Вы находитесь на странице: 1из 48

VRV X – VRV A

NEXT GENERATION VRV


FROM THE WORLD LEADER IN AIRCONDITIONING
MILESTONE
1969 1978
1924 1958
Development of 1st "SkyAir" air conditioner
Foundation of Osaka Multi-split. for shops and small
Kinzoku Kogyosho Ltd. Window air conditioner • Daikin developed the offices
• Akira Yamada founds the is marketed. world’s first multi-split is marketed.
Osaka Kinzoku Kogyosho Limited • Japan's first window air air conditioning system • Daikin launched a "SkyAir"
Partnership in Osaka. conditioner equipped with Establish Daikin model equipped with electric
a rotary compressor was Australia Pty. Ltd.. heater to heat refrigerant.
marketed • Established as Clark Since then, "SkyAir" has
Daikin Pty Ltd, selling become product series that
water-cooled packaged leads the industry.
air conditioners

1934 1963 1971


Production of
Renamed Daikin
Kogyo Co., Ltd.
Establish Daikin
Europe NV
1982
Refrigerators (Belgium) . Japan's first commercial VRV
begins.
• The refirgerators
1951 • Osaka Kinzoku Kogyo.
CO,Ltd is renamed to • Daikin Industries type air conditioner is
marketed.
Daikin KogyoCo, Ltd. Limited establishes a
was named Production of Package complete production
• Daikin began marketing the multi-
Mifujirator. air conditioners begins. and assembly facility in
split type air conditioner named
• Japan's first packaged air "VRV" for buildings that targeted
Ostend, Belgium.
conditioner, the "Mifujirator" small to medium size buildings.
Daikin Europe is born
air conditioner was
developed.
MILESTONE
1990 1999 2012
Establishment of Daikin
Ururu Sarara launched.
• World first room air conditioner 2008
capable of regulating humidifying Daikin become
Thailand.
system having no waters supply Eco1st company.
• Daikin Industries (Thailand)
was marketed. • Daikin becomes first Daikin Airconditioning Indonesia
Ltd. is established in Thailand
Pichonkun 1st launched. in the air conditioning Established.
and begins production of air
First Time Daikin Mascot debut industry to be • PT. DAIKIN AIRCONDITIONING
conditioners in 1991.
Pichonkun rolls out over the world. endorsed as Eco First INDONESIA is a join venture company
Establishment of Daikin Company. between Daikin Industries Ltd. and PT.
Austria. Imora Makmur.
• Daikin Airconditioning Central 30th Anniversary DAIKIN VRV
Europe GmbH is established in System.
Austria. • For 30 yrs daikin VRV system
has been applied in the world..

1998 2004 2014


1995 Adoption of new
refrigerant
2001
Daikin Compressor
Flash Streamer
Daikin Air Purifier Urusara 7 launched.
Establishment of launched. • "Urusara 7," featuring the
R410A. Industries Co. Ltd. • First time of Flash world's first adoption of the
Daikin Shanghai. • Room air Was established.
• Shanghai Daikin Yah Streamer in Daikin Air- next generation refrigerant
conditioners • Daikin Compressor Purifier which won R-32 in a residential air
Chong Airconditioning employing the new Industries Ltd is
Co., Ltd. is established 2005 Award of The conditioner, is marketed.
R410A refrigerant established in Bangkok, Institute of National Account
in Shanghai, China, as a Thailand, as a swing
were marketed. Electrostatics Japan Established.
joint venture company. compressor manufacturing winner. • PT. Daikin Airconditioning
and sales company. Indonesia formed a new
division to handle multi-
account corporate
companies that provide the
best cooling solution.
Company Profile

Company Name : PT. Daikin Airconditioning Indonesia

Business Field : Import & Sale of air conditioning related


equipment and after sales service.

