Академический Документы
Профессиональный Документы
Культура Документы
BATIK
HAND DRAWN BATIK BATIK STAMP BATIK SILK SCREEN
CONTEMPORARY
CORE PRODUCTION PRODUCTION PRODUCTION
PRODUCTION
BATIK PRODUCTION
BATIK PRODUCTION TEAM COMPETENCY
MONITORING AND
BUDGETING CONTROL ENHANCEMENT
SUPERVISION
1
BATIK EQUIPMENT
BATIK SKETCH MAKING
ELECTIVE MAINTENANCE
SS-100-3:2013-E01 SS-100-3:2013-E02
1. Hand Drawn (Canting) SS-100- Hand drawn batik production is the 1. Identify hand drawn batik design 1.1 Hand drawn batik job order and
Batik Production 3:2013-C01 activity / process of making hand specifications sample approval obtained from
drawn batik product using traditional designer
methods by applying wax resisting 1.2 Hand drawn batik production
and canting techniques. Base on requirements which includes
artist imagination and creativity and production quantity, time frame,
using a small container filled with product quality, production flow
hot melted wax hand-drawn to a and techniques identified
white material a piece of an art is 1.3 Hand drawn batik conceptual
created. Proper usage of tools and design, pattern, motif and theme
equipment is needed during which includes flora and fauna,
performing the task to ensure high geometrical and abstract; and
quality of work performance. ethnic confirmed as per design
specifications
The person who is competent in this 1.4 Hand drawn batik design
CU shall be able to identify hand specifications which includes
drawn batik design specifications, single, overlapping and double
prepare materials, wax, colour, boiling confirmed as per
2
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
colour fixation, tools and equipment, production requirements
produce hand drawn batik, carry out 1.5 Sample colour and fabric
finishing activities, quality inspection materials checked and confirmed
and product packing activities in according to hand drawn batik
accordance with hand drawn batik production job order
design specifications.
The outcome of this competency is 2. Prepare hand drawn batik 2.1 Type and characteristics of hand
to produce hand drawn batik materials, tools and equipment drawn batik fabric materials which
product in accordance with includes silk, cotton, rayon and
customer and production linen identified as per production
requirements. requirements
2.2 White fabric materials prepared
for production activities including
process of pre-washing fabric,
measuring fabric size, cutting
fabric (length and width), 36, 45
and 60 inch according to job order
2.3 Type of hand drawn batik tools
and equipment which includes
canting tools, bucket, painting
brush, container, wax melting pot,
melting stove set and stretcher
set determined as per production
requirements
2.4 Resins materials which includes
wax resins, rosin/dammar and
linseed oil selected according to
hand drawn batik making process
requirements
2.5 Hand drawn batik materials, tools
and equipment checked and
confirmed in good working
3
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
condition
2.6 Hand drawn batik materials, tools
and functionality checked and
confirmed as per process
requirements
3. Prepare hand drawn batik wax 3.1 Quantity of wax, linseed oil and
resin/dammar determined as per
production requirements
3.2 Wax materials formulated and
melting wax temperature set
3.3 Wax concentration level
confirmed as per production
requirements
3.4 Canting wax quality tested on
fabric
4. Prepare hand drawn batik colour 4.1 Type of hand drawn batik colour
and colour fixation requirements which includes type
of dye, colour quantity, colour
mixing and colour shades
4
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
identified as per production job
order
4.2 Hand drawn batik colour scheme,
colour formula and colouring
