Noviembre, 2018
Página 1 de 70
INDICE
Página 2 de 70
7.6.6 Caso 6: Salida de toda la carga de la SE GE1 (PMRT) ...................................................................... 30
7.6.7 Caso 7: Salida de toda la central de cogeneración ........................................................................... 31
8.0 Análisis de Corto Circuito .......................................................................................................................... 33
8.1 Objetivos ......................................................................................................................................................... 33
8.2 Consideraciones............................................................................................................................................ 33
8.3 Metodología .................................................................................................................................................... 34
8.4 Resultados de Cortocircuito....................................................................................................................... 35
8.4.1 Avenida 2020 – Sin Proyecto .............................................................................................................. 35
8.4.2 Estiaje 2020 – Con Proyecto................................................................................................................ 36
8.4.3 Año 2022 – Con Proyecto..................................................................................................................... 38
8.4.4 Año 2024 – Con Proyecto..................................................................................................................... 39
9.0 Análisis de Estabilidad Transitoria .......................................................................................................... 40
9.1 Objetivo ........................................................................................................................................................... 40
9.2 Criterios ........................................................................................................................................................... 41
9.3 Eventos Simulados ....................................................................................................................................... 41
9.3.1 Evento 1: Falla Trifásica en una línea de 220 kV Pariñas – Independencia y apertura
definitiva............................................................................................................................................................. 42
9.3.2 Evento 2: Desconexión de un transformador 220/66 kV de la SE Intermedia ......................... 43
9.3.3 Evento 3: Falla Trifásica en una línea de 66 kV Intermedia – GE1 y apertura definitiva....... 45
9.3.4 Evento 4: Desconexión de un transformador 66/33 kV de la S.E. GE1 ..................................... 46
9.3.5 Evento 5: Desconexión de un generador de la Central de Cogeneración ............................... 48
9.3.6 Evento 5A: Desconexión de un generador de la Central de Cogeneración y conexión
automática del banco de capacitores de 40 MVAr. ................................................................................. 49
9.3.7 Evento 6: Desconexión de toda la carga de la S.E. GE1 (PMRT) ............................................... 51
9.3.8 Evento 7: Desconexión de total de Central de Cogeneración .................................................... 52
9.3.9 Evento 7A: Desconexión de total de Central de Cogeneración y conexión automática de
los bancos de capacitores de 20 MVAr y 40 MVAr. ................................................................................. 54
9.3 Cálculo del Tiempo Crítico de Despeje de Fallas .................................................................................. 56
9.4 Tolerancia a la Circulación de Corriente de Secuencia Inversa ........................................................ 57
10.0 Análisis de Estabilidad Permanente........................................................................................................ 60
10.1 Criterios ......................................................................................................................................................... 60
10.2 Modos de Oscilación Críticos del SEIN ................................................................................................. 60
Página 3 de 70
10.3 Modos de oscilación de la Central de Cogeneración ......................................................................... 63
11.0 Conclusiones de los Estudios Eléctricos .............................................................................................. 67
11.1 Estudio de Flujo de Potencia ................................................................................................................... 67
11.2 Análisis de Contingencias ........................................................................................................................ 67
11.3 Estudio de Corto Circuito ......................................................................................................................... 68
11.4 Estabilidad Transitoria ............................................................................................................................... 68
11.5 Estabilidad Permanente ............................................................................................................................ 69
12.0 ANEXOS ......................................................................................................................................................... 70
Página 4 de 70
1.0 Antecedentes
Página 5 de 70
2.0 Objetivo
3.0 Alcances
Tomando en cuenta el “Procedimiento Técnico PR-20 del COES – Anexo 2”, donde
se establecen los alcances para estudios de Pre Operatividad de centrales de
generación, se ha elaborado los siguientes estudios:
Página 6 de 70
4.0 Información Utilizada
Del Proyecto:
Página 7 de 70
• Características principales de las instalaciones que conforman el nuevo
Proyecto.
l
a
nueva central y la línea de transmisión.
Página 8 de 70
5.2 Sistema Eléctrico de la Planta de Cogeneración
Las dos unidades de generación eléctrica y su sistema eléctrico de interconexión usan
el principio de sistemas paralelos con doble barra e interruptor de unión de barras para
incrementar la confiabilidad del sistema de generación.
Turbogeneradores:
Dos turbinas a vapor. Cada una con las siguientes características:
• 58.8 MVA a 36°C
• 13.8 kV (+/- 10%)
• Factor de potencia 0.85
• 60 Hz
• El combustible primario está disponible y procede de la refinería (Flexigas
(FXG), Gas de Refinería (RFG) y Nafta)
Transformadores:
Dos transformadores de tres devanados. Cada uno con las siguientes características:
• 13.8 kV/ 33 kV/66 kV
• 75 MVA ONAN
• Z= 12.5%
Página 9 de 70
Barra de Conexión 66 kV:
Un sistema de barras en 66 kV con el siguiente equipamiento:
• Interruptores de potencia tipo GIS SF6, 2500 A, 31.5 kA, 79 kA Peak
• IEC 62271-203
Página 10 de 70
Figura 5.2: Diagrama Unifilar Eléctrico de Interconexión con el SEIN
Página 11 de 70
6.0 Generación y Demanda del Nuevo Proyecto
7.1 Objetivo
El objetivo de los análisis en estado estacionario es evaluar, mediante simulaciones
de flujo de potencia, el impacto de la operación de las instalaciones que conforman el
Proyecto de la nueva central, sobre el comportamiento del SEIN.
Página 12 de 70
7.2 Criterios
El horizonte de análisis será de un período de cinco años. En ese sentido los estudios
eléctricos se han analizado los años siguiente:
En Operación Normal:
• Las tensiones en barras deben estar dentro del rango ± 5 % de los equipos
instalados en las subestaciones, principalmente transformadores de potencia.
Asimismo, en el caso de las barras del sistema de transmisión, las tensiones en
Estado Normal deben estar en el rango de ± 2.5 % de las tensiones de
operación.
• En condiciones normales de operación, no se admiten sobrecargas ni en líneas
ni en transformadores de potencia.
En Operación en Contingencia:
Página 13 de 70
de la tensión de operación, en todas las barras con tensión igual o menor a 138
kV.
• En estado de alerta (Contingencia N-1) el nivel de carga en líneas y
transformadores debe ser admisible de acuerdo a las fichas técnicas de los
equipos.
• Para efectos del presente estudio, en condiciones de contingencia se considera
una sobrecarga máxima de 20 % sobre la capacidad nominal de líneas y
transformadores.
7.3 Metodología
El análisis de la operación en estado estacionario, se inicia reproduciendo la condición
operativa de la zona de influencia del Proyecto, sin considerar las nuevas
instalaciones. Debido a que se ha previsto como fecha de ingreso del Proyecto el
segundo semestre del 2020, se ha considerado como escenario base para los
análisis, el período de avenida del año 2020 (ESCENARIOS SIN PROYECTO). A
continuación, se desarrollan los ESCENARIOS CON PROYECTO que considera la
operación de las instalaciones de la nueva central.
En ambos casos se registran los niveles de flujo de potencia por las líneas de
transmisión, transformadores y los perfiles de tensión en las barras presentes en la
zona de influencia del Proyecto. Los escenarios analizados consideran condiciones de
operación normal (N: red completa) y condiciones en contingencias simples (N-1) y
contingencias dobles (N-2).
Página 14 de 70
De esta manera, se evalúa el impacto de las nuevas instalaciones, verificando las
especificaciones técnicas del equipamiento seleccionado y que las nuevas
instalaciones no deterioren los perfiles de tensión y niveles de carga en líneas y
transformadores cercanos al Proyecto.
Página 15 de 70
En los siguientes acápites, se muestran resúmenes de los resultados de flujo de
potencia, cuyo detalle se muestra en el Anexo B, que incluye en forma gráfica los
resultados de cada escenario.
Página 16 de 70
Tensión Av20max Av20med Av20min
Línea o Transformador Nominal (Plano FL-1) (Plano FL-2) (Plano FL-3)
Se puede observar que los resultados muestran que las tensiones en todas las barras
por debajo del punto de conexión (S.E. Pariñas), se encuentran dentro de los
márgenes de la operación normal (es decir, por encima 0.95 p.u.).
Se debe mencionar que es necesario la operación de al menos un banco de
capacitores (40 MVAr en máxima demanda y 20 MVAr en media y mínima demanda)
para mantener tensiones adecuadas en la zona del proyecto.
Asimismo, se observa que no existen sobrecargas en las líneas y transformadores
existentes en el nuevo Proyecto.
