PROJECT TITLE: YANBU DISTRIBUTION HUB AND NORTH JIDDAH BULK PLANT EXPANSION VENDOR NAME: METSCCO
MECHANICAL - JZ Clarification / Confirmation items Vendor's Response JZ Response Vendor's Response JZ Response Clarification Status
Sr.
Rev.
No.
Date Offer Reference Description Date Description Date Description Date Description Date Open/ Closed
MECHANICAL
Vendor shall provide nozzles for RTG along with stilling well as
A M8 10-Dec-2017 per Saudi Aramco Standard Drawing AA-036256.001 13-Dec-2017 Noted Closed
PROCESS
A P01 10-Dec-2017 Vendor to consider for X07-D-0335, Emptying rate is = 69 m3/h. 13-Dec-2017 Noted Closed
As per datasheet doc. No. VE-086484_Rev.B and VE- Please note that as per SAES-H-001,
086485_Rev.B For painting system, APCS-2D, the
specific gravity range is : (0.757-0.870). Revise the whole tank must be 100% coated from
datasheet. Vendor shall comply and consider inside. Now, as per datasheet for
Vendor to X07-D-0335 and X07-D-0336 Surge tank shall contain:
specific gravity range (0.737-0.870). internal floating roof tanks (VE-
Diesel / Kerosene / Gasoline PG91/PG95 as alternative product.
A P02 10-Dec-2017 13-Dec-2017 As per the datasheet for internal floating roof tanks (VE- 17-Dec-17 18-Dec-17 086484, 086485, 086483) it is Open
Specific gravity range for these prducts are between : (0.737 -
086484, 086485, 086483) multiple product is mentioned For painting system, APCS-2D is mentioned as supported cone roof.
0.870)
including kerosene and internal painting spec. is APCS accepted. This has to be revised to self
2A. However as per SAES-H-001, for kerosene product, it supported roof as per cl. 5.10.2.10 of
shall be APCA-2D. we have followed your datasheet for 32-SAMSS-005. We would suggest to
painting spec. APCS 2A. revise your datasheets considering
above comments and others (if any).
Page 1 of 3
PLANT LOCATION: NORTH JEDDAH BULK PLANT REV.: A
PROJECT TITLE: YANBU DISTRIBUTION HUB AND NORTH JIDDAH BULK PLANT EXPANSION VENDOR NAME: METSCCO
MECHANICAL - JZ Clarification / Confirmation items Vendor's Response JZ Response Vendor's Response JZ Response Clarification Status
Sr.
Rev.
No.
Date Offer Reference Description Date Description Date Description Date Description Date Open/ Closed
As per datasheet doc. No. VE-086485_Rev.B Vendor shall comply and consider Filling
Vendor to consider for X07-D-0336, Filling rate is : 2292 m3/h Filling rate is = 1556.8 m3/h rate is : 2292 m3/h
A P04 10-Dec-2017 13-Dec-2017 17-Dec-17 18-Dec-17 Noted Open
and specific gravity range is : (0.775-0.870) specific gravity range is : (0.757-0.870). Revise the and specific gravity range is : (0.737-
datasheet. 0.870)
PIPING
Vendor shall consider the access/ladder (and additional Noted, however sampling jar, valves and pipings are
provisions for mounting them) for the elevated valves part of 13-Dec-2017 excluded from Metscco scope. Metscco scope is upto first 17-Dec-17 Noted Closed
sampling piping; The details in this regard will be provided later. flange only.
ELECTRICAL
No Comment Closed
INSTRUMENTATION
No Comment Closed
CIVIL
No Comment Closed
CMP
FIRE PROTECTION
noted,
The Foam Water piping system associated with external floating METSCCO scope interface ~1.5m The foam system along with piping is
Excluded from Metscco scope. Metscco scope is upto first
tanks X07-D-0329 & 0331 and the provisions required for 13-Dec-2017 17-Dec-17 above grade. Exact location/orientation 18-Dec-17 excluded from Metscco scope. Closed
flange only.
mounting them shall be considered by Vendor. details will be provided on the nozzle Metscco scope is upto first flange only.
projection drawings.
Page 2 of 3
PLANT LOCATION: NORTH JEDDAH BULK PLANT REV.: A
PROJECT TITLE: YANBU DISTRIBUTION HUB AND NORTH JIDDAH BULK PLANT EXPANSION VENDOR NAME: METSCCO
MECHANICAL - JZ Clarification / Confirmation items Vendor's Response JZ Response Vendor's Response JZ Response Clarification Status
Sr.
Rev.
No.
Date Offer Reference Description Date Description Date Description Date Description Date Open/ Closed