Академический Документы
Профессиональный Документы
Культура Документы
Customer/Project Information
Date
Name
Company
End-User
Project Name
Address
City State Zip Code
Country Telephone
Email Address
Application(s)
Wellhead Production Separator Production Heater / Treater
Allocation Pipeline Ship Loading / Unloading
Ship Lightering Marine Terminal Refinery Feed Stock
Desalter Inlet Desalter Outlet Desalter Sampling
Instrument(s)
Mixing Solution
KAM SMP – Static Mixing Plate
KAM SMS – Static Mixing Spool
KAM ML – Measurement Loop (with Dynamic Mixing)
Piping & Instrument Connection
Main Line piping diameter: ________ (inches) Schedule / Grade:
ANSI Rating: ___________
Process Data
Additional Clarifications:
Piping is horizontal or vertical? Horizontal Vertical Both
Pigging operations performed? Yes No
Can the line be shut down or depressurized in
order to in the instrument(s)? Yes No