Академический Документы
Профессиональный Документы
Культура Документы
TRANSPORTE NORMAL
ORIGEN DESTINO D.V. S/. X TM FRV S/. X TM INDICE 32 INDICE 32 REAJUSTE SUB TOTAL
kmv Sep-06 Oct-12
Lima Cerro de Pasco 353.320 66.050 1.000 66.050 386.130 450.670 1.167 77.09
Chasquitambo
ORIGEN DESTINO D.V. S/. X TM FRV S/. X TM INDICE 32 INDICE 32 REAJUSTE SUB TOTAL
kmv (1) Sep-06 Oct-12
Lima Cerro de Pasco 353.320 66.050 1.400 92.470 386.130 450.670 1.167 107.93
Chasquitambo
353.320 66.050 92.470 107.930
(1): Según el Art. 4º del D.S. Nº 033-2006-MTC se aplica el Factor de Retorno de Vacío equivalente a 1.4 siempre que la ruta exceda de 200 km.
Virtuales.
CALCULO DE DISTANCIA VIRTUAL A LA OBRA
MES DE CALCULO : NOVIEMBRE 2012
Calculando la distancia virtual de acuerdo a lo establecido en el D.S. N° 049-2002-MTC del 19.12.02
C.P (CHASQUITAMBO) - HUACHON SIERRA > 2500 Trocha 83.000 3.900 323.700
(OBRA) NINACACA
TOTAL DV 323.700
TIPO CARGA UTIL D.V. S/. X TM FRV S/. X TM INDICE 32 INDICE 32 REAJUSTE SUB
TRANSPORTE (Ton) kmv Dec-02 Oct-12 TOTAL
Normal 15 323.700 865.004 57.667 318.230 450.670 1.416 81.67
Especial (Líquidos) 15 323.700 1,211.01 80.734 318.230 450.670 1.416 114.33
FLETE FLETE
ORIGEN - DESTINO
x TM x KG
FLETE FLETE
ORIGEN - DESTINO
X TM X KG
ABONOS ORGANICO sac 40.00 LIMA 50.00 50.00 6.35 1.00 0.50 57.85
ACEITE PARA MOTOR SAE-30 gal 5.00 LIMA 42.01 42.01 0.79 0.84 0.06 43.70
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 1.00 LIMA 2.76 3.03 2.49 0.16 0.06 0.01 2.99
ALAMBRE NEGRO RECOCIDO N° 16 kg 1.00 LIMA 3.54 3.65 4.09 2.87 0.16 0.07 0.01 3.78
ALAMBRE NEGRO RECOCIDO N° 8 kg 1.00 LIMA 3.54 3.65 4.09 2.87 0.16 0.07 0.01 3.78
ALCANTARILLA METALICA Ø=36" C=12 m 56.14 LIMA 321.00 321.00 8.91 6.42 0.70 337.03
ALCANTARILLA METALICA Ø=48" C=12 m 90.92 LIMA 520.00 520.00 14.43 10.40 1.13 545.96
ANGULO DE FIERRO 1 1/2" x 1 1/2" x 1/8" m 0.35 LIMA 5.80 5.80 0.06 0.12 0.00 5.97
ASFALTO RC-250 gal 1.60 LIMA 6.88 6.10 6.10 8.43 0.25 0.14 0.02 7.29
BARRENO 5' x 1/8" und 4.30 LIMA 322.09 322.09 0.68 6.44 0.05 329.26
CAL BLANCA kg 1.00 LIMA 0.85 0.85 0.16 0.02 0.01 0.04 1.08
CAPTAFAROS und 0.35 LIMA 21.00 21.00 21.00 0.06 0.42 0.00 21.48
CEMENTO PORTLAND TIPO I (42.5 kg) bol 42.50 LIMA 14.49 14.32 14.66 6.75 0.29 0.53 0.72 22.78
CLAVOS PARA MADERA CON CABEZA DE 3" kg 1.00 LIMA 3.62 3.68 4.09 3.08 0.16 0.07 0.01 3.86
DINAMITA kg 1.00 LIMA 7.25 7.25 0.22 0.15 0.01 0.44 8.07
FIBRA DE VIDRIO PREPARADA 4mm m2 2.50 LIMA 145.00 145.00 0.40 2.90 0.03 148.33
FULMINANTE und 0.25 LIMA 0.48 0.48 0.06 0.01 0.00 0.03 0.58
GASOLINA gal 3.20 LIMA 8.40 8.40 0.71 0.17 0.04 0.42 9.74
GEOTEXTIL NO TEJIDO m2 0.26 LIMA 2.49 2.49 0.04 0.05 0.00 2.58
GUARDAVIAS TRANSVERSALES C/ACCESORIOS und 10.66 LIMA 204.00 204.00 1.69 4.08 0.13 209.90
GUIA (MECHA) m 0.10 LIMA 0.48 0.48 0.02 0.01 0.00 0.03 0.54
LAMINA REFLECTORIZANTE p2 0.20 LIMA 12.31 12.31 0.03 0.25 0.00 12.59