Página 17 de 70
Tensión Es20max Es20med Es20min
Barra Nominal (Plano FL-4) (Plano FL-5) (Plano FL-6)
kV p.u. kV p.u. kV p.u. kV
PARIÑAS 220A 220 1.015 223.2 1.007 221.6 1.018 223.9
SE INTERMEDIA 220 1.014 223.0 1.006 221.4 1.017 223.7
INTER 66 66 1.015 67.0 1.011 66.7 1.017 67.1
GE1A 66 66 1.014 66.9 1.010 66.7 1.015 67.0
GE1B 66 66 1.014 66.9 1.010 66.7 1.015 67.0
SEP-A 33 0.993 32.8 0.993 32.8 0.994 32.8
SEP-B 33 0.993 32.8 0.993 32.8 0.994 32.8
SW-4-GE1-01 A 33 0.993 32.8 0.993 32.8 0.994 32.8
SW-4-GE1-01 B 33 0.993 32.8 0.993 32.8 0.994 32.8
SW-3-SEP-01-A 13.8 0.982 13.6 0.982 13.5 0.982 13.6
SW-3-SEP-01-B 13.8 0.982 13.6 0.982 13.5 0.982 13.6
Cuadro 7.3 Tensiones en barras – Estiaje 2020 – Con Proyecto
Se puede observar que que las tensiones en todas las barras por debajo del punto de
conexión (S.E. Pariñas), se encuentran dentro de los márgenes de la operación
normal (es decir, por encima 0.95 p.u.). Se debe mencionar que no es necesaria la
operación de ningún banco de capacitores de 66 kV. Las tensiones en las barras en
33 kV se mantienen por encima de 0.95 p.u. debido a la operación de las dos
unidades de generación de la Central de Cogeneración. Se aprecia que ambas
Página 18 de 70
unidades aportan potencia reactiva necesaria para mantener las tensiones adecuadas.
Casi toda la generación de la nueva central es consumida por la carga de PMRT.
Asimismo, se observa que no existen sobrecargas en las líneas y transformadores
existentes en el nuevo Proyecto.
Página 19 de 70
Tensión Av22max Av22med Av22min Es22max Es22med Es22min
Línea o Transformador Nominal (Plano FL-7) (Plano FL-8) (Plano FL-9) (Plano FL-10) (Plano FL-11) (Plano FL-12)
Se puede observar que que las tensiones en todas las barras por debajo del punto de
conexión (S.E. Pariñas), se encuentran dentro de los márgenes de la operación
normal (es decir, por encima 0.95 p.u.). Se debe mencionar que no es necesaria la
operación de ningún banco de capacitores de 66 kV. Las tensiones en las barras en
33 kV se mantienen por encima de 0.95 p.u. debido a la operación de las dos
unidades de generación de la Central de Cogeneración. Se aprecia que ambas
unidades aportan potencia reactiva necesaria para mantener las tensiones adecuadas.
Casi toda la generación de la nueva central es consumida por la carga de PMRT.
Asimismo, se observa que no existen sobrecargas en las líneas y transformadores
existentes en el nuevo Proyecto.
Página 20 de 70
Tensión Av24max Av24med Av24min Es24max Es24med Es24min
Barra Nominal (Plano FL-13) (Plano FL-14) (Plano FL-15) (Plano FL-16) (Plano FL-17) (Plano FL-18)
kV p.u. kV p.u. kV p.u. kV p.u. kV p.u. kV p.u. kV
PARIÑAS 220A 220 1.001 220.3 1.008 221.8 1.014 223.1 1.006 221.2 1.017 223.8 1.016 223.5
SE INTERMEDIA 220 1.001 220.1 1.007 221.6 1.013 222.9 1.005 221.0 1.016 223.6 1.015 223.2
INTER 66 66 1.008 66.5 1.011 66.8 1.015 67.0 1.010 66.7 1.016 67.1 1.016 67.0
GE1A 66 66 1.007 66.5 1.011 66.7 1.014 66.9 1.009 66.6 1.015 67.0 1.014 67.0
GE1B 66 66 1.007 66.5 1.011 66.7 1.014 66.9 1.009 66.6 1.015 67.0 1.014 67.0
SEP-A 33 0.993 32.8 0.993 32.8 0.993 32.8 0.993 32.8 0.994 32.8 0.994 32.8
SEP-B 33 0.993 32.8 0.993 32.8 0.993 32.8 0.993 32.8 0.994 32.8 0.994 32.8
SW-4-GE1-01 A 33 0.993 32.8 0.993 32.8 0.993 32.8 0.993 32.8 0.994 32.8 0.994 32.8
SW-4-GE1-01 B 33 0.993 32.8 0.993 32.8 0.993 32.8 0.993 32.8 0.994 32.8 0.994 32.8
SW-3-SEP-01-A 13.8 0.981 13.5 0.982 13.5 0.982 13.6 0.981 13.5 0.982 13.6 0.982 13.6
SW-3-SEP-01-B 13.8 0.981 13.5 0.982 13.5 0.982 13.6 0.981 13.5 0.982 13.6 0.982 13.6
Cuadro 7.7 Tensiones en barras – Año 2024 – Con Proyecto
Se puede observar que que las tensiones en todas las barras por debajo del punto de
conexión (S.E. Pariñas), se encuentran dentro de los márgenes de la operación
normal (es decir, por encima 0.95 p.u.). Se debe mencionar que no es necesaria la
operación de ningún banco de capacitores de 66 kV. Las tensiones en las barras en
33 kV se mantienen por encima de 0.95 p.u. debido a la operación de las dos
unidades de generación de la Central de Cogeneración. Se aprecia que ambas
unidades aportan potencia reactiva necesaria para mantener las tensiones adecuadas.
Casi toda la generación de la nueva central es consumida por la carga de PMRT.
Página 21 de 70
Asimismo, se observa que no existen sobrecargas en las líneas y transformadores
existentes en el nuevo Proyecto.
Página 22 de 70
En el Cuadro 7.9 y en el Cuadro 7.10, se muestran las tensiones en las barras
cercanas al nuevo Proyecto y los flujos de potencia en las principales líneas y
transformadores respectivamente.
Página 23 de 70
Los resultados muestran que, ante la salida de una línea de 220 kV Pariñas –
Intermedia, no se producen problemas de tensión a lo largo de todo el sistema
eléctrico en 220 kV, 66 kV y 33 kV, ya que toda la energía se transmite por la línea
paralela que aún está en servicio. Asimismo, se observa que no se presentan
sobrecargas en líneas ni en transformadores.
Página 24 de 70
Tensión Es20max Es20med Es20min
Línea o Transformador Nominal (Plano CN-4) (Plano CN-5) (Plano CN-6)
Página 25 de 70
Tensión Es20max Es20med Es20min
Barra Nominal (Plano CN-7) (Plano CN-8) (Plano CN-9)
kV p.u. kV p.u. kV p.u. kV
PARIÑAS 220A 220 1.014 223.2 1.007 221.6 1.018 223.9
SE INTERMEDIA 220 1.013 222.9 1.006 221.4 1.017 223.7
INTER 66 66 1.015 67.0 1.011 66.7 1.017 67.1
GE1A 66 66 1.013 66.8 1.009 66.6 1.014 66.9
GE1B 66 66 1.013 66.8 1.009 66.6 1.014 66.9
SEP-A 33 0.993 32.8 0.993 32.8 0.994 32.8
SEP-B 33 0.993 32.8 0.993 32.8 0.994 32.8
SW-4-GE1-01 A 33 0.993 32.8 0.993 32.8 0.994 32.8
SW-4-GE1-01 B 33 0.993 32.8 0.993 32.8 0.994 32.8
SW-3-SEP-01-A 13.8 0.982 13.5 0.981 13.5 0.982 13.6
SW-3-SEP-01-B 13.8 0.982 13.5 0.981 13.5 0.982 13.6
Los resultados muestran que, ante la salida de una línea de 66 kV Intermedia – GE1,
no se producen problemas de tensión a lo largo de todo el sistema eléctrico en 220
kV, 66 kV y 33 kV, ya que toda la energía se transmite por la línea paralela que aún
está en servicio. Asimismo, se observa que no se presentan sobrecargas en líneas ni
en transformadores.
Página 26 de 70
7.6.4 Caso 4: Salida de un transformador 66/33 kV de la S.E. GE1
Página 27 de 70
Tensión Es20max Es20med Es20min
Línea o Transformador Nominal (Plano CN-10) (Plano CN-11) (Plano CN-12)
Página 28 de 70
Tensión Es20max Es20med Es20min
Barra Nominal (Plano CN-13) (Plano CN-14) (Plano CN-15)
kV p.u. kV p.u. kV p.u. kV
PARIÑAS 220A 220 1.018 224.0 1.012 222.6 1.014 223.2
SE INTERMEDIA 220 1.018 223.9 1.012 222.6 1.013 222.9
INTER 66 66 1.040 68.6 1.036 68.4 1.023 67.5
GE1A 66 66 1.037 68.4 1.034 68.2 1.021 67.4
GE1B 66 66 1.037 68.4 1.034 68.2 1.021 67.4
SEP-A 33 0.994 32.8 0.993 32.8 0.990 32.7
SEP-B 33 0.994 32.8 0.993 32.8 0.990 32.7
SW-4-GE1-01 A 33 0.994 32.8 0.993 32.8 0.990 32.7
SW-4-GE1-01 B 33 0.994 32.8 0.993 32.8 0.990 32.7
SW-3-SEP-01-A 13.8 0.982 13.6 0.982 13.5 0.978 13.5
SW-3-SEP-01-B 13.8 0.982 13.6 0.982 13.5 0.978 13.5
Página 29 de 70
Por otra parte, se observa que no se presentan sobrecargas en líneas ni en
transformadores.
