Total TR
0
2
8
2
2.4
5.5
1
3
5.5
5.5
0.8
1
4.5
2
0.8
0.8
1.5
3
49.3
56
110%
VRF SYSTEM FOR OFFICE AREA
Supply & Installation of Modular type Variable Refrigerant Flow System, 45 TR capacity, with eco friendly R-410a
refrigerant, Outdoor units comprising of Hermatically sealed Full Inverter Scroll Compressor, High Efficiency
Condenser fan, Heat exchanger with anticorrosive coated fins for incresed durability suitable to connect with all
type of indoor units with cordless/corded remote controllers.
1 OUTDOOR UNITS
Supply of VRF based Outdoor Evaporative Units complete
with all accessories.
The Units shall be suitable for operating with R-410A
refrigerant and equipped with highly efficient scroll
compressors, with condenser coil coated with epoxy
coating to prevent corrosion, low noise condenser fan,
microprocessor controller with auto check function for
dignostics & error correction complete as per OEM
specifications, of following capacities:
Design Ambient Temp.: 40˚C
Design Room Temp.: 26 ± 1˚C
Capacity: 1 x 20 HP + 2 x 18 HP = 56 HP
a Size 20 HP Outdoor Unit 1 No.
b Size 18 HP Outdoor Unit 2 Nos
c ODU Connection kit 2 Nos
2 INDOOR UNITS
Supply of VRF based In-door Evaporative Units
complete with all accessories vibration isolators etc of the
following capacities:
e Remote control
(i) Corded remote controllers - For Ductable 4 Nos
(ii) Cordless remote controllers - For Hi-wall / Cassette 21 Nos
(iii) Central Electronic Remote Controller Unit*: 1 No.
* System should enable operating,monitoring and
controlling of all Indoor & Oudoor Units of the VRF System.
The controller shall have the following minimum
functions:
i) Run status of each IDU.
ii) Temperature setting of the individual IDU's
iii) Fan Speed setting of the individual IDU's
iv) Indication of Temperature in the rooms
v) Switching on/off the indoors/outdoor units from the
front desk
vi) Group formation, view alarms, Fault Diagnosis.
vii)Daily & Weekly scheduling , IDU grouping and
controlling
viii) Communication with ODU microprocessor to share
the complete data of the ODUs & Report generation
A - EQUIPMENT
d Electrical Work
(i) Electrical Panel
Supply, installation, testing & commissioning of IP 65
Electrical Power Panel with necessary MCB / MCCB with
main incoming and out going as required for 56 HP system
for catering to electrical power supply to the VRF
outdoor units. 1 No.
(Incomer power cable to the panel will be terminated by
another agency)
Note: The contractor shall submit details of the Electrical
Panel, including Incomer and Outgoing sizes of all the
switchgears, Isolators / MCB sizes, Indicating Lamps,
Meters etc, along with SLD for the Panel.
(ii) Electrical Power Cabling
Copper Armored power cable between electrical panel &
VRF ODU’s located on the Terrace. The Cabling shall be
properly supported on Cable Trays 1 Lot
Note: The contractor shall submit details of the Electrical
Power Cabling like Cable sizes and lengths.
(iii) Electrical Control Cabling
Supply & Installation of control cum transmission cable
between ODUs, IDUs and Electrical Panel / Contoller
in PVC Conduits 1 Lot
Note: The contractor shall submit details of the Control
Cabling like Cable size and length & PVC Conduit size.
(iv) Earthing
Carrying out Earthing for the entire Electrical System with
GI Strip / Copper Wire, as per requirement 1 Lot
Note: The contractor shall submit details of the Earthing
like Wire / Strip sizes, material & lengths.
(v) Cable Trays
Hot Dipped Galvanized Perforated Tray with necessary
supporting accessories like studs,anchor fastners, clamps
as required for refrigerant piping,drain piping &
communication cabling, with G.I. Sheet cover on top
for protection of copper tubes and cables from damage.
i 400 mm wide 10 Mtr
ii 300 mm wide 25 Mtr
iii 200 mm wide QR Mtr
6 DRAIN PIPING
Condensate Drain Piping constructed out of HDPE Hard
Pipes, PN 10 rating (10 kg/cm2), complete with fittings
bends, elbows, tees, flanges, wall sleeves, hangers,
supports, anchors, clamps etc.
The Drain Piping shall be duly insulated with 6 mm thick
nitrile rubber sleeve insulation.
a 20/25mm Hard PVC Drain piping with insulation 75 Mtr
b 32mm Hard PVC Drain piping with insulation 60 Mtr
B - LOW-SIDE WORK
Total A + B
GST @ 28% of supply of Equipments
GST @ 28% on supply of low side materials
GST @ 18% on supply of low side materials
GST @ 18% on labour
GRAND TOTAL
25.10.2017
endly R-410a
ciency
ect with all
SUPPLY INSTALLATION
UNIT RATE Amount UNIT RATE Amount
(Rs) (Rs)
68,000 68,000 0
9,000 9,000 0
85 10,200 10 1,200
0 5,000 5,000
515 41,200 200 16,000
0 5,000 5,000
0 7,000 7,000
0 5,000 5,000
0 8,000 8,000
939,580 291,325
2,784,680 362,425
516,628
27,160
151,664
65,237
3,907,794