techniques dictated
4.3 Colour mixing process executed
according to colour formulation
5
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
creativity applied according to
design specifications
5.4 Batik fabric pattern intricate by
applying melted wax following
pattern on fabric according to
painting (canting) methods and
techniques
6. Carry out hand drawn batik 6.1 Hand drawn batik fabric deep dye
finishing in dye bath and hand drawn batik
fabric dried
6.2 Coloured hand drawn batik fabric
soaked into fixation materials and
sodium silicate applied sufficiently
6.3 Hand drawn fabric washed to
remove colour fixer
6.4 Hand drawn batik fabric de-
waxing process which includes
boiling fabric to remove wax and
adding de-waxing agent executed
6.5 Hand drawn batik fabric rinsed to
remove excess colour
6.6 Fabric softener and colour
enhancement solution added as
per requirements
6.7 Hand drawn batik fabric dried and
iron cleaned as per requirements
7. Inspect hand drawn batik 7.1 Hand drawn batik product quality
product quality inspection criteria which includes
fabric quality, colour quality and
6
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
canting stroke quality identified
7.2 Hand drawn batik fabric quality
which includes uneven wax line,
excess wax remain and fabric
defect checked
7.3 Hand drawn batik colour quality
which includes uneven colour and
colour bleeding checked
7.4 Canting stroke quality which
includes fine, medium, thick and
continuity checked
7.5 Finished product graded
according to quality criteria
8. Pack hand drawn batik product 8.1 Hand drawn batik finished product
ironed and folding techniques
which includes design placement
and folding size identified
8.2 Finished product folding
techniques applied
8.3 Packing and labelling materials
identified as per packing
requirements
8.4 Packing methods which includes
men, ladies and loose materials
identified according type of hand
drawn batik product
8.5 Packing and labelling method
followed and techniques applied
as per packing requirements
8.6 Finished product packed and
labelled as per packing
requirements
8.7 Hand drawn batik production
activities recorded and
7
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
documented according to
company documentation
procedure
2. Batik Stamp SS-100- Batik stamp (copper block stamp) is 1. Identify batik stamp design 1.1 Batik stamp job order and sample
(Chop/Blok/Terap) 3:2013-C02 a method to apply wax on fabrics by specifications approval obtained from designer
Production putting hot wax onto pre-carved 1.2 Batik stamp production
wooden or copper block and requirements which includes
stamping the fabric. By block production quantity, time frame,
printing the wax onto the fabric, it product quality, production flow
became possible to mass-produce and techniques identified
designs and intricate patterns much 1.3 Batik stamp conceptual design,
faster. Proper usage of tools and pattern, motif and theme which
equipment is needed during includes flora and fauna,
performing the task to ensure high geometrical and abstract, and
quality of work performance. ethnic confirmed as per design
specifications and production
The person who is competent in this requirements
CU shall be able to identify batik 1.4 Batik stamp design specifications
stamp design specifications, which includes single, overlapping
prepare materials, wax, colour, and double boiling confirmed as
colour fixation, tools and equipment, per production requirements
produce batik stamp, carry out 1.5 Sample colour and fabric
finishing activities, quality inspection materials checked and confirmed
and product packing activities in according to batik stamp
accordance with batik stamp design production job order
specifications.
