Вы находитесь на странице: 1из 112

THE OFFICIAL PUBLICATION OF UCA OF SME WWW.TUCMAGAZINE.COM VOLUME 12 N0.

2 June 2018

Future of tunneling in DC

Tunnel rehabilitation

Innovative techniques in tunneling

} Inside: NAT }
} }
Showguide
Special Editorial Supplement from the publisher of Mınıng engıneerıng
Conquering
Connecting Norway by rail: 5 Herrenknecht
Hard Rock TBMs are on the move for 45 km
of new first-class rail tubes at the New

Toughest
Ulrikentunnel and Follo Line projects.

Biting its way through the Scandinavian stone,


the TBMs are facing the absolute hardness test
when dealing with up to 350 MPa rock strengths.
Equipped with excavation tools for such a
demanding mission, the Herrenknecht TBMs
will complete all their tasks.

Hard Rock
Massive geologies call for experi-
enced partners. Herrenknecht
is making headway through hard
rock – for over 822 km.

Contractors:
Follo Line: Acciona Infraestructuras and Ghella ANS
Ulrikentunnel: Skanska Strabag Ulriken ANS

Pioneering Underground Technologies

www.herrenknecht.com
AN OFFICIAL PUBLICATION OF UCA OF SME WWW.SMENET.ORG VOLUME 12 NO 2 JUNE 2018

CONTENTS
COVER STORY DEPARTMENTS
2
Chairman’s column

4
FEATURE ARTICLES Underground
construction news

12
In this issue —
The future of transit tunneling 26
Coming events
By the time the in Washington, D.C.
expansion of the
Metro in Washing- Brian Zelenko, Harald Cordes and 30
Tunnel demand
ton, D.C. is com- William H. Hansmire forecast
pleted in 2020, the
system will serve
32
97 stations and op- UCA of SME News
erate 117 miles of
track. The future
of tunneling in 38
D.C. is discussed
20 New Products

on page 12. Is it
Rehabilitation of tunnels: An
cheaper to reha- owner’s perspective 40
Classifieds/Index of
bilate an existing advertisers
tunnel instead of David Tsztoo, Anthony Yu and Teena
boring a new one? Redhorse
That issue is dis-
cussed from an
owner’s perspec-
tive on page 20.
27
Copyright 2018 by the
Society for Mining, Met-
Use of innovative techniques
allurgy and Exploration, and tools on a massive tunnel
Inc. All rights reserved.
TUNNELING & UNDER- project
GROUND CONSTRUC-
TION (ISSN 0026–5187)
is published quarterly
by the Society for Min-
ing, Metallurgy, and Ex-
ploration, Inc., at 12999
E. Adam Aircraft Circle,
Englewood, CO 80112- Reproduction: More
4167. Phone 1–800–763– than one photocopy of
3132 or 303–973–9550. an item from SME may be
Fax: 303–973 –3845 or e- made for internal use, pro-
mail: sme@smenet.org. vided fees are paid directly
Website: www.smenet. to the Copyright Clearance
org. POSTMASTER: Center, 27 Congress St.,
Send changes of ad- Salem, MA 01970, USA.
dress to TUNNELING & Phone 978–750–8400,
UNDERGROUND CON- fax 978–750-4470. Any
STRUCTION, 12999 E. other form of reproduction
Adam Aircraft Circle, requires special permission
Englewood, CO 80112- from, and may be subject
4167. Article copies and to fees by SME. SME is
back issues available on not responsible for any
microfilm or microfiche statements made or
from Linda Hall Library opinions expressed in
i n K a n s a s C i t y, M o . its publications. Mem-
Printed by Cummings ber subscription rate
Printing Co. Special editorial section from the publisher of Mining Engineering included in dues.
CHAIRMAN’S COLUMN
EDITORIAL STAFF
Editor
Steve Kral
kral@smenet.org
World Tunnel Congress and the
Senior Editor
2018 NAT Conference
William M. Gleason

I
’ve recently returned from the is comprised of the delegates from
gleason@smenet.org 2018 World Tunnel Congress and primarily Scandinavian countries.
44th ITA General Assembly in This is their opportunity to share
Senior Editor Dubai, U.A.E. It was my privilege interests and practices specific to
Georgene Renner and honor to represent all UCA their region. The Nordic Forum meets
renner@smenet.org of SME members at the General a few times per year, either in person
Assembly. This year’s theme was or electronically. Following this
Production Graphic Artist “The Role of Underground Space in meeting, those of us attending from
Ted Robertson Building Future Sustainable Cities.” the U.S. felt that such a forum could
robertson@smenet.org This was an appropriate theme, be beneficial to the United States
considering that Dubai is a bustling tunneling industry. Accordingly,
BUSINESS STAFF and majestic city rising out of the we reached out to delegates from
Media Manager desert. And yes, they do tunnel under Canada and South America, receiving
Advertising the desert. warm reception to the concept.
Ken Goering The United States was well Over the next couple of months,
goering@smenet.org represented, with 38 delegates members of the UCA will begin to
and seven exhibitors attending. explore what such an alliance of the
Phone +1-800-763-3132 or +1-303-973-4200 Additionally, UCA members Americas could accomplish to the
Fax +1-303-973-3845 participated in 10 of the 14 active ITA mutual benefit of all member nations.
Working Groups. One of the many Please contact me if you would like
Internet www.smenet.org important functions of these groups to be a member of this exploratory
is the collection and dissemination of committee.
SOCIETY FOR MINING, innovations and experiences from the Soon we will all be together
METALLURGY, AND EXPLORATION, global tunneling industry. in Washington, D.C. for the 2018
INC. OFFICERS A highlight of the Congress is the North American Tunneling (NAT)
President annual Sir Alan Muir Wood Lecture. Conference. As always at NAT,
Barbara Arnold Ed Cording had previously been the offerings include short courses,
selected to present this year’s lecture, technical sessions, panel discussions,
President-Elect
entitled, Monitoring and Controlling technical field trips and exhibits
Ground Behavior at the Source. from the many suppliers and
Hugh Miller
Ed’s lecture began by describing subcontractors that service our
Past President the development of ground control industry. Given the location of this
John Mansanti techniques using modern pressurized- year’s conference, we have been
face tunnel boring machines working to attract decision makers
Executive Director (TBM). This included several high- from Capital Hill. We all know of
David L. Kanagy profile projects that many of our looming projects that could use some
membership were involved with. He legislative support to move them
Underground Construction
then explained how all of these past closer to reality. I ask that you reach
Association of SME lessons and developments, good and out to your representatives and ask
Executive Committee bad, were brought to bear for the them to attend. We may just aides and
Michael F. Roach (Chair), Robert successful completion of Seattle’s SR- assistants, but they, too, are capable of
Goodfellow (Vice Chair), Artie Silber 99 project. carrying a torch. n
(Past Chair), Paul Schmall, Mike Vitale, While attending WTC, a few of
us were invited to sit in on a meeting Mike Roach,
Pam Moran, Ted Dowey, Leon Jacobs,
UCA of SME Chairman
Colin Lawerence, Mike Mooney, Michael of the Nordic Forum. This group
Rispin, Tony O’Donnell, Matthew Preedy,
Robert Robinson, Leonard Worden, Jack
Brockway, Richard Redmond, Michael
Smithson, Erika Moonin

2 JUNE 2018 T&UC®


NORTH AMERICAN
TUNNELING
2018 PROCEEDINGS
Your timely source for more cost-effective and
less disruptive solutions to your underground
infrastructure needs.

The North American Tunneling Conference is the premier

biennial tunneling event for North America, bringing together

the brightest, most resourceful, and innovative minds in the

tunneling industry. It underscores the important role that the

industry plays in the development of underground spaces,

transportation and conveyance systems, and other forms

of sustainable underground infrastructure.

NORTH AMERICAN With every conference, the number of attendees and breadth of

TUNNELING topics grow. The authors—experts and leaders in the industry—

share the latest case histories, expertise, lessons learned, and


2018 PROCEEDINGS real-world applications from around the globe.

Edited by Alan Howard, Brett Campbell,


Derek Penrice, Matthew Preedy, and Jim Rush Crafted from a collection of 126 papers presented at the

conference, this book takes you deep inside the projects.

It includes challenging design issues, fresh approaches on


2018, 1,160 pages, 4 lbs $149 Member
ISBN 978-0-87335-466-0 $129 Student Member performance, future projects, and industry trends as well as
Book Order No. 466-0 $199 Nonmember/List ground movement and support, structure analysis, risk and

cost management, rock tunnels, caverns and shafts, TBM


Also available as an eBook from SME
technology, and water and wastewater conveyance.

smenet.org/store

books@smenet.org

303.948.4237 or 1.800.763.3132

Society for Mining, Metallurgy & Exploration Inc.


12999 E. Adam Aircraft Circle, Englewood, Colorado 80112
underground CONSTRUCTION
NEWSNEWSNEWSNEWSNEWS

California WaterFix gets funding promise

T
he massive California WaterFix Southern California. … To have race are flatly opposed to the tunnels.
tunnel project might have local ratepayers incur that risk is Moving ahead with just one
gotten new life when the board inappropriate and potentially illegal.” tunnel would “risk serious delay …
of the Metropolitan Water District of State constitutional provisions and jeopardize the entire project,”
Southern California, the largest water requiring local government fees to be Brown wrote to the directors on the
agency in the state, voted to bear proportional to the services provided eve of the vote.
most of the $11 billion cost to get the could leave MWD vulnerable to court After the San Joaquin Valley
project started. challenges, Gold and others warn. agriculture backed out, the state was
The project, which calls for two According to MWD, financing the prompted to shrink the proposal to
tunnels under the Sacramento-San twin tunnels would add an average a cheaper, one-tunnel version that
Joaquin Delta to move water from the of $60 a year to household water would be financed by MWD and the
north to the southern part of the state, rates across the Southland. But local other, mostly urban districts that get
was in jeopardy after San Joaquin purchases of agency supplies vary, State Water Project deliveries from
Valley agriculture districts that were meaning costs will vary too. the delta.
supposed to pick up nearly half of the Backers are worried that a plan Under that scenario, WaterFix
$17-billion tab backed out. The vote to downsize the project to one tunnel would move ahead in stages, with a
by the Metropolitan Water District would drag out the permitting process second tunnel built when financing
of Southern California was seen as beyond the end of the year, when materialized. Not long after the
an 11th hour rescue of the project. Gov. Jerry Brown — WaterFix’s chief downsizing proposal emerged,
However, it does not guarantee that political cheerleader — would be MWD started talking about picking
the project will be built and was not out of office. His successor might not up agriculture’s unfunded portion,
without controversy. be so enthusiastic about the tunnels, with the assumption that the agency
“This vote was honestly quite which are opposed by delta interests could recoup the extra cost by selling
divisive,” Los Angeles board member and major environmental groups. tunnel capacity to growers after the
Mark Gold told the Los Angeles The Los Angeles Times reported project is built.
Times. “The Metropolitan Water that of the leading candidates for But there is no guarantee
District is basically subsidizing Brown’s office two are in favor of the agricultural districts will buy tunnel
benefits for the entire state of one-tunnel option with an emphasis supplies — or if they do, that they will
California over and above the 19 on finding other solutions to the pay a price that reflects the water’s
million customers that Met has in water problem while others in the true cost. n

New tunnel planned for Minneapolis


T
he tunnels that were built about 80 years ago. The city members and legislators to make
built beneath the city of has been fixing its tunnels for about the case for fixing an unseen
Minneapolis, MN to carry a decade to head off mishaps like problem. Minneapolis is seeking $19
storm water from the city to the a 2010 sewage spill into the river, million from the state legislature to
Mississippi River are about 80 years caused by surging rainwater beneath defray the cost of its Washington
old and can no longer handle the job 2nd Avenue that burst through a liner Avenue project, which could begin
alone. into a nearby sewer. construction in 2020.
Like many large cities, The Minneapolis Star Tribune “The tunnels were built to handle
Minneapolis has grown beyond its reported that the urban center of much less water, so even when it’s
original infrastructure in recent years. the Twin Cities is crisscrossed by raining moderately it means they’re
The city is hoping to gain support of subterranean passages that make day- full,” said Katrina Kessler, the city’s
city council members to fund a $38 to-day life possible above ground. director of surface water and sewers,
million project that would dig a new Carved through the softer material on a tour of a tunnel in southeast
tunnel next to the existing one. below a layer of limestone, in places Minneapolis.
The $38 million project will dig as deep as 11 stories, these tunnels The project wasn’t included in
a new passage 21 to 30 m (70 to 100 use gravity to deliver water to the Gov. Mark Dayton’s bonding bill,
ft) beneath Washington Avenue. It river or to a sewage treatment plant. and neither the House nor the Senate
would be the largest project of its The city has been giving has released its bonding proposal. It
kind downtown since the system was underground tours to city council (Continued on page 10)

4 JUNE 2018 T&UC ®


KIEWIT FOUNDATIONS CO.
Keeping safety at the forefront, Kiewit Foundations Co. builds complex foundation projects across North
America. We deliver creative, cost-efficient solutions that are responsive to each project’s specific site
conditions. We specialize in drilled shafts, secant pile shafts, slurry / cut-off walls, augered cast-in-place
piles, displacement piles, stone columns, soil mixing, vibro compaction, and other ground improvement
techniques. We perform these operations with our fleet of specialty equipment and the management
resources of one of the top builders in the country.

Kiewit Foundations Co.


1926 S. 67th Street, Suite 300, Omaha, NE 68106 | (402) 346-8535
Foundations@Kiewit.com

KIEWIT.COM
underground CONSTRUCTION
NEWSNEWSNEWSNEWSNEWS

Elon Musk invests $100 million into the Boring Co.


W
hen Elon Musk vowed than 90 percent — came from by Musk to sell 50,000 Boring Co.
to begin boring tunnels Musk himself. The rest was from branded hats for $20 each.
beneath the streets of Los “early employees” of the company, The Boring Co. has said its goal
Angeles, CA it seemed unlikely that according to the Boring Co. is to increase the speed and lower
much would come from the tweet. The company said no venture the price of digging tunnels to
And when he began to raise money capitalists or outside investors were reduce traffic congestion.
for the new venture by selling hats involved in this round. The company has already dug
and flamethrowers it certainly The funding round is a more a tunnel across from SpaceX’s
raised some doubts. But when it conventional method of fundraising headquarters with a boring
was reported that he has raised than Musk’s most recent money- machine it purchased. Musk
more $110 million for the Boring maker — sales of flamethrowers. said the company’s tunnels and
Co., it looks as if this is more than a Musk said in January that the Hyperloop plans would prioritize
billionaire frustrated by traffic. Boring Co. had pre-sold 10,000 pedestrians and cyclists over cars.
The Los Angeles Times and other flamethrowers branded with the Passengers would load into a pod
outlets reported that Musk, the company logo for $500 apiece. He with large windows that’s lowered
founder of Tesla and SpaceX, raised also said at the time that he sold underground before it speeds on
$112.5 million in a recent funding about 3,000 fire extinguishers for a track, according to a video Musk
round, according to a document $30 each. tweeted in March.
filed with the U.S. Securities and The flamethrower and fire “Will still transport cars, but
Exchange Commission. extinguisher sales came after a only after all personalized mass
Most of the money — more similar, though less flashy, fundraiser transit needs are met,” Musk
tweeted March 9. “It’s a matter of
courtesy & fairness. If someone
can’t afford a car, they should go
TUNNELING SPECIALISTS first.”
The company says tunnel-
digging projects can cost as much as
$1 billion per mile, but its goal is to
lower these costs by a factor of 10
or more.
In October 2017, the Maryland
Department of Transportation
P R O V I D I N G I N N O VAT I V E S O L U T I O N S gave “conditional approval to
the construction of a tunnel from
FOR TUNNELING PROJECTS Baltimore to Washington” for the
project by issuing a utility permit.
In March, six Democratic
members of Congress from
Maryland and Washington wrote
to Maryland Gov. Larry Hogan
seeking information about the
state’s support for the proposed
Hyperloop Project, including the
regulatory standards that will apply.
“While the Hyperloop is
an exciting project that has
microtunneling | tbm tunneling | hand tunneling | shaft work the potential to transform
transportation along the entire

BRADSHAW
U.S. East Coast, it is also a
project that would utilize a
wholly new technology and could
..
CONSTRUCTION CORPORATION have significant impacts on our
constituents,” the members wrote. n

6 JUNE 2018 T&UC ®


TUNNELING
Discover emerging innovations in tunneling
methods, materials and technology through
classroom instruction and hands-on labs

FUNDAMENTALS, and demonstrations. Learn key design and


construction principles applicable to all types of

PRACTICE AND
ground and across all excavation methods.

Who should attend? Industry professionals


INNOVATIONS including owners, planners, designers,
contractors, consultants and suppliers involved
A COLORADO SCHOOL OF MINES in the planning and construction of underground,
professional short course tunneling and mining projects. Space is limited.

OCTOBER 15-18, 2018 Early-bird registration rates are available through


GOLDEN, COLORADO Aug. 31, 2018.

Colorado School of Mines has a long-standing tradition of hosting world-class short


courses in underground construction and tunneling. Learn more and register online
at underground.mines.edu.
underground CONSTRUCTION
NEWSNEWSNEWSNEWSNEWS
BART extension to San Jose approved
A
long-awaited transit tunnel up streets and disrupting traffic flow. predicting that a single tunnel would
extension to San Jose, CA It also should cut 10 months off the result in smaller stations and platforms
was approved by the Bay four-year tunneling phase and drop that BART riders might regret down
Area Rapid Transit (BART) Board of the total price tag by an estimated $50 the line.
Directors in April. million. “Those platforms are going to
In a 5-0 vote, the board approved “The twin-tunnel approach limit capacity in Santa Clara County,”
a single-bore tunneling plan that the originally supported by BART’s staff warned Blalock. But in the end, he
Santa Clara Valley Transportation would have involved ripping up Santa was among those who voted yes on
Authority says will be faster and less Clara Street, from Market Street to the proposal.
disruptive to San Jose traffic. Third Street, for a period of three Writing in 2010, transit news site
Previously, BART planners had years. The cut-and-cover process The Source noted that the single-bore
wanted to go with a more traditional would have required relocating method is the result of new technology
dual-tunnel approach to the San Jose complex utility networks, frequently and larger digging machines like those
dig, and the disagreement put the causing construction delays.” that could be used on this project.
$4.8-billion project into a holding The VTA board approved the Under the present timeline,
pattern. tunnel plan earlier in May. The construction to San Jose would begin
An editorial in the San Jose extension may qualify for federal toward the end of 2020, and the first
Mercury News supported the single grants that cover nearly a third of its passenger service would happen
bore plan, writing, “The technology costs. come 2026. The full 25-km (16-mile)
allows the boring machine to dig Director Thomas Blalock recorded plan involves six new stations, from
deeper underground, without tearing some reservations about the methods, Milpitas to Santa Clara. n

BUILDING
MINES OF
THE FUTURE
WHAT WE DO
• Shaft Sinking
• Raise Boring and Raise Excavating
• Mine Construction and Infrastructure
• Mine Development and Rehabilitation
WORKPLACE
• Mining Engineering Services and Design SAFETY NORTH’S
• Contract Mining PRESIDENT’S
AWARD
RECIPIENT
www.dmcmining.com
Photo courtesy of BHP incorporating Rio Tinto’s “Mine of the Future” ™ technology

8 JUNE 2018 T&UC ®


CALL
for
PAPERS
TOPICS
Contracting Practices and Cost
Design and Planning
Design/Build Projects
Difficult Ground
Drill and Blast
Environment, Health and Safety
The Rapid Excavation and Tunneling Conference (RETC) is the Future Projects
premier international forum for the exchange and dissemination Geotechnical Considerations
of developments and advances in underground construction. Ground Support and Final Lining
RETC provides innovative solutions to the unique challenges Grouting and Ground Modification
associated with the tunneling industry. Hard Rock TBMs
Large Span Tunnels and Caverns
Conference attendance exceeds 1,400 professionals from more than 30 countries. Microtunneling and Trenchless Tunneling
Industry sectors include: construction, mining, geotechnical engineering, exploration, New and Innovative Technologies
environmental, economics, manufacturing, government, land, water/wastewater and Pressure Face TBM Case Histories
transportation. The conference includes a comprehensive exhibit, short courses, field Pressure Face TBM Technology
trips, and tours. Risk Management
SEM/NATM
The 2019 RETC Organizing Committee has issued a Shafts and Mining
call for papers. Prospective authors should submit the Tunnel Rehabilitation
following by June 30, 2018: Abstract of 100 words to Water and Gas Control
International Projects
https://sme-retc.secure-platform.com/a Tunneling for Sustainability
Additional topics of interest will be considered.
The ideal paper presents an interesting or unique challenge
and the solution or outcome of that challenge. Submit abstracts online at:
https://sme-retc.secure-platform.com/a.
https://sme-retc.secure-platform.com/a
For more information, contact:
Deadline is June 30, 2018

Authors will be notified of acceptance by September


2018. Final manuscripts from accepted authors are
due December 15, 2018. Manuscripts are mandatory
Society for Mining, Metallurgy & Exploration for inclusion and must be received on time. All man man-
12999 E. Adam Aircraft Cir. uscripts will be included in the proceedings volume
Englewood, CO USA 80112 distributed on-site to all full registrants. If you cannot
800.763.3132 | 303.948.4200, commit to completing a manuscript on time, please
www.smenet.org, meetings@smenet.org do not submit an abstract for consideration.
underground CONSTRUCTION
NEWSNEWSNEWSNEWSNEWS

Tunneling to begin on LA Metro’s Purple Line


T
unneling for the first phase of that initially broke ground in late “For all the people who live
Metro’s Purple Line Extension 2015 includes three phases, and and work here, the Purple Line
project will begin later this will add about 14.5 km (9 miles) Extension will create faster and more
summer under the Miracle Mile. Two and seven new stations extending convenient ways to get to work and
tunnel boring machines, named Elsie to the Westside, taking riders from get back home to their loved ones,”
and Soyeon were unveiled on April downtown Los Angeles to Westwood added Garcetti.
24, the local CBS affiliate in Los in about 25 minutes. Boring each tunnel on the first
Angeles, CA reported. The project, expected to cost $8.2 phase will take about two years to
The two boring machines will billion, is considered to be one of complete.
begin by digging parallel tunnels Metro’s priority projects. It’s scheduled to be finished and
underneath Wilshire Boulevard “The Wilshire corridor has the ready for riders in 2023.
between Koreatown and Beverly highest population and employment Sections 1 and 2 are funded
Hills to connect three new stations density of any transportation corridor primarily by Measure R, the sales tax
and 6.3 km (3.92) miles of new rail. in Los Angeles,” said Mayor Eric Los Angeles County voters approved
The full extension of the project Garcetti. in 2008. n

Minneapolis: Stormwater tunnel


(Continued from page 4)
another tunnel beside the existing similar task.
is third on the city’s list of bonding one to reduce pressure across the Since 2009, Minneapolis has spent
priorities, behind an overhaul of the downtown system. $2 million to $5 million a year largely
Upper Harbor Terminal property and It’s not the only deep tunnel work on repairing breaks in the lining.
an expansion of the city’s emergency happening in the city. The Minnesota Pressurized water over time fractures
operations and training facility. Department of Transportation has the concrete, creating voids in the
The tunnels are significantly spent nearly four years burrowing 36 surrounding sandstone that further
deeper than the other essential m (120 ft) below Interstate 35W in compromise the tunnels’ strength.
conduits beneath the sidewalks. Most south Minneapolis and repairing its St. Paul has spent about $3.5
gas, electric and communications lines stormwater tunnels there. And the million to $4 million per year
on Nicollet Mall are 1 to 1.5 m (3 to Metropolitan Council is preparing since 2006 on rehab work, said
5 ft) below ground, just above water to repair a wastewater tunnel near Bruce Elder, the city’s sewer utility
mains and sewer pipes. Minnehaha Park that’s as deep as 22 manager. It is now working on a
Once stormwater drops to the m (74 ft) underground. Phalen Creek tunnel northeast of
tunnels, it flows by gravity toward Including tunnels outside downtown.
Washington Avenue, where it follows downtown, the city’s system spans “We’re more or less working
the street’s path underground for nearly 26 km (16 miles), ushering within the existing tunnel and making
several blocks before being spit out rainwater from about a fifth of the repairs,” Elder said. “We don’t really
into the river beside the Stone Arch city to the river. St. Paul has 32 km have a great need for additional
Bridge. The tentative plan is to build (20 miles) of tunnels that perform a capacity.” n

Epiroc introduces new hydraulic breakers


W
hile incorporating the piston in stainless steel, while bushing areas. Two restrictors are available
popular features of Epiroc’s seat wear is minimized by a press- that enable the performance of the
market-leading Solid Body fit, one-piece bushing locked by an hydraulic breaker to be adjusted for
(SB) breaker range, the new SB 302 additional pin. An exchangeable wear either traditional scaling operations
and SB 452 Tunnel versions provide plate protects the hammer body and or for more challenging rock
application-specific modifications durability is enhanced by heavy duty breaking jobs.
that extend equipment lifetime and retainer bars and a locking pin. Together, these new features add
reduce overall operating costs in The special tunneling tool with a up to less wear, extended lifetime
underground applications. collar supporting a robust front shield and lower overall operating costs in
Piston lifetime in the advanced and dust cover minimizes the dust scaling, tunneling and underground
Tunnel version is extended by a new intake when working on overhead mining applications. n

10 JUNE 2018 T&UC ®


NEWSNEWSNEWSNEWSNEWS

Keller and Hayward Baker


acquires Moretrench

K
eller and Hayward Baker the company and expertise of its range of underground construction
have acquired New Jersey- people. We are excited to welcome solutions available through any
based Moretrench, a Moretrench to Hayward Baker and single geotechnical contractor.
contractor operating predominantly look forward to developing new Tom Tuozzolo, president of
along the east coast of the United synergies.” Moretrench, added, “As a division of
States and with a strong heritage Hayward Baker and Moretrench Hayward Baker, we can now offer
of complex geotechnical projects. both enjoy a strong and well- additional geotechnical solutions
Moretrench will operate as a established presence in the tunneling and resources to our established
division within Hayward Baker. and underground construction clients as well as extending our
The enlarged entity will be well- industry and each has worked dewatering and ground freezing
positioned for the expected long run extensively on major subway and techniques to Hayward Baker’s
renewal of infrastructure. other tunnel construction projects clients. This translates to more
Eric Drooff, president of throughout North America. comprehensive and even better
Hayward Baker, noted that, “Having With each company contributing customer service for both our
worked closely with Moretrench particular areas of expertise, and companies. I am excited to lead the
on several key projects, we were sharing others, together the company Moretrench team forward into this
impressed with the quality of will bring to its clients the widest new venture.”n

Czech railway project will link Prague to


European transport network
W
ith the expansion of the spilite rock, for which it was converted for the second tunnel tube. In addition
railway line between to open single-shield mode with to the TBM, Herrenknecht provided
Rokycany and Pilsen as belt conveyor removal. Each of the additional equipment, such as multi-
a high-speed rail link, the Czech conversions was realized inside the service vehicles from subsidiary TMS,
railway network is being modernized. tunnel in just two weeks. “For variable a cooling tower and belt conveyor
The line in the western part of ground conditions along the tunnel systems.
the Czech Republic is part of the alignment, a convertible multi-mode The new high-speed rail link
railway corridor linking Pilsen to TBM is the best and most flexible reduces the average travel time
Prague and, thus, to the European solution. It can be run in different between Rokycany and Pilsen by
railway network. Over a distance tunneling modes and thus operate around 10 minutes, and the capital
of 4.1 km (2.5 miles) it consists in changing geologies,” explained city of Prague can be reached from
of two single-track tunnel tubes. Korbinian Kröger, responsible project Pilsen in less than one hour. As a
The tubes were built by the Czech manager at Herrenknecht. result the region around Pilsen – with
contractor Metrostav. For the first The cutting tools were also about 170,000 inhabitants the fourth
time in Eastern Europe, a convertible changed for the second section of largest city in the Czech Republic –
multi-mode tunnel boring machine each drive and 48 cm (19 in.) disc will be better connected to the trans-
(TBM) (from earth pressure balance cutters were installed for the single- European transport network. The
(EPB) mode to single-shield shield mode section instead of the modernization project not only makes
mode) specifically designed and previously used 46 cm (18 in.) disc the railway line faster, but also brings it
manufactured by Herrenknecht at cutters. The larger disc diameter up to the state of the art. This includes,
its Schwanau plant, was used for the allowed higher contact pressure in the for example, special safety features
project. solid hard rock and longer running such as fire protection solutions and
The multi-mode TBM built two- times. With small overburdens in escape routes in the new tunnels.
thirds of the two tunnels through parts, the flexible allrounder among Herrenknecht is also involved
quartzite shale stone and clay soils the tunnel boring machines achieved in other infrastructure development
in closed EPB mode with screw weekly top advance rates of up to projects in Eastern Europe. They
conveyor muck removal. On the last 182 m (597 ft). After 12 months, in include Poland’s largest tunnel
1.1 km (0.7 miles) of each route, the October 2017 the site crew was able structure – the 10-km (6.1-mile) long
machine S-799 had to penetrate hard to celebrate the final breakthrough Slowacki Route in Gdansk. n

T&UC ® JUNE 2018 11


FEATURE ARTICLE
The future of transit tunneling
in Washington, D.C.
B
y the time the latest expansion of the Washington to dewater the soils. However, due to concerns about
Metropolitan Area Transit Authority (WMATA) conditioning clays with earth pressure balance (EPB)
system, known locally as Metro and which opened TBMs, open face machines were still favored by contractors
in 1976, is completed in 2020, the system will serve 97 for their better advance rates, lower cost and ability to deal
stations and operate on 188 km (117 miles) of track with boulders that were occasionally encountered in the
on six interconnecting lines. Metro provides a critical Coastal Plain Terrace Deposits.
transportation link to a population of approximately Ground improvement techniques that made tunneling
six million people within a 3,900-km2 (1,500-sq-mile) possible in weak or very wet soils at the start of Metro
Washington Metropolitan area and has allowed job growth construction were largely limited to cement and chemical
to expand to all corners of the region. In the 1950s and grouting and, to a lesser extent, ground freezing. Many
1960s, when the system was first conceived and construction early (pre-1978) WMATA tunneling contractors used
began, most jobs were centered in downtown Washington, chemical grout for use in fine-grained soils. This changed
and most of the workforce commuted by bus or car. Today, over time as technologies evolved for jet grouting
transit-oriented development has increased residential, (replacement of soil by grout), compaction grouting and
commercial and government facilities near most of the compensation grouting where grouting is undertaken as
existing 91 stations increasing the importance of the Metro tunneling takes place.
system as a critical transportation link for the region. For tunnels in rock, the work started when tunneling
According to recent American Public Transportation technologies were transitioning from the traditional
Association (APTA) data, Metro is the second busiest method of drill-and-blast excavation with rock support
transit system in the United States (after New York City’s using structural steel (steel sets) to more modern methods.
transit system). The first rock tunnel running north from Dupont Circle
During the nearly 50 years of construction on the Station was a single double-track tunnel excavated by drill-
Washington Metro system, technology improvements and and-blast methods. Later, tunnel contractors used hard-
lessons learned from the global tunneling industry were rock TBMs between and through the stations. WMATA
implemented. Portions of this background and history have personnel had concerns about the delays associated with
been adapted from other work by the authors Roach et gripper-type TBMs getting stuck for extended periods in
al. (2017) and expanded for use herein. For soil tunnels, weak rock formations (there was no reverse gear) and with
these improvements included the change from a “two-pass” replacing worn disc cutters. Consequently, they preferred
tunnel lining with a typical initial lining of steel ribs with conventional rock excavation techniques. Drill-and-blast
wood lagging or segmental precast lining erected within excavation continued out of necessity to excavate station
the tunnel shield followed by a final lining of cast-in-place caverns in rock, as well as many smaller-size excavations
concrete to a one-pass lining system of pre-cast concrete such as for cross-passages between tunnels.
gasketed segmental lining. Soil tunnels were originally Design and construction of rock tunnel linings evolved
excavated using open-face tunnel shields, but changed over to follow principles of rock reinforcement by using rock
time. By the late 1980s, tunneling using closed, pressurized- bolts and shotcrete, eliminating the use of steel sets. These
face tunnel boring machines (TBMs) using a one-pass practices progressed further where rock bolts were replaced
tunnel lining consisting of segmental precast concrete by untensioned rock dowels fully encapsulated with cement
permitted or resin and shotcrete for initial support and, in some cases,
tunneling in a shotcrete as the permanent lining. Ground water leaks were
Brian Zelenko, Harald Cordes and wider range of
soil conditions
a major problem during early construction. Dry tunnels
without leaks became possible when PVC membranes were
William H. Hansmire with much less placed between the initial and final linings of rock tunnels
risk of damaging (Sauer et al., 1987). It was part of the early introduction
Brian Zelenko, Harald Cordes and overlying utilities and adaptation of European tunneling methods and initial
William H. Hansmire, members UCA or structures, use in the United States (Heflin 1985) of the New Austrian
of SME, are vice president, engineering manager greater safety
for tunnel
Tunneling Method (NATM), also known as the sequential
excavation method (SEM). This was the first time in the
and senior vice president with WSP USA, email construction United States where the owner fully accepted the method
brian.zelenko@wsp.com. personnel and and used it for later projects. This approach to tunneling
without the need integrated the several techniques that had evolved globally

