The points which are not attended by Sinoma in their revised Proposal are once
again reproduced below:
Sinoma: Sinoma has provided the partial information as available with them,
balance missing information shall be provided by Sinoma during the detail
engineering.
Mechanical and Process
Ref: Chapter-1: Scope of Work
1) Sinoma to confirm supply of any additional equipment, revision of specifications
within the battery limits of the order, if required, based on detailed engineering.
This needs to be accepted without any rider.
Sinoma Confirmed during meeting.
Sinoma to mention the same in revised proposal.
Added in scope of work.
2) Sinoma to consider Water Treatment Plant in their scope and provide details.
Bore well (4 nos.) construction shall be included in the Scope of Sinoma.
The Water Treatment Plant should be designed to produce RO water
having quality suitable for the requirement of CPP and Cement Plant.
For additional details, please refer common points already sent on
21.02.2018.
Sinoma has still mentioned Water Treatment Plant in “owner Scope” in
Chapter-1 “ Scope of work”. Even in Tech Spec. it has to be changed. We
require 1W + 1SB Water Treatment Plant.
Sinoma Agreed and modified.
3) Supplementary Soil & Geotechnical Investigation shall be in Sinoma Scope.
Sinoma confirmed to include the Soil Investigation in their scope.
Sinoma has still mentioned this in “owner Scope” in Chapter-1 “ Scope of
work”.
Agreed
Ref: Annexure-2 Heat Balance
Sinoma to revise heat balance as per comment given on “Chapter 4
Performance Guarantee Parameters
Sinoma Agreed to submit the same.
Revised Document not submitted yet.
Agreed.
Ref: Annexure-3 Technical Description (Process Part)
Raw Material characteristics
12) Provide a diverter after 314CV04 to divert the material from to hot dust bin /
Blending Silo as per operation.
Sinoma confirmed to provide a Chain Conveyor in revised Proposal.
Additional Diverter still not provided after 314CV04. Collected dust is
always first stored in hot dust bin and then transported to Blending
FUJAIRAH PROJECT Page 3 of 9
CLARIFICATIONS REQUIRED FROM SINOMA / TCDRI – OLD POINTS
Silo / kiln Feed, forcing the Hot dust bin feeding and extraction
equipments to operate all the time.
Dosing so, Sinoma can remove 321VA22 and 321VA23 provided on Air
slide 312AS11.
Agreed
Pyro-Section
1) Sinoma to confirm all Compensators / Expansion Joints in Riser Duct, Down
comer Duct, Material Chutes shall be provided in their scope.
Sinoma Agreed.
Needs to be mentioned in revised proposal also.
2) Sinoma to provide Guillotine Damper in T.A. Duct with slide gate for
cleaning.
Sinoma Agreed.
Not provided.
Agreed
3) 313PH01PC13 (Precalciner):
a) Provide Calciner cross section area in m2 (inside refractory)
b) Provide Calciner volume in m3 (inside refractory)
c) Provide Gas residence time (Coal/ Petcoke) in Sec
d) Provide fuel (Coal / Petcoke) residence time in Sec
e) Correct the moisture content as 3% max as given in tender.
Sinoma agreed to provide the details in revised proposal.
Sinoma is yet to provide the above details.
Agreed
4) There is no mention of Refractory for Pre-heater, Kiln etc in the Proposal,
which should be in Sinoma scope.
5) 316KI01 (Kiln):
a) Provide Specific volumetric loading of Kiln in tpd/m3
b) Provide Specific thermal loading of Kiln in Gcal/hrm2
c) Provide Kiln residence time in minute
d) Provide Kiln % filling at rated capacity
Sinoma agreed to provide details in revised proposal.
Sinoma is yet to provide the above details.
Agreed.
6) Material of construction for the followings:
a) Kiln Shell
b) Grate
Sinoma agreed to provide details in revised proposal.
Sinoma is yet to provide the above details.
Agreed
7) Furnish the shell thickness details in burning zone as well as minimum
thickness considered by Sinoma.
Sinoma agreed to provide details in revised proposal.
Sinoma is yet to provide the above details.
Agreed
9) Provide Details for Girth Gear and Pinion. Also provide Lubrication system
for Kiln Girth Gear.
Sinoma agreed to provide details in revised proposal.
Sinoma is yet to provide the above details.
Agreed
10) Mention service factor and type of Gear Box for Kiln Drive (316DR02).
Sinoma agreed to provide details.
Type of gear box not mentioned.
Agreed .
3) Mill Main Drive: 613DR07: Mention type of Gear Box and its service factor.
Sinoma agreed to provide the detail.
Sinoma is yet to provide the above details.
Agreed
4) Mention material of construction for mill body, Grinding table and its liners,
Grinding Rollers and its liners. Also mention specific wear rate for liners.
Sinoma agreed to provide the details.
Sinoma is yet to provide the above details.
Agreed
5) Coal Mill separator 613SP06: Mention max speed and speed control range,
temperature of gas, pressure drop, details of gear box lubrication system,
details of separator roller bearings lubrication system.
Sinoma agreed to provide these details in the proposal.
Sinoma is yet to provide the above details.
Agreed
1) All the Bag Filter Fans should have 15% margin over its respective bag filter
capacity.
Sinoma agreed.
Have done
2) Provide Slides gates below all bag filter hoppers.
Sinoma agreed.
Only shown in flow sheets. Not mentioned in technical Specifications.
Agreed
3) Provide damper at all Bag Filter Fan inlet, wherever not provided.
Sinoma agreed.
Sinoma has only shown dampers in flow sheet. All these dampers
should be motorized.
Agreed.
Performance Guarantee
Refer to PG documents
Utilities:
Deviation List