Página 30 de 70
Tensión Es20max Es20med Es20min
Línea o Transformador Nominal (Plano CN-16) (Plano CN-17) (Plano CN-18)
Los resultados muestran que, ante la salida de toda la carga de la planta PMRT, no se
producen problemas de tensión a lo largo de todo el sistema eléctrico en 220 kV, 66
kV y 33 kV. También se observa que la operación de la nueva central de cogeneración
permite exportar al SEIN en la S.E. Pariñas hasta 96 MW, sin provocar sobrecargas
en líneas ni en transformadores.
Página 31 de 70
Tensión Es20max Es20med Es20min
Barra Nominal (Plano CN-19) (Plano CN-20) (Plano CN-21)
kV p.u. kV p.u. kV p.u. kV
PARIÑAS 220A 220 0.998 219.6 1.005 221.1 0.999 219.8
SE INTERMEDIA 220 0.998 219.5 1.004 220.8 0.998 219.5
INTER 66 66 1.026 67.7 1.021 67.4 1.013 66.9
GE1A 66 66 1.023 67.5 1.017 67.1 1.009 66.6
GE1B 66 66 1.023 67.5 1.017 67.1 1.009 66.6
SEP-A 33 1.026 33.8 1.012 33.4 1.004 33.1
SEP-B 33 1.026 33.8 1.012 33.4 1.004 33.1
SW-4-GE1-01 A 33 1.026 33.8 1.012 33.4 1.004 33.1
SW-4-GE1-01 B 33 1.026 33.8 1.012 33.4 1.004 33.1
SW-3-SEP-01-A 13.8 1.014 14.0 1.001 13.8 0.992 13.7
SW-3-SEP-01-B 13.8 1.014 14.0 1.001 13.8 0.992 13.7
Página 32 de 70
En los escenarios de media y mínima demanda, no se producen problemas de
tensión.
En esta contingencia, en todos los escenarios, es necesario la operación de los dos
bancos de capacitores en 66 kV, así como la modificación de la ubicación de los taps
de los transformadores de 66/33 kV de la S.E. GE1, a fin de elevar las tensiones en 33
kV.
Por otro lado, no se observa sobrecargas en las líneas de transmisión. Sin embargo,
se observa una sobrecarga del 12 % en los transformadores de 66/33 kV de la S.E.
GE1. De acuerdo con el Procedimiento PR-20, se permite sobrecargas de hasta el 20
% en contingencias N-1. Sin embargo, esta operación deberá ser analizada y
permitida por la empresa PetroPerú cuando opere su planta.
8.1 Objetivos
8.2 Consideraciones
Las simulaciones de cortocircuito han sido realizadas bajo la norma IEC60909 “Short-
Circuit Currents in Three-Phase A.C.”, que considera lo siguiente:
Página 33 de 70
• Se utilizan las reactancias subtransitorias en las máquinas.
Además, esta norma no toma en cuenta las capacitancias de las líneas o las
admitancias shunt (excepto aquellas en el sistema se secuencia cero) y no considera
las cargas no giratorias.
8.3 Metodología
El cálculo de cortocircuito será realizado para el año Sin Proyecto (avenida 2020), y
considerando el Proyecto, a fin de verificar el impacto de la operación de las nuevas
instalaciones en los equipos cercanos a la zona de influencia del Proyecto.
Las evaluaciones de cortocircuito consideran cuatro tipos de falla: (a) monofásicas, (b)
bifásicas, (c) bifásicas a tierra y (d) trifásicas. Se calcula el nivel de cortocircuito en las
barras alrededor del punto de conexión.
Página 34 de 70
En los siguientes acápites, se muestran resúmenes de los resultados de cortocircuito.
En el Anexo C, se incluye en forma gráfica los resultados de cada escenario.
Página 35 de 70
Tensión Av20max Av20med Av20min
Barra Nominal Falla Falla Falla Falla Falla Falla
kV 2Ø (kA) 2Ø-T (kA) 2Ø (kA) 2Ø-T (kA) 2Ø (kA) 2Ø-T (kA)
(CC-3) (CC-4) (CC-7) (CC-8) (CC-11) (CC-12)
PARIÑAS 220A 220 2.78 3.98 2.78 3.98 2.77 3.97
SE INTERMEDIA 220 2.56 3.49 2.56 3.49 2.56 3.49
INTER 66 66 4.06 5.03 4.06 5.03 4.06 5.03
GE1A 66 66 3.94 4.94 3.94 4.94 3.94 4.93
GE1B 66 66 3.94 4.94 3.94 4.94 3.94 4.93
SEP-A 33 5.20 7.48 5.20 7.48 5.20 7.47
SEP-B 33 5.20 7.48 5.20 7.48 5.20 7.47
SW-4-GE1-01 A 33 --- --- --- --- --- ---
SW-4-GE1-01 B 33 --- --- --- --- --- ---
SW-3-SEP-01-A 13.8 --- --- --- --- --- ---
SW-3-SEP-01-B 13.8 --- --- --- --- --- ---
MP-001-A 13.8 --- --- --- --- --- ---
MP-001-B 13.8 --- --- --- --- --- ---
MP-001-C 13.8 --- --- --- --- --- ---
Página 36 de 70
Tensión Es20max Es20med Es20min
Barra Nominal Falla Falla Falla Falla Falla Falla
kV 2Ø (kA) 2Ø-T (kA) 2Ø (kA) 2Ø-T (kA) 2Ø (kA) 2Ø-T (kA)
(CC-15) (CC-16) (CC-19) (CC-20) (CC-23) (CC-24)
PARIÑAS 220A 220 3.39 4.68 3.39 4.69 3.34 4.65
SE INTERMEDIA 220 3.18 4.18 3.18 4.18 3.15 4.14
INTER 66 66 6.91 7.90 6.91 7.90 6.88 7.88
GE1A 66 66 6.85 7.90 6.85 7.90 6.83 7.88
GE1B 66 66 6.85 7.90 6.85 7.90 6.83 7.88
SEP-A 33 14.64 26.02 14.64 26.02 14.61 25.98
SEP-B 33 14.64 26.02 14.64 26.02 14.61 25.98
SW-4-GE1-01 A 33 14.64 26.02 14.64 26.02 14.61 25.98
SW-4-GE1-01 B 33 14.64 26.02 14.64 26.02 14.61 25.98
SW-3-SEP-01-A 13.8 19.13 24.24 19.13 24.24 19.12 24.23
SW-3-SEP-01-B 13.8 19.13 24.24 19.13 24.24 19.12 24.23
MP-001-A 13.8 16.64 20.37 16.64 20.37 16.63 20.36
MP-001-B 13.8 16.64 20.37 16.64 20.37 16.63 20.36
MP-001-C 13.8 16.64 20.37 16.64 20.37 16.63 20.36
Comparando los resultados Con Proyecto y Sin Proyecto, se observa que los mayores
incrementos de la corriente de cortocircuito se presentan en las barras SEP-A, SEP-B
de 33 kV y GE1 de 66 kV. En el caso de las barras SEP-A y SEP-B, las corrientes de
cortocircuito monofásica Sin Proyecto es 7.8 kA y Con Proyecto es 24.3 kA, con un
incremento de 16 kA. En el caso de la barra GE1, la corriente de cortocircuito trifásica
Sin Proyecto es 4.6 kA y Con Proyecto es 8.8 kA, con un incremento de 4.2 kA. Estos
incrementos en las corrientes de cortocircuitos deben ser tomados en cuenta en el
momento de definir las capacidades de ruptura de los equipos a instalar en las redes
de 33 kV y 66 kV.
Por otro lado, en la S.E Pariñas 220 kV, la corriente de cortocircuito monofásica Sin
Proyecto es 4.1 kA y Con Proyecto es 6.1 kA, con un incremento de 2 kA. Este
incremento en las corrientes de cortocircuito, no representan ningún riesgo en las
capacidades de ruptura de los equipos existentes alrededor de esta subestación.
Página 37 de 70
8.4.3 Año 2022 – Con Proyecto
El Cuadro 8.5 muestra un resumen de los resultados de cortocircuito trifásico y
monofásico en las barras cercanas a la zona del Proyecto.