12 JUNE 2018 T&UC ®


over the years and was used to successfully FIG.1
excavate tunnels in rock and, for the first time in Steel pipe arch canopy support for WMATA Silver Line extension in
the United States soil (Heflin et al., 1991). Tyson’s Corner. Source: Vojtech Gall/GZ Consultants.
The contract for the Fort Totten Station
and tunnels in 1988 was the only contract out
of three offered by WMATA in which the
contractor chose to utilize NATM. It was the
first use of NATM in soft ground (sands and
clays) for a transit tunnel in the United States.
The project included 292 m (958 linear ft) of
twin tunnels, in addition to a portion of the
station excavation located west of the Fort Totten
Station. Excavation and ground behavior were
monitored during construction by an extensive
geotechnical instrumentation program. Specified
initial support included shotcrete applied in three
stages, with welded wire fabric and lattice girders.
Soil anchors were also required for initial support.
Additional support was provided by forepoling
bars, forepoling sheets and face shotcreting.
The tunnel research work that began on the
first projects of the Washington Metro set the stage for rocks. Coastal Plain soils include interbedded alluvial soils,
geotechnical instrumentation and monitoring for tunneling ranging from clays, silts and sands to cobbles and boulders,
that is undertaken throughout the world today. Metro deposited by rivers and tributary systems within channels,
engaged the University of Illinois at Urbana-Champaign bars, floodplains, terraces and alluvial fans. The alluvial
Department of Civil Engineering to conduct field research deposits are underlain by older Potomac Group soils, which
on soil tunneling, rock tunneling and cut-and-cover were deposited in a marine environment and are generally
excavations. The lessons learned for instrumentation and denser and stiffer than the alluvial deposits. Northwest of
procedures for tunneling were published as Methods the Fall Line, Piedmont residual soils, weathered and hard
for Geotechnical Observations and Instrumentation in intact bedrock are evident near the ground surface. These
Tunneling (Cording et al., 1975). geologic conditions had a significant influence on tunneling
Washington Metro engaged a board of experts to and underground construction methods. Also influencing
peer review and advise on all aspects of design and construction were the presence of the Potomac and
construction. The Washington Metro Tunnel Board of Anacostia Rivers, Rock Creek and other tributary streams
Consultants (including Ralph B. Peck, Don U. Deere and and creeks.
A. A. Mathews) became the forerunner for what is today a
common practice within the underground industry (Roach Expansion of the system
et al., 2017). In recent years, there have been several expansions of
Approximately half of the original 165-km (103- the original Metro system that have included tunneling
mile) system was constructed underground, including and underground construction. These projects include
approximately 30 km (19 miles) of rock tunnels, 19 km (12 the Dulles Corridor Metrorail, also known as the Silver
miles) of mined soft-ground tunnels and cut-and-cover Line, the Rosslyn Station Expansion and Access project,
construction. A total of 48 stations are underground, 11 of the Medical Center Station Metro Crossing project, and
which were mined in rock, one was mined in soil, and the the Purple Line, a new light rail transit system overseen
rest were constructed by cut-and-cover methods. The 30 by the Maryland Transit Administration that will provide
km (19 miles) of rock tunnels were constructed for the Red a circumferential connection between three suburban
Line extending from Dupont Circle Station north to the Metro Stations (Bethesda, Silver Spring and Greenbelt) in
Rockville Station, approaches to and under the Potomac Maryland.
River between Foggy Bottom and Rosslyn Stations, and The Dulles Corridor Metrorail Project, estimated at
the north end of the Red Line between Wheaton and more than $5 billion, extends Metro service from West Falls
Glenmont Stations. Church Station through Tysons Corner to Wiehle Avenue
The local geology straddles the boundary between the Station (Phase I) and to Dulles International Airport,
Coastal Plain and the Piedmont Physiographic Provinces. terminating at a station beyond the airport in Loudoun
From the boundary, also known as the Fall Line, which County, VA (Phase II). SEM tunneling was employed for
extends through the metropolitan area from SW to NE, a 520 m (1,700 ft) section through Tysons Corner in Phase
there is an increasingly thickening wedge of Coastal Plain I of the project. SEM was used, including a single- and
deposits to the southeast underlain by older Piedmont double-grouted steel pipe arch canopy pre-support due

T&UC ® JUNE 2018 13


FIG.2
Other recent and future tunneling
DC Water’s First Street Tunnel EPB TBM “Lucy” as introduced by Mayor in Washington, D.C.
Muriel Bowser. Source: Brian Zelenko/WSP at TBM Naming Ceremony The DC Water Clean Rivers Project is a
on April 14, 2015. $2.6-billion program to reduce the occurrence
of combined sewer overflows into Washington’s
local waterways. The project includes several
large-diameter conveyance and storage tunnels in
the soft ground of the Coastal Plain deep under
the city. Some of these new tunnels pass below
existing WMATA Metro lines.
The first major tunnel construction started
in 2013 and included an 8-km (5-mile) long,
7-m (23-ft) inside diameter (ID) bored tunnel
along the Potomac and Anacostia rivers from
DC Water’s Blue Plains Advanced Waste water
Treatment Plant to a pump station in the Navy
Yard. Subsequent contracts included a 3.8-km
(2.4-mile) long, 7-m (23-ft) ID tunnel from RFK
Stadium under the WMATA Green Line and the
Anacostia River to Poplar Point, and a half mile
long 6-m (20-ft) ID tunnel in the Bloomingdale
neighborhood along First Street (Fig. 2). All these
tunnels have been successfully excavated in the
Potomac Formation soils with state-of-the-art
EPB TBMs. The most recent tunnel contract
to shallow cover and soft ground (Fig. 1). This design- of the Clean Rivers Project was awarded in 2017 and
build project, overseen by the Metropolitan Washington will include an 8-km (5-mile) long tunnel connecting the
Airports Authority, is funded by various public and private previously constructed Anacostia River and First Street
entities, including the Dulles Toll Road, demonstrating how tunnels. This tunnel will also utilize an EPB TBM with
third parties can work together with WMATA to address pre-cast concrete gasketed segmental lining. The depth of
regional transportation needs and expand the Metro this new tunnel system is between 21 and 49 m (70 to 160
system. ft) below the ground surface and includes multiple deep
Rosslyn Station is an important underground hub shafts and connection tunnels excavated by SEM. Unique
station in Arlington, VA, that serves the Orange, Blue to this project is the fact that DC Water used design-build
and Silver lines. The station was constructed in the early procurement for all the tunnel contracts. To date, DC
1970s and was opened in 1977. As part of a new residential Water’s Clean Rivers project has been successful in terms
and commercial development, an access improvement of work quality and schedule adherence. Those projects
project was undertaken in 2009 and completed in 2013 to with soft-ground tunneling and design-build procurement
accommodate expanded station capacity associated with are solid precedents for any future transit tunneling in
the new development. The work included a new station Washington, D.C.
entrance and a new track-level mezzanine that expands the A final DC Water tunnel scheduled to be procured
passenger capacity of the station. Construction included in 2020 along the Potomac River will provide additional
a new vertical elevator and stair shaft entrance from precedent for tunnel excavation by TBM in rock, mixed-
the ground surface, connected by a 11-m (35-ft)-wide face and soil. As with the other tunnels in DC Water’s
by 12-m (40-ft) high mezzanine constructed using SEM Clean Rivers project, the Potomac River tunnel is expected
techniques leading toward the existing station. Passengers to be procured as a design-build contract.
walk through a 6-ft (19-ft) wide by 4.5-m (15-ft) high
passageway between the new concourse and the existing Current transit tunneling in other major U.S. cities
escalator entranceway. The SEM approach to design and As urban areas grow in population, several major cities
construction made the complex underground structures in the United States have been expanding their transit
possible. systems with tunneling and underground construction.
The Rosslyn Station expansion is an excellent example These projects, which minimize impacts to surface streets
of transit-oriented development leading to privately- and structures, are instructive in helping to envision the
financed expansions of the system. In Maryland, the Purple future of transit tunneling in Washington, D.C. As with the
Line will include a new underground entrance to Metro’s recent DC Water Clean Rivers tunneling program, owners
Bethesda Station to facilitate connectivity between Metro in recent years have been favoring alternative delivery
and the Purple Line. methods, such as design-build.

14 JUNE 2018 T&UC ®


New York City In 2016, Los Angeles County voters approved Measure
Similar to the Rosslyn Station expansion for WMATA, M, which will provide an additional $120 billion in
the New York City Metropolitan Transit Authority (NYC transportation funding over the next 40 years. With the
MTA) has added station access and increased the size of 2028 Olympics set to be in Los Angeles, further extension
stations for a number of locations throughout their system, of the Purple Line (Segment 3) to UCLA, the location of
including Columbus Circle, Hudson Yards, Lexington several sports venues are anticipated.
Avenue/63rd Street Station, and South Ferry, just to
name a few. The NYC MTA’s 2015-2019 Capital Program San Francisco, CA
includes $7.1 billion to expand the network through major San Francisco is served by both the Bay Area Rapid
investments. The NYC MTA receives approximately 35 Transit (BART) system and the San Francisco Municipal
percent of its income from a regional sales tax, regional tax Transportation Agency (SFMTA). Several expansion
on mortgage receipts and a tax on businesses that refine projects are underway or have been proposed.
or sell petroleum-based fuel. In recent years, underground
transit improvements have included: • SFMTA Central Subway Project — $1.6 billion,
2.7-km (1.7-mile) long, tunnel project will extend
• NYC MTA 2nd Avenue Subway (Phase 1) — the Muni Metro T-Third Street Light Rail Line
$4.4 billion project includes a 3.2-km (2-mile) from SOMA to Union Square and Chinatown.
long segment from 96th Street to 63rd Street and The project includes tunneling with two EPBMs
includes new stations at 96th, 86th and 72nd Streets. and three underground stations constructed by
The 2nd Avenue Subway (Phase 2), which will SEM and cut-and-cover methods.
extend the system north to 125th Street, has started • BART 2nd Transbay Tube — this proposed project
preliminary design. would build a second tube between Oakland
• NYC MTA No. 7 Subway Extension and Station and San Francisco south of and parallel to the
— $2.1 billion project extended the subway line existing immersed tube tunnel. It would connect
from Times Square Station to the Jacob K. Javits to the new Transbay Transit Center and provide
Convention Center at Tenth Avenue and West 34th connections to Caltrain and the new California
Street. High Speed Rail.
• Long Island Railroad (LIRR) East Side Access
Project — $10.8 billion project, still under Seattle, WA
construction, extends LIRR service from Queens Over the past 20 years, Sound Transit has expanded
and Long Island to Grand Central Terminal. Seattle’s transit system with a series of tunnel and
underground projects. Since its creation in 1993, the agency
Los Angeles, CA has passed three major funding ballot measures. The most
The Los Angeles County Metropolitan Transportation recent measure in 2016, Sound Transit 3, provides $53.8
Authority has embarked on a major expansion through billion in funding to support expansion of the transit
Measure R, a voter-approved ballot measure that resulted system. The measure is partially funded by increases to
in a half-cent sales tax for Los Angeles County to finance sales, vehicle excise, property taxes as well as federal
new transportation projects and programs which has been grants. Recent work has included:
in place since 2009.
Four segments that include tunneling and underground • Northgate Link Extension — $1.9 billion project
construction are underway as design-build contracts: includes twin tunnels that will extend 5.8 km
(3.6 miles) north from University of Washington
• Crenshaw to Los Angeles International Airport Station at Husky Stadium.
— $1.3 billion, 13.6-km (8.5-mile) long project • East Link Extension — $3.7 billion project, which
includes 3.2 km (2.1 miles) of tunnels and three includes a 610-m (2,000-ft) tunnel constructed by
underground stations. SEM, will extend light rail 22.5 km (14 miles) from
• Purple Line Extension Segment 1 — $1.6 billion, downtown Seattle to downtown Bellevue and
6.2-km (3.9-mile) long tunnel project includes three Redmond.
underground stations and extends to Beverly Hills.
• Purple Line Extension Segment 2 — $2.4 billion, Future transit tunneling in Washington, D.C.
4.1-km (2.6-mile) long tunnel project includes two The future of Metro’s transit tunneling in
underground stations and extends the Purple Line Washington, D.C. is tied to future capital investments and
to Century City. improvements to the Metro system. This was discussed in
• Regional Connector — $1.8 billion, 3-km (1.9-mile) WMATA’s Momentum Strategic Plan (2013-2025) and
long project through downtown L.A. will connect subsequently in planning and analyses conducted soon
two existing transit lines and will include three new after the Momentum Plan for a 2040 Regional Transit
underground stations. System Plan. Although the 2040 Strategic Plan has not yet

T&UC ® JUNE 2018 15


FIG.3
be a demand for safe, efficient and reliable service
Metro’s core and core stations. Source: WMATA, Momentum, The Next that can only be achieved by new tunnels.
Generation of Metro, Strategic Plan 2013-2025. Additionally, the future may also include an
extension of planned high speed rail by Amtrak
in the Northeast Corridor south to a redeveloped
Union Station, possibly extending further south
to Virginia and the Southeast Corridor. Recent
news reports have noted that entrepreneur
Elon Musk, chief executive officer of SpaceX
and Tesla, is planning to privately finance and
develop a new high-speed underground transit
system, Hyperloop, between Baltimore, MD
and Washington, D.C. Maryland has issued a
conditional utility permit to his company, The
Boring Company, allowing construction of a
16.5-km (10.3-mile) section of tunnel along the
proposed route. These future projects are under
consideration because long tunnels and complex
underground works are more feasible and can be
built with less risk than in the past.

Metro
In the last two years, Metro has focused its
efforts on restoring its system to try to correct
been finalized and adopted by Metro’s Board, some of the years of deferred maintenance on an aging system and
planning associated with it has been posted on Metro’s improving safety and reliability for the travelling public.
planning blog website, PlanItMetro. As highlighted by a Programs such as Back2Good, designed to get the system
2013 Washington Post article that included an interview in good repair, and SafeTrack, an accelerated track work
with Shyam Kannan, Metro’s chief planner, Metro plan to address safety recommendations by the Federal
identified a need to expand capacity in the system’s core Transit Administration and the National Transportation
to meet future transit ridership demands. This could be Safety Board, have been implemented. Through
accomplished by adding a new core loop that includes SafeTrack, Metro completed approximately three years’
approximately 10 new stations and adding capacity and worth of maintenance and repair work in approximately
connections at four existing stations. one year. Much of the system’s maintenance work is
This investment faces several hurdles. One of the related to leaking tunnels constructed in the 1970s
big hurdles that Metro has faced is the lack of a local and 1980s. Today’s tunneling industry has the ability
dedicated funding source, unlike many of the other and technology to construct nearly watertight tunnels,
cities and transit agencies previously noted. Without a representing a huge improvement over past construction
dedicated funding source, it will be difficult to achieve methods.
the goals of the Momentum Plan. Now, four years since The Momentum Plan identified several key issues,
the issuance of the Momentum Plan, a local dedicated which are common to other major cities in the United
funding source was finally established in 2018 with all States that have invested in transit improvements:
three jursidictions (Maryland, the District of Columbia
and Virginia) committing funds. Secondly, future • Improve regional mobility and connect
investment has been tied to ridership and recently communities.
transit ridership numbers have been declining across • Enhance access.
the country, especially for Metro. According to APTA, • Add operational redundancy.
national transit ridership was down approximately 1.9 • Build for the future.
percent over the past two years. Metro’s ridership has • Add new sources of predictable funding.
been down by 14 percent during the same period. For
Metro, this is partially due to recent repair work, such as As noted in the Momentum Plan, the region is
the year-long SafeTrack program, and ongoing reliability forecasted to increase 30 percent in population and
challenges. It is also due to the increasing popularity 39 percent in employment over the next 30 years. And
of alternative works schedules, particularly by federal Washington, D.C. is one of the few metropolitan areas
workers, reductions in late-night and weekend service, where growth is occurring in the city core, inner suburbs
as well as the popularity of Uber and other ride share and outer suburbs. The Momentum Plan identified core
companies. However, in the larger, longer view, there will station improvements, including pedestrian underground

16 JUNE 2018 T&UC®


connections, that Metro stated should FIG.4
be completed by 2025 to have maximum Conceptual new Metrorail Blue Line connections at Rosslyn Station. Source: WMATA,
impact, increase system and core capacity, Momentum, The Next Generation of Metro, Strategic Plan 2013-2025.
and improve the effectiveness of the
rail network. These improvements are
envisioned at stations such as Metro
Center, Gallery Place, Union Station,
L’Enfant Plaza, Farragut West, and
Farragut North (Fig. 3). In 2012 dollars,
they were estimated to have an order of
magnitude cost of $1 billion.
Other conceptual improvements,
included in the Momentum Plan, were
further evaluated by Metro during the
planning effort for a 2040 Regional Transit
System Plan. These improvements would
be required, in addition to the 2025 Plan
Core Station Improvements, to serve
the region’s transit needs with the projected growth. It tunneling could be accomplished using either a
noted that as transit patronage reaches full capacity on Slurry or EPB TBM.
lines converging at Rosslyn and L’Enfant Plaza Stations, • Relocated Blue Line ($3.3 billion) — this
new east-west and north-south transit tunnels through would improve east-west capacity by creating
Arlington and Washington, D.C. would be required a new Blue Line alignment through Rosslyn to
to accommodate trips and improve capacity through Georgetown and then along M Street NW to
the system core. Some of those improvements, with Thomas Circle. As this alignment is primarily
associated order of magnitude cost in 2012 dollars, related in the Piedmont sections of Washington,
to future transit tunneling include: D.C., tunneling could be accomplished using
a hard rock TBM. Station construction could
• New connection of existing lines at the Pentagon be completed fully by SEM or cut-and-cover
with a new Pentagon Station ($600 million). methods. Construction of a station in Georgetown
• Silver/Orange Line Express Line from West Falls could be completed by SEM construction with
Church to a 2nd Rosslyn Station to a relocated significant attention made to protect existing
Blue Line ($2.3 billion) — this would
allow passengers on the Silver and FIG.5
Orange Lines better access to the Proposed 2040 Metrorail network – Core Loop. Source: WMATA Planning
eastern side of downtown Washington. Website and Blog. https://planitmetro.com/.
A second Pentagon station would
allow passengers on the Orange and
Silver lines to reach the Pentagon
without having to switch to the Blue
Line. The underground portion of this
new line would begin in the Piedmont
bedrock at the Rosslyn Station and
then transition to Coastal Plain soil
deposits at the second Pentagon
Station. Tunneling could be completed
by an EPB TBM or a Hybrid TBM
(Fig. 4).
• Relocated Yellow Line ($2.7 billion)
— this would improve north-south
capacity and require a new tunnel
south from the Pentagon under
10th Street SW and NW and then
west to Thomas Circle allowing the
Green and Yellow lines to operate in
separate tunnels. As this alignment is
generally in the Coastal Plain Deposits,

T&UC ® JUNE 2018 17


FIG.6 possibly constructed below the existing station
Proposed 2040 Metrorail network – Core Loop detail. Source: WMATA. while providing connections to the existing Red
and Green Lines along the way. As shown in the
conceptual figure, the Core Loop could then extend
south and west to address the needs from the
Relocated Yellow Line noted in Momentum. This
work would involve tunneling and underground
construction for the stations. These are conceptual
drawings and future planning could lead to
alternatives such as a continuation of the new line
from Union Station to the east, perhaps 3.2 km (2
miles) to RFK Stadium.

Union Station redevelopment


The Union Station Redevelopment
Corporation (USRC), in coordination with
Amtrak, is planning for a $7-billion phased
expansion and modernization of Washington
Union Station. The historic station, which opened
in 1907, is proposed to handle triple the number
of passengers and double the train service. Major
improvements are being planned to add a 3-million
SF air-rights development, named Burnham Place
after Union Station architect Daniel Burnham,
structures through a congested part of the city over the train shed. Additional improvements include
with the use of ground improvement. increasing capacity along the Northeast Corridor to New
York and Boston with the addition of new underground
As indicated on the PlanItMetro website, one possible passenger concourses below the existing train shed, and
way to increase capacity in the downtown core would plan for possible High Speed Rail, extension of Maryland
be the conceptual development of a Core Loop (Figs. 5 Regional Rail Trains to Virginia, as well as possible
and 6) that extends north from a second Rosslyn Station extension of Virginia Railway Express trains to Maryland.
in a deep tunnel to Georgetown, extends east toward Constructed in the 1970s, Metro’s busiest station is
Union Station to a second Metro station at Union Station at Union Station on the Red Line. The near-term station
access improvements planned by Metro will be
FIG.7 included in the Union Station redevelopment.
Conceptual proposed WMATA Metrorail line south of Union Station. Source:
According to the U.S. DOT Federal Railroad
U.S. DOT Federal Railroad Administration (FRA), 2017, Washington Union Administration (FRA) 2017 Concept Screening
Station Expansion Project, Concept Screening Report. Report, a second Metro Line servicing Union
Station is being considered in long-term planning
(beyond 2040) in order to meet future travel
demand. The proposed conceptual alignment
is parallel and south of Massachusetts Avenue
passing along the southern edge of Columbus
Plaza, directly south of Union Station (Figs. 7
and 8). A second Metro Station would need
to be constructed below the existing station at
Union Station. This station would extend roughly
between North Capitol Street and Louisiana
Avenue, below existing surface parking lots just
south of Massachusetts Avenue. Tunneling using
a Slurry or EPB TBM would likely be required,
combined with SEM for station construction
within the Coastal Plain deposits. Alternatively, the
second Metro Line could be located on the north
side of Union Station to tie-in with the planned
air-rights development. This would allow Union
Station to be served by two Metro Lines. However,

18 JUNE 2018 T&UC ®


the new Metro station would not be a transfer FIG.8
station due to the distance from the existing Metro Conceptual future WMATA Metrorail line and station south of Union Sta-
Station on the Red Line. tion. Source: U.S. DOT Federal Railroad Administration (FRA), 2017, Wash-
ington Union Station Expansion Project, Concept Screening Report.
High speed rail
High speed rail (HSR) connecting to
the Northeast Corridor, which is only being
considered in the fourth phase of Union Station
Redevelopment, would likely enter the station
at a new deep underground level below the
existing station and platforms. High speed rail
tunnels entering Union Station from the north
would likely need to begin somewhere around
the Anacostia River crossing, approximately
five miles north of the station. As the tunnels
enter the station, they would need to be aligned
in coordination with the existing large footings
which are supporting the existing historic station
structure on Coastal Plain Terrace Deposits. For
HSR to continue south to Virginia, it is possible
that twin-bored tunnels would follow an arc route
out of the station and below the National Mall
before crossing the Potomac River into Virginia.
The FRA, in cooperation with the Virginia
Department of Rail and Public Transportation, is
preparing a Tier II environmental impact statement for the Union Station and south to Virginia across the Potomac
198-km (123-mile) portion of the Southeast High Speed River. These future projects are under consideration
Rail Corridor from Washington, D.C. to Richmond, VA. because long tunnels and complex underground works are
The study begins at the southern terminus of the Long more feasible and can be built with less risk than in the
Bridge across the Potomac River in Arlington, VA. past.
Due to the shallow connection at Union Station, it is Having a reliable funding source with dedicated
anticipated that twin-bore tunnels would be a preferred funding from the region for the first time ever is a big
approach, rather than a single large-bored tunnel with two step for the Washington Metro to meet its future needs.
tracks which would require more complex underpinning. Other major cities such as New York, Los Angeles, Seattle
Due to high groundwater levels and Coastal Plain deposits, and San Francisco have addressed the funding hurdle for
a pressurized-face TBM, either slurry or EPB, would transit capital programs, together with federal support,
likely be used to build the HSR alignment south of Union and are underway with major tunneling and underground
Station. A superconducting maglev program to provide a construction works. A recent decline in transit ridership,
high-speed connection in tunnels between Baltimore and particularly in Washington, D.C., would need to
Washington, DC is also being considered by planners. demonstrate signs of recovery before decision makers
would be willing to make the substantial investments
Conclusion required to improve the transit system. However, planning
Washington, D.C. expects an increase in population, and conceptual design work should continue given the
employment and transit oriented development over clearly identified future demand in the system core.
the next 30 years that will put a strain on the existing State-of-the-art tunneling and underground construction
Metro transit system. This led WMATA to develop the methods that have been used in other major cities for
Momentum Strategic Plan 2013-2025 that identified core recent transit tunneling projects have been successfully
station improvements, new east-west and north-south used in Washington, D.C. for recent Metro expansion as
transit lines that would improve access and effectiveness well as the DC Water Clean Rivers Program. Therefore,
of the network in the system core. These proposed Washington, D.C. is poised for significant transit tunneling
improvements, amounting to more than $10 billion (in work in the future. (References available from the
2012 dollars), would require tunneling and underground authors.) n
structures. In addition, Washington Union Station is about
to begin a $7 billion phased expansion and modernization Acknowledgments
program that will include significant underground The authors would like to acknowledge the invaluable
construction at the station and may include tunneling for discussions and thoughtful reviews provided by Allison
High Speed Rail from the Northeast Corridor, through Davis and James Darmody of WMATA.

T&UC ® JUNE 2018 19


FEATURE ARTICLE
Rehabilitation of tunnels:
An owner’s perspective
S
ince ancient times, storing and conveying water via decide between constructing a new tunnel or rehabilitating
underground water systems and tunnels has been the existing one, the SFPUC embarked on a detailed
touted for its strategic advantages. Underground alternatives analysis study, developing a set of performance
cisterns and tunnels assured protection of essential standards for the tunnel, and identifying different
fresh water supplies from man made contamination and alternatives. The study included four alternatives for in-
especially from enemies who would gain an advantage by depth review (McMillen Jacobs, 2017):
disrupting an adversary’s water supply in a siege. Modern-
day engineers do not usually specify tunnels for reasons of • Rehabilitate the existing tunnel, focusing on repair
avoiding deliberate contamination or siege — however, they and contact grouting of the 18 km (11 miles) of
are just as enamored with the idea of building tunnels for concrete lined section.
water conveyances. • Relining with smaller-diameter steel pipe in the 18
Such was the case for the San Francisco Public Utilities km (11 miles) of the concrete-lined section.
Commission (SFPUC). The SFPUC provides drinking • Construct a new bypass tunnel within the tunnel
water to 2.6 million residential, commercial and industrial right of way to replace the 18 km (11 miles) of
customers in the San Francisco Bay Area. The SFPUC’s concrete lined section.
water system includes 257 km (160 miles) of transmission • Construct a new bypass tunnel outside the tunnel
pipelines and tunnels from the SFPUC’s largest reservoir, right of way to replace the 18 km (11 miles) of
the Hetch Hetchy Reservoir inside Yosemite National Park, concrete lined section.
to San Francisco. About 129 km (80 miles) of the system
consist of tunnels. A 30-km (19-mile) section of the tunnel A 60-day shutdown of the tunnel was scheduled in
network, called the Mountain Tunnel, was thought to be at early 2017 to perform a visual inspection, gather detailed
risk of a catastrophic failure in its concrete-lined section of information regarding the location and type of defects in
18 km (11 miles). For much of the project planning process, the lining and establish the current structural condition
a new replacement tunnel was presumed to be required of the tunnel (Fig. 2). The inspection indicated the many
according to the tunnel planners. defects in the existing tunnel lining and the feasibility of
Originally constructed between 1917 and 1925, the repair (McMillen Jacobs, 2017).
Mountain Tunnel has been in continuous service since 1925. The study also performed geotechnical investigations
The 30-km (19-mile) tunnel is located downstream of the to ascertain site conditions for the new tunnel alignments,
Hetch Hetchy Reservoir water source in Yosemite National a condition assessment of the existing tunnel and a
Park, between the Early Intake and Priest Reservoir (Fig. detailed hydraulic analysis to assess the flow capacity
1). Approximately 18 km (11 miles) of the tunnel is lined of the existing tunnel and evaluate effects of various
with unreinforced concrete. Though the condition of the improvements. The overall assessment was that existing
tunnel was being monitored through water sampling and tunnel was found to be not beyond repair and many
periodic inspections, there was growing concern that the sections to be in relatively good condition (McMillen
tunnel lining was at risk of a partial collapse that could Jacobs, 2017). The hydraulic analysis indicated that relining
interrupt water the tunnel would significantly reduce hydraulic capacity
delivery for up to (McMillen Jacobs and Black & Veatch, 2017). So, the
nine months. The selection of the preferred project came down to comparing
David Tsztoo, Anthony Yu and SFPUC was faced the rehabilitation and the new bypass tunnels against the
Teena Redhorse with a decision to
construct a new
performance standards and the other considerations of
construction, environmental, permitting, cost and schedule
David Tsztoo and Teena bypass tunnel to described in this article. After thoroughly reviewing all
replace the lined this information and data at hand, the SFPUC ultimately
Redhorse, members UCA of SME, and section of the decided the best course of action was to rehabilitate the
Anthony Yu, are Mountain Tunnel Regional Mountain Tunnel Mountain Tunnel.
project manager, former project manager and or to rehabilitate
former project manager, respectively, email the existing Why rehab?
tunnel. The purpose of this article is to explain why tunnel
dtsztoo@sfwater.org. In order to rehabilitation can sometimes meet the needs of water

20 JUNE 2018 T&UC ®


FIG.1
Mountain Tunnel is downstream of Hetch Hetchy Reservoir. Source: SFPUC 2017.

agency owners better, or FIG.2


just as well, as new tunnels
or bypass tunnel projects. Cataloging every lining defect during the 2017 tunnel inspection.
Many owners are resource Source: Robin Scheswohl/SFPUC 2017.
limited. They have competing
program priorities, limited
capital resources and limited
staff expertise to undertake
and properly manage mega
size new tunnel projects.
Water agency capital
budgets typically include
many improvement projects
competing for the same
capital. The project list
can include improvements
to treatment facilities,
transmission pipelines,
pump stations and other
facilities besides tunnel
projects. Not every project
gets immediately funded
and some are postponed for
later funding in a 10-year
plan. Owners want to stretch
every dollar to cover as many
priority projects as possible.
Water agency owners
typically have to sell bonds
to fund their capital projects.
The sale of bonds is a long-
term financial commitment
that many water districts are
more hesitant to undertake

T&UC
® JUNE 2018 21
FIG.3 construction can mean increased
Cleaning the lining defect to exposed rock and reinforcing with wire mesh prior to financial capacity to invest
shotcrete. Source: SFPUC 2017. in periodic maintenance of a
rehabilitated asset for the long
term.
Because the scope of work
for a rehab is significantly less,
the rehab may be completed
in approximately half the time
or significantly less time for
comparable size facilities. This
also translates to significantly less
expense for project management
and other soft costs. A relatively
simple rehab project will not
require large consultant services
contracts for highly skilled and
expensive design consultants.
Nor would just-as-expensive
construction managers and
inspectors need to be hired on
large, multi-year contracts to do
contract administration and in-
tunnel inspections.
There is significantly less
cost and schedule associated
with property acquisition for a
in fiscally conservative times. Smaller water districts, rehab project. No permanent tunnel easements or rights of
in particular, are not willing to mortgage the future ways are needed for new tunnel alignment. Permitting for
operations of the district to significant long-term debt. temporary construction surface access and staging areas
Some districts have to also contend with stakeholder for non-agency owned property takes less effort because
and customer opposition to the raising of water rates either the rehab project does not requires them or require
to service the debt payback. After years of increased less of them. In the case of the new tunnel alignment
water rates to pay for improvements on other parts of proposed for Mountain Tunnel outside the tunnel right of
the SFPUC water delivery system, ratepayers would be way, there was the need to acquire tunnel easements and
understandably wary of additional increases to their water temporary surface rights for staging and access through
bill to pay for a new Mountain Tunnel. private property and national forest lands. The property
issues included concerns about noncooperative private
It’s about less money and time owners, working with the U.S. Department of the Interior,
When choosing to upgrade major transmission and possibly with U.S. Congress for the final approval — a
facilities, most water districts would look seriously potentially long and daunting process.
at cheaper alternatives rather than undertake a total Rehab projects can be done without the need for
replacement facility. Most owners would want to avoid a subsurface exploration. A new tunnel by comparison must
situation where the entire program budget is dominated by conduct an extensive geotechnical investigation along
mega size projects, with outsized impacts on annual cash any new alignment, at locations where tunnel portals, adit
flows to service bond debt and unpopular customer rate tunnels and vertical shafts are contemplated for the design.
increases to cover the bond repayments — as may be the All this is dependent on gaining temporary access usually
case of large capital improvement programs, including new, through private or other agency-owned property. The
expensive tunnel projects. longer the new alignment, the more complicated and time-
Given a choice between constructing a new tunnel, consuming will be the effort. All such considerations are
or bypass tunnel, or simply a rehabilitation of the existing essentially cost and time savings for owners who elect to
tunnel, owners would naturally first look at the rehab go with the rehab option.
option. Rehab projects are significantly cheaper than
building from new. It is estimated that the upfront capital Construction considerations
outlay of a rehab can be 30 percent to 50 percent of the With any new tunnel, there is also an increased risk
cost of comparable size and length of a new or bypass of cost overruns due to technical challenges, unforeseen
tunnel. Cheaper upfront capital investment in initial conditions, large upfront costs for tunnel boring machines

22 JUNE 2018 T&UC ®


and other support equipment, constraints on the electrical project can be approved for construction. For projects
grid for construction power, and environmental unknowns. in California, this involves the development, internal
Each new day of new tunnel excavation can yield a new reviews and public review process of an environmental
set of unknowns and the potential differing site condition impact report (EIR) over several years. If a federal agency
change order. is involved as a project participant or for the approval
By contrast, tunnel rehab projects are somewhat of property for the tunnel easements and temporary
repetitive and have fewer unknowns that could promote construction staging areas, then an environmental impact
a lot of cost overruns. The tunnel repairs are typically statement (EIS) is also required. The EIS can be done
classified into about four types ranging from patching of concurrently with the EIR, but is typically completed with
small holes to routing, cleaning and backfilling of much lag of an additional six months to more than one year after
larger cavities with welded wire mesh and shotcrete (Fig. the EIR certification to allow the findings and related
3). The design details and the construction for these repairs information in the EIR to be re-used in the EIS.
are fairly similar from rehab to rehab project. It is fairly The environmental impacts of new tunnels are
easy for contractor labor crews to get proficient after the generally unavoidable and beyond simple mitigation
first few repairs of each type of repair, gain efficiencies offsets that are easily accepted by the communities that
from lessons learned, and possibly make remarkable must host the construction of the tunnel facilities and
reductions in the unit cost and unit time of the repairs. staging areas. Neighborhoods must endure the visibility,
This would make subsequent repairs of the tunnel more dust and noise and share the streets and highways with the
efficient and less likely to overrun. hundreds of truck traffic on a daily or weekly basis over
The scope of a rehab project also lends itself to many years of construction, and may want more mitigation
flexibility during construction. Tunnel rehab construction for their endurance.
focuses primarily on repair of the concrete lining. Such New tunnel construction projects of large diameter and
repairs are discrete as opposed to continuous construction long alignment have the additional issue of dealing with
along the tunnel alignment that must be completed in exceedingly large volumes of tunnel spoils. Such spoils
blocks or sections before any return to service can be must be transported often at long distances to commercial
contemplated. Discrete repairs can be done in prioritized disposal fill sites, or shorter distances to agency owned fill
batches, or as much as the owner’s shutdown window sites. The longer haul to commercial sites often involves
constraints and budget allows. disclosure of the volume of regulated diesel emissions
that have health effects on the public. The shorter haul
Politics of new versus old to agency owned sites may involve less diesel emissions
Sometimes, project leadership has been known to but requirements on the back end of the project for site
advocate for new replacement projects for reasons other restoration and native plant re-establishment.
than the practicality of cost and time, or even beyond Rehab projects generally have little to no significant
the performance standards. New projects promise environmental impacts that must be described, mitigated
improvements that can be considered as a panacea for and publicly vetted before the project can be approved
problems ranging from the old facility as allegedly beyond for implementation. Repairs, contact grouting and other
repair, to local hiring for a massive number of construction work to rehab or improve an existing tunnel are completed
jobs, to having the opportunity to associate one’s name underground and with relatively little surface visualization.
with a legacy project. The standard construction impacts of noise, traffic and
By contrast, there is less glamor and notoriety environmental pollution can be avoided or mitigated
associated with a repair or rehab project. Tunnel rehab by design to the point of insignificance. Rehab projects
projects tend to be very similar and familiar. The main typically require smaller surface areas for temporary
work is the patching or repair of various defects ranging staging of construction trailers, equipment parking and
from small holes to larger sections big enough for an storage of materials.
inspector to crawl into. The repair is usually performed The environmental review process for a rehab
by shotcreting followed by systematic contact grouting project typically involves less documentation and less
through injection holes drilled through the repaired public review. Because the environmental impacts are
sections and into the native rock surrounding the tunnel in so much less or can be avoided, it is often possible to
order to fill the annular spaces between the rock and the publish a mitigated negative declaration for the rehab
lining. In the case of the current SFPUC Mountain Tunnel, project. If federal agencies are involved, the comparable
the repair details are almost a carbon copy of similar federal document is the environmental assessment. Both
repair details developed 15 years ago for the East Bay documents are easier and less time consuming to develop
Municipal Utility District’s Claremont Tunnel. and may save about one year compared to the EIR/EIS
process for the new tunnel (AECOM, 2017).
Environmental considerations
New tunnel projects generally must undergo an Environmental permits
extensive environmental review process before the Separate from the environmental documentation

T&UC ® JUNE 2018 23


FIG.4 were based upon the performance
Repairing the lining defect with shotcrete. Source: SFPUC 2017. of the existing tunnel back when
the tunnel was relatively new. A few
standards were derived from the
current operations of the tunnel.
There were eight performance
standards used as criteria for the
selection of the preferred project
during the project alternatives
analysis (McMillen Jacobs, 2017):

• Service life: This standard


requires the typical tunnel design for
100 years of service life. Although
the best way to meet this standard is
to construct a new tunnel, the rehab
option can also achieve a 100-year
service life. The Mountain Tunnel
design consultant’s solution was to fix
all the defects in the concrete lining
with welded wire reinforcement
and shotcrete and perform contact
grouting to fill all the annular
spaces between the lining and the
surrounding rock (Fig. 4). When
process is the issue of obtaining the environmental completed, the lining should be as structurally
permits to allow construction to proceed. For example, sound as a new lining and the rehab tunnel should
in California, a biological opinion must be evaluated last another 100 years with normal, periodic
and obtained, and then California Department of Fish & maintenance.
Wildlife permits must be obtained. If the project involves • Water quality: This standard limits the overall
federal participation or obtaining of easements, then U.S. turbidity from Mountain Tunnel to occurrences
Fish & Wildlife Service permits must be obtained. Such of more than 1 NTU to no more than twice per
permits typically require special expertise either in-house year, and occurrences of more than 100 NTU
or hired as consultants to interact with the permitting to no more than once every five years. During
officials in order to work out conditions of approvals and normal operations, ground water intrusion is the
details of the final project descriptions before the permit main culprit for degrading water quality. For both
can be approved. It is not uncommon for such permits to new and existing tunnels, a way has to be found
consume more than a year of critical schedule after the to limit this intrusion. For concrete tunnels, the
environmental review process is completed. best way to cut off the intrusion seepage pathways
If the project requires new tunnel easements and is to do an adequate job of grout injection of the
temporary surface easements for staging areas in national native ground surrounding the tunnel, or contact
park land or forest preserves, as was the case for the new grouting. For the rehab project, the entire 18
Mountain Tunnel options, then the permitting process is km (11 miles) of concrete-lined section will be
more complicated. The federal agency may pre-condition aggressively contact grouted, essentially sealing the
the granting of property easements on the approvals of the rehab tunnel from seepage.
environmental review process, and in the process add more As an improvement, Mountain Tunnel will also
conditions of approval to the environmental permits. install new large control valves at the downstream
portal to keep the tunnel full of water when the
Meeting performance standards tunnel is not running. With the tunnel full and
It is generally assumed that new tunnel projects can be pressurized, there would be little to no hydraulic
designed to satisfy any set of performance standards for gradient for the initiation of ground water
the project. While this is basically true, it overshadows the intrusion. In addition, a short section of very leaky
fact the most performance standards are derived from the tunnel, upstream of the South Fork Siphon crossing
design and operations of the existing facility, with perhaps underneath the Tuolumne River, will be replaced
a few upgrades. by a new 137-m (450-ft) long bypass tunnel section.
In the case of the SFPUC Mountain Tunnel This will eliminate the one worst section where
Improvement project, some of the performance standards ground water intrusion occurs the most.

