CONCRETE WORK
MASONRY
PAINT WORKS
GLASS WORKS
TILE WORKS
STEEL REINFORCEMENT
MATERIAL COST:
AMOUNT
(Php)
CONCRETE WORK
1,921,040.00
1,140,800.00
1,828,400.00
MASONRY
229,184.00
PAINT WORKS
149,760.00
46,200.00
7,000.00
740.00
1,440.00
GLASS WORKS
213,875.00
89,600.00
381,600.00
13,595.00
350.00
9,504.00
750.00
1,375.00
2,400.00
2,925.00
619.00
500.00
1,600.00
TILE WORKS
937,620.00
83,400.00
43,472.00
STEEL REINFORCEMENT
616,216.00
2,076,032.00
2,798,980.00
549,024.00
181,440.00
459,360.00
1,356,040.00
15,142,122.00
ITEM
DESCRIPTION QUANTITY UNIT UNIT COST
NO.
CONCRETE WORK
MASONRY
PAINT WORKS
GLASS WORKS
TILE WORKS
STEEL REINFORCEMENT
27 10mmØ x 6m DSB 5243 pcs 136
28 12mmØ x 6m DSB 4926 pcs 196
29 16mmØ x 6m DSB 12122 pcs 349
30 20mmØ x 6m DSB 380 pcs 602
31 25mmØ x 6m DSB 796 pcs 945
32 28mmØ x 6m DSB 192 pcs
33 32mmØ x 6m DSB 192 pcs
34 No.16 G.I Tie Wire 1898 kg 58
MATERIAL COST:
ADD:
Rates for electrical work in laying of conduits
and wiring excluding switches and fittings
(15%)
Labor (35%)
Supervision (25%)
Profit (15%)
Contingencies (10%)
TOTAL
AMOUNT
ADD:
Labor (35%) 0.35 15,144,122 5300442.7
Supervision (25%) 0.25 15,144,122 3786030.5
Profit (15%) 0.15 15,144,122 2271618.3
Contingencies (10%) 0.1 15,144,122 1514412.2
TOTAL 12872503.7
TOTAL COST 28,016,626