QUOTATION
Project: Geotechnical lnvestigation for G+3 Residence Building
Client: Peter
Location site : A.A. Yeka Sub citv, Kotebe
Your Ref. Ref.
Our 11
Date: Date: 1

Item Description Unit Quantity Unit Price Amount (Birr)

A. Field Work
1
Mobilization & Demobilization of field crew No. L5 I,000.00

Dynamic cone penetration test No. 2 420.00 840.00

5 Test pit logging. photographing and sampling No. 2 r,000.00 2.000.00


5ub Total A 3,840.00
B. Laboratory Tests
I Grain size distribution No. 80.00 160.00
z Atterberg Limit No 2 80.00 l60.oo
5 Free swell No. 2 50.00 100.00
Sub Total B 420.OO
Technical Report
fechnical report including borehole logs, laboratory test results
I L5 r.500.00
and foundation recommendation (two copies).
Sub Total C r,500.00
Total A+B+C 5.760.OO
l5olo VAT 86.+.OO

/ \ Grand Total 6.624.OO


I
!,-.
lni- 'o".rl o
Note:
PiF'$'Sel{ ii'
Field work completion time shall be 2 cale shall be 6 calendar days. Report completion
time shall be 3 Calendar Days. Total durati
5oolo advance shall be paid up on mobilization and be paid up on submission of final report

5incerely yours,

fizj^su{l.nlr-- ,nt:
.liintaye "!-aye
4:F,*tlkh *iah-fir:
t t-c^..-ltecllni.ca :eilng
!:en'vice r

P. O. Box 1 1 0246; Tel +251 I 11 52 96 781 9 29 90 64 64/65; Fax:+251 11 8603699; E-mail:ar-con@ethionet et, AdCis Ababa, Ethiopia

Вам также может понравиться