24 JUNE 2018 T&UC ®


• Water conveyance capacity: This standard requires A related operational consideration during
a hydraulic capacity of 740 cfs (478 MGD). construction is the owner’s requirement for
Advantage goes here to a new tunnel, in that a emergency return to service. The implementation
new tunnel can be sized to accommodate any flow of tunnel repairs can be done in finite prioritized
capacity. However, in the case of the Mountain batches. Such repairs are discrete as opposed
Tunnel rehab, flow capacity will be enhanced by to continuous construction along the tunnel
the complete repair of wall defects, and invert alignment that must be completed in large units
paving and possibly smoothing, to improve before any return to service can be contemplated.
hydraulic efficiency. The rehab project should be This is a very important consideration for any
able to recover 706 cfs of initial capacity, or more owner that encounters an event that requires an
than 95 percent of this performance standard. The emergency return to service. Such emergencies
SFPUC found this sufficient and efficient when usually require the curtailing of construction and
the consideration of budget cost and schedule return to water services over a few days. The 2017
savings over the new tunnel are factored in. Also, Mountain Tunnel inspection and interim repair
the addition of downstream control valves to keep contract had a three-day requirement for the
the tunnel flow at full volume will eliminate the contractor to return the tunnel back to the owner
erosive effects of the current tunnel operations, for emergency return to service.
with intermittent surges and turbulent transitions • Planned outages: This standard requires the
between full flow and open channel flow inside the reliable operation of the tunnel with an inspection
tunnel on a daily basis. frequency of 20 years with outage durations
• Minimum flow: This standard requires a minimum limited to 30 days, and major repairs at no more
flow rate of 300 MGD be available at all times than once every 20 years with outage durations
outside of planned and unplanned outages. This limited to 100 days. This is fairly easy for a
is actually a fairly easy criterion to satisfy for a new tunnel or a rehab tunnel to satisfy. After
new tunnel and a rehab tunnel. For an existing completion of both types of projects, the key is
tunnel, the key is to do the repairs of lining defects to not ignore the periodic maintenance required
competently so that lining fallout does not occur to keep the tunnel lining in good physical
and block flow capacity. This is accomplished by condition, and eliminate the need for major
routing the defects back to structurally sound maintenance that often results from neglect. In
concrete, and backfilling the cavity with welded the case of the rehab tunnel, the repairs need
steel reinforcement and high strength shotcrete. to done competently so that lining fallout does
The resulting repair would be as structurally sound not occur and require major maintenance.
as new lining. For Mountain Tunnel, simple planned inspections
• Operational flexibility: This standard includes would only require outage durations of less than
four key operations. Mountain Tunnel must 10 days. A 30-day outage would allow time for
accommodate reductions in demand such that some patchwork repairs of the lining. These
the tunnel may operate in open channel flow for short duration outages should be conducted
extended periods. The tunnel needs to operate concurrently with the five-year periodic outages
at full portion to meet water supply needs. The for the Hetch Hetchy Aqueduct inspection interval
tunnel needs to accommodate power generation under the operational flexibility performance
and local recreational needs, such that the tunnel standard. Periodic inspections every 20 years with
may operate with substantial fluctuations in outage durations of 100 days for the Mountain
daily and hourly flows to the extent possible. The Tunnel should only be planned if major repairs are
tunnel needs to accommodate full dewatering needed. Again, the goal of the inspection outages
every five years for 100-day shutdowns for needed should be to catch the incipit defects when such
inspections of the Hetch Hetchy Aqueduct. The defects are still small in size and fairly easy to
new tunnel and rehab tunnel can both be designed repair.
to handle all of these operational needs. In the case • Unplanned outages: This standard limits the
of the Mountain Tunnel rehab, downstream control interruption in water delivery from a catastrophic
valves will be added to maintain full volume event to no more than 90 days. Although there is
flows so the erosive effects between full flow and uncertainty with any catastrophic event, the new
open channel flows can be significantly avoided. tunnel and rehab tunnel can both be designed to
With the downstream control valves, keeping the make the lining as robust as possible to withstand
tunnel full of water, flows can be ramped up and shakeout from the forces of remote earthquake
down relatively quickly without developing the faults, or inadvertent damage from man-made
vacuum or surge pressures that promote erosion events. Such is the case with the Mountain Tunnel
of the lining. rehab. The 2017 inspection found the existing

T&UC ® JUNE 2018 25


tunnel lining to be an average of 35 cm (14 in.) for budget and operation minded owners.
thick. The rehab will structurally repair all the
defects and the entire 18 km (11 miles) of lined Conclusion
section will be contact grouted to make sure the Done right, the rehab tunnel project can result in a
lining is in intimate contact with the surrounding renewed tunnel that can match the 100-year service life
granitic rock. By doing so, any need for repairs and other performance standards of a new tunnel but at a
after a catastrophic event will be mitigated and fraction of the cost and schedule. The new tunnel can be a
the forecast interruption for repairs should be less more glamorous project to design and construct, but the
than 90 days. renewed tunnel will typically require a less complicated
• Seismic reliability: This standard requires the and time-consuming environmental review process and
reliable delivery of the minimum flow without fewer environmental permit conditions for completion.
interruption following a near tunnel seismic event. In the case of Mountain Tunnel, the rehab project can
This is the easiest of the performance standards to almost match the required flow capacity of the new tunnel
satisfy in that the tunnel does not cross any active with the same accommodations for operational flexibility,
earthquake faults and the Sierra foothills location planned and unplanned outages, and seismic reliability.
of the tunnel is in a region of low seismic activity. As with any new or renewed tunnel, the key to facility
longevity, without major headaches, is the attention and
Recommended inspections and maintenance commitment to performing periodic inspection and
Comprehensive and competent repairs and contact maintenance. A well-designed and executed periodic repair
grouting during the rehab construction should produce program with the newest engineering and construction
a tunnel whose lining is free from defects and with a methods can yield similar results in a fiscally responsible
renewed service life that compares with a new tunnel way. The rehab option will successfully preserve the
lining. It is important for owners to support the renewed SFPUC’s Mountain Tunnel and meet its needs for many
tunnel with proper, periodic inspection monitoring, water years to come. n
quality testing and maintenance. The inspection should
be conducted at reoccurring intervals of between five and References
20 years, as required by tunnel condition. The inspections McMillen Jacobs Associates, 2017. Mountain Tunnel Improvements
may have to be conducted at shorter intervals if it is noted Project Alternatives Analysis Report, prepared for the San Francisco
during the initial inspection that the erosion is occurring Public Utilities Commission, July, Draft Report.
more aggressively than anticipated. The key is to catch McMillen Jacobs Associates, 2017. Mountain Tunnel Improvements
Project Inspection Report, prepared for the San Francisco Public Utili-
any new defects in the lining while they are still incipiently
ties Commission, June, Final Report.
developing. Such defects should be small in scope and McMillen Jacobs Associates, 2017. Mountain Tunnel Improvements
more easily addressed in subsequently scheduled tunnel Project Condition Assessment Report, prepared for the San Francisco
shutdowns that are well planned and budgeted in advance. Public Utilities Commission, June, Draft Report.
If the repairs can be scheduled periodically at intervals of McMillen Jacobs Associates and Black & Veatch, 2017. Mountain Tunnel
no more than 20 years or concurrent with the inspections, Improvements Project Hydraulic Analysis for Conceptual Improvement
then the scope of repairs will be less significant, cost less Alternatives, prepared for the San Francisco Public Utilities Commis-
per shutdown, and be able to be accomplished in fewer sion, June, Final Report.
shutdowns of shorter duration, with better control of the AECOM, 2017. Opportunities and Constraints Report for the Mountain
scheduling and costs of the work—all good considerations Tunnel Improvements Project, prepared for the San Francisco Public
Utilities Commission, July, Environmental Report.

Coming Events
2018 Cutting Edge 2019 Fox Conference
October 28-31 2018 January 29, 2019
Loews Atlanta Hotel Graduate Center, City University of New York,
1065 Peachtree St. NW 365 Fifth Ave., New York, NY 10016
Atlanta, GA

For additional information contact: Meetings Department, SME,


phone 800-763-3132, 303-948-4200, fax 303-979-4361,
email sme@smenet.org, http://www.smenet.org/full-calendar

26 JUNE 2018 T&UC ®


FEATURE ARTICLE
Use of innovative techniques and tools
on a massive tunnel project
T
here’s no fast way to add more than four miles of track, Workers use a Brokk 400D with a TEI 350 rock drill to
most of it underground, to the Sound Transit Link drill through a tunnel wall. Crews used the attachment to
drill holes for steel spiles, well points and freeze pipes.
Light Rail system in the Seattle area. But increasingly
busy traffic through a number of neighborhoods made it
necessary. That’s the challenge a joint venture of several
tunneling contractors faced when starting its portion of the
$1.9 billion Northgate Link Extension in 2013, and the project
is still keeping them busy three years later. Completion will
mean just a 14-minute ride from Northgate to downtown for
an extra 60,000 passengers by 2030. The transit lines will join
58 km (36 miles) of new and under-construction light rail
lines running north, east and south from Seattle.
Voters, tired of long commute times, approved the
project, a key part of Seattle’s regional mass transit system,
in 2008. The extension is part of a plan adopted by the Sound
Transit board in 1996 to connect the region’s major activity
centers. The Northgate project is meant to relieve one of
the area’s most congested traffic areas by connecting the
Northgate, Roosevelt and University District neighborhoods
to existing routes including downtown Seattle and SeaTac disrupted the experiments. To lower noise levels throughout
airport. the tunnel and to avoid disturbing the university, project
Sound Transit dedicated more than a quarter of the leaders incorporated new sound abatement methods. JCM
project’s estimated expense — $440 million -— to general brought in seven Metalliance rubber-tired vehicles that
contractor JCM Northlink LLC to handle the tunnel segment. stretched 16 m (52 ft) long but were just 2 m (6 ft) wide
JCM is a joint venture formed in 2013 between Jay Dee and could handle 41 t (45 st). Crews could use them as an
Contractors of Livonia, MI, Frank Coluccio Construction alternative to a locomotive on rail for transportation in
of Seattle, WA and Michels Corp. of Brownsville, WI. The and out of the tunnel. In addition, the vehicles work with a
contractors regularly collaborate on large-scale projects and number of attachments, including high-car platforms and
brought experience working on a different section of the concrete distribution attachments, reducing the need for
extension they completed in 2013. additional equipment.
JCM project leaders knew immediately that the schedule Crews started the tunneling portion of the project by
would be demanding. They had to work around the clock, six digging two large vertical shafts and a tunnel portal to
days a week to meet deadlines. The extension runs through initially be used as access points for tunnel boring machines
highly populated areas, meaning contractors had to follow (TBMs), service work, material removal and supplies. The
strict city noise restrictions between 10 p.m. and 7 a.m. Plus, shafts will be converted to light rail stations when the project
supervisors needed to manage the scheduling of nearly 250 is complete. JCM used a Kroll 15000 tower crane with 4,900
employees to keep work running smoothly. kg (108,000 lbs) of lifting capacity, the third largest capacity
“We had eight different operations and four different in North America, to lift stacks of tunnel liner segments,
subcontractors trying to work in one tunnel,” said Chris equipment and material in and out of the 31-m (100-ft) deep
Wood, JCM site project superintendent. “It’s important that shafts.
we keep work linear. That’s the biggest challenge: keeping a Once shaft construction was well underway, JCM began
path in and out so you can pour concrete, keep electricians digging the twin-bore tunnels from Northgate to the already-
and carpenters going, and accomplish everything else.” excavated University of Washington station and existing light
Project planners also realized they wouldn’t be able to rail track. Crews used Hitachi Zosen (Hitz) and Robbins
use the same equipment they had in the past for tunneling TBMs to simultaneously dig two parallel 7-m (21-ft) diameter
projects. The tunnels would run directly below the University tunnels. The machines stretch about 122 m (400 ft) long and
of Washington, which has long-standing, ongoing sensitive advanced an average of 9-15 m/d (30-50 ft/day).
science projects. The train and tracks JCM used for past The tough soil didn’t make the job easy. The TBMs hit
projects to transport crews and supplies through tunnels are harder ground than anticipated, slowing down the machines
loud and produce significant vibrations, which would have as cutters and scraper heads wore down or broke against

T&UC ® JUNE 2018 27


JCM crew members stand in front of one of the tunnel parts and fixing the unit right away.”
boring machines as it sits idle. Crews used Hitachi Zosen JCM worked on multiple cross passages at a time. Crews
(Hitz) and Robbins TBMs simultaneously.
typically started the passages by pairing the Brokk 400D with
a TEI 350 rock drill attachment drilling 10-cm (4-in.) diameter
holes for well points and 6-m (20-ft) steel spiles. These were
installed about every foot to create a canopy to secure the
ground and protect workers from falling debris. Once the spile
canopy was completed, JCM needed the maneuverability and
compact size of the Brokk 260 paired with an Atlas Copco
SB 302 hydraulic breaker to break through the tunnel wall.
After getting through the concrete, JCM brought back the
B400D to complete the passage, often alternating between
an Atlas Copco SB 552 hammer to break through the ground
and a Simex road header to mill the walls. Workers used mini
excavators to remove material and load it into dump trucks,
and crews coated the walls with shotcrete to keep them in
place. Each passage took seven to nine weeks to complete,
including waterproofing, installing rebar, pouring the invert
and headwalls, and finalizing 82 to 100 m (90 to 110 yd) of
fiber-reinforced concrete.
Staying true to its “Rain City” nickname, Seattle gave
JCM much more ground water than expected, causing
complications. The TBMs had earth pressure balance systems
that pushed water away, allowing technicians to do inspections
and service cutter heads, but the cross passages weren’t as easy.
The water volumes that needed to be pumped at some of the
cross passages was far greater than what the municipal system
cobbles and boulders. could handle. Project leaders knew freezing the soil was a
As tunneling moved along, crews started digging 23 solution that would prevent structural issues and ensure safety
cross passages between the tunnels. The 5- to 6-m (16- to 20- during excavation. They originally planned to freeze five of the
ft) long openings house electrical rooms and serve as safe cross passages but expanded that to 10 after encountering the
havens and escape routes for train passengers in case of an excess water. Crews again used the Brokk 400D, this time to
emergency. drill holes for freeze pipe they installed within the haunches of
Cross passages are typically constructed using pneumatic the cross passages. They then pumped the pipes with a brine
tools and mini-excavators, but about five years ago, on solution, chilling the soil to a frozen -12 °C (10 °F) and making
another section of the light rail expansion, JCM began using it an easy target for a Brokk machine’s hydraulic breaker.
a different approach: Brokk remote-controlled demolition “The freezing technique is invaluable to keeping work
machines. They made the switch to limit worker exposure to going quickly and safely,” Wood said. “It is very effective. The
harsh tunnel environments and reduce the inevitable fatigue frozen sand ends up being like concrete until it thaws. This
and potential injuries that come with using handheld tools all makes it really easy to chip away at without worrying about
day. The remote-controlled technology also allows workers to stability issues.”
operate the units from a safe distance, minimizing exposure After three years of tunneling with the TBMs, JCM
to falling debris. JCM owned a Brokk 260 from an earlier completed the final breakthrough on Sept. 1, 2016. In total,
project but with the increased demands and tight deadlines crews removed about 554,000 m3 (725,000 cu yd) of material
of the Northgate project, they decided to invest in two larger — enough to fill about 242 Olympic-sized swimming pools.
Brokk 400Ds and rented another in order to maximize JCM was to continue follow-up work until February 2018. The
productivity. The equipment’s efficiency and precision sped next contractors will continue work on the stations, rail and
up the excavation portion to less than three weeks, shaving electrical components in preparation for project completion in
off more than a week of work compared to handheld tools. 2021.
In addition, the machines held up well in tough tunneling The transit plan approved by voters in 2013 also included
conditions. an 13.7-km (8.5-mile) above-ground light rail extension from
“I tell everybody that anything that goes down into that Northgate to Lynnwood. Project construction is expected to
tunnel will get broken. I can give these guys a glass of water begin in 2018 with a goal of service starting in 2023. Voters
and somehow they’ll break the water,” Wood said. “But the approved another expansion including 100 km (62 miles) of
Brokk remote-controlled machines withstand the conditions. new light rail and other transit additions in November 2016.
When we do have issues, Brokk field mechanics work with The project is just one of a series of planned improvements, all
our mechanics to limit detrimental downtime by bringing in part of an overall goal to relieve commuter headaches. n

28 JUNE 2018 T&UC ®


TUNNEL D E M A N D

COMPILED BY JONATHAN KLUG, DAVID R. KLUG & ASSOCIATES

TUNNEL NAME OWNER LOCATION STATE TUNNEL LENGTH WIDTH BID


USE (FEET) (FEET) YEAR STATUS

Gateway Tunnel Amtrak Newark NJ Subway 14,600 24.5 2019 Design study
2nd Ave. Phase 2 NYC-MTA New York NY Subway 16,000 20 2020 Under design
2nd Ave. Phase 3-4 NYC-MTA New York NY Subway 105,600 20 2020-25 Under study
Water Tunnel #3 NYC-DEP New York NY Water 84,000 20 2020 Under study
Stage 3 Kensico
Flushing Bay CSO NYC_DEP New York NY CSO 13,200 20 2026 Under study
Tunnel
Cross Harbor Freight NYC Reg. Develop. New York NY Rail 25,000 30 2022 Under study
Tunnel Authority
Narragansett Bay Narragansett Bay Providence RI CSO
CSO Phase III - Commission
Pawtucket Tunnel 13,000 28 2020 Under design
Conveyance Tunnel 8,800 10 2024 Under design
Amtrak B&P Tunnel Amtrak Baltimore MD Rail 10,000 30 2018 Under design
Thimble Shoal Chesapeake Bay Chesapeake VA Highway 5,700 45 2016 Dragados/
Parallel Tunnel Bridge & Tunnel Dist. Schiavone
awarded
Hampton Roads Virginia DOT Hampton VA Highway 7,500 42 2018 Shortlist
Bridge-Tunnel Project Roads announced
Northeast Boundary Tunnel DC Water and Sewer Washington DC CSO 17,500 23 2017 Impregilo/Healy
Authority JV awarded
Potomac River CSO Tunnel DC Water and Sewer Washington DC CSO 4,500 33 2022 Under design
Authority
Olentangy Relief City of Columbus Columbus OH Sewer 58,000 14 2017 Under design
Sewer Tunnel
Alum Creek Relief City of Columbus Columbus OH Sewer
Tunnel Phase 1 30,000 18 2018 Under design
Phase 2 21,000 14 2019 Under design
Westerly Main NEORSD Cleveland OH CSO 12,300 24 2020 JayDee/
Storage Tunnel Obayashi
awarded
Shoreline Storage NEORSD Cleveland OH CSO 16,100 21 2021 Under design
Tunnel
Shoreline NEORSD Cleveland OH CSO 11,700 9.5 2022 Under design
Consolidation Tunnel
ALCOSAN CSO
Ohio River Allegheny Co. Pittsburgh PA CSO 10,000 30 2019 Under design
Allegheny River Sanitary Authority 41,700 30 2020 Under design
Mononghahela River 53,900 30 2021 Under design
I-75 modernization Michigan DOT Detroit MI CSO 22,000 14 2018 Bid date
project 8/21/2018
KCMO Overflow City of Kansas City Kansas City MO CSO 62,000 14 2018 Under design
Control Program

Ship Canal Water Quality Seattle Public Utilities Seattle WA CSO 14,250 19 2018 Under design
Project

30 JUNE 2018 T&UC®


F O R E C A S T
To have your major tunnel project added to the Tunnel Demand Forecast, or to update information on a listed project,
please contact Jonathan Klug at jklug@drklug.com.

TUNNEL LENGTH WIDTH BID


TUNNEL NAME OWNER LOCATION STATE STATUS
USE (FEET) (FEET) YEAR
West Seattle to Sound Transit Seattle WA Transit 10,500 18 2022 Under design
Ballard Extension
L.A. Metro Westside Los Angeles MTA Los Angeles CA Subway Tutor Perini/O&G
Phase 2 26,500 20 2016 JV awarded
Phase 3 26,500 20 2017 Proposals 12/11/17
Speulvada Pass Corridor Los Angeles MTA Los Angeles CA High/Trans. 55,500 60 2018 Under study
Northeast Interceptor LA Dept. of Water Los Angeles CA Sewer 18,500 18 2014 Delayed
Sewer 2A and Power indefinitely
River Supply Conduit LA Dept. of Water Los Angeles CA Water 13,500 12 2015 Bid submitted
- Unit 7 and Power
JWPCP Effluent Outfall Sanitation Districts Los Angeles CA Sewer 37,000 18 2015 Bid date 4Q 2018
Tunnel project of LA
Two Mile Bar Tunnel Oakdale Irrigation Oakdale CA Water 5,950 11.5x13 2017 SMCI low bidder
Freeway 710 Tunnel CALTRANS Long Beach CA Highway 26,400 38 2016 Under design
BDCP Tunnel #1 Bay Delta Sacramento CA Water 26,000 29 2018 Under design
BDCP Tunnel # 2 Conservation Plan 369,600 35 2019 Under design
SVRT BART Santa Clara Valley San Jose CA Subway 22,700 20 2016 Single tunnel
Trans Authority option approved
Silicon Valley Clean Silicon Valley Silicon Valley CA CSO 17,500 13 2017 Barnard/Bassac JV
Water Tunnel Clean Water awarded
Coxwell Bypass Tunnel City of Toronto Toronto ON CSO 35,000 12 2015 JayDee/Michels/
program C&M McNally Low
Bidder
Highway 401 Rail Metrolinx Toronto ON Subway 580 35x28 2017 EllisDon/Strabag
Tunnel JV awarded
Keswick Effluent Outfall City of Toronto Toronto ON CSO 11,600 23 2018 Under design
Yonge St. Extension Toronto Transit Toronto ON Subway 15,000 18 2016 Under study
Commission
Taylor Massey Tunnel City of Toronto Toronto ON CSO 20,000 18 2018 Under design
Inner Harbour West City of Toronto Toronto ON CSO 18,400 19 2021 Under design
Scarborough Rapid Toronto Transit Toronto ON Subway 25,000 18 2018 Under design
Transit Extension Commission
REM Transit Tunnel City of Montreal Montreal QC Subway 27,000 22 2017 SNC/Dragados/
Aecon JV Awarded
Newfoundland- Gov. of Newfoundland NL Transit 56,000 40 2020 Under study
Labrador Fixed Link Newfoundland/Lab
Green Line LRT City of Calgary Calgary AB Transit 26,250 20 2018 Under design
Second Narrows Tunnel City of Vancouver Vancouver BC CSO 3,600 14 2013 Shortlist announced
Annacis Island Outfall City of Vancouver Vancouver BC Water 8,000 10 2017 Shortlist announced
Burnaby Mountain Kinder Morgan Vancouver BC Oil 8,000 12 2017 Under design
Broadway Sky train Trans Link Vancouver BC Subway 25,000 18 18 Under design
extension

Northern Gateway Enbridge Northern Kitimat BC Oil 23,000 20 2014 Under design
Hoult Tunnel

T&UC ® JUNE 2018 31


uca of sme NEWS
AWARDS

UCA presents four awards at NAT


Lifetime Achievement Award to Harvey W. Parker

T
he Lifetime Achievement from Harvard ods and monitoring techniques, and
Award recognizes outstanding University in 1967, innovative tunnel linings and tunnel
achievements in the under- and his Ph.D. in support materials. He is the author or
ground design and construction in- civil engineering, co-author of more than 60 publica-
dustry. The outstanding achievements with a minor in tions. He has consulted on world-class
recognized have been accomplished geology, from the projects, including transit systems and
through design or construction of civ- University of Il- water, sewer, highway and hydroelec-
il underground facilities. The winners linois in 1976. His tric tunnels.
have contributed significantly to the specialties are tun- Parker has served as chair of
education, planning, design, construc- nel and geotechni- PARKER UTRC, USNC/TT and ACI under-
tion or rehabilitation of tunnels and cal engineering. He is a Fellow of the ground shotcrete committees. He has
underground facilities. This includes American Society of Civil Engineers also served on the executive council
seeking advances in new methods and (ASCE), a member of the Moles and of the International Tunnelling and
materials, and advancing the public is registered as a civil and a geotech- Underground Space Association
understanding and concurrence with nical engineer. He holds a Diplomate (ITA), represented ITA at the United
the beneficial uses of underground in geotechnical engineering from Nations and was ITA president for
space. ASCE. Parker was involved in the three years. He also served in senior
Harvey W. Parker received his pioneer development of steel-fiber management positions and helped
B.S. in civil engineering from Auburn reinforced shotcrete, improved geo- develop engineering staff and new
University in 1957, a masters degree technical tunnel investigation meth- markets for several firms.

Outstanding Individual Award to David R. Klug

T
he Outstanding Individual ing coordination in the United States and Canada. In
Award recognizes those individ- and distribution conjunction with his European clients,
uals, including contractors, engi- of products and he conducts industry outreach semi-
neers, owners and suppliers, who have specialty services nars to Europe for people from the
made significant contributions to the for precast seg- U.S. and Canadian tunneling industry
field of tunneling and underground mental tunnel to study European methods of tunnel
construction and to the Underground lining, NATM, construction and contract delivery
Construction Association (UCA). soft-ground and practices. To date, Klug has conducted
David R. Klug is the president conventional tun- 12 European tunnel seminars.
of David R. Klug and Associates nel construction KLUG Klug received a bachelor of sci-
Inc. and Klug Construction Systems practices inclusive of initial support ence degree from West Liberty State
LLC based near Pittsburgh, PA. The systems, final lining reinforcement College. He is a past chair of the
companies provide international and products and components for one- UCA (2009-2011), a member of the
national manufacturer representative pass precast tunnel linings. UCA Fox Conference Committee, the
services to the underground heavy Klug has more than 40 years of Moles and the Associated General
civil and mine construction industries. industry involvement in many of the Contractors of America affiliate of
They also specialize in the market- major tunnel programs constructed Western Pennsylvania.

Outstanding Educator Award to Priscilla P. Nelson

T
he Outstanding Educator individuals have also made significant head of the Department of Mining
Award is presented by the contributions to the industry through Engineering at the Colorado School
UCA Executive Committee their academic interests, as well as of Mines. She previously was provost
to professors and teachers who have through the introduction of many stu- at the New Jersey Institute of Tech-
had an exceptional career in academia dent graduates into the industry. They nology, program director and senior
and education in the areas of under- are nominated by their peers. advisor at the U.S. National Science
ground design and construction. These Priscilla P. Nelson is professor and Foundation, and professor in civil

32 JUNE 2018 T&UC ®


uca of sme NEWS
AWARDS

engineering at the University of Texas ciation, and a Fel- and the 2011 ASCE Henry L. Michel
at Austin. She has worked for the U.S. low of the Ameri- Award. In 2016, she was appointed
Department of Energy and the state can Association for chair of the Mine Safety and Health
of Texas on the superconducting super the Advancement Research Advisory Committee of
collider project, and she served two of Science. She is NIOSH.
terms on the U.S. Nuclear Waste Tech- a member of the Nelson received a B.S. degree in
nical Review Board. Moles and is an geology from the University of Roch-
Nelson is a Distinguished Member Eminent Engineer ester, an M.S. in geology from Indiana
of the American Society of Civil En- with Tau Beta Pi. University, an M.S. in structural engi-
gineers (ASCE), former president of She received the NELSON neering from the University of Okla-
the Geo-Institute of ASCE, a lifetime Kenneth Andrew homa and a Ph.D. from Cornell. She
member, first president and Fellow of Roe Award from the American As- has published more than 150 technical
the American Rock Mechanics Asso- sociation of Engineering Societies and scientific publications.

Project of the Year Award to Northern Boulevard Crossing, Queens, NY to


Schiavone/Kiewit, AJV, WSP/Parsons Brinckerhoff and NYCMTA Capital Construction

T
he Project of the Year Award itself, and east/westbound elevated many complicating elements that had
recognizes an individual or a BMT tracks, all heavily traveled. Pub- to be overcome in creating the fro-
group that has shown insight lic safety during the work was critical, zen arch and constructing the tunnel,
and understanding of underground and protecting these structures from including underpinning the elevated
construction in a significant project, movement during the performance of rail line and penetrating the existing
which may include a practice, develop- the work was considered paramount. four clusters of 16 pipe piles, which
ing concepts, theories or technologies However, site restrictions that includ- were indicated without any detail on
to overcome unusual problems within ed groundwater drawdown limitations old structural drawings. There were
a project. and a moratorium on vertical drilling unique and previously unattempted
The construction of the Northern from Northern Boulevard or from settlement and heave-control mea-
Boulevard Crossing, characterized by the overlying subway tunnel severely sures performed in conjunction with
complex soil geometry, a high water limited available options. A canopy a frozen ground improvement to pro-
table and an active, triple-level transit of frozen ground installed above the tect the pre-existing transit structures.
corridor above the tunnel alignment, tunnel alignment to provide the re- Other challenges included waterproof-
is recognized as the most technically quired ground water control, as well ing, which was installed in stages due
challenging aspect of New York City as a structural arch for the sequential to the underpinning piles, and the final
MTA’s East Side Access project. The tunneling operation, was considered lining, which was constructed using
Crossing, approximately 12-m (40-ft) the only technically viable option. This shotcrete and massive ring steel.
high by 18-m (60-ft) wide, 38-m (125- option was suggested by the project The complex and challenging proj-
ft) long and 26 m (85 ft) below ground designer and adopted by the design- ect was marked by extensive preplan-
level, was constructed using the Se- build contractor. ning, stringent controls, a sophisticated
quential Excavation Method. The project was the first sequen- monitoring program and a cooperative
The pre-existing transit corridor tially excavated, soft-ground tunnel in project team effort, which resulted in
consisted of an active five-track IND New York City. The size of the exca- problem-free tunnel excavation with
subway box just a few feet above the vated tunnel completed beneath a fro- no appreciable movement of the over-
tunnel crown, the Northern Boulevard zen arch is unprecedented. There were head structures. n

International tunneling awards to Southland Holdings

S
outhland Holdings LLC re- million) for the Kaneohe/Kailua Sew- Tunnel, Austin, TX, was lauded for
ceived two international tun- er Tunnel Project and the 2017 Out- project innovations related to unique
neling awards from New Civil standing Contribution to a Project environmental conditions and endan-
Engineer. The company received the Award for the Jollyville Transmission gered cave-dwelling invertebrates en-
2017 Tunneling Project of the Year Main Tunnel. countered in the project area within
Award (project of more than $150 The Jollyville Transmission Main the Balcones Canyonlands Preserve.

