Plunger Lift Preliminary Checklist

Wellhead vs. Tubing Size


o Insure the wellhead ID is appropriate for the tubing size.
 This can be found stamped on the flange of the master valve.
Downhole Profile Nipple
o Confirm if there is a profile nipple downhole.
 Confirm profile nipple type and size.
 Confirm profile nipple depth.
Pressure Transducers
o Confirm tubing and casing electric pressure transducers.
 Make sure the transducers are installed and working properly.
Confirm RTU/EFM
o Type and Model
Surface Facility Oil and Water/Gas Separator
o Insure that the gas unit is in proper working condition.
 Inspect dump valves and level controllers.
 Inspect supply gas pot and regulators.
 Inspect and remove chokes to insure maximum flow.
Inspect Meter Run Orifice Plate
o Change out orifice plate if necessary.
 Use a orifice plate that will accurately measurement without over-ranging the
measurement transducer or MVT during moments of high instantaneous rates
during plunger cycling.
Tubing and Casing Pressure Gauges
o Insure tubing pressure gauge is working properly.
 Be sure all gate, ball or needle valves in-line with the pressure gauge are open
and functioning.
o Insure casing pressure gauge is working properly.
 Be sure all gate, ball or needle valves in-line with the pressure gauge are open
and functioning.
 If the well has a packer, note and report any pressure recorded on the casing to
your supervisor for inspection of the source of the pressure.
Final Report
o Be sure to document and report any improper or repairs needed for the mentioned
equipment to your supervisor.