Structural Drawings

Drawing Title Date


Number VI-A VI-A VI-B VI-B
Batch 1 Batch 2 Batch 1 Batch 2
1 Singly Reinforced Beams: Rectangular, T 14.1.2019
and L Beams
2 Cantilever and Continuous Beams 21.1.2019
(Typical)
3 Doubly Reinforced Beams: Rectangular 28.1.2019
and T-Beams (Typical)
4 Reinforcement Detailing of One-Way and 4.2.2019
Two-Way Slabs
5 Reinforcement Detailing of Continuous 25.2.2019
and Cantilever Slabs
6 Reinforcement Detailing of RCC Columns 13.3.2019
7 Isolated, Combined, Strap and Raft 18.3.2019
Footings
8 Typical Reinforcement Detailing in 1.4.2019
Staircases

NOTE:

1. All drawings are to be completed and submitted in a hard folder latest by 8.4.2019 (Monday).
2. The folder should contain duly filled index and lab profile.
3. On top of folder name of student, section, class roll number and enrolment number must be
written.
4. Drawings can be got checked by the students on any working day in lab class or in any free
slot/time.