Project__________________________Take of sheet No___________ PAGE_____

Block ……………….. Block Name ……………..


No L/w/T Vol/Are Discrition No L/w/T Vol/Are Discrition
Ditto but For the second floor -2 1.82
Internal wall plastering 1.1 (4.00)
1 12.18 2 6.98
2.83 34.47 3.28 45.79
-3 1.21 2 2.18
1.61 (5.84) 3.28 14.30
-2 0.71 2 4.41
0.61 (0.87) 3.52 31.05
2 4.81 2 3.41
2.83 27.22 3.28 22.37
1 4.81 2 4.34
0.69 3.32 3.52 30.55
-2 1.81 2 4.41
1.61 (5.83) 3.03 26.72
1 4.72 1 4.41
2.83 13.36 0.49 2.16
0.5 4.72 1 4.94
0.69 1.63 1.1 5.43
1 3.80 2 2.23
2.83 10.75 1.1 4.91
0.5 3.8 1 3.11
0.69 1.31 2.87 8.93
2 3.2 0.5 3.11
3.08 19.71 0.65 1.01
2 3.29 2 1.37
3.08 20.27 2.87 7.86
2 1.29 1 1.37
3.08 7.95 0.65 0.89
2 3.5 2 3.19
3.08 21.56 3.08 19.65
1 2.81 1 4.32
2.83 7.95 2.87 12.40
0.5 2.81 0.5 4.32
0.69 0.97 0.65 1.40
1 3.54 -1 1.21
2.83 10.02 1.61 (1.95)
0.5 3.54 -1 0.71
0.69 1.22 0.61 (0.43)
2 8.81 1 3.81
3.52 62.02 2.87 10.93
1 3.19 1 3.62
3.52 11.23 3.08 11.15
1 8.84 0.5 3.62
3.08 27.23 0.44 0.80
-3 1.21 -1 0.71
1.61 (5.84) 0.61 (0.43)
-1 1.81 1 3.22
1.61 (2.91) 3.03 9.76
1 3.19 0.5 3.22
3.08 9.83 0.49 0.79
0.5 3.19 1 4.61
0.44 0.70 3.03 13.97
Contracter Name Site supervisor Project Engineer
Project__________________________Take of sheet No___________ PAGE_____
Block ……………….. Block Name ……………..
No L/w/T Vol/Are Discrition No L/w/T Vol/Are Discrition
-2 1.21
1.61 (3.90)
543.53 Total Qty
Project________Asella Housing Project Page
Block ………… Abebe Goben Block Name ……………..
No L/w/T Vol/Are Discrition No L/w/T Vol/Are Discrition
Frist floor internal wall
plastering
2 4.41
2.61
23.02 Axis-B B/n 3-4
1 4.94
2.61
12.89 Axis B' B/n 3-4 near stair
1 2.52
2.61
6.58 Axis-4 B/n B-B' near to stair
1 3.41
2.61
8.90 Ditto
2 3.90
2.61
20.36 Axis-2 B/n B-C
1 6.70
2.61
17.49 Axis-5 B/n A-B'
-1 0.71
0.61
(0.43) Ddt windows

88.80 Total Sum


Contracter Name Site supervisor Project Engineer
Project________Asella Housing Development Page
Block ………… T-9 Block Name …………….. ABEBE Gobena
No L/w/T Vol/Are Discrition No L/w/T Vol/Are Discrition
2 1.81 1 0.81
0.10 0.12
Ditto but bottom sides 0.10 Above door
1 1.21 2 9.82
0.10 0.12
ditto 2.36 Axis-C
1 0.60 1 2.30
0.20 0.20
Ditto but sides 0.46 Ditto
0.71 2 9.82
0.10 0.12
Ditto but bottom sides 2.36 Axis-D
563.10 Total 2 12.43
651.90 Total internal plastering 0.12
2.98 Axis-1
To the internal Exposed 4 12.43
Beam & columns 0.12
I). To the second floor 5.97 Axis-2
4 2.83 Column 4 3.81
0.2 0.12
2.26 Axis-A 1.83 Axis-3 between A-B
6 3.52 2 7.62
0.2 0.12
4.22 Axis-1(c1) 1.83 Axis-5
2 3.52 2 3.41
0.4 0.12
2.82 ditto 0.82 Axis -4 B/n B-B'
3 2.5 2 2.53
0.25 0.6
1.88 Axis-B stair column 3.04 Stair Beam
3 3.52 29.22 Total Sum
0.4
4.22 Axis-B(c1) Ditto but to the second floor
7 3.52 roof beams
0.2
4.93 ditto
3 3.08
0.2
1.85 Axis-A between 3-5(c4)
2 3.03
0.2
1.21 Axis-B'(c4)
23.39 Total
To the internal beam ground
first floor
2 14.85
0.12
3.56 Axis-A between 1-5
2 14.85
0.12
3.56 Axis-B
1 1.81
0.2
0.36 Ditto but b/n 4-5 inside showeer
Contracter Name Site supervisor Project Engineer
Project________Asella Housing Development Page
Block ………… T-9 Block Name …………….. ABEBE Gobena
No L/w/T Vol/Are Discrition No L/w/T Vol/Are Discrition
Ditto but to the second floor
roof beams
1 14.43
0.30
4.33 Axis-1
2 6.45
0.30
3.87 Axis A&D B/n 1-2
2 3.20
0.30
1.92 B/n Axis 2 &3 & B
1 1.90
0.30
0.57 Axis-A B/n 3-5
1 10.02
0.30
3.01 Axis-5 B/n AB
1 4
0.3
1.20 Ditto but B/n B-B'
1 3.80
0.3
1.14 Axis-B' B/n 4-5
1 5.1
0.3
1.53 Axis-5 B/n B-B'
1 3.61
0.3
1.08 Axis-3' B/n C-D
1 3.81
0.3
1.14 Axis-C &D B/n 2-3'
2 5.2
0.3
3.12 Axis-C &D B/n 1-2
1 5.61
0.3
1.68 Axis-B B/n 3-4
2 4.44
0.3
Edges of windows to
internal On the second floor
2.66
6 1.81
0.2
2.17
9 1.21
0.21
2.29
4 0.71
0.2
0.57
32.28 Total sum
84.90 Total to summery

Contracter Name Site supervisor Project Engineer


Project__________________________Take of sheet No___________ PAGE_____
Block ……………….. Block Name ……………..
No L/w/T Vol/Are Discrition No L/w/T Vol/Are Discrition

Contractor Name Site supervisor project Engineer


Name: ______________________ Name: ______________________ Name: ______________________
Signature:___________________ Signature:___________________ Signature:___________________
Date:_______________________ Date:_______________________ Date:_______________________

Вам также может понравиться