Вы находитесь на странице: 1из 3

Professional Summary

 Total 4+ years of SAP PM Experience with 1 Implementation and 3 supporting Projects- Maintenance
and Manufacturing.
 Good understanding of business processes and workflow in the areas of Manufacturing Industries.
 Studying the current processes through detailed discussions with the client’s core team.
 Mapping the processes on to SAP and documenting the to-be processes.
 Designing the organization structure and setting it up in SAP in association with other members from
different streams of the implementation team.
 Participated in conceptual design phase.
 Decent exposure to all popular implementation methodologies like ASAP.
 Detail oriented, quick learner, good listener with strong problem solving skills.
 Open to dynamic work environment and ability to work collaboratively with business analysts, testers,
developers and other team members.
 Good communication, management and presentation skills.
 Preparation of functional specification for developing ABAP reports.
 Having good Experience on integration of FICO, MM, PS.
 I have worked with the technical team on creating the RICEF's.
 Special emphasis on Data Migration specifications with Legacy System Migration workbench (LSMW) for
data uploads for various SAP Projects, and having knowledge on BDC.
 Flexible - able to pick up new modules/other applications as required.
 Excellent customer service and problem-solving skills.
 Having good working experience on Testing like Unit testing, Integration testing.

Academic Profile

B.Tech from Jawaharlal Nehru Technological University HYD with 60%

Technical Skills

Operating Systems : MS-Dos, Windows 95/98/XP, Server2000/2003.


Packages : MS-Office,
ERP : SAP-PM

Projects
Project 4 – Support

Client : Ministry of Finance


Environment : ECC 6.0 version
Role : PM Consultant
Duration : July 2018 to Till now

Responsibilities:
 Involved in Configuration of SAP PM module & the Organization structure in plant Maintenance like
Maintenance plant, Maintenance planning plant, Plant section & Functional location.
 Defined & customized various types of Technical Objects, Plant Sections, Planner groups, ABC Indicators,
Authorization Groups, Object Information keys and Structural display for Functional Locations.
 Creating and updating of Master Data for SAP PM for Technical Objects, Task lists, Maintenance plan,
Service Notifications and master data loading through LSMW.
 Defined Permit Categories Permit groups, Measuring Point Categories and Number ranges for Measuring
Documents.
 Created Notifications, Activity types, Causes, Damages.
 Created various types of Orders, like Planned Order, Service Order, Break down Maintenance Order,
Shutdown Maintenance Order, Predictive Maintenance Order, Calibration order etc
 Created preventive maintenance i.e time based maintenance, maintenance strategies, performance
based maintenance, condition based maintenance.
 Created Refurbishment Orders for refurbishment of repairable spares.
 Created external processing orders like subcontracting orders.
 Create and maintain Functional Specification forms for Smart forms, reports and enhancements.
 Preparing test plan, reviewing test plans, unit & integration testing.
 Carried out integration with other Modules such as MM, FICO& PP.

Project 3 – Support

Client : Federal-Mogul Goetze (India) Limited


Environment : ECC 6.0 version
Role : PM Consultant
Duration : April 2017 to June 2018

Responsibilities:
 Project implementation using ASAP methodology (Preparation, Blueprint, Realization, Final preparation.
 Blueprint creation and presentation (AS IS and TO BE )
 Configuration and documentation of PM configuration settings.
 Supervision of Data Migration using LSMW.
 Test plan and Scripts creation and results documentation ( unit & integration testing )
 Training and support for key users during integration and User Acceptance Testing
 Conducted SAP authorization training to the competence team.
 Mapped all cycles of SAP PM like preventive maintenance, predictive maintenance, breakdown
maintenance, corrective maintenance, shutdown maintenance, calibration cycle & refurbishment
process.
 Created Notifications, Activity types, Causes, Damages.
 Created various types of Orders, like Planned Order, Service Order, Break down Maintenance Order,
Shutdown Maintenance Order, Predictive Maintenance Order, Calibration order etc
Project 2 – Implementation & Support

Client : XINDIA CONTINUOUS IMPROVEMENT PROGRAM


Environment : ECC 6.0 version
Role : PM Consultant
Duration : Dec 2015 to April 2017

 Project implementation using ASAP methodology (Preparation, Blueprint, Realization, Final preparation.
 Blueprint creation and presentation (AS IS and TO BE )
 Configuration and documentation of PM configuration settings.
 Supervision of Data Migration using LSMW.
 Test plan and Scripts creation and results documentation ( unit & integration testing )
 Training and support for key users during integration and User Acceptance Testing
 Conducted SAP authorization training to the competence team.
 Mapped all cycles of SAP PM like preventive maintenance, predictive maintenance, breakdown
maintenance, corrective maintenance, shutdown maintenance, calibration cycle & refurbishment
process.
 Created preventive maintenance i.e time based maintenance, maintenance strategies, performance
based maintenance, condition based maintenance.
 Created Refurbishment Orders for refurbishment of repairable spares.
 Created external processing orders like subcontracting orders.
 Create and maintain Functional Specification forms for Smart forms, reports and enhancements.
 Preparing test plan, reviewing test plans, unit & integration testing.
 Carried out integration with other Modules such as MM, FICO& PP.

Project 1 – Support

Client : Sunbulah Group


Environment : ECC 6.0 version
Role : Trainee Consultant
Duration : Dec 2014 to Nov 2015

 Handling the Support Tickets from the client


 Done the work flow for the Notification Process.
 Handled the PP and PM Related Issues.
 Updated the Master Data like functional location, equipment, task list.
 Configure the WCM process for the Plant.
 Handled Issues related to cost calculations for the Maintenance Orders.
 Data Migration templates are handled.
 Upgraded the SAP System.
 Done the various Reports.
 Given the End user Training to the client.

Вам также может понравиться