER (MCC)

LEGEND RESPONSIBILITY : LEGEND ACTIFITY :


Project : F : Fabricator / Contractor / H - Mandatory Hold Point
Location : Installator V - Verity documents
Owner / User : C : Client R - Review documents
Contractor : TP : Third Party (PJIT) W - Witness Activity Date :
Third Party : M : Migas Rev :

SURVEILLANCE INSPECTION
DESCRIPTION PROCESS DESCRIPTION INSPECTION ACTIVITIES
F C TP M
PRE INSPECTION Inform the client regarding the Certification Agencies H H ---
MEETING scope of work

DESIGN APPRAISAL - Drawing R R ---


- Calculations R R ---
- General Specifications R R ---

FACTORY ACCEPTANCE - Identification of Component, Material and Purchasing order H V V


TEST (FAT) - Visual Inspection W W W
- Wiring & Continuity Test W W W
- MCC Contruction Check W W W
- Small dry-type Distribution Transformer For Controls W W W
- Primary Injection Voltage Test W W W
- Electrical & Mechanical interlock test W W W
- Fuction Test W W W
- Check Ground Bus W W W
- Metering calibration W W W
- Automatic Transfer switch test (if Required) W W W
- Insulation Resistance Test W W W
- Relay Test W W W
INSPECTION AND TESTING PLAN
MOTOR CONTROL CENTER (MCC)

LEGEND RESPONSIBILITY : LEGEND ACTIFITY :


Project : F : Fabricator / Contractor / H - Mandatory Hold Point
Location : Installator V - Verity documents
Owner / User : C : Client R - Review documents
Contractor : TP : Third Party (PJIT) W - Witness Activity Date :
Third Party : M : Migas Rev :

SURVEILLANCE INSPECTION
DESCRIPTION PROCESS DESCRIPTION INSPECTION ACTIVITIES
F C TP M
- DC Hi pot test W W W
- Current & Potential Transformer Test W W W
- Current Transducer test W W W

PRE-COMMISSIONING - Verify nameplate of equipment with data sheet H V ---


TEST (ON-SITE) - Check Equipment Layout based on classification area W W ---
- Check Instruction's Book / Manual Guidance R R ---
- Contact resistance bus W W ---
- Open the cell doors and with the design document, check each W W ---
cell to ensure the correct component are installed
- Earthing measurement W W ---
- Check each drawer motor stater or feeder breaker assembly properly W W ---
- Check mechanism door locking and defeat function prpperly W W ---
- Inspect for the tighten W W ---
- Check cleaning on exterior and interior the MCC W W ---
- Check the cable feeder termination W W ---
- Check the power cables are properly color coded W W ---
- MCC wiring test W W ---
- Function test
- Relay test (as required)
INSPECTION AND TESTING PLAN
MOTOR CONTROL CENTER (MCC)

LEGEND RESPONSIBILITY : LEGEND ACTIFITY :


Project : F : Fabricator / Contractor / H - Mandatory Hold Point
Location : Installator V - Verity documents
Owner / User : C : Client R - Review documents
Contractor : TP : Third Party (PJIT) W - Witness Activity Date :
Third Party : M : Migas Rev :

SURVEILLANCE INSPECTION
DESCRIPTION PROCESS DESCRIPTION INSPECTION ACTIVITIES
F C TP M
- Insulation Resistance Test W W ---
- DC Hi pot Test W W ---
COMMISSIONING TEST - Performance Test W W W
, FINAL INSPECTION
, TAKING OF CERTIFICATE
(TOC)