T&UC ® JUNE 2018 33


uca of sme NEWS
AWARDS

The $87-million, 3-m (10-ft) diameter Jollyville Reservoir. A public outreach to groundwater and surface water.
tunnel transports water more than 107 program contributed to community The Kaneohe/Kailua Sewer Tunnel
m (350 ft) below ground from Austin’s support and positive client feedback Project successfully implemented the
Water Treatment Plant No. 4 to the regarding zero environmental impacts first use of a tunnel boring machine in
Hawaii and on the island of Oahu. The
project conveys wastewater from the
Kaneohe waste water pretreatment
facility to the Kailua regional waste
water treatment plant to prevent
overflows and spills during heavy rain
events.
Working within unique island
conditions, the Southland/Mole Joint
Venture coordinated closely with
state, city and county environmental
permitting and enforcement agen-
cies to ensure minimal impact to the
project’s surrounding areas. Ground
water controls, community engage-
ment, and equipment procurement
The Kaneohe/Kailua Sewer Tunnel Project final tunnel liner consisted of 3-m
and logistics were also significant fac-
(10-ft) Hobas glass fiber-reinforced thermosetting resin pipe grouted in place. tors for success. n

STUDENT OUTREACH

Growing the next generation of tunnelers


by Paul Schmall, UCA of SME Student Outreach Chair

I
had breakfast with Mesut Pervi- whole class were in awe. He recount- of engineering students. Tunneling is
spour a couple of weeks ago. He ed to me how Dowey used the site not taught in the typical undergradu-
teaches geotechnical engineering photos to bring the project to life for ate civil engineering program. Only
and construction at Lehigh University. the students. I don’t think Dowey re- the Moles or the Beavers reach a
Ted Dowey had just visited Pervi- ally knew how impactful his one hour significant number of undergraduate
spour to do a lecture on the Rondout lecture was. And most of us don’t civil engineering students to expose
Tunnel Project for his construction know how jaw-dropping impressive them to the world of underground
engineering class. Pervispour and the underground construction work is to construction, and that is still a limited
students who number of students. We are trying
have never to change that. By polling university
seen it. professors, we have learned that live,
The UCA on-campus presentations, such as Ted
of SME Dowey’s at Lehigh, project site visits,
Student Out- and teaching the teachers are the
reach has things we can do to make a difference.
one overrid- And that is our focus now.
ing mission Two years ago, we forged a stra-
— to attract tegic alliance between the UCA and
students to the ASCE Geo-Institute. ASCE has
careers in direct access to all of the civil engi-
underground neers nationwide, and the UCA has
construction. the expertise. It is a complementary
The hard part and mutually beneficial relationship.
is getting that Since that time, we have coordinated
across to the several programs: university speakers,
Three tunneling students from Oregon Tech on a tour of the current (and tunnel tours and a teach-the-teachers
Chinatown Station Project in San Francisco, CA. future) crop workshop.

34 JUNE 2018 T&UC ®


uca of sme NEWS
STUDENT OUTREACH

University speakers cessful, annual Moles Students’ Day, Our young members section may be
The number one thing that all the Tunnel Tours program aims to small, but it’s active. They are work-
professors want is industry people to provide the experience to students ing toward developing close relation-
come to their classes and show their nationwide. ships with colleges and universities
students what the real world is like. So far, we have hosted tours for with strong programs, and they host
University ASCE chapters are always Columbia, the University of Califor- monthly online webinars for younger
looking for good speakers with inter- nia Davis and Oregon Tech to the engineers on a range of topics. One
esting project case histories. Central Subway Chinatown Station of their goals is to provide better
To date, we have dispatched Bar- Project in San Francisco; the Rose- networking and job-seeking oppor-
ry Doyle of MWH Global to the Mil- Hulman Institute of Technology, the tunities for young professionals. They
waukee School of Engineering, Nick University of Michigan and Purdue are on board and enthusiastic about
Maynard of Citizens Energy Group University to the White River Tunnel college-based presentations, and they
to Purdue, Amanda Elioff of Parsons in Indianapolis; North Carolina State are our first line of communication in
Brinckerhoff to UCLA, Adam Curry University to the MD355 (BRAC) that respect. This goal is already pay-
and James Myers of Moretrench to Crossing in Bethesda, MD; and ing dividends. The UCA scholarships,
Widener College, Allen Cadden and Drexel University to Randall’s Island for example, have truly taken off in
Joe O’Carroll of Parsons Brincker- in New York City. Special thanks goes the last couple of years.
hoff to the University of San Diego, to Liza Dwyre and Tom Pennington
Jeremy Kosegi of Citizens Energy who have been our primary hosts and What can I do to get involved?
Group to the University of Illinois, to Barnard Construction, Kiewit and If you have felt that somebody in
Gregory Raines of Stantec to the Atkinson. your past was instrumental in shaping
Polytechnic University at Pomona, your career, please consider passing
Rozbeh Moghaddam of GRL Engi- Teach the teachers that forward.We all have the duty to
neers to Texas Tech and, of course, We are fortunate to have Mike replicate ourselves at least once. We
Ted Dowey of NYC DEP to Lehigh Mooney from the Colorado School have a solid start but welcome more
University. of Mines involved with the Student member participation.
The response everywhere has Outreach program. With one foot There is an impressive roster of
been tremendous. “I cannot express in academia and one in the industry, subject matter experts to do presen-
how unique of an opportunity this Mooney is uniquely capable of being tations, but we lack qualified young
was for our student chapter” is a typi- a liaison between the students and engineers who are seasoned enough
cal response we hear. We have several the industry. He has been spearhead- to know their subject well yet young
more lectures scheduled for the fall. ing the first teach-the-professors enough to relate directly to students.
workshop that will take place at NAT. Energy and enthusiasm are especially
Tunnel tours The intent of this program is to col- needed, but we can use anybody
The Tunnel Tours program expos- lectively develop tunneling-focused (older members included) that has
es the students to life underground, content that can be woven into the a strong connection with any civil
so to speak. The program provides an undergraduate geotechnical, struc- engineering program. There is a need
opportunity for a small group to tour tures and construction courses, edu- for people in the heartland of the
an active tunneling project, which cate the professors in underground country, too. It seems that most of the
most, if not all, of the students have construction, and provide them with a expertise is on the East Coast and the
never seen. With the participation suite of instructional tools. Our hope West Coast, but a lot of the schools
of many industry professionals will- is to equip the people on the front are in the middle.
ing to give their time and expertise, lines every day (the professors) to More tunneling projects need to
the tours include an above-ground promote Ted Dowey-like jaw drop- open their doors to a handful of stu-
presentation as well as lunch with the ping excitement in the classroom. dents at a time. If you have a project
members of the tunnel design and that could accommodate a couple of
construction teams. This gives the stu- UCA Young Members tours a year, please consider it. Noth-
dents a chance to engage with experts A lot of people have already been ing is more effective than seeing the
in the field of underground construc- working hard behind the scenes or real thing.
tion who can give them a true picture have committed to be a part of the If you can be a part of this ex-
of what will hopefully become their future program. The UCA Young citing and worthwhile initiative, or
chosen career. While The Moles pro- Members group is a great example would just like more information,
vide a similar, positive experience under the leadership of Shannon please contact me at pschmall@more-
in the northeast with their very suc- Goff, Tony Bauer and Erin Clarke. trench.com. n

T&UC ® JUNE 2018 35


uca of sme NEWS
NEW MEDIA

North American Tunneling 2018 Proceedings


2018, edited by Alan Howard, tems, and other forms of sustainable
Brett Campbell, Derek Penrice, Mat- underground infrastructure.
thew Preedy and Jim Rush, published With every conference, the num-
by SME, 12999 E. Adam Aircraft ber of attendees and breadth of top-
Cir., Englewood, CO 80112, USA, ics grow. The authors — experts and
www.smenet.org/store, email books@ leaders in the industry — share the
smenet.org, phone 303-948-4237, 800- latest case histories, expertise, lessons
763-3132 x237, 1,160 pp., ISBN 978-0- learned, and real-world applications
87335-466-0, $149 member; $129 stu- from around the globe.
dent member; $199 list, also available Crafted from a collection of 126
as an eBook. papers presented at the conference,

T
he North American Tunnel- this book takes you deep inside
ing Conference is the premier the projects. It includes challenging
biennial tunneling event for design issues, fresh approaches on
North America, bringing together performance, future projects, and
the brightest, most resourceful and industry trends as well as ground
innovative minds in the tunneling movement and support, structure
industry. It underscores the important analysis, risk and cost management,
role that the industry plays in the rock tunnels, caverns and shafts, TBM
development of underground spaces, technology, and water and waste wa-
transportation and conveyance sys- ter conveyance. n

SHORT COURSE

CSM offers tunneling fundamentals short course

C
olorado School of Mines tions in the morning and early af- students. For more information and
(CSM) will offer its interna- ternoon with hands-on laboratories to register, visit http://csmspace.com/
tionally acclaimed Tunneling and demonstrations each afternoon events/tunneling.
Fundamentals, Applications and In- in the school’s world-class tunneling The Colorado School of Mines
novation Short Course Oct. 15-18, laboratories. The labs cover a wide Center for Underground is a col-
2018. range of emerging advances includ- laborative, multidisciplinary group
The three-and-a-half day course ing soil conditioning, slurries, grouts, of faculty and students from civil
weaves presentations of emerging in- rock cutting, abrasivity and wear, engineering, geology and geological
novations in tunneling methods, ma- blasting, geotechnical investigation, engineering, mining engineering and
terials and technology with instruc- TBM simulation, shotcrete, 3D mod- mechanical engineering, as well as
tion on key principles of design and eling and BIM. geophysics and computer science,
construction in all ground types and The course will be held on the with a collective interest in educa-
across all excavation methods. CSM campus in Golden, CO and tion and research in underground
Taught by experts from industry offers a one-of-a-kind learning expe- engineering. For more information
and CSM faculty, this course blends rience and great networking oppor- about the center, visit http://under-
classroom instruction and presenta- tunities with both industry and CSM ground.mines.edu. n

PERSONAL NEWS
DON PAINTER, a senior tunnel Kailua Sewer Tunnel. He has more for the H3/Haiku Tunnels on Oahu.
construction professional, has re- than 43 years of experience, includ- He has extensive experience with
joined Brierley Associates and will ing almost 20 years working with conventional and tunnel boring ma-
head its new office in Honolulu, HI. Brierley Associates. He was senior chine (TBM) tunnel construction for
Painter recently served as the proj- tunnel consultant with Brierley from wastewater, water and transportation
ect manager for Southland Mole JV 2005-2008 and previously served as projects utilizing open (main beam)
during construction of the Kaneohe the general tunnel superintendent shielded TBMs. n

36 JUNE 2018 T&UC®


uca of sme NEWS
OBITUARIES

GEORGE D. YOGGY
An Appreciation by David R. Klug

O
n March 27, 2018, the un- In 1986, his companies were dustry and a desire to learn. Hav-
derground construction acquired by Master Builders Inc. ing knowledgeable and dedicated
industry lost a leader and He and Anne moved to Cleve- people involved on industry techni-
a gentleman with the passing of land, OH, where he created the cal committees and associations is
George D. Yoggy after an extended Underground Construction Group most critical to their success, and
battle with cancer. Born in Morris, (UCG) for Master Builders. As the Yoggy gave of his time freely to
PA on Oct. leader of the UCG, he transformed such endeavors.
16, 1937, Yog- the group into the domestic and As a member of the American
gy grew up in international leader in the devel- Concrete Institute Committee 506,
Johnson City, opment of new concrete/shotcrete Yoggy was a leading advocate for
NY, attended technologies and material placing proper shotcrete specifications.
Wheaton Col- systems. Yoggy was recognized And as a founding member of the
lege and was internationally for the successes American Shotcrete Association
member of created by his group, but he always (ASA), which was formed in 1998,
the U.S. Navy acknowledged that this could not he helped to make the organiza-
Reserves as a have been accomplished without tion the leading industry advocate
Seabee. the high caliber people that were for the use and proper applica-
Yoggy part of his UCG team. Many of tion of shotcrete for a variety of
YOGGY
always had these people now have leadership structural concrete applications.
a love for heavy construction and roles in the underground construc- His involvement with the develop-
the satisfaction derived from see- tion industry. ment of the ASA/ACI Shotcrete
ing complex challenges being met, Yoggy was involved in many Nozzleman Certification program
beginning with his career with a major underground infrastructure in 1999 helped to assure that the
local contractor in 1956. He devel- projects during his long career program got off to a proper start.
oped an early expertise in shotcrete with the implementation of engi- He was always willing to share his
design and material application neered high-performance shotcrete knowledge and experience and was
systems to address specific project systems that accompanied the a mentor to several of ASA mem-
requirements. In 1968, he started his introduction of NATM/SEM con- bers. His strong impact on the ASA
own company, Concrete Equipment struction practices to North Amer- was acknowledged, as several past
Corp., and in 1978 he started Shot- ica. These include the WMATA presidents of the ASA, as well as
crete Plus Inc. One of his first major Program in Washington, DC; the the executive director, attended his
projects was the shotcreting of the Sound Transit Program in Seattle, memorial service in Allentown, PA.
supportive excavation “bathtubs” WA; the Pennsylvania Turnpike From 1999 to 2005, Yoggy was
for the original World Trade Center Lehigh Tunnel and the Cumberland involved in the management struc-
buildings in the early 1970s. Gap Tunnel in Tennessee. Later in ture of the American Underground
After the September 2001 ter- his life he was deeply involved in Association, the predecessor to the
rorist attack on the World Trade the expansion of the subway sys- current Underground Construc-
Center buildings, I, and a group of tem in New York City by working tion Association (UCA) of SME.
other industry individuals, accom- with the major tunnel contractors He was president from June 2001
panied Yoggy on a visit of the 9/11 in the implementation of quality through June 2003. In June 2009,
site to view the potential damage shotcrete application programs for he was awarded the UCA Lifetime
to the PATH Subway Tunnel lin- the East Side Access Program, the Achievement Award for his many
ing and the condition of the 1970s No. 7 Line Extension Project, and industry contributions. He was also
shotcreted supportive excavation the Second Avenue Station and active with the International Tun-
for the foundation bathtubs. Yo- Tunnel Expansion Program. nel Association in conjunction with
ggy took great pleasure in seeing Yoggy had the philosophy that the home office of MBT that was
that the worked performed in the one must give back to the industry based in Switzerland.
early 1970s was still preventing the and not just reap the rewards. And On April 21, 2018, a memorial
Hudson River from entering the he did this in many ways. He was service was held for Yoggy at his
site, even after such a catastrophic a mentor to many young people church in Allentown, PA, which
event. who showed an interest in the in- (Continued on page 38)

T&UC® JUNE 2018 37


uca of sme NEWS
PRODUCTS

3D Laser Mapping releases real-time,


underground monitoring
A
unique scanner and software ground operations. Processmonitor monitoring. Processmonitor Live’s
package developed by 3D La- Live provides real-time, automated scanner and software interface was
ser Mapping will boost safety, measurements of underground sur- originally designed in response to a
efficiency and productivity for under- faces and is designed to be deployed request from a specialist shotcrete
in underground operator based in Australia and has
mining, construc- been used extensively by its under-
tion and tunnel- ground mining team.
ling. The package The system was developed in re-
provides a visual sponse to feedback from customers
representation of who need to place safety and produc-
surface changes in tivity in equally high regard — clients
processes, such as who have identified that time con-
sprayed concrete suming tasks can now be automated
applications, tun- while reducing cost and risk to onsite
nel excavation personnel.
A scan of a tunnel construction project using
Processmonitor Live. and slope-stability www.3dlasermapping.com

Sandvik offers iSURE software for


tunneling construction

I
ntelligent Sandvik underground iSURE 3D SCAN, and an interface lated carrier, it features a next gen-
rock excavation software to a third-party blasting vibration eration cabin supplying 25 percent
(iSURE) is a computer program feedback system. iSURE software increased visibility and a noise level
for tunneling construction and min- capitalizes the improved accuracy of of less than 69 dB at all times. Sand-
ing drill and blast process control. It iSeries rigs for drill and blast usage. vik DT922i is a computer-controlled,
produces all the data needed for an Together, the iSURE software two-boom, electro-hydraulic drilling
optimized drilling and blasting cycle. and DT922i tunneling jumbo, the jumbo with an articlulated carrier
The full-featured iSURE software newest addition to Sandvik’s ex- for tunneling excavation of 12-125
utilizes the drill rig’s data collection tensive tunneling offering, create m² (129-1,345 sq ft) cross sections,
to improve the work cycle and the a combination designed to change including face drilling, bolt hole
drill and blast excavation process. the future of tunneling. The fully drilling and mechanized long-hole
It also has an optional toolset for automated DT922i tunneling jumbo drilling. n
geological analysis, iSURE GEO, a brings quality, reliability and excep-
tunnel profile 3D scanning system, tional versatility. With a new articu- www.rocktechnology.sandvik

OBITUARIES
YOGGY
(Continued from page 37)
I attended. Approximately 25-30 He will be missed by the many family has established a scholarship
people from the underground con- people who came to know him and fund with the Moles organization
struction industry were there to benefited from his wisdom and to help the next generation of in-
pay their respects to a man held in guidance. Rest in peace George, it dustry engineers.
high esteem by the industry and all is well deserved. Individual or company contri-
of the 250 people in attendance. George Yoggy is survived by butions can be made to the George
I knew George Yoggy for more Anne, his wife of 59 years; three Yoggy Moles Scholarship Fund,
than 30 years. He was always a gen- children, Kimberly, Lynn and Kirk, 50 Chestnut Ridge Rd., Ste. 102,
tleman and willing to lend a hand. and eight grandchildren. The Yoggy Montvale, NJ 07645. n

38 JUNE 2018 T&UC ®


WE CAN
NE VE R
DIG DEE P
ENOUGH
D IG D E E PE R.

T&UC – Tunneling & Underground Construction – brings the

underground construction and mining professional serious resources

each and every issue. Feature articles from respected leaders in the

field. Tunnel Demand Forecast – an in-depth review of top mining

projects. New technology. Top products and services. If you are serious

about underground construction – get serious with the resources you

will find in T&UC. Join SME for a free subscription or call to purchase, +1-800-763-3132.

Need advertising or marketing support? +1-303-948-4243. DIG DEEPER.

TUCMAGAZINE.COM tucmagazine.com
SMENET.ORG www.smenet.org
CLASSIFIEDS
ADVERTISING SALES OFFICES
World’s Leader in Underground
HOOPER JONES
Grouting Equipment CENTRAL, NW U.S.
+1-847-486 -1021
• Tunneling & Mining • Environmental Cell: +1-847-903-1853
• Heavy Construction Remediation Fax: +1-847-486-1025
hooperhja@aol.com
• Building Construction • Well
Well Drilling
Drilling
• Restoration Repair Geothermal SHERRI ANTONACCI
• Highway & Bridges EAST, SOUTH, WEST U.S.
+1-267-225-0560
Fax: +1-215-822-4057,
smesherri@gmail.com

DARREN DUNAY
CANADA
+1-201-781-6133
www.chemgrout.com 708.354.7112 Cell: +1-201-873-0891
sme@dunayassociates.com

EBERHARD G. HEUSER
EUROPE
+49 202 2838128
Fax: +49 202 2838126
egh@heusermedia.com

PATRICK CONNOLLY
UNITED KINGDOM
+44 1702-477341
Fax: +44 1702-177559
patco44uk@aol.com

KEN GOERING
INTERNATIONAL SALES
+1-303-948-4243
Fax: +1-303-973-3845
goering@smenet.org

ADVERTISER INDEX • JUNE 2018


GROUND SUPPORT SYSTEMS
YOU CAN BUILD ON
Bradshaw Construction Corp................................. 6
SUPPLYING MINING Colorado School of Mines Center for Underground
OPERATIONS
WORLD WIDE FOR Construction & Tunneling.....................................7
45
52 YEARS DMC Mining Services .............................................8
• GROUT SYSTEMS FKC-Lake Shore ...................... Outside Back Cover
• MIXERS Herrenknecht Tunneling Systems USA Inc...............
• SHOT-CRETERS ................................................Inside Front Cover
• CONCRETE PUMPS
Kiewit Infrastructure Co ..........................................5

www.conmico.com TEL: 1(905) 660-7262

40 JUNE 2018 T&UC®


} }
o w gu i }
d e
S}h
Conquering
Connecting Norway by rail: 5 Herrenknecht
Hard Rock TBMs are on the move for 45 km
of new first-class rail tubes at the New

Toughest
Ulrikentunnel and Follo Line projects.

Biting its way through the Scandinavian stone,


the TBMs are facing the absolute hardness test
when dealing with up to 350 MPa rock strengths.
Equipped with excavation tools for such a
demanding mission, the Herrenknecht TBMs
will complete all their tasks.

Hard Rock
Massive geologies call for experi-
enced partners. Herrenknecht
is making headway through hard
rock – for over 822 km.

Contractors:
Follo Line: Acciona Infraestructuras and Ghella ANS
Ulrikentunnel: Skanska Strabag Ulriken ANS

Pioneering Underground Technologies

www.herrenknecht.com
EXHIBITORS
NAT2018
NAT2018

} }
o w gu i }
d e
S}h
TABLE OF CONTENTS
Sponsor & Exhibit Guide

Sponsors.....................................................................................2-4
Sponsors.....................................................................................
Sponsors .....................................................................................2-4
..................................................................................... 2-4
Floorplan.....................................................................................5
Exhibitor List ................................................................................6-7
Exhibitors ....................................................................................8-59
Products & Services

Index: Products and Services by Category ..........................................60-63


Advertiser Index............................................................................64

Information contained in this Official ShowGuide is published unedited as received from sponsors and exhibitors.

TUNNELING &
UNDERGROUND
CONSTRUCTION
THE OFFICIAL PUBLICATION OF UCA OF SME

UNDERGROUND CONSTRUCTION ASSOCIATION of SME


12999 E. Adam Aircraft Circle, Englewood, CO 80112 • 303-948-4200 • 800-763-3132 • uca.smenet.org • www.tucmagazine.com
SPONSORS
NAT2018

knowledgeable and accessible. Jennmar’s primary


product roster includes PYTHON expandable rock
Overall Conference Sponsor bolts, FRICTION-LOK stabilizer systems, steel sets,
steel tunnel and shaft ribs, lattice girders, rail ties and
resin. For more information, contact a specialist today
or visit our products online.

HNTB
HNTB – Trusted Innovative Underground Solutions.
HNTB National Tunneling Practice is first in innovative
solutions for complex tunnel and underground works.
Our performance has earned our clients’ trust, and na-
The Lane Construction tional and international awards, on some of the most
iconic tunnel projects in the world. Our experience is
Company deeply rooted in our commitment to technical excel- Mapei
The Lane Construction Corporation is a leading U.S. Mapei’s Underground Tunneling Technology (UTT)
lence and our enthusiasm for progressive and innova-
construction company specializing in the transpor- category offers a complete line of products and as-
tive solutions. We have set the standard in state-of-
tation, infrastructure and energy industries. Lane’s sociated technologies for use in and on underground
the-art design. We take pride in our client’s success
unique combination of capabilities includes public- construction projects, including shotcrete accelera-
– measuring our own success by helping clients reach
private partnerships/innovative financing and joint tors and admixtures for concrete, as well as products
their goals – in doing this we accomplish our mission.
ventures; large, complex design-build and bid-build for injection and consolidation, mechanized tunneling
Join us in our continuous quest to provide cost-effec-
projects; and the ability to produce and install asphalt, (TBM), engineering and soil stabilization, coating and
tive and lasting infrastructure solutions! For further in-
aggregates, and concrete. Lane is owned by global protection, maintenance, repair and waterproofing.
formation, please visit: www.hntb.com/Expertise/Tun-
construction leader Salini Impregilo. Learn more at
nels, www.hntb.com/Expertise/Transit, or HNTB.com.
www.laneconstruct.com.

Sanja Zlatanic, PE, Chair


National Tunnel Practice
Office 1-212-294-7567
Mobile 1-646-652-9440
Gold Level Sponsors szlatanic@hntb.com TERRATEC
TERRATEC is a world-renowned Australian-based de-
signer and manufacturer of tunnel boring machines,
raise boring machines and other custom-made equip-
ment for tunneling and mining applications. TER-
RATEC’s success is based on the experience and excel-
lence of its engineering team, which includes engineers
with more than 40 years’ experience in the design and
manufacture of tunneling and mining machines for
Brierley Associates Herrenknecht some of the world’s largest underground projects. TER-
Herrenknecht is a technology and market leader in the RATEC is fully managed by engineers and this gives
Brierley Associates is a privately held nationwide
area of mechanized tunnelling systems. As the only quick and efficient solutions to meet customer ex-
tunnel, trenchless, geotechnical, and geo-structural
company worldwide, Herrenknecht delivers cutting- pectations. TERRATEC products are well-known in the
design firm with offices strategically located across
edge tunnel boring machines for all ground conditions industry as robust, durable and safe, basic principles
the United States. We deliver recognizable value to
and in all diameters – ranging from 0.10 to 19 meters. that must prevail in the design of any equipment made
our clients and projects by providing cost effective and
The Herrenknecht product range includes tailor-made to work in the extreme conditions encountered under-
constructible solutions. “Creating Space Underground”
machines for transport tunnels (Traffic Tunnelling) and ground. For more information visit www.terratec.co.
is what we do each day and we understand that plan-
supply and disposal tunnels (Utility Tunnelling). Fur-
ning, design, and construction of subsurface projects
thermore, Herrenknecht supplies an entire range of
is a complex mixture of client needs, contractual
innovative machines for the mechanized construction
preferences, risk allocation, third-party requirements,
of underground mining infrastructures. The company
and subsurface conditions. With more than 60 ground
also produces state-of-the-art deep drilling rigs that
professionals with national and international experi-
drill down to depths of 8,000m and plants for the ex-
ence, Brierley Associates anticipates and manages
ploration of shallow geothermal energy.
challenges involved with design and construction of
underground infrastructure. WSP USA
For more than a century, WSP has advanced tunneling
AJ McGinn: (315) 434-8885 technology with landmark projects that have shaped
Alan Howard: (925) 247-9000 the course of tunnel engineering and defined industry
Gregg Sherry: (303) 703-1405 practice. Our achievements in underground engineer-
Nancy Nuttbrock: (281) 994-7993 ing include road, rail and water conveyance tunnels
www.brierleyassociates.com in hard rock, soft ground, mixed-face conditions and
Jennmar Civil under water. From program management to design to
construction management, we serve clients in the rail,
Jennmar Civil is dedicated to providing products and
highway, water, utilities, mining, scientific research,
services to the Civil Construction and Tunneling indus-
power and energy industries. Our designs have re-
tries. Products include various types of rock support
sulted in record-setting advances with tunnel boring
bolts, anchoring systems and resins to support tun-
machines and we have employed innovations such
neling, geotechnical, foundation and earth retention
as earth-pressure-balanced and slurry-face tunneling
projects. Jennmar Civil’s Specialists are experienced,
techniques and fiber-reinforced concrete liners. www.
wsp.com
2 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
SPONSORS
NAT2018

Silver Level Sponsors 1695 Allen Rd


Evansville, IN 47710
unique, complex projects we build, to the committed
professionals who design, engineer and construct
Phone: (877) 554-8600 them, Kiewit ensures the ordinary is always extraor-
Email: information@frontierkemper.com dinary.
www.fkc-lakeshore.com
Kiewit Infrastructure Co.
Underground District
® 1926 S 67th St., Suite 300
Omaha, NE 68106
(402) 342-2052
Barnard Construction
Corporation
Forty three years ago, Timothy Barnard founded Bar-
nard Construction Company, Inc. Since then, our pri- J.H. Fletcher & Co.
vately held company has grown into a multimillion- J.H. Fletcher & Co. is one of the top global produc-
dollar contractor, with a bonding capacity exceeding ers of custom underground mining equipment. The
$2 billion. Over these four decades, we have built our company has engineered and manufactured solutions
reputation on skill, innovation, reliability, safety, and since 1937, creating a diverse product line. Fletcher
our ability to complete projects on budget and ahead roof bolters are world renowned and accompanied by Skanska
of schedule. Among our Barnard companies and af- an entire product line, including: drill jumbos, powder Skanska USA is one of the largest, most financially
filiates, we have extensive experience in all aspects of loaders, scalers, and specialty equipment. Fletcher sound construction and development companies in the
construction, including tunnels and shafts, dams, res- equipment is manufactured in a state of the art facility U.S., serving a broad range of clients including those
ervoirs, hydroelectric power, utilities, pipelines, power in the United States. Products are supported through in transportation, power, industrial, water/wastewater,
transmission, oil and gas, and environmental efforts. a highly skilled staff of field service technicians and healthcare, education, sports, data centers, govern-
Headquartered in Bozeman, Montana, we construct backed by a fully stocked warehouse. Visit our website ment, aviation, life sciences and commercial. Through-
projects throughout North America. at www.jhfletcher.com to learn more about our prod- out the 31 metropolitan areas where it works, Skanska
uct line or call us today at 800-543-5431 to get your has extensive tunneling and complex underground
solution started. experience and expertise in support of a variety of in-
frastructure sectors.

Jay Weisberger, APR, LEED AP


Vice President
Head of Communications, West
Skanska USA Inc.
BASF
Through its Master Builders Solutions brand, BASF is a
leading supplier of underground construction solutions Jacobs
that help tunneling customers to become more suc- Jacobs brings extensive design and construction man-
cessful, even in highly challenging ground conditions. agement experience to all types of tunnels projects,
BASF has the largest range of products and services including: highways, transit/railroad, water and waste-
available to meet needs and solve problems in TBM water systems. We have successfully delivered the
and conventional tunneling, whether in soft ground or design of some of the most challenging recent design-
hard rock conditions. We offer a full range of Master- build/P3 tunnel projects in the U.S., such as the Port of Stantec
Roc® tunneling products such as soil conditioning Miami Tunnel project in Florida, the Blue Plains Tunnel Communities are fundamental. Whether around the
foams and polymers, anti-clay agents, tail sealants, in Washington D.C. and the Ohio River Bridge East End corner or across the globe, they provide a foundation,
anti-abrasion agents, dust suppressants, bearing seal Crossing Tunnel in Louisville, Kentucky. With a talent a sense of place and belonging. That’s why at Stantec,
greases, EP2 greases and annulus grouts, plus product force of more than 74,000, Jacobs provides a full we always  design with community in mind. We care
for sprayed concrete and injection for ground consoli- spectrum of services including technical, professional about the communities we serve—because they’re
dation. and construction/program-management for business, our communities too. We’re designers, engineers,
industrial, commercial, government and infrastruc- scientists, and project managers, innovating together
ture sectors. For more information, please visit www. at the intersection of community, creativity, and cli-
jacobs.com. ent relationships. Balancing these priorities results in
projects that advance the quality of life in communities
across the globe. Stantec trades on the TSX and NYSE
under the symbol STN. Visit us at stantec.com or find
us on social media.

FKC-Lake Shore Don Del Nero, Vice President


FKC-Lake Shore serves the underground heavy civil Email: don.delnero@stantec.com
and mining industries throughout North and South (678) 327-2929
America. We offer design-build-install services for Kiewit
innovative hoisting, elevator, and vertical conveyance For more than 50 years, Kiewit has built some of the
systems used to transport personnel and material. Our most complex tunneling and underground projects in
Field Services Division provides routine maintenance, North America. We have the capabilities to self-per-
inspections, wire rope NDT, and 24/7 emergency repair form soft ground and hard rock TBM tunneling, along
of electrical and mechanical systems. FKC-Lake Shore with conventional tunneling techniques such as Drill
products and services include: Vertical Belts, Skips, and Blast, and SEM. At the heart of these projects is
Hoists, Sheaves, Elevators, Cages, Headframes, Brake- a workforce dedicated to industry-leading safety per-
man Cars, Controls, Field Services, and Wire Rope NDT. formance and unmatched quality excellence. From the

SHOWGUIDE exhibitor listings as of April 17, 2018 T&UC ® 2018 NAT SHOWGUIDE 3
SPONSORS
NAT2018

Bronze Level Sponsors

Babendererde Engineers Lovsuns Tunneling Canada Ltd. Traylor Bros


BabEng specializes in mechanized tunneling and un- Lovsuns is a LNSS company that acquired the entire Traylor Bros., Inc. (TBI) is a family-owned corporation
derground storage construction. The world-wide ser- assets of Caterpillar Tunneling Canada Corp. (formerly founded in 1946. For more than 72 years, TBI has
vices range from project development and design to known as LOVAT) in 2014. Lovsuns continues to build provided single-source, comprehensive, cutting-edge
construction management and practical work process on the 40+ years of TBM manufacturing legacy and construction and design-build services to public
optimization. Another successful service being offered is specialized in engineering and manufacturing full works agencies throughout North America. Headquar-
is hands-on troubleshooting on-site for TBMs in dif- range of tunnel boring machines for both traffic and tered in Evansville, Indiana, TBI has regional offices
ficult situations. For water and gas storage, BabEng utility tunnel projects around the world, including EPB, in Long Beach, California; Lakewood, Colorado; and
joins forces with project developers and construction single shield, double shield and dual mode convertible Alexandria, Virginia. TBI capitalizes on state-of-the-art
companies. TPC Tunnelsoft, the software branch, sup- TBMs. By leveraging our modern and high-capacity technology for its soft ground, hard rock, and drill and
ports the tunneling industry with specialized software factory in China, Lovsuns is fully committed and ca- shoot tunnel projects worldwide. We have success-
for technical data management and visualization on pable of supplying new TBM and legacy LOVAT TBM fully completed more than 110 tunneling projects,
tunnel projects. Its unique flexibility, combined with refurbishment support solutions for our global including two of the most technically demanding EPB
powerful automatic reporting and notification tools, customers. tunnels in the United States and over 100 miles of
makes it one of the leading solutions in the market. tunnels utilizing tunnel boring machines. Our services
also include drill and blast tunnels and precast tunnel
segments.