Capital : USD 20 million

Capital Contribution : Daikin Industries Ltd 60%


PT. Imora Makmur 40%

Establishment : 16th April 2012

Representative : Isao Tsumura, President Director


Yosuke Matsumoto, Director
Budi Mulia, Director

Total Employee : 650 (As December end 2018)


3 Offices in Jakarta, 1 Office in Bekasi
& 10 Branches in Indonesia > 1.000 Dealers
Medan

Pekanbaru Tangerang
Palembang
Jakarta
Tangerang
Bekasi Makassar
Bandung Bali
Semarang Yogyakarta Surabaya
Head Office

Branch Office
New Branch Office
Main Dealer
YOGYAKARTA
JAKARTA YOGYAKARTA BRANCH
Jl. Magelang No. 76, Kel. Karangwaru, Yogyakarta
HEAD OFFICE Phone. + 62 74 551 321
WISMA KEIAI 18th Floor Fax. + 62 74 551 071
Jl. Jend. Sudirman Kav 3-4
Jakarta Pusat 10220 EAST JAVA
SURABAYA BRANCH
Phone . +62 21 572 4377
Jalan Jawa No.25, Gubeng, Surabaya
Fax. +62 21 572 4366 Phone. + 62 31 503 1138
Fax. + 62 31 503 1139
BANTEN
TANGERANG BRANCH BALI
Jl. Jalur Sutera Kav.29D No. 36-37 Serpong Utara DENPASAR BRANCH
Phone. + 62 21 5314 1195 Jl. Buluh Indah 51X Denpasar, Bali
Fax. + 62 21 5314 1196 Phone. + 62 361 900 5541 / 900 5518
Fax. + 62 361 412 694
WEST JAVA
BANDUNG BRANCH SOUTH SULAWESI
Jl. BKR No.23, Bandung, Jawa Barat MAKASSAR BRANCH
Phone. + 62 22 522 5150 Jl. AP Pettarani No. 9, Makassar, Sulawesi Selatan
Phone. + 62 4114 46263 / 4114 45246
Fax. + 62 22 522 5190
Fax. + 62 411 447867
CENTRAL JAVA SOUTH SUMATERA
SEMARANG BRANCH PALEMBANG BRANCH
Jl. M.T. Haryono No.714 Semarang, Jawa Tengah Jl. Jend. Sudirman Km. 3,5 no.07, Kec. Kemuning
Phone. + 62 24 841 2695 / 841 5947 Palembang 30126
Fax. + 62 24 8448 020 Phone. + 62 711 319 776
Fax. + 62 711 316 961
 Jakarta Service Station
SUNTER
TEL : (021) 6530 8716/295 61950
FAX : (021) 294 60755
REMPOA
TEL : (021) 7369 2899
FAX : (021) 7369 2919
BEKASI
WEST JAVA
TEL : (021) 2945 0585 TANGERANG BRANCH
FAX : (021) 7369 2919 Jl. Jalur Sutera Kav.29D No. 36-37 Serpong Utara
Phone. + 62 21 5314 1195
BANDUNG BRANCH Fax. + 62 21 5314 1196
Jl. BKR No.23, Bandung, Jawa Barat
Phone. + 62 22 522 5150 BALI
Fax. + 62 22 2945 0586 DENPASAR BRANCH
Jl. Buluh Indah 51X Denpasar, Bali
CENTRAL JAVA Phone. + 62 361 900 5541 / 900 5518
SEMARANG BRANCH Fax. + 62 361 412 694
Jl. M.T. Haryono No.714 Semarang, Jawa Tengah
Phone. + 62 24 841 2695 / 841 5947 SOUTH SULAWESI
Fax. + 62 24 8448 020 MAKASSAR BRANCH
Jl. AP Pettarani No. 9, Makassar, Sulawesi Selatan
YOGYAKARTA Phone. + 62 4114 46263 / 4114 45246
YOGYAKARTA BRANCH Fax. + 62 411 447867
Jl. Magelang No. 76, Kel. Karangwaru, Yogyakarta
Phone. + 62 74 551 321 SOUTH SUMATERA
Fax. + 62 74 551 071 PALEMBANG BRANCH
Jl. Jend. Sudirman Km. 3,5 no.07, Kec. Kemuning Palembang
EAST JAVA 30126
SURABAYA BRANCH Phone. + 62 711 319 776
Jalan Jawa No.25, Gubeng, Surabaya Fax. + 62 711 316 961
Phone. + 62 31 503 1138
Fax. + 62 31 503 1139 CALL CENTER : 0800 1 081 081
In near future we will build service centre in several other cities.
First launched in Japan in 1982, The Daikin VRV System has
been embraced by world markets for over 30 years. It now
offers improved energy savings, comfort and ease of installation
to meet an ever wider variety of needs.