Página 38 de 70
Los resultados muestran que en las barras SEP-A y SEP-B, las corrientes de
cortocircuito se han incrementado en 0.2 kA con respecto al año 2020. En el caso de
la barra GE1, la corriente de cortocircuito trifásica se ha incrementado en sólo 0.25 kA,
con respecto al año 2020.
En la S.E Pariñas 220 kV, la corriente de cortocircuito monofásica se ha incrementado
en sólo 1 kA con respecto al año 2020. Este incremento en las corrientes de
cortocircuito, no representan ningún riesgo en las capacidades de ruptura de los
equipos existentes alrededor de esta subestación
Página 39 de 70
Tensión Av24max Av24med Av24min Es24max Es24med Es24min
Barra Nominal Falla Falla Falla Falla Falla Falla Falla Falla Falla Falla Falla Falla
kV 2Ø (kA) 2Ø-T (kA) 2Ø (kA) 2Ø-T (kA) 2Ø (kA) 2Ø-T (kA) 2Ø (kA) 2Ø-T (kA) 2Ø (kA) 2Ø-T (kA) 2Ø (kA) 2Ø-T (kA)
(CC-51) (CC-52) (CC-55) (CC-56) (CC-59) (CC-60) (CC-63) (CC-64) (CC-67) (CC-68) (CC-71) (CC-72)
PARIÑAS 220A 220 3.91 5.78 3.91 5.78 3.90 5.77 3.91 5.77 3.90 5.77 3.86 5.73
SE INTERMEDIA 220 3.62 4.91 3.62 4.91 3.62 4.91 3.62 4.91 3.62 4.91 3.58 4.88
INTER 66 66 7.22 8.27 7.22 8.27 7.21 8.26 7.21 8.27 7.21 8.26 7.19 8.24
GE1A 66 66 7.14 8.25 7.14 8.25 7.13 8.25 7.14 8.25 7.14 8.25 7.12 8.23
GE1B 66 66 7.14 8.25 7.14 8.25 7.13 8.25 7.14 8.25 7.14 8.25 7.12 8.23
SEP-A 33 14.88 26.36 14.88 26.36 14.88 26.35 14.88 26.35 14.88 26.35 14.86 26.33
SEP-B 33 14.88 26.36 14.88 26.36 14.88 26.35 14.88 26.35 14.88 26.35 14.86 26.33
SW-4-GE1-01 A 33 14.88 26.36 14.88 26.36 14.88 26.35 14.88 26.35 14.88 26.35 14.86 26.33
SW-4-GE1-01 B 33 14.88 26.36 14.88 26.36 14.88 26.35 14.88 26.35 14.88 26.35 14.86 26.33
SW-3-SEP-01-A 13.8 19.27 24.37 19.27 24.37 19.26 24.36 19.27 24.37 19.27 24.36 19.26 24.36
SW-3-SEP-01-B 13.8 19.27 24.37 19.27 24.37 19.26 24.36 19.27 24.37 19.27 24.36 19.26 24.36
MP-001-A 13.8 16.74 20.46 16.74 20.46 16.73 20.46 16.74 20.46 16.73 20.46 16.73 20.45
MP-001-B 13.8 16.74 20.46 16.74 20.46 16.73 20.46 16.74 20.46 16.73 20.46 16.73 20.45
MP-001-C 13.8 16.74 20.46 16.74 20.46 16.73 20.46 16.74 20.46 16.73 20.46 16.73 20.45
Cuadro 8.8 Cortocircuito Bifásico y Bifásico a Tierra – Año 2024 – Con Proyecto
Los resultados muestran que, en las barras SEP-A, SEP-B y en la barra GE1, las
corrientes de cortocircuito prácticamente no se han incrementado con respecto al año
2022.
En la S.E Pariñas 220 kV, la corriente de cortocircuito monofásica prácticamente no se
ha incrementado con respecto al año 2022.
9.1 Objetivo
Página 40 de 70
9.2 Criterios
Página 41 de 70
• Evento 3: Falla Trifásica en una línea de 66 kV Intermedia – GE1 y apertura
definitiva
• Evento 4: Desconexión de un transformador 66/33 kV de la S.E. GE1
• Evento 5: Desconexión de un generador de la Central de Cogeneración
• Evento 6: Desconexión de toda la carga de la S.E. GE1 (PMRT)
• Evento 7: Desconexión de total de Central de Cogeneración
Con la desconexión por falla trifásica de una línea de 220 kV Pariñas – Intermedia, no
interrumpe el servicio al proyecto PMRT, ya que aún queda en servicio su línea
paralela.
En la Figura 9.1 se muestra el comportamiento de las principales variables eléctricas
en el escenario de máxima demanda en estiaje del 2020.
Página 42 de 70
DIgSILENT
1.20 800.00
600.00
0.90
400.00
0.60
200.00
0.30
0.00
0.00 -200.00
-0.1000 0.9200 1.9400 2.9600 3.9800 [s ] 5.0000
L-2250: Loading in %
-0.30 L-2295: Loading in %
-0.1000 0.9200 1.9400 2.9600 3.9800 [s ] 5.0000 LT Pariñas - Valle Chira: Loading in %
GE1B 66: Voltage, Magnitude in p.u. LT Piura Oes te - Valle Chira: Loading in %
INTER 66: Voltage, Magnitude in p.u. Lne Intermedia GE_1A: Loading in %
PARIÑAS 220\PARIÑAS 220A: Voltage, Magnitude in p.u. Lne Intermedia GE_1B: Loading in %
PIURA OESTE 220\PIURA OESTE 220A: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia1: Loading in %
SE INTERMEDIA: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia2: Loading in %
SEP-A: Voltage, Magnitude in p.u. TR54-SEP-01-A: Loading in %
TALARA 220\TALARA 220A: Voltage, Magnitude in p.u. TR54-SEP-01-B: Loading in %
VALLE CHIRA 220: Voltage, Magnitude in p.u. Trafo Interm edia1: Maximum Loading in %
ZORRITOS 220: Voltage, Magnitude in p.u. Trafo Interm edia2: Maximum Loading in %
60.00 61.10
40.00 60.80
60.50
20.00
60.20
0.00
59.90
-20.00
59.60
-40.00 -0.1000 0.9200 1.9400 2.9600 3.9800 [s ] 5.0000
-0.1000 0.9200 1.9400 2.9600 3.9800 [s ] 5.0000 GE1A 66: Electrical Frequency in Hz
CPato G1: Rotor angle with reference to reference machine angle in deg INTER 66: Electrical Frequency in Hz
Carhq G1: Rotor angle with reference to reference machine angle in deg PARIÑAS 220\PARIÑAS 220A: Electrical Frequency in Hz
Eners ur G1: Rotor angle with reference to reference machine angle in deg PIURA OESTE 220\PIURA OESTE 220A: Electrical Frequency in Hz
GCiego G1: Rotor angle with reference to reference machine angle in deg SE INTERMEDIA: Electrical Frequency in Hz
GE-3-GE1-01: Rotor angle with reference to reference machine angle in deg SEP-A: Electrical Frequency in Hz
GE-3-GE1-02: Rotor angle with reference to reference machine angle in deg TALARA 220\TALARA 220A: Electrical Frequency in Hz
Malac G4: Rotor angle with reference to reference m achine angle in deg VALLE CHIRA 220: Electrical Frequency in Hz
Tablazo G1: Rotor angle with reference to reference machine angle in deg ZORRITOS 220: Electrical Frequency in Hz
Luego de la ocurrencia del Evento 1, se observa que los ángulos rotóricos de las
máquinas síncronas del SEIN no pierden sincronismo. Luego de ocurrido el evento,
las tensiones varían muy poco en las barras del sistema, las cargabilidades de las
principales líneas y transformadores casi no sufren cambios, excepto la línea de 220
kV que queda en servicio Pariñas – Intermedia1 con una cargabilidad final del 9 %
(cuya carga inicial es 4 %).
Similares resultados se observan en los escenarios de media y mínima demanda en
estiaje del 2020.
Página 43 de 70
Con la desconexión intempestiva de un transformador 220/66 kV de la S.E.
Intermedia, no interrumpe el servicio al proyecto PMRT, ya que aún queda en servicio
un transformador paralelo.
En la Figura 9.2 se muestra el comportamiento de las principales variables eléctricas
en el escenario de máxima demanda en estiaje del 2020.
