Академический Документы
Профессиональный Документы
Культура Документы
TOTAL -
Considerations-
* Supply of materials like cement,
reinf. steel, struct. Steel in the scope
of contractor.
Notes:
* Tax - At actual extra.
* Rate are considered from IPSM
data bank.
OPTION-2 - BBM wall with OPTION-3 - Galvalume Sheet with
Sandwitch Insulated Clean Room Sandwitch Insulated Clean Room
Partition Partition
- -
- -
- -
2,200 - 2,200 -
70,000 - 70,000 -
- -