VRV itself has been applied in Indonesia since 1986 and almost
all the buildings in Indonesia is already know and use highly
advanced VRV technology.
Historical step
1982: First VRV launched in Japan
1987: Oversea first VRV Sales
2003: Launched VRV II
2007: Launched VRV III
2013: Launched VRV IV
VRV II
1996
K Series
2013
1987
D Series 1993 T Series
H Series 2007
2003
M Series P Series

1990
G Series
LONG PIPING LENGTH

• Max. Height Difference


90 m
• Max. Actual Piping Length
165 m
• Max. Equiv. Piping Length
190 m
*
• Max. Total Piping Length
1000 m

* No special requirements up to 40 m. the maximum piping length can be 90m. Depending on


conditions. Various conditions and requirements have to be met to allow utilization of 90 m
piping length.
* When level differences are 50 m or more, the diameter of the main liquid piping size must be increased and connection
ratio must be 80% to 130%. If the outdoor unit is above the indoor unit, a dedicated setting on the outdoor unit is required.
Refer to the Engineering Data Book and contact your local dealer for more information.
COMFORT
HIGH EXTERNAL STATIC PRESSURE

78.4 pa

NIGHT TIME QUITE OPERATION


 Outdoor PCB Automatically
memories the time when the peak
outdoor temperature appears

 It will enable quite operation mode


after 8h, and return to normal mode
after it keeps for 9h
ADVANCED TECHONOLOGY
REFRIGERANT COOLING
EFFICIENT AUTOMATIC TEST OPERATION TECHNOLOGY

Wiring
Check

Automatically checks the • Improve Reability at high


wiring between outdoor & ambient temperature
indoor units • Control board failure ratio at
Piping stable operation is reduced
Check

Confirms and corrects the SIMPLIFIED AFTER SALES SERVICE


actual piping length

Stop Valve
Check

Automatically check the stop


valve in each outdoor units
is in normal status
COMPRESSOR OPERATION
SINGLE MODULE SINGLE MODULE TWO
SINGLE COMPRESSOR & TWO MODULE
THREE MODULE TWO
COMPRESSOR SINGLE COMPRESSOR COMPRESSOR

A A
A
SEQUENCE TECHNOLOGY
Stage 1 Stage 2 Stage 3

1 Automatic 3 Automatic 2
2 Sequencing 1 Sequencing 3
Priority 3 2 1
Priority
Priority

OUTDOOR UNIT SEQUENCING TECHNOLOGY 8 hour operations

Automatic sequencing operation


During start-up, VRV IV unit sequencing operation will be automatically enabled to
ensure balance operation on each unit, to improve longevity of equipment and stable
operation.

DOUBLE BACKUP OPERATION FUNCTIONS


RESPONDING RESILIENTLY TO VARIOUS
UNEXPECTED SITUATIONS
EASE OF MAINTENANCE

EASE INDOOR UNIT MAINTENANCE


Comfort is maintained even in maintenance
VRV IV provides maintenance feature* which allows the shutdown of FCU without shutting down the whole VRV
system. This feature comes in handy during maintenance period as the remaining indoor units continue to operate.
* Field setting is required. This feature does not apply to BP unit connection.

EASE OUTDOOR UNIT MAINTENANCE


New design electrical component location
• In previous VRV III design, the electrical component is usually
situated on the front surface which requires the whole
electrical component to be removed before maintenance can
be carried out.
• With the new design, the electrical component is strategically
located on the top which ease the maintenance process.
• Moreover, the heat exchanger on the front side can be
extended to take up the previous space used for the electrical
component and improve its performance.
FACT
Energy Efficiency during Actual Operation
The key to innovative energy savings is to increase efficiency during low-
load operation.
Using data gathered from
actual operation, Daikin
discovered that air
conditioning systems operate
at a load factor of 50% or less
for 80% of their annual
operation period.
This inspired us to develop
new technologies to enhance
energy efficiency during low
loads.
Utilizing these technologies,
Daikin’s new VRV X and A
series raise the standard for
energy efficiency.
DEVELOP LINE TO 2 TYPES
VRV X Enables Further Energy Saving
7%
12 HP VRV IV VRV X increase
COP 4.41 4.71
INSTALLATION SPACE 0.71 m2 0.95 m2

VRV A Wide range capacity from 6 HP


7%
6 HP VRV IV VRV A
increase
COP 4.41 4.73
INSTALLATION SPACE 0.71 m2 0.71 m2
Higher Efficiency is Provided During Rated
Operation