Michael Roach
3050 E Airport Way
Long Beach, CA 90806
Telephone (562) 264-2500

Jay Dee Contractors, Inc. SAK Construction, LLC


Jay Dee Contractors, Inc. has been delivering quality SAK Construction, LLC (SAK), a national pipeline re-
and innovative underground construction since 1965. habilitation and tunneling services contractor is a
Our team is comprised of experienced and dedicated leading provider of pipeline rehabilitation services.
industry professionals, and our commitment to quality The company solves the challenge of maintaining and
is evident in everything we do. We continue to build restoring aging water and sanitary infrastructure for
upon our reputation of excellence by delivering in- the municipal, energy and industrial markets. Founded
novative, quality and reliable underground tunneling in 2006, SAK Construction has built a reputation as an
projects including: Soft Ground, Hard Rock and Pres- industry leader and is recognized as one of the nation’s
surized Face Tunneling; Tunnel Rehabilitation – Shaft most respected pipeline rehabilitation contractors. Led
and Caisson Excavations - Concrete Structures by industry pioneers, Bob Affholder, Jerry Shaw and
Tom Kalishman, SAK has become one of the fastest
38777 Schoolcraft Road growing privately owned construction companies in
Livonia, MI 48150 the United States.
Telephone: (734) 591-3430
Email: estimating@jaydee.us

4 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
FLOORPLAN
EXHIBITORS
NAT2018

NORTH AMERICAN TUNNELING CONFERENCE


June 24-27, 2018
NORTH AMERICAN TUNNELING CONFERENCE
Marriott Wardman Park 2018
JUNE 24-27, - Hall B South & C - Washington, DC
MARRIOTT WARDMAN PARK - HALL B SOUTH & C - WASHINGTON, DC

EXIT
601 603 605 607 611 617 619 623 629 633 FREEMAN SERVICE
CENTER
636 643 647 651 653 657 659

600 604 606 608 610 612 616 618 620 622 624 626 628
539 541 543 545 547 553 555 557 559 561 563
F&B
LOADING DOCK C

501 505 507 509 511 513 517 523 527 529
538 542 546 552 556 560

EXIT
500 502 504 506 510 512 516 518 522 524 526 528 530
F&B
451 455 457 459
401 405 407 411 417 419 421 423 425 427 429 UCA OF SME SALES & OPS

400 402 404 406 408 410 412 416 418 422 424 428 430
F&B

301 305 307 311 317 323 325 327 329

308 310 312 316 318 322 326


300 302 304 332 336 338

209 211 213 217 223 225 227


LY

206 208 214 216 218 222 224 226


N
O
IT
EX

ENTRANCE 118 116


11
4
10
0
10

2
11
2

10

0
11
4
10

8
10
6

Monday, June 25 5 PM – 7 PM
Exhibit Hall Hours Tuesday, June 26 11 AM – 2 PM, 4 PM – 6 PM
Wednesday, June 27 9 AM – 12 PM

SHOWGUIDE exhibitor listings as of April 17, 2018 T&UC ® 2018 NAT SHOWGUIDE 5
EXHIBITORS
NAT2018 EXHIBITOR LIST

NAT 2018 Exhibitors


Company Booth No Company Booth No
ABC Industries, Inc 305 Drill Tech Drilling & Shoring Inc 110
ABC Ventilation Systems 322 DSI Tunneling LLC 517
Advanced Concrete Technologies 225 EC Applications - Tunnel Lining 302
AECOM 500 Elasto Plastic Concrete 612
Aerix Industries 542 Englo, Inc, DBA Engart, Inc 618
Agru America, Inc 300 Epiroc 501
AIL Mining 510 Everest Equipment Co 428
Akkerman 633 Fibermesh 509
Alchemy-Spetec 659 Gall Zeidler Consultants 427
Algaher S.A. 559 GCP Applied Technologies 404
Alpine Equipment 211 Geocomp Corp/GeoTesting Express, Inc 312
Amberg Technologies Ltd 653 Geo-Instruments, Inc 327
American Chemical Technologies, Inc 604 Geokon, Inc 552
Amix Systems Ltd 227 GEOSLOPE International Ltd 553
Antraquip Corp 311 Gomez International, Inc 523
ASI Marine 522 Grindex Pumps 626
Avanti International 455 Hager-Richter Geoscience, Inc 526
BABENDERERDE ENGINEERS, LLC 216 Halfen 620
Ballard Marine Construction 513 Hatch 412
BASF Corporation 401 Hayward Baker Inc 325
BAUER-Pileco Inc 546 Herrenknecht Tunnelling Systems USA, Inc 217
Bekaert Maccaferri Underground Solutions 318 HNTB Corp 223
Brokk Inc 407 Hobas Pipe USA 647
Brookville Equipment Corp 430 Innovative Wireless Technologies 643
Cascade Drilling L.P. 425 JADCO Manufacturing Inc 555
Case Foundation - Bencor 323 JENNMAR Civil 607
CDM Smith 429 Kern Tunneltechnik SA 457
ChemGrout, Inc 224 King Shotcrete Solutions 511
Comtrol International 459 KOSTEEL CO, LTD 336
ConShield Technologies 118 Line Power 616
COWI North America 329 Lovsuns Tunneling Canada Ltd 411
Crux Subsurface, Inc 406 Malcolm Drilling Co Inc 619
CTS Cordes tubes & seals GmbH & Co KG 422 Mapei Corp 307
Daigh Company, Inc 504 Matrix Design Group 301
Datwyler Sealing Technologies 214 McDowell Equipment Ltd 405
David R. Klug & Associates, Inc 418 McMillen Jacobs Associates 316
Derrick Equipment Co 608 Measurand Inc 538
Dr. Sauer & Partners Corp 410 Messinger Bearings 606

6 2018 NAT SHOWGUIDE T&UC® SHOWGUIDE exhibitor listings as of April 17, 2018
EXHIBITOR LIST EXHIBITORS
NAT2018

Company Booth No Company Booth No


Michels Corp 527 SIXENSE 507
Mighty Shield Industries Sdn Bhd 603 Smith and Long - Tunnelling Division 104
Mining Equipment Ltd 506 SoilFreeze Inc 116
Moretrench 326 Spendrup Fan Co 528
Mott MacDonald 451 Stantec 539
MSP Structures Inc 605 Surecrete Inc 226
Mueser Rutledge Consulting Engineers 557 TBM Supply 524
Naylor Pipe Co 213 Technical Tunnelling Components LTD (TTC) 218
Nexans AmerCable 622 Techni-Metal Systems 402
Nicholson Construction Co 505 Tenbusch, Inc 516
Nightstick 629 Terratec 530
NKT Photonics Inc 512 The Lane Construction Corporation 623
Normet Americas, Inc 611 The PBE Group 502
Northern Light Technologies 518 The Robbins Company 317
Northwest Laborers-Employers Training Trust 424 Thompson Pipe Group - Flowtite 408
Ocean Advanced Research 338 Tioga Air Heaters - Mobile Air 560
Palmieri S.p.A. 112 Tolsa Wyoming Bentonite Inc 547
Parsons 529 TRE ALTAMIRA Inc 543
Plaxis Americas LLC 419 TREVIICOS 545
Poltinger Precision Systems GmbH 651 Tsurumi Pump 563
Promat International NV 600 Tunnel Business Magazine (TBM) 100
Putzmeister 400 Tunneling Journal/Tunnelling Journal 106
R.S.T. Instruments Ltd 561 Tunnels & Tunnelling 114
Renesco Inc 102 TunnelTalk 108
Richard Goettle, Inc 601 VMT USA 308
Richway Industries 416 Williams Form Engineering Corp 657
Rite Geosystems 209 Wisko America, Inc 332
ROBODRILL 222 Worldsensing 617
Rocscience, Inc 310 WSP 208
Ruen Drilling, Inc 304 Xylem 556
Sandvik Mining and Rock Technology 628 Zed Tunnel Guidance Ltd 421
Schauenburg Flexadux Corp 636
Schnabel - SWS 624
Schnabel Foundation Co 541
Shannon & Wilson, Inc 206
Shotcrete Technologies, Inc 423
Sika Corporation 610
Simem Underground Solutions, Inc 417

SHOWGUIDE exhibitor listings as of April 17, 2018 T&UC ® 2018 NAT SHOWGUIDE 7
EXHIBITORS
NAT2018

glass rovings and reinforced with polyester fibers for


ABC Industries, Inc added strength and resiliency. Visit our website to see
Branch Office
ABC Industries, Inc
Booth: 305 more innovative solutions. 610 S 12th St
See our ad on page 8 Grand Junction, CO 81501 USA
For over 90 years, ABC Industries continues to be a Products & Services Telephone: (970) 242-3664
leading supplier of high quality, customized ducting so- Dust and Fume Control Technology
lutions in mine, tunnel and underground construction Ventilation Systems, Materials and Equipment
operations worldwide. As these operations continue ABC Ventilation Systems
to evolve, ABC proactively collaborates with industry Main Office Booth: 322
professionals to engineer unique, premium ventilation 301 Kings Hwy ABC Ventilation Systems is one of the world’s leading
products. A new innovative addition to ABC’s arsenal, Winona Lake, IN 46590 USA companies in underground ventilation. ABC Ventilation
RigiVent™ is a flexible, interlocking ducting solution Telephone: (574) 267-5166 Systems provides complete tunnel ventilation design
for positive pressure applications requiring minimal Fax: (574) 267-2045 along with a package of AMCA certified fans and MSHA
storage and ease of handling. Similar to RigiDuct®, www.abc-industries.net approved ducting. ABC provides one of the most silent
RigiVent™ is constructed from filament wound fiber- fan systems with its patented Sound Trap fans or op-
tional exterior silencers. ABC now offers a highly ef-
ficient deduster as well as a new low resistance, high
pressure, flat shipped hard line ducting for positive
and negative pressure applications. ABC Ventilation
Systems high pressure Zipper Coupling has one of the

RIGIDUCT
® lowest resistance and leakage profiles available.

Products & Services


Filament-Wound Fiberglass Tubing Safety Products
Ventilation Systems, Materials and Equipment

A leader in tunnel ventilation, ABC provides high quality, Main Office


customized solutions such as our RigiDuct® filament-wound 1802 Quebec Ave
Saskatoon, SK S7K 1W2 Canada
fiberglass tubing. Its excellent strength under high degrees Telephone: (306) 653-4303
of negative pressure, high resistance to attack from acid or Fax: (306) 653-3890
alkaline conditions, and its UV-stabilized rubberized elastic www.abcventilation.com

gaskets resist degrading while remaining pliable in cold


weather conditions. Learn about our other tunnel offerings,
such as MineVent® and TruOval MineVent® layflat blower
tubing by visiting us at abc-industries.net.

Advanced Concrete
Technologies
Booth: 225
See our ad on page 9
Advanced Concrete Technologies, Inc. is the North
America division of German based Wiggert & Co manu-
facturer of turnkey concrete batching plants, mixers,
control systems, batching equipment, concrete distri-
bution systems. Amongst the well-known brands are
the high shear HPGM planetary countercurrent mixer,
High output DWM twin shaft mixer, MobilMat concrete
plants, SmartMix concrete plants, HydroMat micro-
wave moisture measuring technology and the WCS
PC based control system. ACT delivers highly efficient,
fully integrated equipment solutions to the concrete
industries and fulfills the demands for today’s highest
quality and environmental standards.

Products & Services


Concrete Mixing and Transportation Equipment

Main Office
300 Portsmouth Ave
Greenland, NH 03840 USA
www.abc-industries.net • (574) 267-5166 • (800) 426-0921
Telephone: (603) 431-5661
RigiDuct®, MineVent ®, and TruOval MineVent ® are registered trademarks of Fax: (603) 431-5547
ABC Industries, Inc. Email: sales@concretebiz.com
www.concretebiz.com

8 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
EXHIBITORS
NAT2018

AECOM AECOM Aerix Industries


Booth: 500 250 Apollo Dr Booth: 542
AECOM is built to deliver a better world. We design, Chelmsford, MA 1824 USA Aerix Industries (formerly Cellular Concrete Solutions),
build, finance and operate infrastructure assets for Telephone: (978) 905-2100 manufactures and supplies a dynamic product line
governments, businesses and organizations in more Fax: (978) 905-2101 of integrated engineered foam liquid concentrates,
than 150 countries. As a fully integrated firm, we con- Email: rob.dill@aecom.com enabling its customers to produce and install high
nect knowledge and experience across our global quality lightweight cellular concretes, ideal for annu-
network of experts to help clients solve their most AECOM lar grouting, tunnel arch backfill and flowable fill. The
complex problems. 125 Broad St, 15th Fl company’s foams also allow its customers to transport
New York, NY 10004 USA tailings, sand, or other construction materials using
Products & Services Telephone: (212) 377-8400 minimal amounts of water. Aerix Industries dedica-
Consulting Engineers Fax: (212) 377-8410 tion to research and technical support has allowed it
Engineering Design and Services for Tunnels Email: verya.nasri@aecom.com to provide advanced engineered foam solutions to the
Geological, Geotechnical Services and Equipment construction and mining industries for more than 70
AECOM years.
Main Office 300 Lakeside Dr, Ste 400
1999 Avenue of the Stars, Ste 2600 Oakland, CA 94612 USA Products & Services
Los Angeles, CA 90067 USA Telephone: (510) 893-3600 Ground Improvement Equipment and Services
Telephone: (213) 593-8000 Fax: (510) 874-325 Grouting Services, Equipment and Materials
Fax: (213) 593-8178 Email: theodore.feldsher@aecom.com
Email: AskAmericas@aecom.com Main Office
www.aecom.com AECOM 5902 McIntyre St
1300 E 9th St, Ste 500 Golden, CO 80403 USA
Branch Offices Cleveland, OH 44114 USA Telephone: (303) 271-1773
AECOM Telephone: (216) 622-2300 Fax: (303) 273-5411
1111 3rd Ave, Ste 1600 Fax: (216) 622-2301 www.aerixindustries.com
Seattle, WA 98101 USA Email: david.mast@aecom.com
Telephone: (206) 438-2700
Fax: (206) 438-2699
Email: paul.nicholas2@aecom.com

ENGINEERED IN GERMANY
INSTALLED IN NORTH AMERICA

om-ddeseessignened fofor you.


ust om-
C us
Every concrete producer has unique production
requirements. That’s why every turnkey plant
we create begins life on the technical “drawing
board”, ensuring from the start that it is perfectly
suited to your individual needs. The precision
and customized-development continues on until
your pre-wired, one-of-a-kind plant is fully-tested,
commissioned and operational on location.
Contact us to find out how our innovative plant
solutions can add profitability to your mix.

www.concretebiz.com 603.431.5661
American Division of Wiggert & Co. GmbH and Würschum GmbH

SHOWGUIDE exhibitor listings as of April 17, 2018 T&UC ® 2018 NAT SHOWGUIDE 9
EXHIBITORS
NAT2018

pipe diameters and lengths. We are committed to mak- Rail Products


Agru America, Inc ing every effort to position our equipment on your next Segment Accessories
Booth: 300 pipe jacking or tunneling project. Akkerman systems Tunnel Lining and Support Materials
Since 1988, Georgetown, SC–based Agru America, Inc. are available for purchase, lease-to-purchase, or rent
has been the world’s leading manufacturer of flat die from our rental fleet. Main Office
extrusion geomembranes, geonets, geocomposites, Carretera Corella S/N
geotextiles, geo clay liners, concrete protective lin- Products & Services Alfaro, La Rioja 26540 Spain
ers and fittings. Agru America also supplies vertical Conveyor Equipment and Systems Telephone: +34 941 182 153
barrier systems and piping systems for the U.S. and Earth Pressure Balance Machines Fax: +34 941 183 715
international markets. The company’s state-of-the-art Microtunneling Equipment, Tools, and Supplies Email: algaher@grupoalgaher.com
products include Sure-Grip® CPL, Hydroclick®, Agru Rock TBM’s www.tunnelsegmentgaskets.com
Smooth Liner® / MicroSpike® (structured textured Tunnel Boring Equipment
products), Super Gripnet®, and Drain Liner®. Agru Tunnel Haulage Systems
America is part of the worldwide AGRU Group, an Aus- Alpine Equipment
trian family-owned business since 1948 with produc- Main Office Booth: 211
tion facilities in Austria, the U.S., Germany and China, 58256 266th St Alpine pioneered the use of hydraulic cutterhead at-
and distribution in over 80 countries worldwide. Brownsdale, MN 55918 USA tachments (Rockwheels) in North America and contin-
Telephone: (800) 533-0386 ues to lead in the technological development of these
Products & Services Fax: (507) 567-2605 rock cutting machines. Now operating under the ban-
Environmental Control Equipment and Supplies Email: akk@akkerman.com ner of Rockwheel Americas we’ve expanded our prod-
Precast Concrete Linings www.akkerman.com uct line of the most advanced hydraulic cutterheads in
Tunnel Lining and Support Materials the world. Our sales and engineering team is glad to
Wastewater Management Products assist with equipment selection and if a custom solu-
Water Treatment Plant and Materials Alchemy-Spetec tion is called for, we’ve got a long history of experience
Booth: 659 to draw from. Factory service and support in the USA
Main Office Your best chance of solving leak seal, soil stabilization means a rapid response and our deep inventory and
500 Garrison Rd and slab lifting problems is to arm yourself with the rental fleet means we’ve got you covered.
Georgetown, SC 29440 USA most reliable products and experienced tech support
Telephone: (843) 546-0600 the industry can offer. In today’s demanding economy, Products & Services
Fax: (843) 546-0516 getting all this at a competitive price is essential. Non-Explosive Mechanical Excavation
Email: salesmkg@agruamerica.com Alchemy-Spetec products are designed by people Roadheaders
www.agruamerica.com who’ve worked in the field and know how much you Rotary Drum Cutters
depend on your material. This same on-the-job experi- Scaling
ence allows us to offer you unparalleled technical sup- Soil Conditioning Equipment and Materials
AIL Mining port. Alchemy-Spetec is 100% focused on providing Underground Excavation Services and Equipment
Booth: 510 the most powerful polymers, painless procedures and
AIL Mining designs and manufactures a 4 flange and rapid results to contractors, engineers and municipali- Main Office
2 flange shaft or tunnel liner plate which is 10 times ties. 801 Pleasant View Blvd
stiffer and 5 times stronger than traditional steel liner Bellefonte, PA 16823 USA
plate • Diameters in excess of 25 m/82 ft„ • Custom Products & Services Telephone: (814) 466-7134
sizes and shapes available„ • Fabricated elbows • Grouting Services, Equipment and Materials Fax: (814) 355-0046
Easy to ship and install • Accelerated assembly, easier www.alpinecutters.com
fitting of plates • Smaller crews needed, lower in- Main Office
stalled costs • Added safety, structures can be built
from one side • Facilitates curved structures • Allows
4508 Bibb Blvd, Ste B5
Tucker, GA 30084 USA
Amberg Technologies Ltd
for leak-resistant structures • Structures can be dis- Telephone: (404) 618-0438 Booth: 653
mantled and removed. www.alchemy-spetec.com More than 35 years the Swiss company Amberg Tech-
nologies has been one of the global leaders specialised
Products & Services in user-friendly surveying solutions. The Amberg Tun-
Engineering Design and Services for Tunnels Algaher S.A. nel product portfolio offers the customer an innovative
Fabrication Materials Booth: 559 and reliable solution and supports tunnelling in all con-
Steel Pipe We are a Spanish company that designs and pro- struction phases. The system solutions under the um-
Tunnel Lining and Support Materials duces EPDM gaskets and profiles since 1987. We brella name of Amberg Tunnel combine precise mea-
Ventilation Systems, Materials and Equipment work different materials depending on the Standards suring instruments with task-specific software and
of application. We are specialized in designing and are nowadays an indispensable tunnelling equipment
Main Office producing Tunnel Segment Gaskets. We are capable of component. Significant improvements in efficiency are
111 Springstead Ave manufacturing glued, anchored and hydrophilic gas- realised, especially in tunnel navigation, tunnel profile
Stoney Creek, ON L8E 6E7 Canada kets. All our productions are made according to STUVA measurements, tunnel scanning, geotechnical analysis
Telephone: (289) 775-8958 Recommendations and EN 681-1 standard. We have and as-built tunnel analysis.
www.ailmining.com designed, manufactured and supplied tunnel segment
gaskets to over than 50 projects around the world in Products & Services
the last years: EEUU Miami Dade Water Project, Saudi Computer Hardware and Software
Akkerman Arabia Metro Riyadh, Australia Transcity Brisbane and Control Systems
Booth: 633 many others. A project a challenge. Geological, Geotechnical Services and Equipment
Established in 1973, Akkerman develops, manufac- Laser Guidance Systems
tures and supports quality pipe jacking and tunneling Products & Services Survey Equipment and Lasers
equipment that accurately installs a variety of under- Fabrication Materials Underground Excavation Services and Equipment
ground infrastructure. We partner with contractors to Microtunneling Equipment, Tools, and Supplies
explore project solutions for a wide range of geology, Precast Concrete Linings

10 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
EXHIBITORS
NAT2018

Main Office Amix Systems Ltd


Trockenloostrasse 21
Regensdorf-Watt, 8105 Switzerland Booth: 227
Telephone: +41 44 870 92 22 Amix Systems Ltd., is a design, engineering and fabrication team that solves prob-
Email: info@amberg.ch lems for today’s most challenging grout mixing & backfill projects. We take complex
www.amberg.ch/at project needs and build automated, self-cleaning products and systems that sim-
plify the grout mixing process. The Perfect Storm series of plants produce outputs
from 2m3/hr over and above 100m3/hr. Also, if you are retrofitting existing plants,
American Chemical Technologies, Inc we are your solution. Our team has a deep expertise in systems design and control
Booth: 604 automation. It’s not about selling systems, we’re on a mission to help companies
American Chemical Technologies, Inc. (ACT) manufactures and distributes biode- reduce their overall equipment costs and make significant advances in productivity.
gradable, fire-resistant, and water-soluble lubricants for TBMs across the globe.
EcoSafe® FR hydraulic fluid & EcoGear gear oil technology represents a significant Products & Services
advancement in synthetic, fire-resistance, and biodegradability. Neptune® Series Concrete Mixing and Transportation Equipment
lubricants meet the same requirements for demanding industrial applications. Ad- Control Systems
ditionally, Neptune® Series offer a non-sheening, 100% water-solubility, and an ex- Ground Improvement Equipment and Services
cellent aquatic toxicity profile; score in the practically non-toxic category according Grouting Services, Equipment and Materials
to the U.S. Fish and Wildlife Classification. ACT commits to setting new standards Jet Grouting Equipment and Services
for product performance and “Pride in Personal Service.” Slurry Services and Machines

Products & Services Main Office


Lubricants for TBM 33250 Ravine Ave
Abbotsford, BC V2S 1V6 Canada
Main Office Telephone: (604) 746 0555
485 E Van Riper Rd www.amixsystems.com
Fowlerville, MI 48836 USA
Telephone: (800) 938-0101
Fax: (517) 223-1703
Antraquip Corp
www.americanchemtech.com Booth: 311
See our ad on page 11
Antraquip continues to build on its reputation as the leading supplier of rock and
concrete cutting attachments for excavators which are commonly used for scaling,
profiling, mixing/remediation and tunnel enlargement projects, as well as road-
headers for tunnel and mining applications. In the field of tunnel support, Antraquip
offers lattice girders, steel ribs and complete casing systems for pipe roofing, an-
choring and drainage. Other products offered include self-drilling rock bolts, steel
fibers, rock saw attachments and custom engineered shaft sinking equipment.

Products & Services


Mining Equipment
Roadheaders
Rotary Drum Cutters
Scaling
Tunnel Lining and Support Materials

Main Office
758 Bowman Ave
Hagerstown, MD 21740 USA
Telephone: (301) 665-1165
Fax: (301) 665-9079
Email: info@antraquip.net
www.antraquip.net

ASI Marine
Booth: 522
Established in 1987, ASI Group Ltd. is a full-service engineering and marine tech-
nology company comprised of two groups; ASI Marine and ASI Water. ASI Marine
provides industries worldwide with leading edge underwater services focused on
assessment, maintenance, rehabilitation and construction of underwater infra-
structure and tunnels. ASI Marine, partnered with Associate Underwater Services
(AUS) provide turnkey hyperbaric intervention tunneling support services to the
tunneling industry. To date, ASI has performed over 500 hyperbaric interventions
in soft ground tunnels.

Products & Services


Air Locks and Bulkheads
Consulting Engineers
Earth Pressure Balance Machines
Microtunneling Equipment, Tools, and Supplies

12 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
SOLVING YOUR
UNDERGROUND CHALLENGES

Our customers shape the future. By listening to their needs and


challenges, we have developed a complete and comprehensive
offering for the tunneling industry.
We continue to focus our R&D efforts on safe, sustainable,
innovative solutions for tomorrow‘s challenges.

www.master-builders-solutions.com

Photo credit: Catherine Bassetti Photography


EXHIBITORS
NAT2018

Main Office Products & Services Mining Equipment


40 Centre Dr, Ste 3 Computer Hardware and Software Precast Concrete Linings
Orchard Park, NY 14127 USA Consulting Engineers Shotcrete Equipment, Supplies, and Services
Telephone: (716) 667-3507 Engineering Design and Services for Tunnels Tunnel Lining and Support Materials
Email: info@asi-group.com Instrumentation Equipment and Services
www.asi-group.com Main Office
Main Office 23700 Chagrin Blvd
Branch Offices 28205 203rd Ave SE Beachwood, OH 44122 USA
ASI Group Ltd Kent, WA 98042 USA Telephone: (216) 839-7800
566 Arvin Ave Telephone: (253) 630-2221 Fax: (216) 839-8830
Stoney Creek, ON L8E 5P1 Canada Fax: (866) 378-2223 www.master-builders-solutions.basf.us
Telephone: (905) 643-3283 Email: contact@babeng.com
Fax: (905) 643-1816 www.babeng.com BAUER-Pileco Inc
Email: info@asi-group.com
Booth: 546
Branch Office BAUER-MAT is a mid-size mechanical and plant engi-
ASI Marine Babendererde Engineers, GmbH
neering company with more than 20 years experience
1525 Broadway St, Ste 112 Markt 2
in the Tunneling/Microtunneling Industry. MAT designs
Port Coquitlam, BC V3C 6P6 Canada Bad Schwartau, 23611 Germany
and manufactures equipment for mixing, handling and
Telephone: (604) 472-5121 Telephone: +49 4513 009390
separation applications for bentonite and cement slur-
Email: contact@babeng.com
ries; mixers and mixing plants for colloidal mixing of
Avanti International slurries; screening, cyclone and decanting plants for
Booth: 455 Ballard Marine Construction solids-liquids separation. Recently BAUER-MAT intro-
Avanti International is the most experienced producer Booth: 513 duced the BE-550 for use on bentonite slurries. The
of high-quality injection grouts in the U.S. For decades, Compressed air workers, contractor training, cham- BE-550 comprises two adjoining identical standalone
AvantiGrout has been used in geotechnical applica- bers and related services for hyperbaric / intervention plants and is capable of processing 550m3 of slurry
tions to stabilize soils and control groundwater before, support. We have a reputation for managing highly per hour and when combined with MAT’s BD-90 big
during, and after construction. Injection grouts can complex tasks in a cost effective and efficient manner. bowl centrifuge provides a closed circuit system with
be used: 1) Before tunnel break-ins/outs to stabilize We have a wide assortment of Medical Chambers as minimum footprint requirement.
surrounding soils, control groundwater inflow, and well as varied sized of tunnel specific saturation sys-
improve project productivity; 2) During tunnel con- tems. Planned or emergency services, we will be there Products & Services
struction to stabilize weak soils, control groundwater to support you. Drilling Services and Equipment
ahead of and behind TBMs, and create a safer work Ground Improvement Equipment and Services
environment; and 3) After project completion to create Products & Services Hydraulic Hammers and Drills
an impermeable water barrier. For more information on Air Locks and Bulkheads Microtunneling Equipment, Tools, and Supplies
Avanti’s injection grouts, visit our website. Construction - Contracting Services Pumps and Pumping Equipment
Earth Pressure Balance Machines Slurry Services and Machines
Products & Services Microtunneling Equipment, Tools, and Supplies
Grouting Services, Equipment and Materials Tunnel Boring Equipment Main Office
Pumps and Pumping Equipment 9303 New Trails Dr, Ste 425
Soil Conditioning Equipment and Materials Main Office The Woodlands, TX 77381 USA
Underground Utility Materials and Operations 727 S 27th St Telephone: (713) 699-7600
Wastewater Management Products Washougal, WA 98671 USA www.bauerpileco.com
Telephone: (360) 991-5226
Main Office Email: eric.muller@ballardmc.com Bekaert Maccaferri
1100 Hercules Ave, Ste 320 www.ballardmc.com/projects/tunnel-support/
Houston, TX 77058 USA Underground Solutions
Telephone: (281) 486-5600
BASF Corporation Booth: 318
Fax: (281) 486-7300 Bekaert Maccaferri Underground Solutions, your global
Email: sales@avantigrout.com Booth: 401 partner for smart reinforcement of your tunnelling and
www.avantigrout.com See our ad on page 13 mining project. We optimize your project, by provid-
Through its Master Builders Solutions brand, BASF is a ing innovative, more cost-effective and safer solutions.
leading supplier of underground construction solutions
Babenderede Engineers, LLC that help tunneling customers to become more suc-
New for 2017, we can now offer a range of Dramix®
Steel Fibers directly produced in the US to meet the
Booth: 216 cessful, even in highly challenging ground conditions. buy America requirements in rebuilding the infrastruc-
See our ad on page 12 BASF has the largest range of products and services ture. We have a team of technical experts available,
BabEng specializes in mechanized tunneling and un- available to meet needs and solve problems in TBM especially dedicated to the underground construction
derground storage construction. The world-wide ser- and conventional tunneling, whether in soft ground or world. Bekaert Maccaferri Underground Solutions un-
vices range from project development and design to hard rock conditions. We offer a full range of Master- derstands you. Because we are tunneling.
construction management and practical work process Roc® tunneling products such as soil conditioning
optimization. Another successful service being offered foams and polymers, anti-clay agents, tail sealants, Products & Services
is hands-on troubleshooting on-site for TBMs in dif- anti-abrasion agents, dust suppressants, bearing seal Concrete Reinforcement
ficult situations. For water and gas storage, BabEng greases, EP2 greases and annulus grouts, plus product Precast Concrete Linings
joins forces with project developers and construction for sprayed concrete and injection for ground consoli- Tunnel Lining and Support Materials
companies. TPC Tunnelsoft, the software branch, sup- dation.
ports the tunneling industry with specialized software
Main Office
for technical data management and visualization on Products & Services SkylinE40
tunnel projects. Its unique flexibility, combined with Dust and Fume Control Technology Korte Keppestraat 23/02
powerful automatic reporting and notification tools, Lubricants for TBM Erembodegem Aalst, 9320 Belgium
makes it one of the leading solutions in the market.

14 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
Work Harder
or Work Smarter?

INTRODUCING
BROKK 500

Today, harder is not enough. Successful projects are about outsmarting


the competition. That’s why Brokk machines are used in tunnelling projects
around the world. The intelligent demolition powerhouse combines flexibility
and efficiency in a unique, remote-controlled way, so it’s perfect for debris
removal, drilling, excavating, rock breaking and splitting and shotcreting.
Brokk – a smarter tunnel vision.
See you at the 2018 North American Tunneling Conference
at booth 407.

Intelligent Demolition Power


Brokk Inc. | Monroe, WA | 1-360-794-1277 | info@brokkinc.com | www.brokk.com
EXHIBITORS
NAT2018

Telephone: +32 53 43 10 10
Fax: +32 53 43 10 19 Cascade Drilling L.P.
Email: contact@bm-underground.com Booth: 425
www.bm-underground.com Cascade Drilling LP is a full service provider of drill-
ing services specializing in the application of its Sonic
drilling system for tunnel professionals globally. Cas-
Brokk Inc cade has applied the Sonic system for numerous soft
Booth: 407 ground tunnel projects globally in support of both de-
See our ad on page 15 Brookville Equipment Corp sign and construction efforts.
BROKK is the world leader in electrically powered
Booth: 430
remote controlled demolition machines, which are Products & Services
See our ad on page 16
used extensively in tunneling, cross-passages, shaft Drilling Services and Equipment
Brookville is a leading manufacturer of rail-mounted
sinking, micro-tunneling, scaling, and other under-
diesel and battery-powered tunneling locomotives and
ground construction applications. BROKK machines Main Office
personnel carriers. Featuring planetary final drive gear
can be equipped with a variety of attachments, such 1010 Green St
reducers at each wheel end to divide driveline torque,
as hydraulic breakers, rock drills, rotary drum cutters, Marietta, OH 45750 USA
shock loading for reduced stress and longer service
digging buckets, beam manipulators, and shotcrete Telephone: (614) 402-1808
life, and liquid-cooled internal wet disc brakes to ex-
nozzles. Boasting an impressive power-to-weight ra- Fax: (740) 373-3877
tend brake life and provide maximum braking capacity
tio, these compact machines can operate effectively in www.cascade-env.com
for long, continuous grades, Brookville units are de-
limited access, confined spaces, with zero-emissions.
signed for dependability. Optional equipment features
Operators can remain at a safe distance while they
maneuver BROKK machines in challenging areas un-
include explosion proofing and patented on-board
rerailing systems to enhance safety in all work envi-
Case Foundation - Bencor
derground.
ronments. Brookville also manufactures rubber-tired Booth: 323
equipment, ideal for steep tunnel grades, inspections, See our ad on page 17
Products & Services and maintenance for non-tracked projects. Case Foundation Company and Bencor are both part of
Hydraulic Hammers and Drills the connected companies of Keller, the world’s leader
Microtunneling Equipment, Tools, and Supplies in geotechnical solutions. Case is an industry leader
Products & Services
Rock Drills in providing full-service deep foundation techniques in
Mining Equipment
Rotary Drum Cutters the U.S. Case specializes in earth retention systems
Rail Products
Scaling used for tunnel shaft construction such as secant pile
Underground Locomotives and Rail Haulage Equip-
Underground Excavation Services and Equipment walls. Bencor provides slurry diaphragm walls for sup-
ment
port of excavation during the construction of tunnels
Main Office or shafts along with a range of ground improvement
Main Office
1144 Village Way /stabilization methods. With over 50 years of experi-
175 Evans St
Monroe, WA 98272 USA ence and a well-maintained equipment fleet, Bencor &
Brookville, PA 15825 USA
Telephone: (360) 794-1277 Case have proven track records of completing projects
Telephone: (814) 849-2000
Fax: (360) 805-2521 on-time and on budget.
Fax: (814) 849-2010
www.brokkinc.com
www.brookvillecorp.com
Products & Services
Geological, Geotechnical Services and Equipment
Shaft Drilling and Raiseboring Equipment
Slurry Services and Machines

Booth #

430

Durable. Designed
Dependable. to Meet
Your
Demands.

+1 814.849.2000 • brookvillecorp.com

16 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
EXHIBITORS
NAT2018

Main Office Products & Services Products & Services


7550 Teague Rd, Ste #300 Consulting Engineers Grouting Services, Equipment and Materials
Hanover, MD 21076 USA Earth Pressure Balance Machines
Telephone: (410) 551-1938 Engineering Design and Services for Tunnels Main Office
www.kellerfoundations.com Geological, Geotechnical Services and Equipment 805 E 31st St
Ground Freezing LaGrange Park, IL 60526 USA
Rock TBM’s Telephone: (708) 354-7112
Fax: (708) 354-3881
Main Office Email: cginfo@chemgrout.com
75 State St, Ste 701 www.chemgrout.com
Boston, MA 02109 USA
Telephone: (617) 452-6000
Fax: (617) 345-3901
ConShield Technologies
CDM Smith www.cdmsmith.com Booth: 118
CONmicSHIELD® is an EPA-registered, liquid admix-
Booth: 429 ture that prevents MIC corrosion in combined and
See our ad on page 18 ChemGrout, Inc sanitary concrete tunnels other structures. Dosed di-
CDM Smith provides lasting and integrated solutions
in water, environment, transportation, energy and fa-
Booth: 224 rectly into the concrete or mortar during the shotcrete,
With more than 50 years of experience, ChemGrout gunite, poured-in-place, and precast processes, CON-
cilities to public/private clients worldwide. As a full-
continues to manufacture the worlds largest selec- micSHIELD® is not a surface treatment or coating that
service engineering and construction firm, we deliver
tion of grouting equipment. ChemGrouts underground can wear off, wash off, delaminate, or peel. It is an in-
exceptional client service, quality results and enduring
series offers exceptional productivity for the contact tegral component of the concrete added during mixing,
value across the entire project life-cycle. CDM Smith’s
grouting, water cut-offs, cable stays and rock bolts. providing protection throughout the entire thickness at
underground construction staff includes geotechnical,
Its patented pumps are industry standards offering less cost. Crystal-X® products are CONmicSHIELD®
structural, and civil engineers and geologists located
reliability and durability, along with unique features compatible concrete additives for economical and ef-
across the globe. With a full range of tunnel related
simplifying clean up and maintenance. Offering many fective waterproofing protection of new and existing
services, we provide planning, feasibility and design -
unique and innovative features, ChemGrout has re- concrete tunnels, subway systems, and other concrete
both 2D and 3D FEM analyses, construction services,
mained the industry leader in underground grouting structures where water damage may occur.
program management, inspection and geotechnical
since 1963.
instrumentation monitoring and data interpretation.

