Вы находитесь на странице: 1из 2

Doc. No NDER.

042
Non Destructive Examination Request (NDER) Rev. No 0
Date 20 August 2010
Prepared by Approved by Reviewed by Notes :-
Signature 1) NDE for WQT (Both end only)
Stamp
Name Welding Inspector Welding Engineer
Date 20/8/2010
Sta Welding WPP/WPS Dimension [mm] NDE Method Acceptance
Weld ID Process Type Base Metal Position Welder ID Procedure
tus Date No L WT OD RT UT PT MT Criteria
TC.WQT-A01 Off 20/08/10 MM10003-A2 SAW Mechanized BS4360 43A 1G 1000 25 - EW-36 X AWSD1.1,ASME IX AWSD1.1,ASME IX
EN 1418 EN 1418
TC.WQT-A02 Off 20/08/10 MM10003-A2 SAW Mechanized BS4360 43A 1G 1000 25 - EW-37 X AWSD1.1,ASME IX AWSD1.1,ASME IX
EN 1418 EN 1418
TC.WQT-A03 Off 20/08/10 MM10003-A2 SAW Mechanized BS4360 43A 1G 1000 25 - EW-38 X AWSD1.1,ASME IX AWSD1.1,ASME IX
EN 1418 EN 1418
TC.WQT-A04 Off 20/08/10 MM10003-A2 SAW Mechanized BS4360 43A 1G 1000 25 - EW-39 X AWSD1.1,ASME IX AWSD1.1,ASME IX
EN 1418 EN 1418
TC.WQT-A05 Off 20/08/10 MM10003-A2 SAW Mechanized BS4360 43A 1G 1000 25 - EW-40 X AWSD1.1,ASME IX AWSD1.1,ASME IX
EN 1418 EN 1418

Form Control No: EEW/W/081-1 EEW MALAYSIA SDN. BHD. Page 1 of 2


Doc. No NDER.042
Non Destructive Examination Request (NDER) Rev. No 0
Date 20 August 2010
Prepared by Approved by Reviewed by Notes :-
Signature 1) NDE for WQT (Both end only)
Stamp
Name Welding Inspector Welding Engineer
Date 20/8/2010
Sta Welding WPP/WPS Dimension [mm] NDE Method Acceptance
Weld ID Process Type Base Metal Position Welder ID Procedure
tus Date No L WT OD RT UT PT MT Criteria

Form Control No: EEW/W/081-1 EEW MALAYSIA SDN. BHD. Page 2 of 2

Вам также может понравиться