LOW
Running Space System
COST Saving Flexibility
VRV New Technology
New VRV Generation
By uniting advance Software & Harware VRT Smart
technologies we have attained both energy Variable Refrigerant Volume
savings & comfort. Variable Refrigerant Temperature
VRV II Variable Air Volume Indoor Unit
D Series G Series H Series K Series

1987 1990 1993 1996 2003

VRV III VRV IV VRV A

Automatic Refrigerant Charge


The proper refrigerant amount to get
2007 2013 2018 optimum operation efficiency

New Scroll
Compressor
Refrigerant
leakage is
minimised during New PCB Board
low-load Durability inverter PCB
operation by using
Film Capacitors
NEW Scroll Compressor

Conventional During Full Pressure


Scroll Load Unsufficient
Compressor Operation Resulting
Without Higher Refrigerant
Intermediate Pressure Leakage
Pressure Required
NEW Scroll Compressor

New Intermediate Low Load


Scroll Pressure Operational
Compressor Adjustment Minimize
With Port Gas Leaking
Intermediate for Minimize To Increase
Pressure Leakage Efficiency
VRT TECHONOLOGY

Customize your VRV system for optimal annual efficiency


The new VRV IV system now features VRT technology. VRT automatically adjust refrigerant
temperature to individual building and climate requirement, thus further improving annual
energy efficiency and maintaining comfort. With this excellent technology, running cost are
reduced.
VRT S M A R T CONTROL

New Heights in Energy Efficiency During Actual Operation


Load

PARTIAL FULL PARTIAL


LOAD LOAD LOAD

Time

The Key to Innovative energy Savings is to Increase


Efficiency During Low-load Operation
VRT S M A R T CONTROL

VRT
SMART
AUTO FAN

VRT
Hardware Technology Software Technology
NEW SCROLL COMPRESSOR VRT SMART CONTROL

VRT

Te: Auto Te:


Lo ~ Hi FAN Lo ~ Hi

VRT

Te: Auto Te:


Lo ~ Hi FAN Lo ~ Hi
Auto Refrigerant Charge
Overcharging of Refrigerant  Excess Pressure
Running in the System.
Improper in Operating Pressure
System

Compressor does work to achieve “Higher


Pressure” at the same Cooling Capacity

System Consumes more Energy 


COP Drop !!!

Electric Consumption goes up 


Operation becomes Expensive !!!

In Addition, Excess Refrigerant May Enter


Compressor & Result 
Total Failure & require Replacement !!!
Auto Refrigerant Charge

Calculation Start of
Necessary of Pre -Charge Automatic
Refrigerant
Amount from
of Refrigerant
Design Refrigerant Charge
Drawing Operation
Automatic

Unnecessary

Recalculation
Automatic Monitoring No Recalculation
Completion by Refrigerant of Charge
Proper Amounts to
Refrigerant Charging is Minor Changes
Amount Unnecessary Locally
Auto Refrigerant Charge

Cost & Time Saving


• Reduction in Refrigerant Usage
• Reduce Labor Cost

Efficient
• Less Human Error
• Prevent Overcharging

Simple & Easy Execution


• 3 Step Procedures
• Automatic Charging Process
VRV INDOOR UNITS
Outdoor-Air Processing Unit

VKM Series

VAM Series
Double-Layered Efficient Filtration
PM2.5 filters are double-layered

1. The front filter effectively removes large particles


2. The PM2.5 filter layer contains a large amount of static
PM: Particulate matter. Particles of various size electricity to capture particulate matter efficiently
are found in the air; the smaller PM2.5 have
diameters of 2.5 micrometers or less, about
1/20 diameter of a human hair. PM2.5
concentration refers to the amount of
particulate matter per cubic meter of air. The
higher the concentration is, the more severe
the air pollution is.
 1 iTM can managed 512 groups (1024 IU)
 Scheduling
 Interlocking with another equipments using WAGO I/O System
 Easy instalation
 Easy operation
 Web accessibility
 PPD function
POWER PROPORTIONAL DISTRIBUTION

• Billings for individual tenant


• Energy consumption analysis for each indoor units
• Max 31 Watt-hour meters can be connected to iTM System
Supervision
1. Regular visit supervision job site :
a. Daily report paperwork  Project Leader, Dealer & Sales
b. Evaluation report paperwork  Project Leader, Dealer/Installer
c. Report by email (documentation)  Sales, Project Leader & Dealer/Installer
d. Check List before T&C report  After sales service

