Академический Документы
Профессиональный Документы
Культура Документы
Roofing Solutions
for Cold Formed Steel Construction
www.framecad.com
FRAMECAD® Metal Roof Tile offer:
2. Lead Time
a. Less than 2 colours : 2-3 weeks
b. More than 2 colours : 2-4 weeks
3. Payment Terms: 100% payment prior to delivery by T/T remittance (or by negotiation)
Packaging
1. Minimum 500 pieces per pallet
Maximum 16 pallets per 20” container
© FRAMECAD 2013
FRAMECAD® - GRAND
Red
25mm
370mm
Brown Bark
395mm
Teak
25mm
25mm
Item Dimensions
Silver Grey
© FRAMECAD 2013 1
FRAMECAD® - VENETIAN
Terrecotta
1285mm
380mm
Red
440mm 250mm 250mm 300mm
Screw / Nailing Position
420mm
25mm
25mm
Item Dimensions
© FRAMECAD 2013 2
FRAMECAD® - WOODGRAIN
Brown Bark
1335mm
Charcoal 25mm
370mm
Teak
415mm
Red 25mm
25mm
Item Dimensions
© FRAMECAD 2013 3
FRAMECAD® - PAINTED METAL
25mm
380mm
420mm
25mm
25mm
DOVER Painted
1345mm
25mm
370mm
415mm
25mm
25mm
© FRAMECAD 2013 4
INSTALLATION
Fixing locations
With Batten
Use 50mm fastener
When screwing in fasteners, always face the eaves while standing on top of the tiles
being installed. Ensure fastenings are positioned on the crest above pan not in water channel.
In high winds or coastal regions, use a minimum of 6 fasteners per tile.
After fastening, in order to prevent water damage always use an adhesive / sealant to finish.
Changing Pitch
365mm 365mm
365mm
365mm Rafter
Batten
Rooftile
Please Note:
Avoid fastening in places with electrical wiring above and below.
Apply fasteners with a sealing washer in the upcurve as marked in red above
© FRAMECAD 2013 5
INSTALLATION - Tile Lapping
Grand tile Dover tile
Tile B overlaps tile A End of tile A Tile B overlaps tile A End of Tile A
(Overlap)
A B
A B
A A A B fastening
B placement
Rafter Rafter
Rafter
Batten
Batten Batten
Fascia
Fascia Fascia
Gutter
© FRAMECAD 2013 6
INSTALLATION - Barge Boards
When using side flashing install the batten above the rafter and match the top of the barge board to the top of
the batten. The edge of the steel roof tiles must be bent up so that the part tucked into the side flashing is long
enough to prevent water ingress / damage.
Rafter
INSTALLATION - Valleys
Batten
Valley
Screw position
Valley
Screw position
Valley
Batten
Roof Tile
Roof Tile
Screw
Valley
Batten
© FRAMECAD 2013 7
FINISHING
- Half round ridge/hip - V- Ridge / Hip - V-Ridge / Hip Cap - Half round Ridge / Hip Cap
150mm
92mm
180mm
94mm
400mm
400mm 110mm
140mm 145mm
160mm 160mm
12mm 60mm
457mm 30mm
20mm
12mm
60mm 1340mm
1340mm 180mm 1340mm
50mm
12mm
1340mm 1340mm
160mm
12mm
8
© FRAMECAD 2013
Notes:
© FRAMECAD 2013
This document has been published for
the purpose of providing information
of a general nature only. Further, no
guarantee, warranty, or any other
form of assurance is given as to the
accuracy, currency or completeness of
the information provided. Accordingly,
any reliance on, or use, by you of any
information contained within this
document for any purpose whatsoever
shall be entirely at your own risk, and any
liability to you is expressly disclaimed to
the maximum extent permitted by law.
FRAMECAD® Ltd , logos and Trademarks
are the property of FRAMECAD Ltd.
Copyright 2013 FRAMECAD® Ltd.
www.framecad.com