2. Prepare batik stamp materials, 2.1 Type and characteristics of batik
The outcome of this competency is tools and equipment stamp fabric materials which
to produce batik stamp product in includes silk, cotton, rayon and
accordance with customer linen identified as per production
8
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
requirements. requirements
2.2 White fabric materials prepared
for production activities including
process of pre-washing fabric,
measuring fabric size, cutting
fabric (length and width), 36, 45
and 60 inch according to job order
2.3 Type of batik stamp tools and
equipment which includes
stamping tools set, stamping table
set, bucket, container, wax
melting pot, melting stove set and
stretcher set determined as per
production requirements
2.4 Resins materials which includes
wax resins, rosin/dammar and
linseed oil selected according to
batik stamp making process
requirements
2.5 Batik stamp materials, tools and
equipment checked and
confirmed in good working
condition
2.6 Batik stamp materials, tools and
functionality checked and
confirmed as per process
requirements
2.7 Batik stamp materials, tools and
equipment arranged and
preparation confirmed according
to production requirements
2.8 White fabric position on fabric
stretcher determined according to
fabric stretch tension
requirements
9
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
2.9 Fabric stretch on fabric stretcher
according to fabric stretch tension
requirements
3. Prepare batik stamp wax 3.1 Quantity of wax, linseed oil and
resin/dammar determined as per
production requirements
3.2 Wax materials formulated and
melting wax temperature set
3.3 Wax concentration level
confirmed as per production
requirements
3.4 Wax stamping quality tested on
fabric
4. Prepare batik stamp colour and 4.1 Type of batik stamp colour
colour fixation requirements which includes type
of dye, colour quantity, colour
mixing and colour shades
identified as per production job
order
4.2 Batik stamp colour scheme,
colour formula and colouring
techniques dictated
4.3 Colour mixing process executed
according to colour formulation
4.4 Colour absorption result detected
on batik stamp fabrics
4.5 Batik stamp colour mixing
specifications confirmed as per
customer requirements
10
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
4.6 Batik stamp colour mixing sample
approval obtained from customer/
superior
4.7 Batik stamp colour fixation
materials which includes fixative
type, fixative quantity, fixative
amount/dilution level prepared
4.8 Batik stamp fixation process tools
and colouring unit set up as per
production requirements
6. Carry out batik stamp finishing 6.1 Batik stamp fabric deep dye in
dye bath and batik stamp fabric
dried
6.2 Coloured batik stamp fabric
soaked into fixation materials and
sodium silicate applied sufficiently
6.3 Stamped fabric washed to remove
colour fixer
6.4 Batik stamp fabric de-waxing
process which includes boiling
11
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
fabric to remove wax and adding
de-waxing agent executed
6.5 Batik stamp fabric rinsed to
remove excess colour
6.6 Fabric softener and colour
enhancement solution added as
per requirements
6.7 Batik stamp fabric dried and iron
cleaned as per requirements
12
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
requirements
8.4 Packing methods which includes
men, ladies and loose materials
identified according type of batik
stamp product
3. Batik Silk Screen SS-100- Batik silk screen is a printing 1. Identify batik silk screen design 1.1 Batik silk screen job order and
Production 3:2013-C03 technique that uses a woven mesh specifications sample approval obtained from
to support an ink-blocking stencil. designer
The attached stencil forms open 1.2 Batik silk screen production
areas of mesh that transfer ink or requirements which includes
other printable materials which can production quantity, time frame,
be pressed through the mesh as a product quality, production flow
sharp-edged image onto a and techniques identified
substrate. A fill blade or squeegee is 1.3 Batik silk screen conceptual
moved across the screen stencil, design, pattern, motif and theme
forcing or pumping ink into the mesh which includes flora and fauna,
openings for transfer by capillary geometrical and abstract, and
action during the squeegee stroke. ethnic confirmed as per design
Basically, it is the process of using a specifications and production
stencil to apply ink onto another requirements
material. Proper usage of tools and 1.4 Batik silk screen design
13
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
equipment is needed during specifications which includes
performing the task to ensure high single and overlapping confirmed
quality of work performance. as per production requirements
1.5 Sample colour and fabric
materials checked and confirmed
according to batik silk screen
production job order
The person who is competent in this 2. Prepare batik silk screen 2.1 Type and characteristics of batik
CU shall be able to identify batik silk materials, tools and equipment silk screen fabric materials which
screen design specifications, includes silk, cotton, rayon and
prepare materials, wax, colour, linen identified as per production
colour fixation, tools and equipment, requirements
produce batik silk screen, carry out 2.2 White fabric materials prepared