DIgSILENT
1.02 40.00
30.00
1.01
20.00
1.00
10.00
0.99
0.00
0.98 -10.00
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997
L-2250: Loading in %
0.97 L-2295: Loading in %
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997 LT Pariñas - Valle Chira: Loading in %
GE1B 66: Voltage, Magnitude in p.u. LT Piura Oes te - Valle Chira: Loading in %
INTER 66: Voltage, Magnitude in p.u. Lne Intermedia GE_1A: Loading in %
PARIÑAS 220\PARIÑAS 220A: Voltage, Magnitude in p.u. Lne Intermedia GE_1B: Loading in %
PIURA OESTE 220\PIURA OESTE 220A: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia1: Loading in %
SE INTERMEDIA: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia2: Loading in %
SEP-A: Voltage, Magnitude in p.u. TR54-SEP-01-A: Loading in %
TALARA 220\TALARA 220A: Voltage, Magnitude in p.u. TR54-SEP-01-B: Loading in %
VALLE CHIRA 220: Voltage, Magnitude in p.u. Trafo Interm edia1: Maximum Loading in %
ZORRITOS 220: Voltage, Magnitude in p.u. Trafo Interm edia2: Maximum Loading in %
60.00 60.03
40.00 60.02
60.01
20.00
60.00
0.00
59.99
-20.00
59.98
-40.00 -0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997 GE1A 66: Electrical Frequency in Hz
CPato G1: Rotor angle with reference to reference machine angle in deg INTER 66: Electrical Frequency in Hz
Carhq G1: Rotor angle with reference to reference machine angle in deg PARIÑAS 220\PARIÑAS 220A: Electrical Frequency in Hz
Eners ur G1: Rotor angle with reference to reference machine angle in deg PIURA OESTE 220\PIURA OESTE 220A: Electrical Frequency in Hz
GCiego G1: Rotor angle with reference to reference machine angle in deg SE INTERMEDIA: Electrical Frequency in Hz
GE-3-GE1-01: Rotor angle with reference to reference machine angle in deg SEP-A: Electrical Frequency in Hz
GE-3-GE1-02: Rotor angle with reference to reference machine angle in deg TALARA 220\TALARA 220A: Electrical Frequency in Hz
Malac G4: Rotor angle with reference to reference m achine angle in deg VALLE CHIRA 220: Electrical Frequency in Hz
Tablazo G1: Rotor angle with reference to reference machine angle in deg ZORRITOS 220: Electrical Frequency in Hz
Página 44 de 70
Similares resultados se observan en los escenarios de media y mínima demanda en
estiaje del 2020.
DIgSILENT
1.20 800.00
600.00
0.90
400.00
0.60
200.00
0.30
0.00
0.00 -200.00
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997
L-2250: Loading in %
-0.30 L-2295: Loading in %
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997 LT Pariñas - Valle Chira: Loading in %
GE1B 66: Voltage, Magnitude in p.u. LT Piura Oes te - Valle Chira: Loading in %
INTER 66: Voltage, Magnitude in p.u. Lne Intermedia GE_1A: Loading in %
PARIÑAS 220\PARIÑAS 220A: Voltage, Magnitude in p.u. Lne Intermedia GE_1B: Loading in %
PIURA OESTE 220\PIURA OESTE 220A: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia1: Loading in %
SE INTERMEDIA: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia2: Loading in %
SEP-A: Voltage, Magnitude in p.u. TR54-SEP-01-A: Loading in %
TALARA 220\TALARA 220A: Voltage, Magnitude in p.u. TR54-SEP-01-B: Loading in %
VALLE CHIRA 220: Voltage, Magnitude in p.u. Trafo Interm edia1: Maximum Loading in %
ZORRITOS 220: Voltage, Magnitude in p.u. Trafo Interm edia2: Maximum Loading in %
60.00 61.50
40.00 61.10
60.70
20.00
60.30
0.00
59.90
-20.00
59.50
-40.00 -0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997 GE1A 66: Electrical Frequency in Hz
CPato G1: Rotor angle with reference to reference machine angle in deg INTER 66: Electrical Frequency in Hz
Carhq G1: Rotor angle with reference to reference machine angle in deg PARIÑAS 220\PARIÑAS 220A: Electrical Frequency in Hz
Eners ur G1: Rotor angle with reference to reference machine angle in deg PIURA OESTE 220\PIURA OESTE 220A: Electrical Frequency in Hz
GCiego G1: Rotor angle with reference to reference machine angle in deg SE INTERMEDIA: Electrical Frequency in Hz
GE-3-GE1-01: Rotor angle with reference to reference machine angle in deg SEP-A: Electrical Frequency in Hz
GE-3-GE1-02: Rotor angle with reference to reference machine angle in deg TALARA 220\TALARA 220A: Electrical Frequency in Hz
Malac G4: Rotor angle with reference to reference m achine angle in deg VALLE CHIRA 220: Electrical Frequency in Hz
Tablazo G1: Rotor angle with reference to reference machine angle in deg ZORRITOS 220: Electrical Frequency in Hz
Página 45 de 70
Luego de la ocurrencia del Evento 3, se observa que los ángulos rotóricos de las
máquinas síncronas del SEIN no pierden sincronismo. Luego de ocurrido el evento,
las tensiones varían muy poco en las barras del sistema, las cargabilidades de las
principales líneas y transformadores casi no sufren cambios, excepto la línea de 66 kV
que queda en servicio Intermedia – GE1 con una cargabilidad final del 16 % (cuya
carga inicial es 7 %).
Similares resultados se observan en los escenarios de media y mínima demanda en
estiaje del 2020.
Página 46 de 70
DIgSILENT
1.02 40.00
30.00
1.01
20.00
1.00
10.00
0.99
0.00
0.98 -10.00
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997
L-2250: Loading in %
0.97 L-2295: Loading in %
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997 LT Pariñas - Valle Chira: Loading in %
GE1B 66: Voltage, Magnitude in p.u. LT Piura Oes te - Valle Chira: Loading in %
INTER 66: Voltage, Magnitude in p.u. Lne Intermedia GE_1A: Loading in %
PARIÑAS 220\PARIÑAS 220A: Voltage, Magnitude in p.u. Lne Intermedia GE_1B: Loading in %
PIURA OESTE 220\PIURA OESTE 220A: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia1: Loading in %
SE INTERMEDIA: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia2: Loading in %
SEP-A: Voltage, Magnitude in p.u. TR54-SEP-01-A: Loading in %
TALARA 220\TALARA 220A: Voltage, Magnitude in p.u. TR54-SEP-01-B: Loading in %
VALLE CHIRA 220: Voltage, Magnitude in p.u. Trafo Interm edia1: Maximum Loading in %
ZORRITOS 220: Voltage, Magnitude in p.u. Trafo Interm edia2: Maximum Loading in %
60.00 60.03
40.00 60.02
60.01
20.00
60.00
0.00
59.99
-20.00
59.98
-40.00 -0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997 GE1A 66: Electrical Frequency in Hz
CPato G1: Rotor angle with reference to reference machine angle in deg INTER 66: Electrical Frequency in Hz
Carhq G1: Rotor angle with reference to reference machine angle in deg PARIÑAS 220\PARIÑAS 220A: Electrical Frequency in Hz
Eners ur G1: Rotor angle with reference to reference machine angle in deg PIURA OESTE 220\PIURA OESTE 220A: Electrical Frequency in Hz
GCiego G1: Rotor angle with reference to reference machine angle in deg SE INTERMEDIA: Electrical Frequency in Hz
GE-3-GE1-01: Rotor angle with reference to reference machine angle in deg SEP-A: Electrical Frequency in Hz
GE-3-GE1-02: Rotor angle with reference to reference machine angle in deg TALARA 220\TALARA 220A: Electrical Frequency in Hz
Malac G4: Rotor angle with reference to reference m achine angle in deg VALLE CHIRA 220: Electrical Frequency in Hz
Tablazo G1: Rotor angle with reference to reference machine angle in deg ZORRITOS 220: Electrical Frequency in Hz
Luego de la ocurrencia del Evento 4, se observa que los ángulos rotóricos de las
máquinas síncronas del SEIN no pierden sincronismo. Luego de ocurrido el evento,
las tensiones varían muy poco en las barras del sistema, las cargabilidades de las
principales líneas y transformadores casi no sufren cambios, excepto el transformador
de 66/33 kV de la S.E. GE1 que queda en servicio con una cargabilidad final del 25 %
(cuya carga inicial es 13 %).
Similares resultados se observan en los escenarios de media y mínima demanda en
estiaje del 2020.