LIJA und 0.20 LIMA 0.98 0.98 0.03 0.02 0.00 1.03
MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA p2 1.18 LIMA 4.45 4.50 4.40 0.19 0.09 0.01 4.74
MECHEROS und 2.00 LIMA 10.00 10.00 0.32 0.20 0.02 10.54
PERNOS 1/4" x 2 1/2" und 0.35 LIMA 1.71 1.71 0.06 0.03 0.00 1.80
PERNOS 14" x 5/8" und 0.35 LIMA 2.59 2.59 0.06 0.05 0.00 2.70
PERNOS 3/8"x7" und 0.35 LIMA 1.71 1.71 0.06 0.03 0.00 1.80
PERNOS TUERCA Y ARANDELA jgo 1.60 LIMA 27.00 27.00 27.00 27.00 0.25 0.54 0.02 27.81
PETROLEO DIESSEL # 2 gal 3.20 LIMA 12.00 12.00 0.51 0.24 0.04 0.60 13.39
PINTURA ANTICORROSIVA gal 4.30 LIMA 25.75 25.56 25.06 26.64 0.68 0.52 0.05 27.01
PINTURA ANTICORROSIVA EPOXICA gal 4.30 LIMA 61.50 61.50 0.68 1.23 0.05 63.46
PINTURA ESMALTE gal 4.30 LIMA 32.00 32.00 0.68 0.64 0.05 33.37
PINTURA ESMALTE EPOXICO BLANCO gal 4.30 LIMA 207.00 207.00 0.68 4.14 0.05 211.87
PINTURA ESMALTE EPOXICO NEGRO gal 4.30 LIMA 137.35 137.35 0.68 2.75 0.05 140.83
PINTURA ESMALTE METALICO gal 4.30 LIMA 33.17 35.00 31.33 0.68 0.66 0.05 34.56
PINTURA ESMALTE SUPER SINTETICA gal 4.30 LIMA 35.00 35.00 0.68 0.70 0.05 36.43
PLANCHA DE TECNOPOR DE 1"x4´x8´ pln 1.00 LIMA 9.48 9.24 9.71 0.16 0.19 0.01 9.83
PLANCHA Fe LAC 5/8" kg 1.00 LIMA 6.28 6.21 6.34 0.16 0.13 0.01 6.57
PLANCHA GALVANIZADA DE 1.5mm und 33.91 LIMA 111.14 106.69 115.58 5.38 2.22 0.42 119.16
PLATINA DE FIERRO DE 1/8" X 2 " X 20 pza 16.36 LIMA 24.62 24.62 24.62 2.60 0.49 0.20 27.91
POSTE METALICO DE L=1.2m y E=6.00mm pza 20.95 LIMA 78.00 78.00 78.00 3.33 1.56 0.26 83.15
SELLADOR P/superficie cristalizador/ poros e impermeabilizacion. (20Kg) gal 4.30 LIMA 8.85 8.85 0.68 0.18 0.05 9.76
SEMILLA DE RAY GRASS kg 1.00 LIMA 12.00 12.00 0.16 0.24 0.01 12.41
SOLDADURA kg 1.00 LIMA 12.71 12.71 0.16 0.25 0.01 13.13
THINNER gal 3.66 LIMA 12.71 12.71 0.81 0.25 0.05 0.64 14.46
TINTA SEROGRAFICA gal 4.30 LIMA 1,086.25 1,086.25 0.68 21.73 0.05 1108.71
TRANQUERA und 30.00 LIMA 100.00 100.00 4.76 2.00 0.37 107.13
TRIPLAY e=12mm pln 6.00 LIMA 59.12 59.24 59.00 0.95 1.18 0.07 61.32
TUBERIA FO.GO. 3" m 7.50 LIMA 22.50 22.50 1.19 0.45 0.09 24.23
TUBERIA PVC SAP 2" m 4.00 LIMA 7.30 7.30 0.64 0.15 0.05 8.14
DISTANCIA REAL LIMA - HUACHON OBRA (kmv) 436.32 km
EQUIPO TRANSPORTADO
N° DE VIAJES
EQUIPO Peso (Ton) CANTIDAD Cama Baja 25 Cama Baja 18 Plataforma 19 Semitrayler
tn tn tn 40 tn
EQUIPO AUTOTRANSPORTADO
ALQULER DISTANCIA
EQUIPO AUTOTRANSPORTADO UND CANTIDAD VELOCIDAD ALQUILER
HORA S/. KM
CAMION CISTERNA 4x2 (AGUA) 122 HP 2,000 H.M 129.50 2.00 436.32 60.00 1,883.45
CAMION VOLQUETE 6x4 330 HP 10 M3 H.M 212.48 5.00 436.32 60.00 7,725.59
TOTAL MOVILIZACION DE EQUIPO S/. 9,609.04
TOTAL MOVILIZACION Y DESMOVILIZACION DE EQUIPO S/. 9,609.04
MONTAJE Y DESMONTAJE
CATEGORIA
DESCRIPCION OPERARIO- OFICIAL- PEON-
NIVELADOR CONTROLADOR AYUDANTE
Leyes y Beneficios Sociales sobre el BUC 12% S/. 1.87 1.50 1.34
COSTO HORA
CATEGORIA
HOMBRE S/.