finishing activities, quality inspection for production activities including
and product packing activities in process of pre-washing fabric,
accordance with batik silk screen measuring fabric size, cutting
design specifications. fabric (length and width), 36, 45
and 60 inch according to job order
The outcome of this competency is 2.3 Type of batik silk screen tools and
to produce batik silk screen product equipment which includes silk
in accordance with customer screen frame, silk screen/printing
requirements. table set, squeegee, registration
mark, container, steamer and
setting machine set determined
as per production requirements
2.4 Silk screen frame and photo
stencils/emulsion prepared which
includes preparation of frame,
fixing organza to the frame,
applying stencils materials and
transferring design onto the
organza
2.5 Batik silk screen materials, tools
and equipment checked and
14
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
confirmed in good working
condition
2.6 Batik silk screen materials, tools
and functionality checked and
confirmed as per process
requirements
3. Prepare batik silk screen colour 3.1 Type of batik silk screen colour
and colour fixation requirements which includes type
of dye, colour quantity, colour
mixing, colour shades and
thickener agent identified as per
production job order
3.2 Batik silk screen colour scheme,
colour formula and colouring
techniques dictated
3.3 Colour mixing process executed
according to colour formulation
3.4 Colour absorption result detected
on batik silk screen fabrics
3.5 Batik silk screen colour mixing
specifications confirmed as per
customer requirements
15
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
3.6 Batik silk screen colour mixing
sample approval obtained from
customer/superior
3.7 Batik silk screen colour fixation
materials which includes fixative
type, fixative quantity and fixative
amount/dilution level prepared
3.8 Batik silk screen fixation process
tools and colouring unit set up as
per production requirements
5. Carry out batik silk screen 5.1 Coloured batik silk screen fabric
finishing soaked into fixation materials
applied sufficiently
5.2 Silk screen fabric washed to
remove colour fixer
16
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
5.3 Batik silk screen fabric rinsed to
remove excess colour
5.4 Fabric softener and colour
enhancement solution added as
per requirements
5.5 Batik silk screen fabric dried and
iron cleaned as per requirements
6. Pack batik silk screen product 6.1 Batik silk screen finished product
ironed and folding techniques
which includes design placement
and folding size identified
6.2 Finished product folding
techniques applied
6.3 Packing and labelling materials
identified as per packing
requirements
6.4 Packing methods which includes
men, ladies and loose materials
identified according to type of
batik silk screen product
6.5 Packing and labelling method
followed and techniques applied
as per packing requirements
6.6 Finished product packed and
labelled as per packing
requirements
6.7 Batik silk screen production
activities recorded and
documented according to
company documentation
procedure
17
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
4. Batik Contemporary SS-100- Contemporary batik, while owing 1. Identify batik contemporary 1.1 Batik contemporary job order and
Production 3:2013-C04 much to the past, is markedly design specifications sample approval obtained from
different from the more traditional designer
and formal styles. For example, the 1.2 Batik contemporary production
artist may use etching, discharge requirements which includes
dyeing, stencils, different tools for production quantity, time frame,
waxing and dyeing, wax recipes product quality, production flow,
with different resist values and work creativity, art and design
with silk, cotton, wool, leather, paper development, innovation and
or even wood and ceramics. Proper techniques identified
usage of tools and equipment is 1.3 Batik contemporary conceptual
needed during performing the task design, pattern, motif and theme
to ensure high quality of work which includes flora and fauna,
performance. geometrical and abstract, and
ethnic confirmed as per design
The person who is competent in this specifications
CU shall be able to identify batik 1.4 Batik contemporary design
contemporary design specifications, specifications which includes
prepare materials, wax, colour, single, overlapping and double
colour fixation, tools and equipment, boiling confirmed as per
produce batik contemporary, carry production requirements
out finishing activities, quality 1.5 Sample colour and fabric
inspection and product packing materials checked and confirmed
activities in accordance with batik according to batik contemporary
contemporary design specifications. production job order
The outcome of this competency is 2. Prepare batik contemporary 2.1 Type and characteristics of hand
18
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
to produce batik contemporary materials, tools and equipment drawn batik fabric materials which
product in accordance with includes silk, cotton, rayon, linen,
customer requirements. ramie, voile, viscose, blended
fabric, bamboo and synthetic
fabric identified as per production
requirements
19
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
and preparation confirmed
according to production