Página 47 de 70
9.3.5 Evento 5: Desconexión de un generador de la Central de Cogeneración
DIgSILENT
1.035 90.00
70.00
1.010
50.00
0.985
30.00
0.960
10.00
0.935 -10.00
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997
L-2250: Loading in %
0.910 L-2295: Loading in %
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997 LT Pariñas - Valle Chira: Loading in %
GE1B 66: Voltage, Magnitude in p.u. LT Piura Oes te - Valle Chira: Loading in %
INTER 66: Voltage, Magnitude in p.u. Lne Intermedia GE_1A: Loading in %
PARIÑAS 220\PARIÑAS 220A: Voltage, Magnitude in p.u. Lne Intermedia GE_1B: Loading in %
PIURA OESTE 220\PIURA OESTE 220A: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia1: Loading in %
SE INTERMEDIA: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia2: Loading in %
SEP-A: Voltage, Magnitude in p.u. TR54-SEP-01-A: Loading in %
TALARA 220\TALARA 220A: Voltage, Magnitude in p.u. TR54-SEP-01-B: Loading in %
VALLE CHIRA 220: Voltage, Magnitude in p.u. Trafo Interm edia1: Maximum Loading in %
ZORRITOS 220: Voltage, Magnitude in p.u. Trafo Interm edia2: Maximum Loading in %
60.00 60.07
40.00 60.03
59.99
20.00
59.95
0.00
59.91
-20.00
59.87
-40.00 -0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997 GE1A 66: Electrical Frequency in Hz
CPato G1: Rotor angle with reference to reference machine angle in deg INTER 66: Electrical Frequency in Hz
Carhq G1: Rotor angle with reference to reference machine angle in deg PARIÑAS 220\PARIÑAS 220A: Electrical Frequency in Hz
Eners ur G1: Rotor angle with reference to reference machine angle in deg PIURA OESTE 220\PIURA OESTE 220A: Electrical Frequency in Hz
GCiego G1: Rotor angle with reference to reference machine angle in deg SE INTERMEDIA: Electrical Frequency in Hz
GE-3-GE1-01: Rotor angle with reference to reference machine angle in deg SEP-A: Electrical Frequency in Hz
GE-3-GE1-02: Rotor angle with reference to reference machine angle in deg TALARA 220\TALARA 220A: Electrical Frequency in Hz
Malac G4: Rotor angle with reference to reference m achine angle in deg VALLE CHIRA 220: Electrical Frequency in Hz
Tablazo G1: Rotor angle with reference to reference machine angle in deg ZORRITOS 220: Electrical Frequency in Hz
Luego de la ocurrencia del Evento 5, se observa que los ángulos rotóricos de las
máquinas síncronas del SEIN no pierden sincronismo. Sin embargo, se observa una
pronunciada caída de tensión en todas las barras de la zona del proyecto,
Página 48 de 70
especialmente las barras SEP-A y SEP-B, cuya caída de tensión alcanza por debajom
de 0.95 p.u.
Las cargabilidades de las principales líneas y transformadores se incrementan sin
presentarse sobrecargas. Las mayores cargas se presentan en los dos
transformadores 220/66 kV de la S.E. Intermedia y en los dos transformadores 66/33
kV de la S.E. GE1, que alcanzan hasta el 55 %.
A fin de evitar las bajas tensiones en barras cuando ocurre el Evento 5, se recomienda
implementar un sistema automático para conectar el banco de capacitores de 40
MVAr, inmediatamente después de la desconexión de un generador de la central de
cogeneración. En el siguiente Item (denominado Caso 5A), se analiza el
comportamiento de las tensiones cuando se implementa este automatismo.
Similares resultados se observan en los escenarios de media y mínima demanda en
estiaje del 2020.
Página 49 de 70
DIgSILENT
1.055 90.00
70.00
1.030
50.00
1.005
30.00
0.980
10.00
0.955 -10.00
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997
L-2250: Loading in %
0.930 L-2295: Loading in %
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997 LT Pariñas - Valle Chira: Loading in %
GE1B 66: Voltage, Magnitude in p.u. LT Piura Oes te - Valle Chira: Loading in %
INTER 66: Voltage, Magnitude in p.u. Lne Intermedia GE_1A: Loading in %
PARIÑAS 220\PARIÑAS 220A: Voltage, Magnitude in p.u. Lne Intermedia GE_1B: Loading in %
PIURA OESTE 220\PIURA OESTE 220A: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia1: Loading in %
SE INTERMEDIA: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia2: Loading in %
SEP-A: Voltage, Magnitude in p.u. TR54-SEP-01-A: Loading in %
TALARA 220\TALARA 220A: Voltage, Magnitude in p.u. TR54-SEP-01-B: Loading in %
VALLE CHIRA 220: Voltage, Magnitude in p.u. Trafo Interm edia1: Maximum Loading in %
ZORRITOS 220: Voltage, Magnitude in p.u. Trafo Interm edia2: Maximum Loading in %
60.00 60.04
40.00 60.00
59.96
20.00
59.92
0.00
59.88
-20.00
59.84
-40.00 -0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997 GE1A 66: Electrical Frequency in Hz
CPato G1: Rotor angle with reference to reference machine angle in deg INTER 66: Electrical Frequency in Hz
Carhq G1: Rotor angle with reference to reference machine angle in deg PARIÑAS 220\PARIÑAS 220A: Electrical Frequency in Hz
Eners ur G1: Rotor angle with reference to reference machine angle in deg PIURA OESTE 220\PIURA OESTE 220A: Electrical Frequency in Hz
GCiego G1: Rotor angle with reference to reference machine angle in deg SE INTERMEDIA: Electrical Frequency in Hz
GE-3-GE1-01: Rotor angle with reference to reference machine angle in deg SEP-A: Electrical Frequency in Hz
GE-3-GE1-02: Rotor angle with reference to reference machine angle in deg TALARA 220\TALARA 220A: Electrical Frequency in Hz
Malac G4: Rotor angle with reference to reference m achine angle in deg VALLE CHIRA 220: Electrical Frequency in Hz
Tablazo G1: Rotor angle with reference to reference machine angle in deg ZORRITOS 220: Electrical Frequency in Hz
Luego de la ocurrencia del Evento 5A, se observa que los ángulos rotóricos de las
máquinas síncronas del SEIN no pierden sincronismo. Con la conexión automática del
banco de capacitores, se observa que las tensiones en las barras SEP-A y SEP-B se
mantienen en 0.99 p.u. Adicionalmente, las tensiones en las barras de 66 kV
Intermedia y GE1, alcanzan tensiones de 1.039 p.u. y 1.036 p.u. respectivamente.
Similares resultados se observan en los escenarios de media y mínima demanda en
estiaje del 2020.
Página 50 de 70
9.3.7 Evento 6: Desconexión de toda la carga de la S.E. GE1 (PMRT)
DIgSILENT
1.095 160.00
120.00
1.070
80.00
1.045
40.00
1.020
0.00
0.995 -40.00
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997
L-2250: Loading in %
0.970 L-2295: Loading in %
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997 LT Pariñas - Valle Chira: Loading in %
GE1B 66: Voltage, Magnitude in p.u. LT Piura Oes te - Valle Chira: Loading in %
INTER 66: Voltage, Magnitude in p.u. Lne Intermedia GE_1A: Loading in %
PARIÑAS 220\PARIÑAS 220A: Voltage, Magnitude in p.u. Lne Intermedia GE_1B: Loading in %
PIURA OESTE 220\PIURA OESTE 220A: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia1: Loading in %
SE INTERMEDIA: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia2: Loading in %
SEP-A: Voltage, Magnitude in p.u. TR54-SEP-01-A: Loading in %
TALARA 220\TALARA 220A: Voltage, Magnitude in p.u. TR54-SEP-01-B: Loading in %
VALLE CHIRA 220: Voltage, Magnitude in p.u. Trafo Interm edia1: Maximum Loading in %
ZORRITOS 220: Voltage, Magnitude in p.u. Trafo Interm edia2: Maximum Loading in %
60.00 60.40
40.00 60.30
60.20
20.00
60.10
0.00
60.00
-20.00
59.90
-40.00 -0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997 GE1A 66: Electrical Frequency in Hz
CPato G1: Rotor angle with reference to reference machine angle in deg INTER 66: Electrical Frequency in Hz
Carhq G1: Rotor angle with reference to reference machine angle in deg PARIÑAS 220\PARIÑAS 220A: Electrical Frequency in Hz
Eners ur G1: Rotor angle with reference to reference machine angle in deg PIURA OESTE 220\PIURA OESTE 220A: Electrical Frequency in Hz
GCiego G1: Rotor angle with reference to reference machine angle in deg SE INTERMEDIA: Electrical Frequency in Hz
GE-3-GE1-01: Rotor angle with reference to reference machine angle in deg SEP-A: Electrical Frequency in Hz
GE-3-GE1-02: Rotor angle with reference to reference machine angle in deg TALARA 220\TALARA 220A: Electrical Frequency in Hz
Malac G4: Rotor angle with reference to reference m achine angle in deg VALLE CHIRA 220: Electrical Frequency in Hz
Tablazo G1: Rotor angle with reference to reference machine angle in deg ZORRITOS 220: Electrical Frequency in Hz
Luego de la ocurrencia del Evento 6, se observa que los ángulos rotóricos de las
máquinas síncronas del SEIN no pierden sincronismo. Inicialmente por la salida
brusca de toda la carga, las tensiones se elevan en las redes de 33 kV y 66 kV, hasta
en 1.07 p.u en las barras SEP-A y SEP-B, por menos de medio segundo. Por la
Página 51 de 70
actuación de los reguladores de tensión de los generadores de la central de
cogeneración, las tensiones se reducen alrededor de 1.0 p.u. en todas las barras.