SHOWGUIDE exhibitor listings as of April 17, 2018 T&UC ® 2018 NAT SHOWGUIDE 17
EXHIBITORS
NAT2018

Grouting Services, Equipment and Materials


Products & Services Main Office
Tunnel Lining and Support Materials 25B Vreeland Rd, Ste 300 Main Office
Wastewater Management Products Florham Park, NJ 7932 USA 4308 N Barker Rd
Telephone: (973) 379-6699 Spokane Valley, WA 99027 USA
Main Office Fax: (973) 379-6774 Telephone: (509) 892-9409
541 Tenth St NW, #233 Email: krml@cowi.com Fax: (509) 892-9408
Atlanta, GA 30318 USA www.cowi.com www.cruxsub.com
Telephone: (877) 543-2094
www.conshield.com
Crux Subsurface, Inc CTS Cordes tubes & seals
Booth: 406
COWI North America See our ad on page 19 GmbH & Co KG
Booth: 329 Crux is a leader in geotechnical construction and ex- Booth: 422
For over 85 years, COWI has been at the forefront of ploration. With more than 15 years’ experience in the CTS develops and manufactures elastomer sealing
tunnel and underground engineering. Our reputation tunneling industry, the company has provided solu- profiles & gaskets for tunnel and pipe line construction:
as tunnel specialists enables us to contribute to many tions to some of the most difficult-access and geologi- Tunnel segment gaskets + Seals for TBMs + Seals for
of the world’s most prestigious and challenging tun- cally challenging projects in North America. Crux spe- launching shafts + Seals for jacking pipes and pipe
nel projects. Whether a total engineering solution or cializes in long range deviation-controlled horizontal jacking stations + Inflatable emergency seals. For
professional advice on a specific problem is needed, core holes, borehole surveying, optical and acoustical more than 50 years CTS has been a reliable industry
we offer a comprehensive set of competencies to own- televiewer services, high-quality sampling, and instru- partner in providing sealing solutions for underground
ers and contractors from early concepts to operations, mentation installation. Pre-excavation stabilization construction. CTS also offers on-site installation & re-
through to rehabilitation or decommissioning. With services include dewatering, permeation and compac- pair service worldwide.
over 450 dedicated tunnel and underground engineers tion grouting, tube arch canopies, and cased horizontal
and specialists worldwide, we work together to deliver boreholes. Crux provides design-build services and a Products & Services
multidisciplinary solutions focused on safety, function fleet of custom designed equipment to ensure unique Tunnel Lining and Support Materials
and value. project needs can be met.
Main Office
Products & Services Products & Services Im Suedfeld 3
Consulting Engineers Drilling Services and Equipment Senden, DE-48308 Germany
Geological, Geotechnical Services and Equipment Telephone: +49 25 36993921
Ground Improvement Equipment and Services Fax: +49 25 36993920
www.cordes.de

18 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
EXHIBITORS
NAT2018

Daigh Company, Inc Products & Services


Concrete Reinforcement
Booth: 504 Precast Concrete Linings
See our ad on page 20 Tunnel Lining and Support Materials
NEW PRODUCT: Hirado Powerful Hydraulic Rock Splitter: www.rocksplittingtech.
com. Supplies Da-mite Rock Splitting Mortar, a non-explosive product used to frac-
Main Office
ture rock and concrete in no-blast conditions. Da-mite is an ideal and effective tool
6000 Waterdam Plaza Dr, Ste 120
for boulders, tunnels, presplitting, mass rock, trench rock, dimensional stone &
McMurray, PA 15317 USA
reinforced concrete. Easy to use. Mix with water & pour into properly drilled holes.
Telephone: (724) 942-4670
Da-mite sets & expands with enough strength to fracture most any rock. No license
Fax: (724) 942-4671
required. 4 grades of Da-mite provide enough versatility to be utilized in drilled hole
Email: information@drklug.com
diameters from 1” to 2 3/4”.
www.drklug.com
Products & Services
Drilling Services and Equipment
Explosive Materials and Services
Hydraulic Hammers and Drills
Non-Explosive Mechanical Excavation
Underground Excavation Services and Equipment

Main Office Derrick Equipment Co


2393 Canton Hwy, Ste 400
Cumming, GA 30040 USA Booth: 608
Telephone: (770) 886-4711 See our ad on page 23
Fax: (770) 887-3783 Derrick is a family-owned and operated company with a global presence focused
Email: sales@daighcompany.com on pioneering fine-separation technology. Since 1951, Derrick has manufactured
www.da-mite.com fine separation and dewatering equipment for the Mining and Aggregates indus-
tries. In 1988, Derrick branched out into the Civil Construction industry. From rug-
gedly dependable dewatering to slurry separation, Derrick’s innovative technologies
Datwyler Sealing Technologies are applicable to a global customer base and many worldwide markets. Derrick has
Booth: 214 remained dedicated to complete in-house manufacturing of every machine, screen
DATWYLER Sealing Technologies, is the world leading provider of tunneling gas- panel, and tank system. Each unit is created and assembled at Derrick’s Buffalo,
kets. With the acquisition of PHOENIX PDT Profiles business, DATWYLER features New York headquarters facility. To discover more, visit Derrick’s website.
successful references in more than 700 tunnels on five continents. DATWYLER
offers a full range of gasket profiles and material options, designed and offered
on a project basis, for hydrostatic and/or environmental conditions encountered.
DATWYLER manufacture and delivered all types of gaskets to meet all segmental DIFFICULT Booth

ACCESS
tunnel applications: mono EPDM, hydrophilic, Co-ex Swell/Composite Black Swell #406
and anchored gasket. Come and learn about the performance and updates of the
new generation of DATWYLER anchored gaskets. See the latest Innovation!

Products & Services


Precast Concrete Linings
Geotech Drilling
Segment Accessories
Tunnel Lining and Support Materials
geotech sampling
dewatering
Main Office
Eisenacher Landstrasse 70
grouting
Waltershausen, Thuringia D-99880 Germany speciality shoring
Telephone: (732) 763-6203
Fax: +49 3622633463 value engineering
Email: peter.tiedemann@datwyler.com
www.datwyler.com

David R. Klug & Associates, Inc


Booth: 418
See our ad on page 21
David R. Klug & Associates, Inc. provides manufacturers representative services to
the underground civil and mine construction industries. The company specializes
in products and services for soft ground, conventional, and NATM/SEM tunnels.
Expertise is offered in the supply of componentry used in precast tunnel linings
inclusive of EPDM gaskets, plastic and steel connectors, grout lifting assemblies
and steel segment moulds plus final lining forming systems for C-I-P applications.
Through their distribution company, Klug Construction Systems, LLC offers GFRP
rock bolts and soft-eyes, steel and synthetic fiber reinforcement, prefabricated
mesh and rebar reinforcement plus specialty grout systems for tunnel backfill re-
quirements. www.cruxsub.com

SHOWGUIDE exhibitor listings as of April 17, 2018 T&UC ® 2018 NAT SHOWGUIDE 19
EXHIBITORS
NAT2018

Products & Services Fax: (703) 707-0703


Drilling Services and Equipment Email: washington@dr-sauer.com
Microtunneling Equipment, Tools, and Supplies www.dr-sauer.com
Slurry Services and Machines
Drill Tech Drilling & Shoring Inc
Main Office Booth: 110
15630 Export Plaza Dr
Drill Tech is a drilling, tunneling, and shaft sinking contractor. Recent drilling and
Houston, TX 77032 USA
shoring work includes foundations for high rise buildings in San Francisco, and
Telephone: (281) 590-3003
station excavations for San Francisco’s Central Subway and L.A. Metro’s Crenshaw/
Fax: (281) 442-6948
LAX Line. Notable recent tunneling projects include a 2000’ tunnel mined through
Email: info@derrick.com
sandstone uphill at 13% grade using a Drill Tech shop built cog railroad. Drill and
www.derrick.com
blast work includes a 1,000 foot deep shaft in Wyoming, and roadheader work in-
cludes 14,200 feet of mine access decline tunneling for Barrick Gold in Nevada. We
Dr. Sauer & Partners Corp also do pipe jacking and box jacking under freeways and railroads.
Booth: 410
See our ad on page 22 Products & Services
Dr. Sauer & Partners has been in practice in the United States for over 30 years, and Construction - Contracting Services
employs tunnel engineers at Main Offices located in Washington D.C., London and Drilling Services and Equipment
Salzburg. The firm provides cost effective and innovative tunneling solutions using Jet Grouting Equipment and Services
conventional mining approaches to owners and contractors. Dr. Sauer & Partners is Non-Explosive Mechanical Excavation
recognized worldwide as one of the leading consultants for design and construction Underground Excavation Services and Equipment
supervision of tunnels and underground structures. The application of innovative
design solutions and high quality field supervision has led to the successful comple- Main Office
tion of numerous transportation and utility tunnels. 2200 Wymore Way
Antioch, CA 94509 USA
Products & Services Telephone: (925) 978-2060
Consulting Engineers Fax: (925) 978-2063
Engineering Design and Services for Tunnels www.drilltechdrilling.com

Main Office
560 Herndon Pkwy, Ste 310
Herndon, VA 20170 USA
Telephone: (703) 707-0700
CLASSIFIEDS
BUSINESS OFFICE PRESS RELEASES
SME - 8307 Shaffer Parkway Steve Kral
Littleton, CO 80127 kral@smenet.org
800-763-3132 • Advertising: x243
Direct: 303-948-4243
Fax: 303-973-3845 ADVERTISING AND
www.smenet.org PRODUCTION/
MEDIA MANAGER
EDITOR Johanna McGinnis
Steve Kral mcginnis@smenet.org
kral@smenet.org
Rock Splitting Mortar PRODUCTION DESIGNER
SENIOR EDITOR
D-mite Fractures Rock and Concrete in No Blast Conditions Bill Gleason Nate Hurianek
D-mite aids and accelerates mechanical rock excavation gleason@smenet.org hurianek@smenet.org
No fly rock, no vibration, no noise,
Applications: Boulders, mass rock, tunneling, concrete removal

DAIGH COMPANY, INC.


2393 Canton Hwy, Ste 400, Cumming, GA 30040
Tunneling & Underground Construction is supported
Office: 770-886-4711, Fax: 770-887-3783 by leaders
Rock in the underground industry. Please
Splitting Technologies
www.daighcompany.com sales@daighcompany.com
patronize them and mention their ad in T&UC.
Rock Splitting Technologies is
ADVERTISING SALES OFFICES
the distributor for the HIRADO
N50 Powerful Hydraulic Splitter.

HOOPER JONES
CENTRAL,Sales@RockSplittingTech.com
NW U.S.
www.RockSplittingTech.com
847-486 -1021 • Cell: 847-903-1853 • Fax: 847-486-1025
hooperhja@aol.com

20 2018 NAT SHOWGUIDE T&UC SHOWGUIDE exhibitor listings as of April 17, 2018
ADVERTISER PAGE NO. MARSHA TABB
®

EAST, SOUTH, WEST U.S.


plays
on of of the San Andreas Fault varying code standards throughout
Contractor Shop Drawings
locations.
ound Steel Construction Support California’s counties. EXHIBITORS NAT2018
trol of ground water inflows
in North America. While much of the work Jacobs
al in order to avoid impacts to Associates does is in California, the
Bernardino National ForestEC Applications firm is -not Tunnel limited.
Lining Englo, One Inc,of DBA itEngart,
biggest Inc
n Manwel Indian Reserva-EC Applications Booth: current
302 projects is the Rio Piedra
Booth: 618
supplies and installs protective tunnel Dust Extraction engineering, Manufacturing and Ser-
Contract in San Juan
liner systems combining the advantages of thermo-
plastics (HDPE and LLDPE) with associated materials
Puerto Rico.
vice of complete dust removal systems.

tunnel lining for the Arrow-ponents) required forThis job lining consists
(geotextile, waterbar, injectable grout hose and com-
a turnkey tunnel ofControlaTechnology
Products & Services
system. Dust and Fume 1,500-m
DSI Tunneling LLC (4,921-ft)
nnels isBooth:
designed to withstand Angeles based fabricationlong
facility provideunderground rapid
ECA’s qualified installation technicians, project experi- Mining Equipment
DSI 517
Tunneling LLC ence and Los Non-Explosive Mechanical Excavation

hquakeSee of
our ad magnitude
502-473-1010
on page 25 8.0. In a cost
transit guidewayVentilation
effective
DSI Tunneling LLC Inc. is a world leader in ground sup- ing on any project.
solution for geomembrane tunnel lin-
with
Underground
two Materials under-
Excavation
Systems,
Services and Equipment
and Equipment

n, one port portion of the align-


systems for the tunneling industry. DSI manufac-
ground subway stations.
tures a variety of Roof Bolts, Steel Ribs, Liner Plates, Products & Services Main Office
osses tomers
an ground active splay of the
Lattice Girders & Canopy Umbrella Systems for its cus-
Most of the project
Construction - Contracting Services
support needs. DSI’s Equipment Divi- Engineering Design and Services for Tunnels
1 White Oak Trace
Beckley, WV 25801 USA structures
are located belowFax:the groundwater
Precast Concrete Linings
dreas uctsFault,
in tunneling,where a Equipment
special
sion represents some of the world’s best known prod-
from Communications to Tunnel Lining and Support Materials
Telephone: (304) 253-0777
(304) 253-0719

table and many of the tunnels pass


www.engartglobal.com
ectionas Biomarine
was Tunnel used to accom-
Rock Drills. DSI is proud to represent such companies
Rescue Equipment, Boart Long- Main Office
901 E Orangethorpe Ave
faultHydraulic
rupture. A Equipment,
primary
year Drilling Products, Condat lubriciants, Montabert
beneath occupied Epiroc
historical build-
Drifters, Hany Grouting Strata Anaheim, CA 92801 USA
Telephone: (714) 921-9848 Booth: 501
f bolted and gasketed precastFax:
Worldwide Communication Equipment..
ings with less than
(866) 475-1225
www.tunnellining.com
See our 5ad m on page (16 29 ft) of
Epiroc is responsible for the sales, aftersales service
Products & Services
e segmentsGrouting Services,was designed
Equipment and Materials to cover. and rental of equipment for surface and underground
rock excavation, civil works and infrastructure proj-
Elasto Plastic Concrete
of 274 m (900Booth: 612 A unique aspect of this project
Lubricants for TBM
nd a pressure
Rock Drills
ects, exploration drilling, rock reinforcement, and
ground engineering. The company is headquartered
Tunnel Communication Systems and Equipment
drostatic head
Tunnel Lining —Materials
and Support the highest is that different tunneling
See our ad on page 27
methods
in the US near Denver, Colorado. Employing approxi-
mately 450 people, it extends its reach through a

e everMain considered
Office
1774 Mellwood Ave
in designConcrete Reinforcement were used alongspecialist
Products & Services
the drilling alignment,
nationwide network of sales and service stores and
distributors.

gmental tunnel
Louisville, KY 40206 USA lining.
Telephone: (502) 473-1010
Two which yielded many
Tunnel Lining and Support Materials
Products lessons
& Services on the
ace tunnel boring machinesPO Box 460impact of these Grouting
Fax: (502) 473-0707
www.dsiunderground.com
Main Office
methods Services, Equipmenton the
Geological, Geotechnical Services and Equipment
and Materials

d to withstand a pressure of 91Telephone:structures Waxhaw, NC 28173 USA


(704) 843-8401 above. Shaft Rock Drills
■ Drilling and Raiseboring Equipment
t) of www.elastoplastic.com Underground Excavation Services and Equipment
Ventilation Systems, Materials and Equipment

atic
ere
ex- DAVID R.
DAVID R. KLUG
KLUG && ASSOCIATES,
ASSOCIATES, INC.
INC.
the
head
s. In SpecialtyProducts
Specialty Marketing andServicesServicestofor thethe
na- North North American American Tunneling Tunneling and Mining Industry Industries
h the
ight David R. Klug - President
and www.drklug.com
ings, Two Penn Center West, Suite 122 Tel (412) 787-2255
6000 Waterdam Plaza Dr., Ste. 120 Tel (724) 942-4670
ive Pittsburgh, Pennsylvania 15276-0102 Fax (412) 787-5267
McMurray, Pennsylvania 15317 Fax (724) 942-4671
drill- Email: dklug@drklug.com
Email: dklug@drklug.com Cell (412)
Cell (412) 670-0263
670-0263
pre-
SHOWGUIDE exhibitor listings as of April 17, 2018 T&UC ® 2018 NAT SHOWGUIDE 21
EXHIBITORS
NAT2018

Main Office Ayer’s Cliff, QC J0B 1C0 Canada


3700 E 68th Ave Telephone: (819) 838-4257 Gall Zeidler Consultants
Commerce City, CO 80022 USA Fax: (819) 838-5653 Booth: 427
Telephone: (303) 253-6931 www.everestconstructionforms.com See our ad on page 24
www.epiroc.us Worldwide services provided in the disciplines of
Geotechnics, Tunnel Design and Civil Engineering in-
Fibermesh cluding: Geotechnical Engineering, NATM/TBM Tunnel
Everest Equipment Co Booth: 509 Design, Soil Improvement (Ground Freezing, Grout-
Booth: 428 Fibermesh has spent decades innovating and perfect- ing), Construction Design, Soil-Structure Interaction
Since 1975, Everest Equipment Co. has been a lead- ing fiber reinforcement solutions that offer perfor- Analyses and Design Calculations, Instrumentation
ing designer and manufacturer of custom construction mance benefits over the entire life span of concrete. and Monitoring, Claim Analyses, Tunnel Waterproof-
forms in North America. We design and fabricate shaft, Fibermesh® works to simplify placement, minimize ing, Shaft Design, Construction Management and Site
blast-proof shaft, tunnel formwork serving mass tran- cracking in early plastic state, and control cracking Support.
sit development, fresh water supply, sanitary water in the hardened state of concrete. With a full line of
treatment and vehicular tunnels. Everest has recently microsynthetic, macrosynthetic, blended, and steel Products & Services
acquired an expanded design expertise which will al- fibers, our concrete reinforcement fibers provide the Consulting Engineers
low us to bring additional products to our existing and perfect balance of performance and value to replace Engineering Design and Services for Tunnels
soon to be partners. Everest is proud to encompass in- traditional reinforcement in precast , shotcrete, and Geological, Geotechnical Services and Equipment
house sales support, in-house engineering, in-house cast in place tunneling applications. The team at Fiber-
fabrication and on-site servicing of custom formwork mesh are experts in fiber reinforcement, and can help Main Office
designed to meet the harsh requirements of under- solve your tough problems. 44345 Premier Plz, Ste 210
ground forming. “Best in class partner for custom Ashburn, VA 20147 USA
formwork solutions.” Products & Services Telephone: (703) 726-2700
Concrete Reinforcement Fax: (703) 726-6999
Products & Services Email: office@gzconsultants.com
Consulting Engineers Main Office www.gzconsultants.com
Precast Concrete Linings 4019 Industry Dr, PO Box 19269
Tunnel Lining and Support Materials Chattanooga, TN 37416 USA
Telephone: (800) 621-1273
Main Office Email: orderexpress@propexglobal.com
1077 Westmount St www.fibermesh.com

INNOVATIVE TUNNEL ENGINEERING


Salzburg | London | Washington | Toronto

Tunnel Design

Geotechnical Engineering

Instrumentation & Monitoring

Waterproofing & Water Control

Construction Management

Mining Support Services


www.dr-sauer.com
Tunnel Rehabilitation
Follow us @DrSauerUK

22 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
DERRICK MUD RECYCLING TECHNOLOGY
PATENTED SCREEN SURFACES I COMPLETE SYSTEMS I SOLIDS REMOVAL EQUIPMENT

Derrick’s separation technology offers unmatched


solids removal performance. Using this equipment
and innovative screen technology, customers
continuously recycle and re-use drilling fluid, while
also controlling drilled solids and impact on the
environment. Our civil construction solutions are
currently used worldwide by companies that require
high efficiency separation and slurry dewatering in
environmentally sensitive and urban environments.

Discover more visit www.Derrick.com

Leading-Edge Solutions
The DE-6400™ VFD™ (Variable Frequency Drive) centrifuge offers a robust mechanical design
coupled with advanced control technology, enabling it to provide consistent and effective solids
Clean Slurry Technology, Inc.
control in a wide range of drilling fluid types and drilling conditions.
4101 Union Ave
Bakersfield, California 93305
Reducing: Toll Free: (877) 365-8396
n
Disposal Costs Web: www.CleanSlurry.com
n
Chemical and Dilution Costs
n
Total Operating Costs
n
Environmental Impact

Increasing: Derrick Equipment Company


n
ROP (Rate of Penetration) 15630 Export Plaza Drive
n
Fluid and Solids Handling Capacity Houston, Texas 77032
n
Project Profits Toll Free: (866) DERRICK
Web: www.Derrick.com
EXHIBITORS
NAT2018

management system and high-performance water-


proofing products. GCP products have been used to
Geocomp Corp/GeoTesting
build some of the world’s most renowned structures. Express, Inc
More information is available on our website. Booth: 312
Geocomp designs, installs, and manages real-time,
Products & Services web-based instrumentation and monitoring programs
Concrete Reinforcement for tunnels around the world. We also help identify, as-
Grouting Services, Equipment and Materials sess, and mitigate risks associated with construction
Precast Concrete Linings by providing quantitative identification of risks and the
GCP Applied Technologies Shotcrete Equipment, Supplies, and Services potential impact to project cost, schedule, and qual-
Booth: 404 Tunnel Lining and Support Materials ity. Our laboratory division, GeoTesting Express, is a
GCP is a leading global provider of construction prod- fully accredited, world-class laboratory providing high-
ucts technologies that include DE NEEF® Injection Main Office quality results with fast turnaround time for mechani-
Materials/Soil Stabilization, specialty systems includ- 62 Whittemore Ave cal and physical properties testing on soils, rocks, and
ing TYTRO™ solutions for tunnels, additives for ce- Cambridge, MA 02140 USA geosynthetics. We perform a full suite of testing in sup-
ment and concrete, the VERIFI® in-transit concrete Telephone: (617) 876-1400 port of tunnel projects, including rock strength, rock
www.gcpat.com drillability, soil strength, and soil abrasion.

Products & Services


Geological, Geotechnical Services and Equipment

Main Office
125 Nagog Park
Acton, MA 01720 USA
Telephone: (978) 635-0012
Fax: (978) 635-0266
Email: info@geocomp.com
www.geocomp.com

Branch Offices
Geocomp
111 John Street, Suite 650
New York, NY 10038 USA
Telephone: (212) 566-6630

Geocomp
355 South Grand Avenue
Los Angeles, CA 90071 USA
Telephone: (213) 943-1372

Geocomp
1390 Busch Parkway
Buffalo Grove, IL 60089 USA
Telephone: (224) 676-1371

Geocomp and GeoTesting Express


2358 Perimeter Park Drive, Suite 320
Atlanta, GA 30341 USA
Telephone: 770-217-5388

Geo-Instruments, Inc
Booth: 327
GEO-Instruments provides geotechnical and structural
monitoring services. We supply, install, and integrate
geotechnical sensors and geomatic systems, and we
automate the collection, processing, and delivery of
data. Our systems monitor SOE, settlement, deforma-
tion, structures, vibration, dust, and noise.

Products & Services


Geological, Geotechnical Services and Equipment

A World Leader in Geotechnics, Tunnel Engineering,


Instrumentation Equipment and Services

and Tunnel Construction Management Main Office


24 Celestial Dr
Narragansett, RI 02882 USA
www.gzconsultants.com Telephone: (401) 782-1045
Fax: (401) 633-6021
VIRGINIA | NEW YORK | CALIFORNIA | UNITED KINGDOM | AUSTRIA | CHILE | SINGAPORE www.geo-instruments.com

24 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
Leading the Industry
in the Design, Development, and Production of
Underground Steel Supports in North America

UNDERGROUND
UPLIFTED

VISIT US IN
BOOTH #517

We offer full service support:


DSI Tunneling LLC Engineering Estimates
Design Collaboration
502-473-1010 Contractor Shop Drawings
www.dsiunderground.com Construction Support
EXHIBITORS
NAT2018

Preparation and more. Specializing in all types of un-


GEOSLOPE International Ltd derground excavation, support and operation systems,
Booth: 553 TBM application, design and procurement. Equipment
GEO-SLOPE develops and markets GeoStudio, the Sales/Manufacturing - We can Design, Manufacture,
numerical modeling software for geo-engineers and Rebuild and assist with all of your material and equip-
earth scientists. GeoStudio is composed of eight soft- ment needs. Including, Diesel and Battery Powered
ware products that enable everything from simple-to- Locomotives, Rolling Stock, Excavators, Generators,
complex analyses. When integrated, the products offer Power Systems, Transformers, Ventilation Fans, Tun-
Geokon, Inc a broader analytical environment that offers signifi- nel Entrance and Exit Seals, Flex Rubber Ω-Type Seals,
Booth: 552 cantly more power and capabilities. Used in over 100 Grout./Shotcrete Plants, Peristaltic Pumps, Starloy
See our ad on page 26 countries since 1977, our software has been helping Cutters/Scrapers, RoadHeaders, Vertical/Overland
Geokon, Inc. is a specialist in the supply of instruments engineering firms, large multi-national corporations, Conveyor Systems, TBM Tail Brushes, Mobile Power
for the NATM method of tunnel support. In addition to government agencies, regulatory commissions and Centers, Switchgear, High Voltage Cable and more.
almost all major cities in the USA, the company has universities with their engineering projects and re-
instrumented subway systems in Seoul, Taipei, Guang- search. Products & Services
zou, Istanbul, Hong Kong, Singapore and London. Geo- Consulting Engineers
kon also has instruments in the Channel Tunnel. Call Products & Services Grouting Services, Equipment and Materials
Geokon for a quote or with questions on an application. Computer Hardware and Software Pumps and Pumping Equipment
The company is prompt and courteous in its replies. Tunnel Boring Equipment
Main Office Underground Excavation Services and Equipment
Products & Services 1200, 700-6 Ave SW Underground Locomotives and Rail Haulage Equip-
Geological, Geotechnical Services and Equipment Calgary, AB T2P 0T8 Canada ment
Instrumentation Equipment and Services Telephone: (403) 269-2002
Email: info@geoslope.com Main Office
Main Office www.geoslope.com 1415 E Elwood St
48 Spencer St Phoenix, AZ 85040 USA
Lebanon, NH 03766 USA Gomez International, Inc Telephone: (602) 268-9275
Fax: (520) 421-7165
Telephone: (603) 448-1562
Booth: 523 Email: info@gomezinternational.com
Fax: (603) 448-3216
Consulting/Engineering - We can assist from Project www.gomezinternational.com
Email: info@geokon.com
Concept to Completion, including Electrical/Ventilation/
www.geokon.com
Mechanical Design, Engineering, Estimating, Submittal

TUNNEL MONITORING
PROVEN LONG-TERM RELIABILITY, PRECISION AND ACCURACY
GEOKON offers a full-range of tunneling instrumentation, including:

■ Piezometers ■ NATM Pressure Cells ■ Load Cells ■ Dataloggers


■ Strain Gages ■ Convergence Meters ■ Instrumented Rock Bolts ■ Web-Based Software
■ Crackmeters ■ Tape Extensometers ■ Inclinometers ■ Settlement Systems
■ Extensometers ■ Tiltmeters

to learn more, please visit: www.geokon.com/Tunnel-Data

| INNOVATION AND QUALITY SINCE 1979


GEOKON, INCORPORATED | Lebanon, NH, USA | phone: +1.603.448.1562

26 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
REINFORCED WITH

An American First!
Super Excavators’ Black Snake Stormwater Tunnel,
Missouri, is the first North American Tunnel to incorporate
a 100% Macro Synthetic Fiber Reinforced Segmental
Lining.
They said it couldn’t be done. They said you can’t use macro synthetic fibre
to replace steel in concrete and shotcrete. With the help of our innovative
construction partners, we’ve proven that it can be.
BarChip concrete fiber continues to lead the way in the North American
Tunnelling Market.

2007 - First MSF Shotcrete Lining - BarChip Reinforced Devil’s Slide Tunnel, California.
2014 - First MSF Cast In Place Lining - BarChip Reinforced Euclid Creek Tunnel, Ohio.
2017 - First MSF Rail Track Slab - BarChip Reinforced MTA, New York City.
2018 - First MSF Segmental Lining - BarChip Reinforced Black Snake Tunnel, Missouri.

Achieved Results

100% 70% 50% 40% 25%

Reduction in Reduction Increase in Segment Reduction Increase in Shotcrete


Steel Corrosion in Carbon Production Speeds in Tunnel Development
Footprint Segment Costs Speeds www.elastoplastic.com

When Performance Matters, Choose BarChip Synthetic Fiber.


EXHIBITORS
NAT2018

Grindex Pumps Halfen


Booth: 626 Booth: 620
See our ad on page 28
A complete line of highly efficient and reliable sub- Main Office
mersible pumps designed for heavy-duty drainage/ 4965 Eisenhauer, Ste 101
sludge applications. Range from 0.6 to 140 HP. Solids San Antonio, TX 78218 USA
handling capability of up to 3.2 in., capacities of up to Telephone: (800) 423-9140
750 ft. and 5,100 GPM. On construction sites, in mines www.halfenusa.com
and various industrial applications, Grindex submers-
ible pumps are constantly being put to the test in some
of the most demanding applications imaginable. Air Hatch
cooling valves permit pumps to run dry without dam- Booth: 412
age. With SMART motor protection, Grindex Pumps Hatch is an employee-owned, award winning, multi-
will not run backwards, will not single phase, will not disciplinary professional services firm that delivers a
overheat. comprehensive array of technical and strategic servic-
es, including consulting, engineering and project and
Products & Services construction management to the Infrastructure, Energy
Pumps and Pumping Equipment and Mining sectors. Hatch has served clients for over
six decades with project experience in more than 150
Main Office countries around the world. With over 9,000 staff in
8402 W 183rd St, Ste A over 50 offices, the firm has more than $35 billion in
Tinley Park, IL 60487 USA projects currently under management. Hatch has par-
Telephone: (708) 781-2135 ticipated in the delivery of most complex tunnels such
Fax: (708) 532-8767 as OPG Niagara tunnel, Seattle Beacon Hill project and
Email: info.us@grindex.com Toronto-York Spadina Subway Extension Twin Tunnels.
www.grindex.com
Products & Services
WHEN THE GOING Hager-Richter Geoscience, Inc
Consulting Engineers
Consulting Environmental
Booth: 526
GETS TOUGH, THE HAGER-RICHTER GEOSCIENCE, INC. is a well estab- Main Office
lished small business that specializes in Surface and 2800 Speakman Dr
TOUGH GET GOING Borehole Geophysics for Engineering applications
(NAICS 541360). The firm has been in business since
Mississauga, ON L5K2R7 Canada
Telephone: (905) 855-7600
1984, has earned a national reputation, and has a www.hatch.com
nationwide practice. Hager-Richter is headquartered
in Salem, New Hampshire and has had a fully staffed
Construction sites and under- and equipped New York/New Jersey Regional Office in
ground operations. Temporary or New Jersey since 2001. Hager-Richter has extensive
permanent installations. Rescue experience in providing high resolution geophysical
or emergency responses. With services to support tunneling infrastructure projects in
400,000+ pumps delivered since the Northeastern, Southeastern, and Midwestern sec-
1940, global dewatering leader tions of the U.S.
Grindex is specialized in removing Hayward Baker Inc
Products & Services Booth: 325
unwanted water in harsh environ-
Consulting Engineers See our ad on Outside Back Cover
ments. When others fall short, we Consulting Environmental
just keep on going. Hayward Baker is part of the connected companies of
Engineering Design and Services for Tunnels Keller and provides services to solve a variety of tun-
Geological, Geotechnical Services and Equipment neling issues: the stabilization of soft soils for tunnel
Instrumentation Equipment and Services
Want to know more? boring and break-ins and break-outs; groundwater
control; tunnel liner stabilization; access shaft con-
Visit www.grindex.com to find Main Office struction; re-leveling TBMs; and controlling settlement
your local representative. 8 Industrial Way, D10 of overlying structures during tunnel boring. Hayward
Salem, NH 03079 USA Baker has the experience and state-of-the-art tech-
Telephone: (603) 893-9944 nology to solve every subsurface problem, typical or
Fax: (603) 893-8313 unique.
Email: jeff.reid@hager-richter.com
www.hager-richter.com Products & Services
Construction - Contracting Services
Branch Office Ground Improvement Equipment and Services
Hager-Richter Geoscience, Inc Grouting Services, Equipment and Materials
846 Main Street Jet Grouting Equipment and Services
Fords, NJ 8863 USA
Get the job done. Grindex. Telephone: (732) 661-0555 Main Office
Email: Rob@hager-richter.com 7550 Teague Rd, Ste 300
Hanover, MD 21076 USA
info.us@grindex.com Telephone: (410) 551-8200
Fax: (410) 799-3786
www.haywardbaker.com

28 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
The future
is electric

United. Inspired.