Daily report Evaluation report Documentation report Check list before T&C
Supervision
2. Regular conduct training to dealer member in SUD Office 19th Floor on Friday/month
a. Installation guide VRV system  Dealer
b. Bad and Good  Dealer
Lecture installation guide & Bad and Good Attendance dealer member

3. Commissioning centralized controller and AHU unit :


a. ITM, WAGO & SVMPR smart control  Proshop/DID branch office
b. AHU OK room and Hospital  Dealer & Owner representative
Supervision
4. Conduct training before installation start, as follow SS SBY :
a. Good and Bad banner  Installer, Dealer & Project Leader
b. Installation manual guide  Installer, Dealer & Project Leader
Warehouse

Split, Cassette,
Split Duct & VRV
Celling Suspended, etc
[Sankyu]
[K-Log]
PROJECT REFERENCE – OFFICE 1
Project Name : Project Name :
WISMA KEIAI THE CITY TOWER (TCT)
Jl. Jend. Sudirman - Jakpus Jl. MH Thamrin - Jakpus
Completion : 2012 Completion : 2008
VRV Type : VRV Type :
VRV III SYSTEM (Replacement) VRV III SYSTEM
No. IU : 405 Units No. IU : 251 Units
No. OU : 129 Units No. OU : 88 Units
Total HP : 1,908 HP Total HP : 1,287 HP
Ctrl Control : I–Manager Ctrl Control : I–Manager

Project Name : Project Name :


SAHID SUDIRMAN CENTER THE CITY CENTER (TCC)
Jl. Jend. Sudirman - Jakpus Jl. KH Mas Mansyur - Jakpus
Completion : 2014 Completion : 2012
VRV Type : VRV Type :
VRV III SYSTEM VRV W - III & VRV III SYSTEM
No. IU : 1,816 Units No. IU : 1,279 Units
No. OU : 600 Units No. OU : 558 Units
Total HP : 9,370 HP Total HP : 5,510 HP
Ctrl Control : ITM Ctrl Control : I–Manager

41
PROJECT REFERENCE – OFFICE 2
Project Name : Project Name :
PRUDENTIAL TOWER EQUITY TOWER
Jl. Jend. Sudirman - Jakpus SCBD - Jakpus
Completion : 2008 Completion : 2006
VRV Type : VRV Type :
VRV III SYSTEM VRV III SYSTEM
No. IU : 295 Units No. IU : 1,745 Units
No. OU : 84 Units No. OU : 522 Units
Total HP : 1,385 HP Total HP : 6,566 HP
Ctrl Control : I–Manager Ctrl Control : I–Manager

Project Name : Project Name :


GRAHA ENERGY NOBLE HOUSE
SCBD - Jakpus Lingkar Mega Kuningan
Completion : 2008 Completion : 2015
VRV Type : VRV Type :
VRV III SYSTEM VRV IV SYSTEM
No. IU : 933 Units No. IU : 1,025 Units
No. OU : 362 Units No. OU : 290 Units
Total HP : 4,174 HP Total HP : 3,852 HP
Ctrl Control : I–Manager Ctrl Control : ITM

42
PROJECT REFERENCE – HOTEL 1
Project Name : Project Name :
JW MARRIOT RITZ CARLTON
Completion : 2003 Completion : 2007
VRV Type : VRV Type :
VRV I SYSTEM VRV II SYSTEM (R-410A)
No. IU : 430 Units No. IU : 1,360 Units
No. OU : 120 Units No. OU : 400 Units
Total HP : 1,250 HP Total HP : 4,835 HP
Ctrl Control : - Ctrl Control : I-Manager

Project Name : Project Name :


LUXURY COLLECTION HOTEL AT JS LUWANSA
KERATON PLAZA INDONESIA Jl. HR Rasuna Said - Jaksel
Completion : 2014 Completion : 2012
VRV Type : VRV Type :
VRV III SYSTEM VRV III SYSTEM
No. IU : 594 Units No. IU : 294 Units
No. OU : 180 Units No. OU : 60 Units
Total HP : 2,706 HP Total HP : 810 HP