Adicionalmente, se observa también que las cargabilidades de las principales líneas y
transformadores se incrementa, ya que casi toda la generación es exportada al SEIN.
Las mayores cargabilidades se observa en los dos transformadores 220/66 kV de la
S.E. Intermedia y en los dos transformadores 66/33 kV de la S.E. GE1, que alcanzan
una carga del 94 %.
Similares resultados se observan en los escenarios de media y mínima demanda en
estiaje del 2020.
Página 52 de 70
DIgSILENT
1.04 125.00
100.00
0.99
75.00
0.94
50.00
0.89
25.00
0.84 0.00
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997
L-2250: Loading in %
0.79 L-2295: Loading in %
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997 LT Pariñas - Valle Chira: Loading in %
GE1B 66: Voltage, Magnitude in p.u. LT Piura Oes te - Valle Chira: Loading in %
INTER 66: Voltage, Magnitude in p.u. Lne Intermedia GE_1A: Loading in %
PARIÑAS 220\PARIÑAS 220A: Voltage, Magnitude in p.u. Lne Intermedia GE_1B: Loading in %
PIURA OESTE 220\PIURA OESTE 220A: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia1: Loading in %
SE INTERMEDIA: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia2: Loading in %
SEP-A: Voltage, Magnitude in p.u. TR54-SEP-01-A: Loading in %
TALARA 220\TALARA 220A: Voltage, Magnitude in p.u. TR54-SEP-01-B: Loading in %
VALLE CHIRA 220: Voltage, Magnitude in p.u. Trafo Interm edia1: Maximum Loading in %
ZORRITOS 220: Voltage, Magnitude in p.u. Trafo Interm edia2: Maximum Loading in %
60.00 60.04
40.00 59.99
59.94
20.00
59.89
0.00
59.84
-20.00
59.79
-40.00 -0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997 GE1A 66: Electrical Frequency in Hz
CPato G1: Rotor angle with reference to reference machine angle in deg INTER 66: Electrical Frequency in Hz
Carhq G1: Rotor angle with reference to reference machine angle in deg PARIÑAS 220\PARIÑAS 220A: Electrical Frequency in Hz
Eners ur G1: Rotor angle with reference to reference machine angle in deg PIURA OESTE 220\PIURA OESTE 220A: Electrical Frequency in Hz
GCiego G1: Rotor angle with reference to reference machine angle in deg SE INTERMEDIA: Electrical Frequency in Hz
GE-3-GE1-01: Rotor angle with reference to reference machine angle in deg SEP-A: Electrical Frequency in Hz
GE-3-GE1-02: Rotor angle with reference to reference machine angle in deg TALARA 220\TALARA 220A: Electrical Frequency in Hz
Malac G4: Rotor angle with reference to reference m achine angle in deg VALLE CHIRA 220: Electrical Frequency in Hz
Tablazo G1: Rotor angle with reference to reference machine angle in deg ZORRITOS 220: Electrical Frequency in Hz
Luego de la ocurrencia del Evento 7, se observa que los ángulos rotóricos de las
máquinas síncronas del SEIN no pierden sincronismo. Sin embargo, se observa una
pronunciada caída de tensión en todas las barras de la zona del proyecto,
especialmente las barras SEP-A y GE1, cuyas caídas de tensión alcanzan hasta 0.82
p.u. y 0.84 p.u. respectivamente.
Adicionalmente, se observa que las cargabilidades de las principales líneas y
transformadores se incrementan, alcanzando sobrecargas del 6 % en los dos
transformadores 220/66 kV de la S.E. Intermedia y en los dos transformadores 66/33
kV de la S.E. GE1.
A fin de evitar las bajas tensiones en barras cuando ocurre el Evento 7, se recomienda
implementar un sistema automático para conectar los dos bancos de capacitores de
20 MVAr y 40 MVAr, inmediatamente después de la desconexión de la central de
Página 53 de 70
cogeneración. En el siguiente Item (denominado Caso 7A), se analiza el
comportamiento de las tensiones cuando se implementa este automatismo.
Página 54 de 70
DIgSILENT
1.06 125.00
100.00
1.01
75.00
0.96
50.00
0.91
25.00
0.86 0.00
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997
L-2250: Loading in %
0.81 L-2295: Loading in %
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997 LT Pariñas - Valle Chira: Loading in %
GE1B 66: Voltage, Magnitude in p.u. LT Piura Oes te - Valle Chira: Loading in %
INTER 66: Voltage, Magnitude in p.u. Lne Intermedia GE_1A: Loading in %
PARIÑAS 220\PARIÑAS 220A: Voltage, Magnitude in p.u. Lne Intermedia GE_1B: Loading in %
PIURA OESTE 220\PIURA OESTE 220A: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia1: Loading in %
SE INTERMEDIA: Voltage, Magnitude in p.u. Lne Pariñas - Intermedia2: Loading in %
SEP-A: Voltage, Magnitude in p.u. TR54-SEP-01-A: Loading in %
TALARA 220\TALARA 220A: Voltage, Magnitude in p.u. TR54-SEP-01-B: Loading in %
VALLE CHIRA 220: Voltage, Magnitude in p.u. Trafo Interm edia1: Maximum Loading in %
ZORRITOS 220: Voltage, Magnitude in p.u. Trafo Interm edia2: Maximum Loading in %
40.00 60.17
20.00 60.07
59.97
0.00
59.87
-20.00
59.77
-40.00
59.67
-60.00 -0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997
-0.1000 0.9199 1.9399 2.9598 3.9797 [s ] 4.9997 GE1A 66: Electrical Frequency in Hz
CPato G1: Rotor angle with reference to reference machine angle in deg INTER 66: Electrical Frequency in Hz
Carhq G1: Rotor angle with reference to reference machine angle in deg PARIÑAS 220\PARIÑAS 220A: Electrical Frequency in Hz
Eners ur G1: Rotor angle with reference to reference machine angle in deg PIURA OESTE 220\PIURA OESTE 220A: Electrical Frequency in Hz
GCiego G1: Rotor angle with reference to reference machine angle in deg SE INTERMEDIA: Electrical Frequency in Hz
GE-3-GE1-01: Rotor angle with reference to reference machine angle in deg SEP-A: Electrical Frequency in Hz
GE-3-GE1-02: Rotor angle with reference to reference machine angle in deg TALARA 220\TALARA 220A: Electrical Frequency in Hz
Malac G4: Rotor angle with reference to reference m achine angle in deg VALLE CHIRA 220: Electrical Frequency in Hz
Tablazo G1: Rotor angle with reference to reference machine angle in deg ZORRITOS 220: Electrical Frequency in Hz
Luego de la ocurrencia del Evento 7A, se observa que los ángulos rotóricos de las
máquinas síncronas del SEIN no pierden sincronismo.
En el caso de máxima demanda, se considera un rechazo de carga de 10.5 MW. Con
la conexión automática de los dos bancos de capacitores, se observa que las
tensiones en las barras de 66 kV Intermedia y GE1 se encuentran por encima de 1.0
p.u. Sin embargo las barras SEP-A y SEP-B alcanzan el valor de 0.96 p.u. Estas
tensiones pueden ser mejoradas posteriormente, modificando la ubicación de los taps
de los transformadores de 66/33 kV de la S.E. GE1.
Aún se observan sobrecargas del 5 % en los dos transformadores 66/33 kV de la S.E.
GE1. Estas sobrecargas pueden evitarse si se rechaza una cantidad de carga aún
mayor en la planta PMRT.
Página 55 de 70
Similares resultados se observan en los escenarios de media y mínima demanda en
estiaje del 2020.
Página 56 de 70
DIgSILENT
X = 0.130 s X = 0.140 s
80.00 300.00
60.00 200.00
40.00 100.00
20.00 0.00
0.00 -100.00
-20.00 -200.00
-0.100 1.920 3.940 5.960 7.980 [s] 10.00 -0.100 1.920 3.940 5.960 7.980 [s] 10.00
GE-3-GE1-01: Rotor angle with reference to reference machine angle in deg GE-3-GE1-01: Rotor angle with reference to reference machine angle in deg
GE-3-GE1-02: Rotor angle with reference to reference machine angle in deg GE-3-GE1-02: Rotor angle with reference to reference machine angle in deg
Los resultados muestran que el tiempo crítico de despeje de fallas es 130 ms.
Página 57 de 70
Donde:
I2 : Componente de secuencia negativa de la corriente de armadura del
generador (en pu)
t: Tiempo que el generador puede soportar la circulación de la corriente de
secuencia negativa (en s)
n: Constante de diseño del generador, el cual representa el tiempo que el
generador puede soportar una corriente de secuencia negativa de 1 pu
(en s). Se considera un valor de n = 10 s, considerando un generador
con rotor de polos cilíndricos.