We wait for no one. We want to change minds and move markets. Our zero-
emission equipment brings massive savings on ventilation and creates a
healthier work environment for miners everywhere. The future is electric.
North American Tunneling Conference June 24-27
Booth #501 epiroc.com
EXHIBITORS
NAT2018

Empire State Building impact and abrasion resistant wear steel mainly fo-
Herrenknecht Tunnelling New York, NY 10118 USA cused on mining, tunneling, cement, dredging, pulp
Systems USA, Inc Telephone: (212) 294-7567
Fax: (212) 947-4030
and paper, foundry, waste, recycling and general in-
dustry. Along with our wear steel offering we provide
Booth: 217 Email: szlatanic@hntb.com full line fabrication and service to compliment. JADCO
See our ad on Inside Front Cover
www.hntb.com delivers unmatched technical expertise, quality, and
Herrenknecht is a technology and market leader in the
customer service - and offers an unparalleled array
area of mechanized tunnelling systems. As the only
of wear-fighting products, particularly our QT-PLUS®
company worldwide, Herrenknecht delivers cutting- Hobas Pipe USA and CHROMEWELD brands. Specific industry applica-
edge tunnel boring machines for all ground conditions Booth: 647 tions can be found on our website.
and in all diameters – ranging from 0.10 to 19 meters. Hobas pipes are centrifugally cast, fiberglass-rein-
The Herrenknecht product range includes tailor-made forced, polymer mortar (CCFRPM) pipe, they are inher- Products & Services
machines for transport tunnels (Traffic Tunnelling) and ently corrosion resistant and last 100 years or more. Abrasion and Impact Resistant Materials
supply and disposal tunnels (Utility Tunnelling). Fur- Engineers and contractors regularly select Hobas pipe Steel Pipe
thermore, Herrenknecht supplies an entire range of for all its performance features: light weight, high
innovative machines for the mechanized construction strength, ease of installation, leak-free push together
of underground mining infrastructures. The company
Main Office
joints and adaptability to most installation methods PO Box 465
also produces state-of-the-art deep drilling rigs that including open cut, sliplining, jacking, microtunnel- Zelienople, PA 16063 USA
drill down to depths of 8,000m and plants for the ex- ing, two-pass tunnel, casing carrier and above ground. Telephone: (724) 452-5252
ploration of shallow geothermal energy. Non-pressure and pressure classes are manufactured Fax: (724) 452-1318
in diameters from 18 to 126 inches. Email: info@jadcomfg.com
Products & Services
www.jadcomfg.com
Earth Pressure Balance Machines Products & Services
Microtunneling Equipment, Tools, and Supplies Wastewater Management Products
Rock TBM’s Water Treatment Plant and Materials
Shaft Drilling and Raiseboring Equipment
Soft Ground Shields Main Office
Tunnel Boring Equipment 1413 E Richey Rd
Houston, TX 77073 USA
Main Office Telephone: (281) 821-2200
1613 132nd Ave E, Ste 200
Sumner, WA 98390 USA
Fax: (281) 821-7715 JENNMAR Civil
Email: eboudreaux@hobaspipe.com
Telephone: (253) 447-2300 www.hobaspipe.com
Booth: 607
Fax: (253) 863-9376 See our ad on page 33
www.herrenknecht.com JENNMAR Civil is dedicated to providing products and
Innovative Wireless services to the Civil Construction and Tunneling indus-
tries. Products include various types of rock support
Branch Office
Herrenknecht Tunnelling Systems USA, Inc
Technologies bolts, anchoring systems and resins to support tun-
1613 132nd Ave E, Ste 200 Booth: 643 neling, geotechnical, foundation and earth retention
Sumner, WA 98390 USA Innovative Wireless Technologies, Inc. (IWT) is the projects. JENNMAR Civil’s Specialist are experienced,
Telephone: (253) 447-2300 leading supplier of wireless underground communica- knowledgeable and accessible. Jennmar’s primary
Fax: (253) 863-9397 tion and tracking systems. IWT’s SENTINEL™ system product roster includes PYTHON expandable rock
Email: brockway.jack@herrenknecht.com is easy to install and maintain and provides crystal bolts, FRICTION-LOK stabilizer systems, steel sets,
clear voice communications for maximum produc- steel tunnel and shaft ribs, lattice girders, rail ties and
tivity and low cost of ownership. Continuous track- resin. For more information, contact a specialist today
HNTB Corp ing is also supported – all in one system. IWT offers or visit our products online.
Booth: 223 line-powered, battery backed-up, mesh networking
See our ad on page 31 infrastructure for long term construction projects, or Products & Services
With 3800 professionals, HNTB is a leader in providing battery-powered infrastructure for shorter term in- Engineering Design and Services for Tunnels
solutions to infrastructure problems nationwide. The spections. IWT equipment is 100% recoverable and Grouting Services, Equipment and Materials
firm has a long history in design and engineering ser- reusable once the project is completed. Listen to our Mining Equipment
vices for tunnels and underground construction. HNTB presentation at the 2018 NAT Conference, stop by our Rail Products
has completed award-winning projects on some of the booth or visit our website. Shotcrete Equipment, Supplies, and Services
countrys most complex projects, including highway, Tunnel Lining and Support Materials
transit, rail, aviation and water resources. HNTB’s ex- Products & Services
perts have the insight and knowledge to provide state Tunnel Communication Systems and Equipment Main Office
of the art innovative solutions to tunneling challenges, 258 Kappa Dr
from small diameter excavations to designing the Main Office Pittsburgh, PA 15238 USA
largest bored tunnel in the world (Alaskan Way Tun- 1100 Main St Telephone: (412) 963-9071
nel)-- utilizing both conventional tunneling methods Lynchburg, VA 24504 USA Fax: (412) 963-7179
(sequential excavation) or mechanized tunneling for Telephone: (434) 316-5230 www.jennmar.com
variety of ground conditions. Fax: (434) 316-5232
Email: sales@iwtwireless.com
Products & Services www.iwtwireless.com Kern Tunneltechnik SA
Consulting Engineers Booth: 457
Consulting Environmental
Engineering Design and Services for Tunnels
JADCO Manufacturing Inc Products & Services
Booth: 555 Tunnel Lining and Support Materials
Main Office Founded in 1980, we are an industry leading and
350th 5th Ave, 57th Flr ISO 9001:2008 certified manufacturer of proprietary

30 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
WORLD CLASS TUNNELING
EXPERIENCE

TOP CLOCKWISE: Tom Lantos’ Tunnels California | Istanbul Strait Road Tunnel Crossing Istanbul Istanbul, Turkey | Alaskan Way Tunnel Seattle, Washington

Sanja Zlatanic
Chair, National Tunnel Practice
szlatanic@hntb.com
(646) 652-9440
The HNTB Companies
Infrastructure Solutions

hntb.com
EXHIBITORS
NAT2018

Main Office Line Power Products & Services


Via Zorzi 4 Drilling Services and Equipment
Paradiso, 6900 Switzerland Booth: 616 Ground Improvement Equipment and Services
Telephone: 41919214891 Custom electrical power distribution and control prod- Grouting Services, Equipment and Materials
Fax: 41919214892 ucts including portable substations, power centers, Jet Grouting Equipment and Services
www.kern-tunneltechnik.com vacuum circuit breaker switch houses, longwall con- Non-Explosive Mechanical Excavation
trols, belt and pump starters, transformers. Custom Shaft Drilling and Raiseboring Equipment
electrical controls for TBMs.
King Shotcrete Solutions Main Office
Booth: 511 Products & Services 92 Natoma St
King Shotcrete Solutions include pre-packaged shot- Electrical - Generator-Motor, Wire-Cable San Francisco, CA 94105 USA
crete material, as well as mixing and placement Mining Equipment Telephone: (415) 901-4400
equipment, intended for mining, tunneling, concrete Underground Utility Materials and Operations Fax: (415) 901-4421
construction and concrete rehabilitation projects. King www.malcolmdrilling.com
Shotcrete Solutions supports your complete shotcrete Main Office
operation. King is also a distributor of mixing and 329 Williams St
pumping equipment designed for a variety of grouting Bristol, VA 24201 USA
applications. The strength of King Shotcrete Solutions Telephone: (276) 466-8200
lies in its ability to provide high-quality equipment, as Fax: (276) 645-8225
well as a high level of technical support from the sup- Email: adver@linepower.com
ply of wear parts to equipment servicing and training. www.linepower.com

Products & Services Lovsuns Tunneling Canada Ltd Mapei Corp


Concrete Mixing and Transportation Equipment
Concrete Reinforcement Booth: 411 Booth: 307
Lovsuns is a LNSS company that acquired the entire See our ad on page 37
Grouting Services, Equipment and Materials
assets of Caterpillar Tunneling Canada Corp. (formerly MAPEIs Underground Tunneling Technology (UTT)
Mining Equipment
known as LOVAT) in 2014. Lovsuns continues to build category offers a complete line of products and as-
Pumps and Pumping Equipment
on the 40+ years of TBM manufacturing legacy and sociated technologies for use in and on underground
Shotcrete Equipment, Supplies, and Services
is specialized in engineering and manufacturing full construction projects, including shotcrete accelera-
range of tunnel boring machines for both traffic and tors and admixtures for concrete, as well as products
Main Office
utility tunnel projects around the world, including EPB, for injection and consolidation, mechanized tunneling
3385 Harvester Rd
single shield, double shield and dual mode convertible (TBM), engineering and soil stabilization, coating and
Burlington, ON L7N 3N2 Canada
TBMs. By leveraging our modern and high capacity protection, maintenance, repair and waterproofing.
Telephone: (800) 461-0566
Fax: (905) 333-3730 factory in China, Lovsuns is fully committed and ca-
Email: kingshotcrete@kpmindustries.com pable of supplying new TBM and legacy LOVAT TBM Products & Services
refurbishment support solutions for our global custom- Shotcrete Equipment, Supplies, and Services
www.kingshotcrete.com
ers. Soil Conditioning Equipment and Materials
Underground Excavation Services and Equipment
KOSTEEL CO, LTD Products & Services
Booth: 336 Earth Pressure Balance Machines Main Office
BUNDREX Business Division (BBD) is a leading produc- Microtunneling Equipment, Tools, and Supplies 1144 E Newport Center Dr
er and supplier of top quality fibers for reinforcement of Rock TBM’s Deerfield Beach, FL 33442 USA
concrete in tunnel application in Korea since 2001. We Tunnel Boring Equipment Telephone: (954) 246-8888
provide Total Solution from products to technical sup- Fax: (954) 246-8801
port including design calculations of precast segments Main Office Email: w.morrison@utt.mapei.com
for TBM. Our products are CE and ISO 9001/14001 441 Carlingview Dr www.utt.mapei.com/
certified and confroms to ASTM A820 to meet global Toronto, ON M9W 5G7 Canada
standards of quality and safety as well as customer’s
satisfaction. We are innovative and future-oriented
Telephone: (647) 255-0018
Fax: (647) 255-3667
Matrix Design Group
company which delivers Results and Solutions of fiber www.lovsuns.com Booth: 301
reinforcement to our customers. Please stop by our Matrix is a designer, developer, and marketer of safety
and productivity technology for use in hazardous work
booth for additional information and detailed discus-
sions about future business together.
Malcolm Drilling Co Inc environments. It’s innovative and industry-leading
Booth: 619 products include Proximity Detection Systems, Com-
Malcolm Drilling Company, Inc. has for over 5 decades munications and Tracking Systems, Atmospheric Mon-
Products & Services
been an innovator and leader in the deep foundation itoring Systems and Underground Camera and Lighting
Abrasion and Impact Resistant Materials
industry. Malcolm’s list of core services as it relates systems.
Concrete Reinforcement
Engineering Design and Services for Tunnels to tunneling and geotechnical construction includes
Precast Concrete Linings drilled shafts, support of excavation systems, cutoff, Products & Services
Shotcrete Equipment, Supplies, and Services slurry and secant pile walls, grouting techniques, Computer Hardware and Software
Tunnel Lining and Support Materials various soil mixing methods and dewatering. These Dust and Fume Control Technology
combined services have routinely been applied on nu- Environmental Control Equipment and Supplies
merous complex tunneling projects throughout North Lighting Systems
Main Office
America. The company’s engineering experience facili- Safety Products
Haustory 4F 122
tates design/build efficiency and allows for timely col- Tunnel Communication Systems and Equipment
Sagajeong-Ro, Dongdaemun-Gu
Seoul, 130-120 Korea, South laboration with owners and contractors. This delivery
Telephone: +82 2-2106-0135 system optimizes cost savings while offering inherent Main Office
Fax: +82 2-2106-0240 scheduling advantages. 3299 Tower Dr
www.kosteel.co.kr

32 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
Demanding Conditions Demand JENNMAR.
We’ve been an innovative leader in ground plates and resins are backed by experienced
control for the mining industy for more than engineers and technicians who are with you
forty years. Over the past decade, our every step of the way, from initial consultation
growth has led us to make key acquisitions to qualified instruction and on-going technical
of resources to further enhance our deep support. And, of course, our customer service
commitment to serve the tunneling industry as is second-to-none. That’s something we’ve
well. Our rock bolts, anchoring systems, liner always demanded of ourselves.

Pittsburgh, PA USA • 412-963-9071 • www.jmcivil.com


EXHIBITORS
NAT2018

Newburgh, IN 47630 USA Branch Offices tom bearings in low volumes for special applications.
Telephone: (812) 490-1525 McMillen JA Engineering, PLLC Messinger goes above and beyond supplying just the
Email: info@matrixteam.com 183 Madison Avenue, Suite 505 bearing, offering complete solutions (field inspection,
www.matrixteam.com New York, NY 10016 USA bearing storage tanks, etc.). With Messingers expand-
Telephone: 212-376-1310 ing core of expertise and experience, its customers
can expect a quick response, unparalleled application
McDowell Equipment Ltd Email: murray@mcmjac.com
support and timely delivery to better support the tun-
Booth: 405 McMillen Jacobs Associates nel market.
McDowell can supply brand NEW and LATE model
1350 Treat Boulevard, Suite 1350
tunnelling equipment for Rental or Sales. Our rental Products & Services
Walnut Creek, CA 94597 USA
fleet consists of Underground Loaders(LHD) ½ yd to Mining Equipment
Telephone: 925-945-0677
10 yd, Underground Haul Trucks from 7 ton to 40 ton, Rock TBM’s
Email: spreng@mcmjac.com
low profile Motor Graders, Jumbo Drills with one, two Tunnel Boring Equipment
or three booms, Underground Remixers, Locomotives
McMillen Jacobs Associates
, Muck cars. We manufacture shotcrete machines, Main Office
5585 Landerbrook Drive, #120
scissor lifts , Anfo loaders, and personnel carriers. We 10385 Drummond Rd
Mayfield Heights, OH 44124 USA
can also offer fully re-manufactured or reconditioned Philadelphia, PA 19154 USA
Telephone: 216-292-9710
equipment at significant savings from new with Fast Telephone: (215) 824-4987
Email: dombroski@mcmjac.com
delivery times. Fax: (215) 824-4989
McMillen Jacobs Associates www.messingerbearings.com
Products & Services 1500 SW 1st Ave #750
Microtunneling Equipment, Tools, and Supplies
Mining Equipment
Portland, OR 97201 USA
Telephone: 503-227-1800
Michels Corp
Shotcrete Equipment, Supplies, and Services
Email: havekost@mcmjac.com Booth: 527
Tunnel Haulage Systems See our ad on page 38
Underground Excavation Services and Equipment Michels is an industry-leading utility contractor. A
McMillen Jacobs Canada Corporation
Underground Locomotives and Rail Haulage Equip- sampling of our deep foundation services for tunneling
1188 W Georgia St., Suite 1850
ment consist of design/build of a multitude of ERS systems,
Vancouver, BC V6E 4A2 Canada
Telephone: 604-336-8639 soil nails, secant piles, soldier piles, tiebacks, grouting,
Main Office Email: grimes@mcmjac.com and steel sheeting. Michels has the experience in a
2018 Kingsway variety of tunneling techniques, including Earth Pres-
Sudbury, ON P3B 4J8 Canada McMillen Jacobs Limited sure Balance Tunnel Boring Machines (TBM), hard rock
Telephone: (705) 566-8190 Customs St E TBMs, conventional drill blast tunneling, sequential ex-
Fax: (705) 566-6401 Auckland, 1010 New Zealand cavation methods (SEM), remote-controlled tunneling
Email: sales@bmcdowell.com Telephone: 64 09 551 2325 systems and microtunneling.
www.bmcdowell.com Email: knelson@mcmjac.com
Products & Services
McMillen Jacobs Associates Measurand Inc
Construction - Contracting Services
Drilling Services and Equipment
Booth: 316 Booth: 538 Shaft Drilling and Raiseboring Equipment
See our ad on page 36 Measurand designs and manufactures ShapeArray, a Shotcrete Equipment, Supplies, and Services
McMillen Jacobs Associates is a mid-sized multi-disci- 3D shape-sensing automated instrument that mea- Slurry Services and Machines
plined firm, with self-performing design-build capabil- sures deformation in slopes, tunnels, dams, and other Underground Excavation Services and Equipment
ity. We are experts in tunneling and water resources civil structures. With over 96,000 m of ShapeArray in-
and deploy that expertise to serve water, wastewater, stalled worldwide, Measurand is the industry standard Main Office
transportation, hydropower, energy, aquaculture, and for real-time 3D geotechnical and structural deforma- 817 Main St
regulatory clients using a wide range of delivery meth- tion monitoring. Brownsville, WI 53006 USA
ods. For over 60 years, we have worked closely with Telephone: (920) 583-3132
our clients at every stage of a project, assisting them
Products & Services www.michels.us
with planning, design, project management, construc-
Geological, Geotechnical Services and Equipment
tion, and start-up services. McMillen Jacobs Associ-
ates maintains offices covering North America and
Instrumentation Equipment and Services
Mighty Shield Industries Sdn
Australasia.
Main Office Bhd
Products & Services
2111 Hanwell Rd Booth: 603
Fredericton, NB E3C 1M7 Canada Mighty Shield Industries incorporated in 2002, is lo-
Construction - Contracting Services
Telephone: (506) 462-9119 cated in Shah Alam, Malaysia. As part of our range
Consulting Engineers
Fax: (506) 462-9095 of products, we manufacture Dunamis™ FRC macro
Engineering Design and Services for Tunnels
Email: sales@measurand.com polypropelene (PP) fibers to support reinforcement in
Geological, Geotechnical Services and Equipment
www.measurand.com mining and concrete construction. Our PP fibres bridge
Underground Excavation Services and Equipment
cracks support, resist flexural deformation with added
Main Office Messinger Bearings energy absorption capacity. Fibre lengths are 32mm,
47mm, 56mm and 65mm. Packaging is water soluble
1109 First Ave, Ste 501 Booth: 606 mixer-ready packed in 3kg, 4kg and 5kg, lightweight
Seattle, WA 98101 USA Surpassing 100 years, Messinger Bearings is one
Telephone: (206) 588-8193 and easy to use. High-strength fibres reduce cracks
of an elite few companies in the world capable of
Fax: (206) 588-8200 and shrinkage in shotcrete, precast products, mining
producing large (up to 25 feet in diameter), custom-
Email: info@mcmjac.com blocks, pavements, concrete floors and structures.
designed bearings in limited quantities for tunnel bor-
www.mcmjac.com ing machines (TBMs). In fact, Messinger focuses on
manufacturing new and expert repairing of large cus-

34 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
We build large, complex
infrastructure projects

95 Years of Expertise in Tunneling. This is Lane. A complex tunneling


contractor with a diversified portfolio including outstanding projects like the Lake
Mead Intake No. 3 in Nevada and the Anacostia River Tunnel in Washington,
D.C., both completed by S.A. Healy Company, now merged with Lane. Meet us
at this year’s North American Tunneling Conference in Washington, D.C.
www.LaneConstruct.com
EXHIBITORS
NAT2018

Products & Services Tunnel Haulage Systems


Concrete Reinforcement Ventilation Systems, Materials and Equipment
Precast Concrete Linings
Tunnel Lining and Support Materials Main Office
PO Box 2114
Main Office Durango, CO 81302 USA
Lot 6018, 6-1/2 miles, Jalan Bukit Kemuning Telephone: (970) 259-0412
Shah Alam, Selangor Darul Ehsan 40460 Malaysia Fax: (970) 259-5149
Telephone: 60123336000 Email: info@miningequipmentltd.com
Email: dunamisfiber@mightyshield.com.my www.miningequipmentltd.com
www.mightyshield.com.my

Moretrench
Mining Equipment Ltd Booth: 326
Booth: 506 See our ad on page 41
See our ad on page 39 Moretrench, a division of Hayward Baker, is a leader in providing the ground sup-
Mining Equipment has been supplying the mining and tunneling industries with port and groundwater control necessary for deep shafts, tunnels and adits, un-
quality rebuilt underground equipment for more than 30 years. The business has derground structures, and launch and retrieval boxes. Services include: ground
grown to encompass new ventilation equipment, Jetair fans, and new rolling stock, freezing; jet, compensation, and compaction grouting; dewatering; and groundwa-
C.S. Card and Moran Engineering. Mining Equipment, Jetair and Mine Hoists Inter- ter treatment. Our expertise has been put to work on the most complex and chal-
national are currently doing business in North and South America, Australia, Asia, lenging projects. Proud to now be part of Hayward Baker, bringing you enhanced
Africa and Europe. resources, capabilities, and local expertise across North America and abroad.

Products & Services Products & Services


Concrete Mixing and Transportation Equipment Construction - Contracting Services
Hoists and Headframes Ground Freezing
Mining Equipment Ground Improvement Equipment and Services
Mucking Systems Grouting Services, Equipment and Materials
Jet Grouting Equipment and Services
Water Treatment Plant and Materials

Main Office
100 Stickle Ave
Rockaway, NJ 07866 USA
Telephone: (973) 627-2100
Fax: (973) 627-3950
www.moretrench.com

Mott MacDonald
Booth: 451
Mott MacDonald provides tunnel design and engineering solutions for rail and tran-
sit, road, water/wastewater conveyance, CSO storage, and cable and communica-
tions. With a reputation for technical excellence, Mott MacDonald identifies prac-
tical approaches to tunneling, equipment selection and contracting approaches.
Expertise includes soft ground and rock tunneling, cut and cover, underground
UNDERGROUND ENGINEERING caverns, immersed tube tunnels, jacked tunnels, and microtunneling. Complemen-
tary skills in technical areas include tunnel rehabilitation, ground stabilization and
McMillen Jacobs Associates is treatment, tunnel systems, ventilation, and life safety and security. With 16,000
a highly technical firm providing employees worldwide, Mott MacDonald is one of the world’s largest employee-
engineering, environmental, owned companies.
and construction services to
the water, wastewater, Products & Services
transportation, hydropower, Consulting Engineers
and heavy civil industries. Engineering Design and Services for Tunnels

Main Office
111 Wood Ave S
Iselin, NJ 8830 USA
Telephone: (800) 832-3272
mcmjac.com Fax: (973) 376-1072
Email: americas@mottmac.com
www.mottmac.com

36 2018 NAT SHOWGUIDE T&UC® SHOWGUIDE exhibitor listings as of April 17, 2018
Proven Technology for
Underground
Construction

Our commitment is the detail that makes the difference.


Reliable technology and expertise for underground construction
• Alkali-free set accelerators and admixtures for shotcrete
• Products for mechanized tunneling: foaming agents for soil conditioning, polymers, sealants and lubricants
• Products for grouting and consolidation
• Products for concrete repairing, protection and coating
• Products for waterproofing: synthetic waterproofing membranes and waterproofing accessories

Discover the world of MAPEI: Visit www.utt-mapei.com or email us at hq.utt@utt.mapei.com

MAPEI Americas
EXHIBITORS
NAT2018

Branch Offices Main Office


Mott MacDonald
Mott MacDonald 162 Cowie St, Ste 100
4301 Hacienda Drive Suite 300
4600 N. Fairfax Drive Suite 806 Granby, QC J26 3V3 Canada
Pleasanton, CA 94588 USA
Arlington, VA 22203 USA Telephone: (450) 558-7141
Telephone: 925-469-8010
Telephone: 571-451-0950 www.mspstructures.com
Fax: 925-469-8011
Fax: 703-807-0120
Email: americas@mottmac.com
Email: americas@mottmac.com
Mueser Rutledge Consulting
Mott MacDonald
18013 Cleveland Parkway Drive Suite 200
MSP Structures Inc Engineers
Cleveland, OH 44135 USA Booth: 605 Booth: 557
Telephone: 216-535-3640 MSP Structures Inc offers 22 years experience of de- Mueser Rutledge Consulting Engineers (MRCE) is a
sign and fabrication of custom tunnel forming equip- leading engineering firm providing structural design
Fax: 216-265-2816
ment and accessories. We offer technical help for form of foundations and complete geotechnical studies. De-
Email: americas@mottmac.com system and production optimization. We also have a sign solutions for tunnels and shafts is one of the firm’s
Mott MacDonald specialized department offering used form analysis, specialties, and MRCE is involved in a wide range of
modification and refurbishment services for all types tunnel projects in both soft ground and rock for rail-
550 Burrard Street Suite 1888, Bentall 5
of forms. We offer design and fabrication of work roads, subways, highways, power and infrastructure.
Vancouver, BC V6C 2B5 Canada
decks, lifting equipment, material transportation and These projects often involve large underground struc-
Telephone: 604-681-4400 other custom heavy-duty components used to improve
Email: americas@mottmac.com tures inside deep and open cuts. MRCE has expertise
production cycles on construction job sites. We offer in constructing watertight retaining structures using
specialized 2D and 3D design and drafting services in secant piles, slurry wall, braced sheet piles supported
Mott MacDonald
addition finite element analysis services for structural by struts, rakers, or tie-backs and providing ground-
10 South LaSalle Street Suite 2520 equipment. We offer bid preparation and Owner sub-
Chicago, IL 60603 USA water seepage control with jet grouting and ground
mittal assistance. freezing.
Telephone: 312-894-5372
Email: americas@mottmac.com
Products & Services Products & Services
Mott MacDonald Consulting Engineers Construction - Contracting Services
1400 Broadway 30th Floor Engineering Design and Services for Tunnels Consulting Engineers
New York, NY 10018 USA Tunnel Lining and Support Materials Engineering Design and Services for Tunnels
Telephone: 212-532-4111 Geological, Geotechnical Services and Equipment
Fax: 716-970-4044 Ground Freezing
Email: americas@mottmac.com Ground Improvement Equipment and Services

Main Office
www.michels.us 515 M St, Ste 210
Washington, DC 20003 USA

Your story is told Telephone: (202) 554-0770


Email: mhuguet@mrce.com
www.mrce.com
Transportation & Utility Contractor through the
Branch Office
things we build. Mueser Rutledge Consulting Engineers
14 Penn Plz, 225 W 34th St
New York, NY 10122 USA
Telephone: (917) 339-9300
Fax: (917) 339-9400
Email: mhuguet@mrce.com

Naylor Pipe Co
Booth: 213
See our ad on page 40
Naylor Pipe is manufactured in accordance with ASTM
A-139 and ASTM A-211 specifications. Diameters from
4” to 96”, and thicknesses from 1/16” to 1/2”. Also
available are the necessary fittings and connections
including the exclusive Naylor Heavy Duty Wedgelock
Couplings to complete your pipe system.

Products & Services


Steel Pipe
Ventilation Systems, Materials and Equipment

Swift action & attitude are Main Office


GAME CHANGERS. 1230 E 92nd St
Chicago, IL 60619 USA
UP FOR THE CHALLENGE? Telephone: (773) 721-9400
Fax: (773) 721-9494
AA/EOE/M/W/Vet/Disability www.michelscareers.us Email: sales@naylorpipe.com
www.naylorpipe.com

38 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
EXHIBITORS
NAT2018

Nicholson constructs access shafts with diaphragm dards, Nightstick products cost less as compared to
Nexans AmerCable walls and jet grout columns and the company supports competitor offerings. Explosive Environments; Industri-
Booth: 622 operations with a wide variety of grouting and earth al Plants; Automotive Shops; EMS; Rescue Teams; Law
Nexans AmerCable is the leading manufacturer of tun- retention techniques. Nicholson has offices around the Enforcement; Fire Fighting, Protection and Inspection;
nel power cables in the United States. Some of the country to address each region’s unique geotechnical Security; Military Operations.
largest TBMs in the world, including the SR-99 Seattle construction needs.
project, are powered by our Tiger® Brand cables. Products & Services
These cables are designed to provide safer, longer Products & Services Lighting Systems
service life in harsh environments. Nexans AmerCable Geological, Geotechnical Services and Equipment Microtunneling Equipment, Tools, and Supplies
is the industry leader in engineering support and prod- Grouting Services, Equipment and Materials Safety Products
uct innovation. We also offer cable repair services to Jet Grouting Equipment and Services Segment Accessories
extend the life of your cable – project after project. Shaft Drilling and Raiseboring Equipment Underground Excavation Services and Equipment
Underground Utility Materials and Operations
Products & Services Main Office
Consulting Engineers 2400 Ansys Dr, Ste 303 Main Office
Electrical - Generator-Motor, Wire-Cable Canonsburg, PA 15317 USA 640 S Sanden Blvd
Telephone: (412) 221-4500 Wylie, TX 75098 USA
Main Office Fax: (412) 221-3127 Telephone: (800) 233-2155
350 Bailey Rd www.nicholsonconstruction.com Fax: (469) 326-9401
El Dorado, AR 71730 USA Email: info@baycoproducts.com
Telephone: (214) 550-4681 www.nightstick.com
Fax: (870) 864-1860 Nightstick
Email: tom.rice@nezansamercable.com Booth: 629
www.nexansamercable.com Nightstick, is a global brand of professional LED light- NKT Photonics Inc
ing products including flashlights, headlamps and Booth: 512
Intrinsically Safe hazardous environment lighting so- NKT Photonics is the leading supplier of high perfor-
Nicholson Construction Co lutions that exceed the industry standards in perfor- mance fiber lasers, fiber optic sensing systems, and
Booth: 505 mance, quality, user-safety and value. The Nightstick photonic crystal fibers. Our main markets are within
Founded in 1955, Nicholson is a leader in geotechnical product line is designed and manufactured to outper- imaging, sensing and material processing. Our prod-
construction, providing a wide range of deep founda- form and be of a higher quality standard than any other ucts include ultrafast lasers, supercontinuum white
tion, earth retention and ground treatmentservices on product in its class. Even with the highest quality stan- light lasers, low noise fiber lasers, distributed tem-
projects throughout the United States. For tunnels, perature sensing systems and a wide range of spe-

GOING ABOVE & BEYOND


Mining Equipment has been supplying the tunneling and mining
industries with top quality underground equipment for more than
35 years. With our depth of experience and broad range of new and
used equipment, our dedicated staff will work closely with you to
determine and fulfill your equipment needs.
Locomotives
Rolling Stock
Scooptrams
Drill Jumbos
Mine Hoists
Stage Winches
Ventilation Equipment
Phone: (970) 259-0412 | www.miningequipmentltd.com

SHOWGUIDE exhibitor listings as of April 17, 2018 T&UC ® 2018 NAT SHOWGUIDE 39
EXHIBITORS
NAT2018

cialty fibers. Our LIOS product line offers distributed explosive charging, lifting and installation, under- needs, while backed by NLT proven support and ex-
fiber optic sensing systems for temperature, strain and ground logistics and scaling. For concrete spraying pertise.
acoustic sensing. and transport, Normet provides equipment, compre-
hensive range of construction chemicals and support Products & Services
Products & Services for the whole application. Control Systems
Ground Improvement Equipment and Services Environmental Control Equipment and Supplies
Safety Products Products & Services Instrumentation Equipment and Services
Soil Conditioning Equipment and Materials Concrete Mixing and Transportation Equipment Lighting Systems
Survey Equipment and Lasers Concrete Reinforcement Tunnel Communication Systems and Equipment
Tunnel Communication Systems and Equipment Scaling
Underground Utility Materials and Operations Shotcrete Equipment, Supplies, and Services Main Office
Soil Conditioning Equipment and Materials 33 Laird Dr
Main Office Tunnel Lining and Support Materials Toronto, ON M4G 3S8 Canada
3514 N Vancouver Ave, Ste 310 Telephone: (416) 425-6559
Portland, OR 97227 USA Main Office Fax: (416) 425 5960
Telephone: (503) 863-0901 1414 Gladiola St, Ste 100 Email: info@nltinc.com
www.nktphotonics.com Salt Lake City, UT 84104 USA www.nltinc.com
Telephone: (262) 497-7136
Fax: (262) 886-1673
Normet Americas, Inc www.normet.com
Northwest Laborers-
Booth: 611 Employers Training Trust
See our ad on page 42
Normet provides solutions for selected, demanding Northern Light Technologies Booth: 424
customer processes in underground mining and tun- Booth: 518 See our ad on page 45
neling. For 50 years Normet has developed, manu- NLT is a global integrator of underground tracking, The Safety and Hazard Awareness for Tunnels (SHAFT)
factured and marketed equipment and vehicles for voice / text communications, video, gas and airflow courses are designed to teach skills for working safely
underground applications. In addition, it provides a monitoring, automated ventilation, emergency evacu- in tunnels constructed using a tunnel boring machine
comprehensive range of life time care services e.g. ation technology, and underground internet capabili- (TBM). The program was developed by the Northwest
maintenance, service programs and spare parts. ties. NLT’s industry leading solutions and applications Laborers-Employers Training Trust with input and
Normet offers solutions for the following underground enable our clients to create or expand an underground consultation from several organizations. In addition to
customer processes: concrete spraying and transport, tracking and communication system specific to their classroom lecture and discussion, participants have

40 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
EXHIBITORS
NAT2018

the experience of training in a simulated, lifelike tun- caisson and tunneling work, or critical-care hyperbaric Products & Services
neling environment. treatments. Drilling Services and Equipment
Engineering Design and Services for Tunnels
Products & Services Products & Services Microtunneling Equipment, Tools, and Supplies
Educational Consulting Environmental Shaft Drilling and Raiseboring Equipment
Safety Products Tunnel Boring Equipment
Main Office
27055 Ohio Ave NE Main Office Main Office
Kingston, WA 98346 USA 1816 Industrial Blvd Via dell’Industria n.58
Telephone: (360) 297-3035 Harvey, LA 70058 USA Gaggio Montano, BO 40041 Italy
Fax: (360) 297-7366 Telephone: (504) 366-7638 Telephone: +39 053432511
www.nwlett.org www.oceanadvancedresearch.com Fax: +39 053432501
www.palmierigroup.com
Ocean Advanced Research Palmieri S.p.A.
Branch Office
Booth: 338 Booth: 112 DynaMEK Group Ltd
Ocean Advanced Research (OAR) is a New Orleans- With over 50 years of experience in the manufactur-
6200 Dixie Rd, Unit 7
based company providing medical support for com- ing of Tunneling and Drilling parts and consumables,
Mississauga, ON L5T 2E1 Canada
mercial, scientific, and recreational diving activities. the Palmieri is nowadays one of the most experienced
Telephone: (905) 795-1968
Under the direction of Dr. Keith Van Meter, an interna- and specialized group of companies worldwide. De-
Email: sales@dynamekgroup.com
tionally-recognized expert, OAR provides ADCI physi- sign and production of either rolling and fixed tools for
cals, medical support, TBM air-lock system operations, any type of excavation; from horizontal boring (Tun-
and on-site hyperbaric chamber support and opera- nels for roads, railways and water) to vertical boring Parsons
tion. With well over 100 years of combined experi- and drilling. Engineering development, manufacturing, Booth: 529
ence, OAR staff includes: Board-certified physicians, refurbishment and rental of underground equipment See our ad on page 47
qualified mid-level providers, hyperbaric nurses, diver such as TBMs, Raise Boring Machines, Microtunnel- Parsons is a technology-driven engineering services
medical technicians, and certified hyperbaric tech- ling/Pipejacking equipment, Cutterheads, Back-Up firm with more than 70 years of experience in the
nologists. OAR can supply the equipment and skilled, systems, Rolling Stock, as well as innovative and non- engineering, construction, technical, and professional
experienced personnel necessary for complete medi- conventional solutions for all the above mentioned services industries. We have successfully delivered
cal support of on-shore or off-shore diving operations, business sectors. some of the largest and most complex tunneling and

EQUIPMENT SERVICE CONSTRUCTION ROCK


CHEMICALS REINFORCEMENT

UNDERGROUND
EXPERTISE
PROJECT SUCCESS BEGINS AT THE BEGINNING

We are a global brand with access to the brightest minds in our industry. We deploy

these experts to the local level where we serve as true collaborative partners for our

clients. This partnership allows us to fill knowledge gaps, maximize efficiencies, and

assume full responsibility to offer our clients the greatest return possible.