requirements
3. Prepare batik contemporary wax 3.1 Quantity of wax, linseed oil and
resin/dammar determined as per
production requirements
3.2 Wax materials formulated and
melting wax temperature set
3.3 Wax concentration level
confirmed as per production
requirements
3.4 Batik contemporary wax quality
tested on fabric
20
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
4.6 Batik contemporary colour mixing
sample approval obtained from
customer/superior
4.7 Batik contemporary colour fixation
materials which includes fixative
type, fixative quantity, fixative
amount/dilution level prepared
4.8 Batik contemporary fixation
process tools and colouring unit
set up as per production
requirements
21
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
adding de-waxing agent executed
6.5 Batik contemporary fabric rinsed
to remove excess colour
6.6 Fabric softener and colour
enhancement solution added as
per requirements
22
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
followed and techniques applied
as per packing requirements
8.6 Finished product packed and
labelled as per packing
requirements
5. Batik Production SS-100- Batik production monitoring and 1. Identify work activities, 1.1 Type of work activities which
Monitoring and 3:2013-C05 controlling describes requirements information and requirements includes hand drawn batik
Supervision in handling and monitoring production, batik stamp
production activities as per production, batik silk screen
requirements to achieve capacity of production and batik
batik production output. contemporary production
determined according to company
The person who is competent in nature of business
work organising shall be able to 1.2 Work target determined according
identify work activities information to production job order and
and requirements, prepare work company requirements
schedule, arrange unit manpower, 1.3 Job workflow determined
execute subordinate briefing, according to company SOP
conduct batik production inventory, 1.4 Resources availability determined
monitor batik production and according to current situation
distribution activities in accordance
with company requirements. 2. Prepare work schedule 2.1 Work schedule format
determined according to
The outcome of this competency is company’s requirements
to ensure the objectives of work are 2.2 Workflow detailed out according
delivered effectively, increase work to work instruction
23
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
productivity and quality in 2.3 Time frame for workflow set
accordance with company according to company
requirements. requirements
2.4 Manpower allocated according to
job requirements
2.5 Work schedule drafted and
computer literacy applied
24
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
4.2 Type of inventory recording
system and batik production
security which includes security
system, storage area and safety
boxes identified
25
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
5.3 Batik preparation, production and
finishing activities checked,
monitored, confirmed and verified
as per procedure
5.4 Current work problem determined
according to actual situation and
work problem handled
5.5 Improvement plan in batik
production activities suggested to
superior
5.6 Manpower performance checked
according to manpower skill chart
5.7 Information and ideas conveyed
to subordinate and performance
of subordinate monitored
5.8 Consultations and counselling
provided according to HR
guidelines
6. Batik Production SS-100- Batik production budgeting control 1. Identify unit/activity budget 1.1 Details of expense items listed
Budgeting Control 3:2013-C06 describes the competency in requirements according to nature of company’s
unit/activity budgeting control and business
controlling sufficient budget for the 1.2 Duration of budget identified
batik production operation. according to company
requirements
The person who is competent in 1.3 Scope of budget preparation
unit/activity budgeting control shall identified according to level of
be able to identify unit/activity authority
budget requirements, prepare 1.4 Company policies, SOP and
unit/activity budget, control guidelines regarding budget
unit/activity budget and prepare preparation identified.
unit/activity budget utilisation report.
2. Prepare unit/activity budget 2.1 Format of budget determined
The outcome of this competency is according to company
26
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
to produce efficient and responsible requirements
personnel in utilising fund and 2.2 Type of usage items determined
resources allocated by the according to previous data
company. 2.3 Information related to usage item
gathered according to company
requirement
27
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
company SOP
4.3 Budget utilisation report drafted
according to company SOP and
computer literacy applied
4.4 Report submitted and presented
to superior
7. Team Competency SS-100- Team competency enhancement 1. Identify team competency 1.1 Type of work activities
Enhancement 3:2013-C07 describes the competency in enhancement requirements. determined according to nature
monitoring subordinates during of company’s business
working period and developing 1.2 Types of organisation chart
suitable knowledge and skills in hierarchy determined according
training. to nature of company’s business.