Para determinar la máxima corriente de secuencia negativa que circulará por los
devanados de armadura de los grupos generadores, se ha considerado una falla
bifásica en la barra SEP-A de 66 kV de la S.E. GE1
En la Figura 11.1 se muestra la corriente de secuencia negativa que circula por los
generadores de la central de cogeneración, ante una falla bifásica en la barra 66 kV de
la S.E GE1.
Página 58 de 70
DIgSILENT
2.00 5.00
0.002 s
0.002 s 4.396 kA
1.745 p.u.
1.50 3.75
1.00 2.50
0.50 1.25
0.00 0.00
-0.50 -1.25
-0.100 0.120 0.340 0.560 0.780 [s] 1.000 -0.100 0.120 0.340 0.560 0.780 [s] 1.000
GE-3-GE1-01: Negative-Sequence Current, Magnitude in p.u. GE-3-GE1-01: Negative-Sequence Current, Magnitude in kA
GE-3-GE1-02: Negative-Sequence Current, Magnitude in p.u. GE-3-GE1-02: Negative-Sequence Current, Magnitude in kA
Página 59 de 70
10.0 Análisis de Estabilidad Permanente
10.1 Criterios
El análisis de estabilidad permanente es realizado sobre pequeñas perturbaciones, las
cuales son consideradas suficientemente pequeñas que permiten la linealización de
las ecuaciones del sistema. Estos estudios se apoyan en el análisis modal
(autovalores y autovectores) para la verificación de los modos de oscilación que
presentan un amortiguamiento bajo o negativo.
Se realizado los análisis para detectar eventuales oscilaciones inter-área y locales con
el objetivo de verificar la condición de estabilidad permanente del SEIN. Se realizaron
las simulaciones para los escenarios de máxima, media y mínima demanda del SEIN
en el período de estiaje del año 2020.
Se ha analizado mediante análisis modal, los modos más críticos que se presentan en
el SEIN cuando la central de cogeneración opera conectado al SEIN.
En el Cuadro 10.1 se muestran los eigenvalores con menor amortiguamiento (menor
al 5 %), correspondiente al escenario de máxima demanda en estiaje del 2020 con la
central de cogeneración en servicio.
Página 60 de 70
Real Imaginario Magnitud Ángulo Frecuencia Período Amortiguamiento
Modo
1/s ras/s 1/s deg Hz s %
Mode 03480 0.0000 0.0000 0.0000 90.0012 0.0000 215565163.9 0.00
Mode 01614 -0.2504 13.6663 13.6686 91.0499 2.1751 0.4598 1.83
Mode 01895 -0.5178 10.7379 10.7504 92.7605 1.7090 0.5851 4.82
DIgSILENT
_CM CPATO_G6 Reivax / Actuador; x5: +1.000 / +0.0 deg
Página 61 de 70
DIgSILENT
Area Centro 2 / La Virgen G2; s peed: -1.000 / -180.0 deg
DIgSILENT
Página 62 de 70
Los resultados muestran que el primer modo (3480) se trata de una oscilación de baja
frecuencia provocada por el SEIN, con una frecuencia menor a 0.01 Hz, por lo que no
representa mayores problemas a la dinámica del sistema. El segundo modo (1614) El
modo 7 se trata de una oscilación intraplanta entre los grupos generadores de la C.H.
La Virgen, con una frecuencia de 2.17 Hz con 1.8 % de amortiguamiento. El tercer
modo (1895) se trata de oscilaciones inter-área entre la C.H. Cerro del Águila y la C.H.
La Virgen contra centrales Chaglla, Charcani V y Mantaro. Se puede observar que la
central de cogeneración no presenta oscilaciones locales y/o intraplanta con
amortiguamiento menores al 5 %.
Página 63 de 70
DIgSILENT
External ..
PARIÑAS220
INTER 66
GE1A 66 Brk66
GE1B 66
TR-345-GE1-01 TR-345-GE1-02
GE-3-GE1-01
GE-3-GE1-02
TR54-SEP-01-A
TR54-SEP-01-B
SG
SG
~
~
SW-4-GE1-01 A SW-4-GE1-01 B
Brk33C
Brk33A
Brk33B
ss aa1 Brk33 ss aa2
SEP-A SEP-B
Line M1
Line M2
Load PMRT
Trafo M1
Trafo M2
SW-3-SEP-01-A SW-3-SEP-01-B
Brk13.8
Line AM1
Line AM2
Line AM3
Banc o C1 Banc o C2
AM AM AM
~ ~ ~
SWC-MP-001-A SWC-MP-001-B SWC-MP-001-C
Página 64 de 70
los factores de participación de los modos de oscilación en las unidades generación
de la Central de Cogeneración.
DIgSILENT
Equivalente / External Grid; speed: +1.000 / +0.0 deg
Página 65 de 70
DIgSILENT
Equivalente / GE-3-GE1-02; s peed: +1.000 / +0.0 deg
DIgSILENT
Página 66 de 70
Se puede observar todos los modos encontrados tienen un amortiguamiento mayor al
5 %. El modo 9 se trata de una oscilación local entre los rotores de los generadores de
la Central de Cogeneración y el SEIN, con una frecuencia de 2.07 Hz con 6.9 % de
amortiguamiento. El modo 7 se trata de una oscilación intraplanta entre los grupos
generadores de la Central de Cogeneración, con una frecuencia de 2.57 Hz con 15.2
% de amortiguamiento. El modo 13 se trata de una oscilación de baja frecuencia
provocada por el SEIN, con una frecuencia de 0.01 Hz con 79.3 % de
amortiguamiento, por lo que no representa mayores problemas a la dinámica del
sistema.
Página 67 de 70
transformadores. En esta contingencia es necesario operar uno de los bancos de
capacitores en 66 kV a fin de evitar caídas de tensión en 66 kV y 33 kV.
• Ante la salida de toda la carga de la planta PMRT, no se presentan problemas de
tensión en barras. La operación de la nueva central de cogeneración permite
exportar al SEIN en la S.E. Pariñas hasta 96 MW, sin provocar sobrecargas en
líneas ni en transformadores.
• Los resultados muestran que, ante la salida de toda la central de cogeneración,
aparecen graves problemas de tensión (problemas de colapso de tensión) sólo
en máxima demanda. En este escenario será necesario rechazar un promedio de
10.6 MW a fin de evitar bajas tensiones en la zona del proyecto. Sin embargo, se
observa una sobrecarga del 12 % en los transformadores de 66/33 kV de la S.E.
GE1. De acuerdo con el Procedimiento PR-20, se permite sobrecargas de hasta
el 20 % en contingencias N-1. En esta contingencia, es necesario la operación de
los dos bancos de capacitores en 66 kV, así como la modificación de la ubicación
de los taps de los transformadores de 66/33 kV de la S.E. GE1, a fin de elevar
las tensiones en 33 kV.
Página 68 de 70
sistema resulta estable, las tensiones varían muy poco en las barras del sistema
y las cargabilidades de las principales líneas y transformadores casi no sufren
cambios.
• Asimismo, los eventos de desconexión de un transformador 220/66 kV de la S.E.
Intermedia o de un transformador 66/33 kV de la S.E. GE1, el sistema resulta
estable, las tensiones varían muy poco en las barras del sistema y las
cargabilidades de las principales líneas y transformadores casi no sufren
cambios.
• Ante la desconexión intempestiva de un grupo generador de la central de
cogeneración, el sistema resulta estable. Sin embargo, se observa una
pronunciada caída de tensión en todas las barras de la zona del proyecto,
especialmente las barras SEP-A y SEP-B, cuya caída de tensión alcanza hasta
0.91 p.u. A fin de evitar las bajas tensiones en barras, se recomienda
implementar un sistema automático para conectar el banco de capacitores de 40
MVAr, inmediatamente después de la desconexión de un generador de la central
de cogeneración. En el Item “Caso 5A”, se analiza este escenario, mejorando las
tensiones en las barras SEP-A y SEP-B hasta en 0.98 p.u.
• La desconexión de toda la carga de la planta PMRT, no se presentan problemas
de tensión en barras. No se presentan problemas de tensión ni sobrecargas en
líneas ni transformadores.
• Ante la desconexión intempestiva de toda la central de cogeneración, El sistema
resulta estable. Sin embargo, se observa una pronunciada caída de tensión en
todas las barras de la zona del proyecto, especialmente las barras SEP-A y GE1,
cuyas caídas de tensión alcanzan hasta 0.82 p.u. y 0.84 p.u. respectivamente. A
fin de evitar las bajas tensiones en barras, se recomienda implementar un
sistema automático para conectar los dos bancos de capacitores de 20 MVAr y
40 MVAr, inmediatamente después de la desconexión de la central de
cogeneración. En el Item “Caso 7A”, se analiza este escenario, mejorando las
tensiones en las barras hasta en 0.96 p.u.
Página 69 de 70
12.0 ANEXOS
Página 70 de 70