Вы находитесь на странице: 1из 1

CONVEYING | DRYING | SEED PROCESSING | ELECTRONIC SORTING | STORAGE | TURNKEY | SERVICE

INCREASING HARVEST
IN GRAIN CROPS
FURTHER PROGRESS IN UKRAINE DEMANDS MORE
AND BIGGER SILOS
AND TRANS-SHIP
TERMINALS
The volume of cereals grown in Ukraine exceeds the capacity of Cimbria has supplied the following conveying equipment for this
storage facilities currently available. According to grain market project: belt conveyors chain conveyers, bucket elevators and
experts, the harvest of grain crops in Ukraine in 2017 is expected Moduflex loading chutes.
to be 63.45 million tonnes. Such a situation aggravates the
problem of crop preservation for a lot of agrarian companies. Holoprystans’ka branch
Despite the gradual improvement of the country’s economy and Another new trans-shipment terminal for grain and oilseed
increasing investment in the agricultural sector, a dilemma still crops for river transport was opened on July 14 in Hola Prystan
exists for many agricultural producers: to use the services of (Kherson region).
private and state silo plants or to purchase their own and sell The technical characteristics of the fully automated complex
products when prices are at their highest? How much investment operated from a central control panel are as follows:
will be needed and how quickly will this investment pay off?
Our customers’ solution is “to build” and “to purchase”. ● storage volume of grain - 77 thousand tonnes;
● daily capacity of dryers - 4 thousand tonnes;
Khortytsya branch ● daily outloading to river transport - 12 thousand tonnes.
A grand opening ceremony of a new trans-shipment terminal ● The total capacity of the complex is 300 thousand tonnes/
took place on June 15 at the village of Bilenke (Zaporizhzhia year.
region) with the participation of the Prime Minister of Ukraine, Mr.
V. Groysman. This terminal for shipment of grain and oilseeds by Cimbria has supplied the following conveying equipment for this
river transport was built in the best traditions of Nibulon – high project: belt conveyors, bucket elevators and Moduflex loading
quality and on time – in just three months. chutes.

The newly built complex has the following technical characteristics:


● Storage volume of grain - 77 thousand tonnes;
● Daily capacity of dryers - 4 thousand tonnes;
● Daily outloading to river transport - 12 thousand tonnes.
● The total capacity of the complex is 300 thousand tonnes/
year.

New Nibulon New Nibulon


trans-shipment trans-shipment
terminals at terminals at
Khortytsya branch Holoprystans’ka
branch

Вам также может понравиться