1.3 Type of designation and job
The person who is competent in description determined according
team competency enhancement to nature of company’s business
shall be able to identify team 1.4 Resource availability determined
competency enhancement according to current situation
requirements, conduct staff training,
maintain team cooperation and 2. Conduct in-house training 2.1 Training requirements
generate staff performance report. determined according to Training
Need Analysis (TNA) report
The outcome of this competency is 2.2 Types of training method
to develop competent manpower in determined according to
terms of discipline, attitude, company practice
knowledge and skills. 2.3 Training details proposed
according to company
requirements
2.4 Related department liaised with
according to company guidelines
2.5 Training tools and equipment
prepared according to specific
training programme
2.6 Training material developed
28
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
according to specific training
programme
2.7 Training programme delivered
according to training programme
2.8 Training feedback and
effectiveness assessed
29
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
8. Batik Sketch Making SS-100- Batik sketch making is the art of 1. Identify batik sketch making 1.1 Elements of design which
3:2013-E01 drawing sketches at the core of requirements includes line, colour, shape,
every figurative image with space, texture and form
expression and power. It is a interpreted as per batik sketch
process of gathering inspiration and making requirements
exploring creative ideas. It has 1.2 Principles of design which
multifaceted subject that can be includes unity, harmony/balance,
linked to a range of sociological, hierarchy, scale/proportion,
cultural, psychological and dominance/emphasis, similarity
commercial perspectives. and contrast, and rythme
interpreted as per batik sketch
The personnel who are competent making requirements
in this competency unit shall be able 1.3 Sketching techniques which
to identifying batik sketch making includes hatching, shading,
requirements, prepare drawing scribble and mass line interpreted
materials and tools and produce as per batik sketch making
batik sketch book according to batik requirements
design market/customer 1.4 Basic fashion illustration
requirements. interpreted as per batik sketch
making requirements
The outcome of this competency is
to sketch batik design and idea 2. Prepare drawing materials and 2.1 Sketching method which includes
development on the designing tools dry media and wet media
process. determined as per batik sketch
making requirements
2.2 Drawing materials, tools and
equipment identified and selected
30
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
2.3 Drawing materials, tools and
equipment condition checked and
confirmed in good working
condition
2.4 Drawing materials, tools and
equipment arranged as per batik
sketch making requirements
3. Produce batik sketch book 3.1 Type of product, idea and type of
motif determined as per batik
sketch making requirements
3.2 Visual interest identified and
rough idea transferred on paper
3.3 Ideas which includes layout, motif,
colour and stylise developed as
per batik sketch making
requirements
3.4 Principles and elements of design
applied as per batik sketch
making requirements
3.5 Batik sketching idea development
presented to superior/designer for
confirmation and approval
31
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
9. Batik equipment SS-100- Batik equipment maintenance 1. Identify batik equipment 1.1 Types of batik tools and
maintenance 3:2013-E02 describes requirements in maintenance requirements equipment defect which includes
monitoring and maintaining machine canting tools, block, wax
and production activities as per container, screen, screen
requirements to achieve capacity of exposure machine, brushes and
batik production output. frame identified
1.2 Machine and equipment
The personnel who are competent maintenance requirements,
in this competency unit shall be able schedule and scope of work
to identify batik equipment identified
maintenance requirements, conduct 1.3 Batik equipment type and
machine and equipment functionality determined according
maintenance and test batik tools to user guideline manual
and equipment according to 1.4 Workflow for basic maintenance
company requirements. determined according to machine
manual
32
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
includes checking, cleaning,
repairing, and verification followed
as per requirements
2.5 Routine maintenance execution
monitored before and after works
33
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
34