43
PROJECT REFERENCE – HOTEL 2
Project Name :
Project Name :
BVLGARY HOTEL –
GRAND MERCURE KEMAYORAN
REPLACEMENT (BALI)
Jl. Benyamin Sueb - Jakpus
Completion : On Progress
Completion : 2015
(2017)
VRV Type :
VRV Type :
VRV III SYSTEM
VRV IV SYSTEM
No. IU : 1,145 Units
No. IU : 270 Units
No. OU : 216 Units
No. OU : 76 Units
Total HP : 3,552 HP
Total HP : 820 HP
Ctrl Control : ITM
Ctrl Control : ITM

Project Name :
Aloft Hotel Project Name :
Jl.KH Wahid Hasyim - Jakpus CITADINES
Completion : On Progress Jl. Legian Kuta - Bali
(2016) Completion : 2013
VRV Type : VRV Type :
VRV IV SYSTEM VRV III SYSTEM
No. IU : 290 Units No. IU : 244 Units
No. OU : 21 Units No. OU : 14 Units
Total HP : 316 HP Total HP : 280 HP
Ctrl Control : ITM Ctrl Control : ITC
44
PROJECT REFERENCE – APARTMENT 1
Project Name : Project Name :
DA VINCI RESIDENCES RITZ CARLTON
Jl. Jend. Sudirman - Jakpus SCBD Jaksel
Completion : 2000 Completion : 2007
VRV Type : VRV Type :
VRV II SYSTEM VRV II SYSTEM (R-410A)
No. IU : 304 Units No. IU : 1,360 Units
No. OU : 72 Units No. OU : 400 Units
Total HP : 1,104 HP Total HP : 4,835 HP
Ctrl Control : I-Manager Ctrl Control : I-Manager

Project Name : Project Name :


THE PEAK APARTMENT FRASER TOWER –
Jl. Jend. Sudirman - Jakpus SETIABUDI SKY GARDEN
Completion : 2007 Jl. HR Rasuna Said - Jaksel
VRV Type : Completion : 2014
VRV II SYSTEM VRV Type :
No. IU : 1,300 Units VRV III SYSTEM
No. OU : 385 Units No. IU : 484 Units
Total HP : 4,692 HP No. OU : 82 Units
Ctrl Control : I-Manager Total HP : 1,129 HP
Ctrl Control : I-Manager
PROJECT REFERENCE – APARTMENT 2
Project Name : Project Name :
SENAYAN APARTMENT C & D KERATON APARTMENT -
Jl. Asia Afrika - Jaksel PLAZA INDONESIA
Completion : 2012 Completion : 2014
VRV Type : VRV Type :
VRV III & VRV III-S System VRV III SYSTEM
No. IU : 98 Units No. IU : 594 Units
No. OU : 36 Units No. OU : 72 Units
Total HP : 1,930 HP Total HP : 2,706 HP
Ctrl Control : Central Remote
Control

Project Name :
Project Name :
PROVIDENCE PARK
SENOPATI SUITE
Jl. Permata Hijau – Jaksel
Jl. Senopati No. 41 - Jakarta
Completion : 2014
Completion : 2014
VRV Type :
VRV Type :
VRV III SINGLE OU
VRV III-S System
VRV III – S SYSTEM
No. IU : 430 Units
No. IU : 703 Units
No. OU : 120 Units
No. OU : 123 Units
Total HP : 720 HP
Total HP : 1,734 HP
Ctrl Control : ITM 46
Ctrl Control : ITM
On Progress PROJECT REFERENCE – APARTMENT 3 On Progress
Project Name : Project Name :
ANANDAMAYA MANGKULUHUR – REGENT
RESIDENCES Completion : -
Jl. Jend. Sudirman VRV Type :
Completion : - VRV IV SYSTEM
VRV Type : No. IU : 921 Units
VRV IV & IV-S No. OU : 150 Units
No. IU : 360 Units Total HP : 968 HP
No. OU : 90 Units Ctrl Control : ITM
Total HP : 540 HP
Ctrl Control : ITM

Project Name : Project Name :


SOUTH HILL ONE VELVET RESIDENCES
Jl. Pedurenan Mesjid 1 Completion : -
Completion : - Unit Type :
VRV Type : MULTI R-32
VRV IV, VRV IV-S, MULTI NX No. OU : 430 Unit
No. IU MULTI : 879 Units
No. IU : 1,270 Unit
No. OU MULTI : 249 Units
No. IU VRV : 1235 Units
No. OU VRV : 370 Units
Total HP : 2,266 HP

Вам также может понравиться