CAPATAZ 1.2 Operario 19.30
TOPOGRAFO 1.10 Operario 17.69
AYUDANTE 1.0 Peón 12.43
OPERARIO MECANICO 1.2 Operario 19.30
OFICIAL MECANICO 1.2 Oficial 16.54
PEON MECANICO 1.2 Peón 14.92
OPERARIO ELECTRICO 1.15 Operario 18.49
OFICIAL ELECTRICO 1.15 Oficial 15.85
PEON ELECTRICO 1.15 Peón 14.29
TABLA DE ALQUILER DE EQUIPO MECANICO
COSTO
CAMION CISTERNA 4x2 (AGUA) 122 HP 2,000 122 2,000 gl 13,000.00 129.50 128.96 130.04
CAMION VOLQUETE 6x4 330 HP 10 M3 330 10 m3 26,000.00 212.48 188.87 236.08
CARGADOR S/LLANTAS 125-155 HP 3 YD3 125 3 YD3 16,584.00 171.82 170.08 173.56
CARGADOR S/LLANTAS 160-195 HP 3.5 YD3 160 3.5 YD3 18,585.00 199.82 197.58 202.05
CHANCADORA PRIM. SECUND. 5 FAJAS 75 HP 46-70 T/H 75 46 TN/Hrs 23,000.00 271.39 271.39
COMPACTADOR VIB. TIPO PLANCHA 7 HP 7 160.00 26.97 26.97
COMPACTADOR VIBRATORIA TIPO PLANCHA 4 HP 4 95.00 22.74 22.95 22.53
COMPRESORA NEUMATICA 196 HP 600-690 PCM 196 600-690 PCM 5,000.00 171.06 171.06
COMPRESORA NEUMATICA 250 - 330 PCM,87 HP 87 250-330 PCM 2,300.00 77.42 77.42
EQUIPO ARENADO 500.00 7.10 7.10
EQUIPO DE SOLDAR 295 A 50.00 7.23 7.23
ESTACION TOTAL 30.00 12.60 12.60
FAJA TRANSPORTADORA 18"x50" M.E. 3HP 150 TON/H 3 150 T/H 4,000.00 5.39 5.39
GRUPO ELECTROGENO 230 HP 150 KW 230 150 Kw 2,000.00 173.24 173.24
GRUPO ELECTROGENO116 HP 75 KW 116 75 Kw 1,500.00 139.76 139.76
MARTILLO NEUMATICO DE 25 kg 25.00 7.97 12.20 3.74
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 18 11-12 P3 1,500.00 12.13 15.05 9.20
MOTOBOMBA 4" INCLUYE MANGUERA Y ACCESORIOS 12 4" 295.00 21.12 21.12
MOTONIVELADORA DE 125 HP 125 11,515.00 158.97 158.97 158.97
NIVEL TOPOGRAFICO 10.00 2.52 2.52
PRISMA PARA ESTACION TOTAL 8.00 13.44 13.44
RETROEXCAVADORA S/O 115-165 HP 75-1 4Y3. 115-165 1.4 YD3 8,000.00 120.27 119.54 121.00
RODILLO LISO VIBR. AUTOP 101-135 HP 10-12 T. 101-135 11,100.00 147.73 147.73
RODILLO LISO VIBR. AUTOP 70-100 HP 7-9 T. 70 7-9 TON 7,300.00 96.32 96.32
RODILLO PATA CABRA V. AUTOP 100-135 HP 11-13 T. 100 11-13 TON 11,300.00 148.49 148.49
TRACTOR DE ORUGAS DE 140-160 HP 140 14,900.00 243.15 243.06 243.23
TRACTOR DE ORUGAS DE 190-240 HP 190 20,520.00 311.42 289.79 333.05
VIBRADOR DE CONCRETO 4 HP 2.40" 4 18 PL (2.40") 40.00 5.59 5.90 5.28
ZARANDA VIBRATORIA 4"x6"x14" M.E. 15HP 15 7,000.00 50.39 50.39