1. ACTIONS
- Ultimate load
2. ANALYSIS
3 Moment –Equation method: the relation btw any 3-points is derived as follows (the beam is of constant cross-section
for all its spans, E & I are constant therefore):
MAL1+2MB(4+5)+5MC=-77.96(43/4+53/4)
18MB + 5MC = -3683.61 (1)
MBL2+2MC(5+4)+4MD=-77.96(53/4+43/4)
5MB + 18MC + 4MD = -3683.61 (2)
MCL3+2MD(4+6)+155.92=-77.96(43/4+63/4)
4MC+ 20MD + 155.92 = - 5613.12 (3)
Solving for (1), (2) and (3), MB = -196.96 kNm, MC = -27.66 kNm, MD = -550.25 kNm
Taking each span seperately and solving the beam (attached hand calculations), the reactions on each suupport are
obtained as:
Ay = 106.68 kN Dy = 528.85 kN
By = 433.87 kN Ey = 324.08 kN
Cy = 243.73 kN
3.1 SPAN AB
beff = bf = 1660 mm
M 73.07 x 106
k= = =0.011 → l a=0.95(fig . 7.5)
b f d 2 f ck 1660 x 3922 x 25
d – z = 392 – 372.4 = 19.6 < hf/2 = 200/2 = 100 mm → n.a. in flange, section is designed as rectangular cross-section
3.2 SPAN BC
beff = bf = 1700 mm
6
M 335.06 x 10
k= 2
= 2
=0.051 →l a =0.95( fig .7.5)
b f d f ck 1700 x 392 x 25
d – z = 392 – 372.4 = 19.6 < hf/2 = 200/2 = 100 mm → n.a. in flange, section is designed as rectangular cross-section
d
z= ( 1+ √ 1−3.53 K ) ≤0.95 d
2
392
z= ( 1+ √ 1−3.53 x 0.024 )=383.51>372.4=0.95 d → z=372.4
2
M 27.66 x 10 6
As= = =170.74 mm 2
0.87 f yk z 0.87 x 500 x 372.4
3.3 SPAN CD
beff = bf = 1420 mm
6
M 43.80 x 10
k= 2
= 2
=0.008 →l a=1( fig .7.5)
b f d f ck 1420 x 392 x 25
z = la x d = 1 x 392 = 392 mm
d – z = 0 < hf/2 = 200/2 = 100 mm → n.a. in flange, section is designed as rectangular cross-section b = bf = 1420 mm
M 550.25 x 106
k= = =0.477> 0.167 →compression reinforcement is required
b f d 2 f ck 300 x 3922 x 25
3.4 SPAN DE
beff = bf = 1980 mm
6
M 519.89 x 10
k= 2
= 2
=0.068 →l a=0.93( fig .7.5)
b f d f ck 1980 x 392 x 25
d – z = 392 – 364.56 = 27.44 < hf/2 = 200/2 = 100 mm → n.a. in flange, section is designed as rectangular cross-
section
M 519.89 x 106
As= = =3278.33 m m2
0.87 f yk z 0.87 x 500 x 364.56
M 155.92 x 106
k= = =0.135< 0.167→ no compression reinforcement is required
b f d 2 f ck 300 x 3922 x 25
d
z= ( 1+ √ 1−3.53 K ) ≤0.95 d
2
392
z= ( 1+ √ 1−3.53 x 0.135 ) =337.81< 372.4=0.95 d → z=337.81
2
6
M 155.92 x 10
As= = =1061.06 mm2
0.87 f yk z 0.87 x 500 x 337.81
beff = bf = 1460 mm
M 155.92 x 106
k= 2
= 2
=0.028 →l a=0.95( fig .7.5)
b f d f ck 1460 x 392 x 25
d – z = 392 – 372.4 = 19.6 < hf/2 = 200/2 = 100 mm → n.a. in flange, section is designed as rectangular cross-section
M 155.92 x 106
As= = =962.50 mm 2
0.87 f yk z 0.87 x 500 x 372.4
4. SHEAR DESIGN
= 0.124x300x392(1-25/500)25 = 328 kN > 287.96 kN → θ = 22 ° , cotθ = 2.5 will be used for all shear calculations.
4.1 SPAN AB
- Shear links near support A
4.2 SPAN BC
4.3 SPAN CD
4.4 SPAN DE
4.5 SPAN EF