42 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
WE CAN
NE VE R
DIG DEE P
ENOUGH
D IG D E E PE R.

T&UC – Tunneling & Underground Construction – brings the

underground construction and mining professional serious resources

each and every issue. Feature articles from respected leaders in the

field. Tunnel Demand Forecast – an in-depth review of top mining

projects. New technology. Top products and services. If you are serious

about underground construction – get serious with the resources you

will find in T&UC. Join SME for a free subscription or call to purchase, +1-800-763-3132.

Need advertising or marketing support? +1-303-948-4243. DIG DEEPER.

TUCMAGAZINE.COM tucmagazine.com
SMENET.ORG www.smenet.org
EXHIBITORS
NAT2018

underground construction projects in the world. From Main Office Promat®-H, Promaspray®-F5, PROMASEAL® Archi-
planning and design through construction manage- 2500 Wilcrest Dr, Ste 300 tectural Decroative Cladding Product: Glasal®-T. All
ment and operations, Parsons provides a complete Houston, TX 77042 USA fire protection products have undergone full scale
range of services for water, wastewater, and trans- Telephone: (248) 268-8200 testing and meet NFPA-502 and all international stan-
portation tunnels. Whether your project involves soft www.plaxis.com dards, regulations and recommendations for fire pro-
ground, rock, or mixed-faced conditions, our dedicated tection of tunnel structures.
staff of more than 100 tunnel professionals have the
experience and skills to manage the risks and deliver Poltinger Precision Systems Products & Services
safe, economical, and innovative solutions.
GmbH Construction - Contracting Services
Engineering Design and Services for Tunnels
Products & Services Booth: 651 Safety Products
Engineering Design and Services for Tunnels Manufacturer of Underground Navigation Solutions for Tunnel Lining and Support Materials
TBMs, Roadheaders, Pipejacking/Microtunneling and Underground Utility Materials and Operations
Main Office other types of tunnelling machines. Additional products Ventilation Systems, Materials and Equipment
100 M St SE, Ste 1200 for conventional mining as well as surveying related
Washington, DC 20003 USA services are offered as well. Main Office
Telephone: (202) 775-3300 1731 Fred Lawson Dr
Fax: (202) 775-3422 Products & Services Maryville, TN 37801 USA
Email: steve.minassian@parsons.com Instrumentation Equipment and Services Telephone: (888) 681-0155
www.parsons.com Laser Guidance Systems Fax: (865) 681-0016
Microtunneling Equipment, Tools, and Supplies www.promat-tunnel.com
Roadheaders
Plaxis Americas LLC Survey Equipment and Lasers
Booth: 419 Tunnel Boring Equipment Putzmeister
The renowned Plaxis software is based on finite ele- Booth: 400
ment method and is intended for 2-Dimensional and Main Office Putzmeister is an international group based in Aichal,
3-Dimensional geotechnical analysis of deformation Henschelring 15A Germany, with over 50 years’ experience in the con-
and stability of soil structures. Geo-engineering appli- Kirchheim, 85551 Germany struction and public works sector, and worldwide lead-
cations such as tunnels, excavation, foundations, em- Telephone: +49 89 12766 1440 er in the development and manufacture of concrete
bankments, and slopes can be designed and analyzed Fax: +49 89 12766 14420 pumping equipment. The Putzmeister Group is set in 5
in this user-friendly and intuitive software. A suite of Email: info@pps-muc.de different business divisions. Putzmeister Underground
constitutive models is available, ranging from soft www.pps-muc.de Technology Division develops, manufactures, and mar-
soil to rock, and from linear elastic to fully nonlinear. kets concrete spraying equipment for rock-support in
Special modules are available for modeling dynamics
and (complex) groundwater flow. Easy to use tools are
Promat International NV tunnels and underground mining as well as low profile
concrete mixing and transport equipment.
available to define construction stages and to build Booth: 600
complex geometries of tunnels and excavations. Passive fire protection solutions manufactured and Products & Services
supplied globally for transportation tunnels, bridges, Concrete Mixing and Transportation Equipment
Products & Services limited access highways, ventilation corridors, cable Mining Equipment
Computer Hardware and Software trays, immersion and expansion joint protection, ac- Pumps and Pumping Equipment
Geological, Geotechnical Services and cess utility corridors, and architectural decroative
T&UC ad 2017.pdf 1 Equipment
11/10/17 9:42 AM Shotcrete Equipment, Supplies, and Services
tunnel linings. Fire Protection Products: PromatT,

CM

MY

CY

CMY

SHOWGUIDE exhibitor listings as of April 17, 2018 T&UC ® 2018 NAT SHOWGUIDE 45
EXHIBITORS
NAT2018

Main Office Instrumentation Equipment and Services plication include national and international large-scale
1733 90th St Mining Equipment projects in tunnelling and infrastructure, as well as in
Struevant, WI 53177 USA Tunnel Communication Systems and Equipment the hydraulic, environmental and rehabilitation sectors.
Telephone: (800) 553-3414
Email: shotcrete@putzam.com Main Office Products & Services
www.putzmeisteramerica.com 11545 Kingston St Construction - Contracting Services
Maple Ridge, BC V2X 0Z5 Canada Engineering Design and Services for Tunnels
Telephone: (604) 540-1100 Grouting Services, Equipment and Materials
R.S.T. Instruments Ltd Fax: (604) 540-1005 Shaft Drilling and Raiseboring Equipment
Booth: 561 www.rstinstruments.com Tunnel Lining and Support Materials
R.S.T. Instruments Ltd. has been in the engineering
instrumentation industry since 1977. From conceptual Branch Office Main Office
designs of site-specific products to the exceptional R.S.T. Instruments Ltd (UK) 13800 Coppermine Rd
post-sale calibration and repair service offered by the Unit 4 Charles Industrial Estate Herndon, VA 20171 USA
company’s technical department, RST’s commitment Stowupland Road,Stowmarket Telephone: (703) 234-4161
to client satisfaction is our ultimate organizational Suffolk, IP14 5AH United Kingdom Email: info@renesco.com
goal. RST takes much pride in providing custom en- Telephone: +44 1449 613677 www.renesco.com
gineered solutions to site-specific problems on a de- Email: gtaylor@rstinstruments.com
sign-build basis. With ISO 9001 Certification, RST has
a proven track record for quality, long-term stability,
Richard Goettle, Inc
and product reliability. Our 26,000 sq.ft. modern fa-
Renesco Inc Booth: 601
cility incorporates CAD, CAM, and CNC manufacturing Booth: 102 Richard Goettle, Inc. is a geotechnical engineering and
techniques. Such techniques assure high quality, at a Renesco is a leading international company, special- construction company serving the United States. With
reasonable cost, with timely delivery. ized in the field of structural waterproofing and injec- over 60 years of experience, Goettle continues to be
tions/grouting services. Established in 1965, Renesco an industry leader specializing in design-build, earth
Products & Services is part of the Marti Group in Switzerland, an owner-op- retention systems, deep foundations, ground modifi-
Engineering Design and Services for Tunnels erated family business that specializes in underground cation, and marine construction. Goettle services the
Geological, Geotechnical Services and Equipment construction. Renesco provides all kind of specialty tunneling industry by providing large diameter drilled
Grouting Services, Equipment and Materials services for sealing operations in underground struc- shafts and earth retention systems, Including secant
tures against pressurized and non-pressurized water, pile, soldier piles and lagging, and sheet pile systems.
as well as injection/grouting works. Main areas of ap- Solid engineering, state of the art equipment, innova-

Providing core drilling services for coal


and mineral exploration, geotechnical,
and geothermal industries

Providing core
2320 River Rd.,drilling services
P.O. Box 267, for
Clark Fork, ID coal
83811 and
Ph: (208) 266-1151 Fx: (208) 266-1379
mineral exploration, geotechnical, and
www.ruendrilling.com office@ruendrilling.com
geothermal industries
Modesto, CA Bozeman, MT Wytheville, VA Lima, Peru
2320 River Rd., P.O. Box 267, Clark Fork, ID 83811
46 2018 NAT SHOWGUIDE T&UC Ph: (208) 266-1151 Fx: (208) 266-1379
SHOWGUIDE exhibitor listings as of April 17, 2018
www.ruendrilling.com | office@ruendrilling.com
®
People. Process.
Technology.
Delaware Aqueduct Bypass Tunnel
Newburgh, New York

parsons.com
EXHIBITORS
NAT2018

tive construction techniques, creative problem solving, can also provide solutions for other aspects of your Telephone: (412) 680-2526
and many years of experience are the hallmarks of business. Richway knows foam and equipment. Email: melih@ritegeosystems.com
what Goettle provides to our clients. www.ritegeosystems.com
Products & Services
Products & Services
Construction - Contracting Services
Grouting Services, Equipment and Materials
Lubricants for TBM
ROBODRILL
Drilling Services and Equipment Tunnel Boring Equipment Booth: 222
Grouting Services, Equipment and Materials Tunnel Lining and Support Materials ROBODRILL is specialized in the design, the manu-
Shaft Drilling and Raiseboring Equipment Underground Excavation Services and Equipment facture and the rental of underground drilling rigs.
With a fleet of more than 100 jumbos, from 1 to 3
Main Office Main Office booms, automated and manual, we are committed
12071 Hamilton Ave PO Box 508 to projects all over the world. Along with the ma-
CIncinnati, OH 45231 USA Janesville, IA 50647 USA chines, we also provide jumbos servicing, spare parts
Telephone: (513) 825-8100 Telephone: (319) 987-2976 inventory,supervisors, and experienced operators for
Fax: (513) 825-8107 Fax: (319) 987-2251 short or long duration projects.
Email: info@goettle.com www.cretefoamer.com
www.goettle.com Products & Services
Drilling Services and Equipment
Rite Geosystems Rock Drills
Richway Industries Booth: 209 Shaft Drilling and Raiseboring Equipment
Booth: 416 Instrumentation and Monitoring Solution Provider. Geo- Underground Excavation Services and Equipment
Richway Industries is the premier manufacturer of technical, Structural and Environmental Instrumenta-
equipment and foam concentrate for the production of tion Manufacturer. Online Cloud Based Automated Main Office
cellular concrete. With equipment capable of produc- Data Acquisition Solutions. 5 Rue Jean Perrin
ing up to 100 yards per hour, it’s ASTM C869 foam Genas, 69740 France
concentrate, and over 40 years of foam generation and Products & Services Telephone: +33 4 72 79 00 20
manufacturing experience, Richway can help with all Instrumentation Equipment and Services Fax: +33 4 72 79 00 29
of your cellular concrete needs. Because foam con- www.robodrill-sa.com/
centrate formulation & production, as well equipment Main Office
design & production, are done in our own facility, we 1653 McFarland RD
Pittsburgh, PA 15216 USA

48 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
EXHIBITORS
NAT2018

Rocscience, Inc Ruen Drilling, Inc


Booth: 310 Booth: 304
Founded in 1996, Rocscience is a world leader in de- See our ad on page 46
veloping 2D and 3D software for civil, mining, and geo- Ruen Drilling provides drilling services including sur-
technical engineers. For over 20 years, we’ve built on face, underground, and horizontal directional core
leading-edge research to create the best geotechnical drilling for the geotechnical, exploration and geother-
software available. As engineers ourselves, we know mal industries throughout the U.S., South America and
the importance of having accurate, reliable, and easy- Asia. Drilling equipment includes truck, track, skid, and Sandvik Mining and Rock
to-use software, so we constantly develop and refine helicopter supported core drills. Rig capacities are to
our products to make solutions that work for you. Ex- 10,000 ft. vertical or angle and 3,000 ft. horizontal. Technology
plore our comprehensive suite of tools used by over Crews are all trained in achieving a high degree of Booth: 628
7,000 engineers around the world for slope stability, core recovery for the client. Recent projects include: Sandvik Mining and Rock Technology is a business
excavation design, and geotechnical analysis. Devils Slide Tunnel, Irvington Tunnel, Caldecott Tunnel area within the Sandvik Group and a global leading
4th bore, Route 9 Tunnel in Hong Kong, Highway 53 supplier of equipment and tools, service and technical
Products & Services Tunnel in Puerto Rico, White Sands Missile Range and solutions for the mining and construction industries.
Computer Hardware and Software Mt. Olympus Pipeline No. 6. Application areas include rock drilling, rock cutting,
Geological, Geotechnical Services and Equipment crushing and screening, loading and hauling, tunnel-
Products & Services ing, quarrying and breaking and demolition.
Main Office Drilling Services and Equipment
54 St Patrick St Products & Services
Toronto, ON M5T1V1 Canada Main Office Drilling Services and Equipment
Telephone: (416) 698-8217 2320 River Rd Dust and Fume Control Technology
Email: software@rocscience.com Clark Fork, ID 83811 USA Mining Equipment
www.rocscience.com Telephone: (209) 988-4261 Roadheaders
Fax: (209) 577-3157 Rock Drills
www.ruendrilling.com Tunnel Boring Equipment

Tunnel
Design
Precast Segment Shaft
Liner Design Design

Cavern Design Geostructural


Design

Instrumentation Risk
& Monitoring Management

Construction
Engineering 5D BIM

Feasibility Cost
Estimating

Inspection &
Constructability Rehab

Numerical Value
Methods Engineering
Geotechnics

SHOWGUIDE exhibitor listings as of April 17, 2018 T&UC ® 2018 NAT SHOWGUIDE 49
EXHIBITORS
NAT2018

Main Office Main Office Products & Services


300 Technology Ct 2233 Sanford Dr Consulting Engineers
Smyrna, GA 30082 USA Grand Junction, CO 81505 USA Consulting Environmental
Telephone: (404) 589-2823 Telephone: (970) 245-9400 Engineering Design and Services for Tunnels
Fax: (404) 589-2923 Fax: (970) 245-9402 Geological, Geotechnical Services and Equipment
www.sandvik.com www.schauenburg-us.com Precast Concrete Linings
Underground Excavation Services and Equipment
Schauenburg Flexadux Corp Main Office
Booth: 636 12720 Hillcrest Rd, Ste 585
See our ad on page 48 Dallas, TX 75230 USA
Schauenburg offers a complete line of ventilation Telephone: (972) 250-3322
products and ventilation design assistance for the min- Email: d.kochis@schnabel-sws.com
ing and tunneling industry. Its products include forced schnabel-sws.com
air ventilation ducting, cassette systems for tunneling, Schnabel - SWS
flexible wire reinforced suction ducting, high pressure
couplings, phenolic fiberglass ducting, inflatable stop-
Booth: 624 Schnabel Foundation Co
See our ad on page 49
pings, fans and dust collectors (wet or dry) as well as
Schnabel Engineering and SWS Engineering USA have
Booth: 541
all fittings and adapters required to complete your ven- Schnabel Foundation Company is a specialty geo-
formed a strategic alliance to provide tunnel and un-
tilation system. In addition, Schauenburg carries gas technical contractor that has been designing and con-
derground solutions for complex infrastructure chal-
detection radio cap lamps, brattice line curtains, tarps, structing earth retention and deep foundation projects
lenges in North America, specifically the United States
brattice cable hangers, powder bags and cushions. All since 1959. Schnabel has a wide range of design and
and Canada. We have combined our project experience
of its ventilation products are MSHA approved for un- construction methods to provide the tunneling industry
and expertise in tunnel and geostructural design, risk
derground use. with the best possible circular access shaft or water
management, construction management and BIM.
cutoff retention system. These methods include secant
This association also brings significant experience and
Products & Services piles, jet grouting and soil mixing, along with more
a sophisticated array of personnel to regions served by
Dust and Fume Control Technology conventional earth support systems and micropile
our more than 21 strategic offices in the United States
Safety Products foundations. Schnabel’s numerous offices throughout
and Canada.
Ventilation Systems, Materials and Equipment the United States and in-house design capabilities al-
low a tailored fit system for project specific needs.

When
When You‘re
You‘re Six
Six Miles
Miles Inside
Inside A
A Mountain,
Mountain,
You’ll
You’ll Really
Really Appreciate
Appreciate Your
Your Partnership
Partnership
With
With Shotcrete
Shotcrete Technologies,
Technologies, Inc.
Inc. Whether it’s a quarry in Iowa, a subway tunnel in Washington
D.C., or a mine in Australia, Shotcrete Technologies, Inc. has “been
there, done that!” STI has the products, the know-how, and the serv-
ice support to get your project done right, on time, and on budget.
Our uniquely designed equipment - the Shot-Tech Telescoping
Robotic Arm and the Shot-Tech Nozzle - puts your shotcrete where
you want it, even in the tightest work spaces. And STI offers a choice
of accelerators and formulas that keep your shotcrete in place, with
the specification needed to fit the job.
When you assemble the team for your next project, new or rehab,
pick Shotcrete Technologies, Inc., the partner the experts pick for
shotcrete solutions. Call us today.
Visit our new website - www.shotcretetechnologies.com.

1431 Miner Street • Idaho Springs, CO 80452 • Phone: (303) 567-4871 • Fax: (303) 567-4605 • E-mail: Shotset250@aol.com

50 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
Applied Innovation. Proven Solutions.

Everyone knows that ground freezing succeeds in extremely difficult soil conditions where other excavation
support methods are not feasible. Everyone also knows that soil freezing is one of only a handful of shoring
methods can eliminate groundwater infiltration. But did you also know advancements in freeze technology
and refinements in our freeze equipment has made SoilFreeze more mobile, versatile, and more cost effi-
cient than ever before? And that soil freezing is extremely eco-conscious?
So why wait for the worst soil conditions? Ground freezing can solve any ground support requirements and
eliminate dewatering at the same time. SoilFreeze is a leading provider of efficient, environmentally friend-
ly ground freezing solutions. Installations can be designed, installed, and maintained for projects lasting a
few weeks, or for several years. We serve both the private and public sectors and have a substantial list of
successful projects and clients.

The Industry Leader in Frozen Soil Technologies


• STRUCTURAL SHORING INDUSTRIES SERVED
Tunneling and Shafts
• GROUNDWATER CUTOFF Foundation Excavations
• ENVIRONMENTAL REMEDIATION Utilities and Pump Stations
Environmental/Soil Remediation
Mining

5931 238th ST SE #201 • Woodinville, WA 98072


(206) 420-2759 • www.soilfreeze.com
EXHIBITORS
NAT2018

When
When You‘re You‘re Six Six Miles
Miles Inside
Inside A A Mountain,
Mountain,
You’ll
You’ll
Products Really
ConstructionReally
& Services Appreciate
Appreciate Your
- Contracting Services Your
Shannon
Partnership
Partnership
&
evaluations,
Wilson offers services in geotechnical Fax: (206) 695-6777
tunnel assessments, groundwater and de- Email: rtd@shanwil.com

With
With Shotcrete
Shotcrete
Drilling Services and Equipment
Ground Improvement
Technologies,
Equipment andTechnologies,
Services resourceInc.
watering, instrumentation, environmental, and natural
Inc.
assessments. Shannon & Wilson, Inc
Whether it’s a quarry in Iowa, a subway tunnel in Washington
13400 Sutton Park Dr S, Ste 1401
Grouting Services, Equipment and Materials
Jet Grouting Equipment and Services Products & Services D.C., or a mine in Australia, Shotcrete
Jacksonville, Technologies,
FL 32224 USA Inc. has “been
Underground Excavation Services and Equipment Consulting Engineers there, done that!” STI has the products,
Telephone: the know-how, and the serv-
(904) 223-6676
Consulting Environmental Email: rjg@shanwil.com
ice support to get your project done right, on time, and on budget.
Main Office Engineering Design and Services for Tunnels
45240 Business Ct, Ste 250 OurEquipment
Geological, Geotechnical Services and uniquely designed equipment
Shannon & Wilson,- Inc
the Shot-Tech Telescoping
Sterling, VA 20166 USA Instrumentation Equipment and Robotic 2043 Westport
Services Arm and the Shot-Tech Nozzle Center
- putsDr your shotcrete where
St Louis, MO 63146 USA
Telephone: (703) 742-0020 you want it, even in the tightest work spaces. And STI offers a choice
Fax: (703) 742-3319 Main Office Telephone: (314) 699-9660
of accelerators and formulas that keep your shotcrete in place, with
Email: info@schnabel.com 400 N 34th St, Ste 100 Fax: (314) 699-9661
Seattle, WA 98103 USA the specification needed to fit the job.
Email: tja@shanwil.com
www.schnabel.com
Telephone: (206) 632-8020
Fax: (206) 695-6777
When you assemble the team&for
Shannon your Inc
Wilson, next project, new or rehab,
Shannon & Wilson, Inc www.shannonwilson.com pick Shotcrete Technologies, Inc., the
3990 Collins Way,partner
Ste 100 the experts pick for
Booth: 206 shotcrete solutions. CallLake
us today.
Oswego, OR 97035 USA
Since 1954, Shannon & Wilson has been a pioneer in Branch Offices Telephone: (503) 210-4750
developing effective underground solutions to complex Shannon & Wilson, Inc Visit our new website Fax:-(206)
www.shotcretetechnologies.com.
695-6777
site development problems. This includes geotechni- 1321 Bannock St, Ste 200 Email: rpp@shanwil.com
cal assessments, GBRs, design, plans, specifications, Denver, CO 80204 USA
construction management, and expert witness support Telephone: (303) 825-3800
on over 700 soft ground and hard rock tunnel projects, Fax: (206) 695-6777
ranging from trenchless to the world’s largest bore Email: mag@shanwil.com
tunnels. Resources include over 300 staff from the
corporate headquarters in Seattle, Washington, and Shannon & Wilson, Inc
Branch Offices in Alaska, California, Colorado, Florida, 664 W Broadway
Missouri, Oregon, Utah, Washington, and Wisconsin. Glendale, CA 91204 USA
Telephone: (818) 543-4560 Shotcrete Technologies, Inc
1431 Miner Street • Idaho Springs, CO 80452 • Phone: (303) 567-4871 • Fax: (303) 567-4605 • E-mail: Shotset250@aol.com
Booth: 423
See our ad on page 50

SURECRETE INC.
STI has been providing innovative Shotcrete Products
and Services to the mining and tunneling industry for
over 30 years. ST Robotic Arm, which can be mounted
on many types of carriers and our STI Alkali Free and
www.surecrete.com Shotset 250 Liquid Accelerators. STI’s new shaft lin-
ing (vertical lining) technology - Centrifugal System
and Double Nozzle Shaftlining Systems are the latest
CEMENTITIOUS GROUT MATERIALS in Shaftlining Technology. STI’s knowledgeable team
of professionals provide everything from a Shotcrete
HI STUFF CONCRETE CRACK REPAIR System, help with a mix design, to testing and training
based on your specific needs - mega projects to small
EARTH TIGHT PEAT AND SLUDGE STABILIZER mines. We support you from start to finish!

Products & Services


COLLOID MEDIUM CRACKS AND SANDS Mining Equipment
COLLOID SQA FAST SETTING GEOTECHNICAL Shotcrete Equipment, Supplies, and Services
Tunnel Lining and Support Materials
OIL AND GAS SQUEEZE/
REMEDIATION Main Office
PO Box 3274
SUPER FINE FINE CRACKS AND SANDS 1431 Miner St
Idaho Springs, CO 80452 USA
SUPER FINE L GEOTHERMAL AND BRINE Telephone: (303) 567-4871
Fax: (303) 567-4605
SUPER FINE SQA FAST--SETTING GEOTECHNICAL
FAST Email: info@shotcretetechnologies.com
X--3
SUPER FINE X LIMITED PENETRATION www.shotcretetechnologies.com

FOR SURFACE SEALING


Sika Corporation
HNP--1500
HNP NANO--FINE GEOTECHNICAL
NANO Booth: 610
Sika Corporation is a specialty chemicals company
with a leading position in the development and pro-
 +1 206-523-1233  jeff@surecrete.com duction of systems and products for bonding, sealing,
damping, reinforcing and protecting in the building
S H OT CR ET E, C ON CR ETE
ET E , AN D GR OUT IN G M AT ER I AL S sector and automotive industry. For tunneling, Sika
offers a wide variety of products such as chemical ad-

52 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
PARTNERS IN YOUR PROGRESS

Every tunnel stands as evidence of problems solved, obstacles


overcome, and partnerships solidified. Our drive has always
been—and will continue to be—meeting our customers’ challenges
RELIABLE | RESPONSIVE
head-on. Visit us at NAT to learn more about how The Robbins
Company is utilizing forward-thinking tunneling methods to carve
new paths in the tunneling industry.
EXHIBITORS
NAT2018

mixtures for concrete, repair and protection products, Engineering Design and Services for Tunnels Main Office
waterproofing products and equipment for shotcrete. Geological, Geotechnical Services and Equipment PO Box 4308
Sika has subsidiaries in 100 countries around the Instrumentation Equipment and Services Grand Junction, CO 81502 USA
world and manufactures in over 200 factories. Its more Telephone: (970) 243-3429
than 18,000 employees generated annual sales of CHF Main Office Fax: (970) 242-6724
6.25 billion in 2017. 11812N Creek Pkwy N, Ste 104B www.spendrupfanco.com
Bothell, WA 98011 USA
Products & Services Telephone: (206) 588-1691
Concrete Reinforcement www.sixense-soldata.com/en/ Stantec
Grouting Services, Equipment and Materials Booth: 539
Shotcrete Equipment, Supplies, and Services
Smith and Long - Tunnelling The Stantec community unites approximately 22,000
employees working in over 400 locations across six
Main Office Division continents. We have successfully delivered more than
201 Polito Ave Booth: 104 1,200 underground projects in the past five years. Our
Lyndhurst, NJ 07071 USA portfolio includes tunnels up to 33 feet in diameter and
Telephone: (201) 933-8800 shafts up to 110 feet in diameter. Our recent experi-
Main Office
Fax: (201) 933-6225 ence includes the City of Atlanta’s Raw Water Delivery
115 Idema Rd
usa.sika.com System with 5 miles of 10-foot diameter tunnels, City
Markham, L3R 1A9 Canada
of Ottawa’s CSST project with 3.7 miles of 9.8-foot
Telephone: (416) 391-0443
diameter tunnels, and Metro Crenshaw/LAX Transit
Simem Underground Fax: (416) 391-0621
Corridor with three underground stations connected by
www.smithandlong.com
Solutions, Inc four reaches of twin-bored, 21-foot diameter tunnels
totaling 2 miles.
Booth: 417
The team at Simem Underground Solutions has over
SoilFreeze Inc
30 years experience providing fully automated mate- Booth: 116 Products & Services
rial handling systems for TBM bi-component grout, hy- See our ad on page 51 Construction - Contracting Services
drated bentonite, lightweight cellular grout, shotcrete, SoilFreeze Inc. provides temporary frozen soil shor- Consulting Engineers
concrete and mining backfill. SUS manufactures col- ing systems to support excavations and provide Consulting Environmental
loidal mixers, pumping and delivery systems, as well groundwater cut-off. Our technology can be used for; Engineering Design and Services for Tunnels
as the automation and controls package. Concepts groundwater cut-off, in situ-isolation barriers, founda- Geological, Geotechnical Services and Equipment
are specifically tailored to the customer’s needs and tion excavation shoring, cross passages, adits, ground
include complete engineering, design and fabrication stabilization and more. We design, fabricate, install and Main Office
of all mechanical, structural and electrical systems. maintain customized freeze systems for each client’s 1340 Treat Blvd, Ste 300
Services range from preliminary engineering and case needs. We serve both the private and public sectors Walnut Creek, CA 94597 USA
studies through to hands-on commissioning and field and have a substantial list of successful projects and Telephone: (925) 941-1400
training with complete CAD documentation and sup- satisfied clients. SoilFreeze Inc. has advanced and re- Fax: (925) 941-1401
port. fined freeze technology to create freeze systems that www.stantec.com
are mobile, reusable, and expandable to address the
Products & Services needs of any sized project in urban and remote loca-
tions.
Surecrete Inc
Conveyor Equipment and Systems
Booth: 226
Grouting Services, Equipment and Materials
Products & Services See our ad on page 52
Jet Grouting Equipment and Services
Ground Freezing Surecrete Inc. is a supplier focusing on packaged
Pumps and Pumping Equipment
cementitious materials, admixtures, placing equip-
Soil Conditioning Equipment and Materials
ment and related accessories to the heavy civil tunnel,
Main Office
geotechnical and mining markets. Product lines in-
Main Office 5931 238th St SE, Ste 201
clude Super Fine ultrafine cement and HNP nano-fine
1A - 30528 Great Northern Ave Woodinville, WA 98072 USA
cement grouts as well as other specialized grouting
Abbotsford, BC V2T 6H4 Canada Telephone: (206) 261-0733
materials. We also concentrate on supplying wet and
Telephone: (604) 288-2500 www.soilfreeze.com
dry shotcrete materials that are custom blended for
Email: sales@simemug.com specific applications by including fibers, accelerators,
www.simem.com Spendrup Fan Co special cements, and additives. Our additives include
Booth: 528 rheology modifiers, waterproofing and repair materi-
SIXENSE Since 1968, Spendrup Fan Co. has designed and man- als. We also represent several major equipment manu-
facturers specializing in the mixing and placing of
Booth: 507 ufactured quality vane axial fans and accessories for
all types of mining and industrial applications. Spend- shotcrete, concrete, and grout.
Soldata is a leading provider of automated real time
instrumentation monitoring for geotechnical, structural rup fans are designed to withstand the harshest envi-
and environmental projects. With 20 years of experi- ronments. Fan casings are made of 5/16” steel. Impel- Products & Services
ence, Soldata has demonstrated expertise in large ler hubs are fabricated from mild steel. Impeller blades Grouting Services, Equipment and Materials
urban tunnel instrumentation projects in cities includ- are 356-T6 hardness, to resist highly abrasive condi- Shotcrete Equipment, Supplies, and Services
ing Seattle, Washington DC, Los Angeles, Amsterdam, tions. Spendrup Fan Co. designs fans to meet client
London, Budapest, Barcelona, Toronto, etc. Soldata is specifications. Spendrup Fan can meet client needs, Main Office
currently monitoring the largest TBM project in the from MSHA Sch. 2-G, U/L approved explosion proof, 155 NE 100th St, Ste 300
world, the Alaskan Way viaduct replacement project, marine duty, to fans that provide trouble-free service in Seattle, WA 98125 USA
as well as the light rail “Northlink Project, both in Se- high-temperature or corrosive environments. Telephone: (206) 523-1233
attle. Fax: (206) 524-6972
Products & Services Email: jeff@surecrete.com
Products & Services Dust and Fume Control Technology www.surecrete.com
Computer Hardware and Software Tunnel Boring Equipment
Ventilation Systems, Materials and Equipment

54 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
EXHIBITORS
NAT2018

TBM Supply Main Office


Parc Rhône Vallée - Ile Chambenier Sud
Main Office
171 Davey St
Booth: 524 Le Pouzin, France 7250 France Hobart, Tasmania 7000 Australia
Supplier factory new, used and surplus , carbon, stain- Telephone: +33 475 85 8531 Telephone: +61 362233282
less and PVC: pipe, valves, fittings. Grooved, Threaded, Fax: +33 475 85 8535 Email: info@terratec.com.au
Flanged, Welded. Domestic, DIN, JIS replacement in- Email: sales@tms-company.com www.terratec.co
cluding actuation. www.tms-company.com

Products & Services The Lane Construction


Steel Pipe Tenbusch, Inc Corporation
Underground Utility Materials and Operations Booth: 516
Tenbusch, Inc. designs and manufactures custom tun- Booth: 623
Main Office neling and pipe jacking systems. Products include: See our ad on page 35
3301 Zachary Ave shieds, excavators, conveyors, spoil carts and track, The Lane Construction Corporation is a leading U.S.
Shafter, CA 93263 USA jacking frames, hydraulic power units, bentonite/poly- construction company specializing in the transpor-
Telephone: (855) 535-1555 mer lubrication systems, and backstops. Tenbusch tation, infrastructure and energy industries. Lane’s
www.tbmsupply.com also manufactures sliplining systems and pipe carri- unique combination of capabilities includes public-
ers. In addition to the fabrication and manufacture of private partnerships/innovative financing and joint
ventures; large, complex design-build and bid-build
Technical Tunnelling high quality heavy equipment, it offers reconditioning
and refurbishment of used heavy equipment, support projects; and the ability to produce and install asphalt,
Components LTD (TTC) and training with design and problem solving services aggregates, and concrete. Lane is owned by global
construction leader, Salini Impregilo.
Booth: 218 centered around over 40 years experience with hy-
Technical Tunnelling Components has over 40 years draulics, and underground construction equipment.
Over 15 years in mechanical design, mechanical en- Products & Services
of experience manufacturing and supplying segment Construction - Contracting Services
accessories such as connection bolts, grout/lifting gineering, and stress analysis, solid modeling and 3-D
CAD design capabilities. Underground Excavation Services and Equipment
sockets, segment packers and grommets along with
the award winning Dowelock connection and align- Main Office
ment system, now with high shear options. TTC truly Products & Services
Air Locks and Bulkheads 90 Fieldstone Crt
is the one stop shop for all precast segmental fixing Cheshire, CT 6410 USA
and grouting systems. The in-house design and manu- Conveyor Equipment and Systems
Fabrication Materials Telephone: (203) 235-3351
facturing capabilities that Tunnelling Accessories and www.laneconstruct.com
Bosworth Plastics have can also offer bespoke prod- Mining Equipment
ucts for challenging situations as well as the standard Soft Ground Shields
segment accessories. TTC are Supplying components Tunnel Boring Equipment The PBE Group
worldwide with an impressive product portfolio along Booth: 502
with an excellent service record. Main Office The PBE Group, founded over 45 years ago, is a global
PO Box 417
heavy industries technology company, unique in the
Products & Services Lewisville, TX 75067 USA
vertical integration of its engineered solutions. Serving
Grouting Services, Equipment and Materials Telephone: (972) 221-2304
multiple markets including, mining, tunneling and con-
Precast Concrete Linings Fax: (972) 221-2498
struction, PBE is unparalleled in its range of internally
Segment Accessories Email: info@tenbusch.com
designed and manufactured safety, communications
Tunnel Lining and Support Materials www.tenbusch.com
and productivity systems. Through one supplier of all
equipment and software, the customer benefits from
Main Office Terratec the reliability, functionality and cost benefits only a true
Unit K Radius Ct, Tungsten Pk
Booth: 530 single source solution provider can deliver. PBE offers
Hinckley, Leicester LE10 3BE United Kingdom a designed for purpose, robust, advanced solution
TERRATEC is a world-renowned Australian-based de-
Telephone: +44 0 1455 234401 enabling data-driven decisions through PBE’s suite of
signer and manufacturer of Tunnel Boring Machines,
Fax: +44 0 1455 250578 management and control software.
Raise Boring Machines and other custom-made
www.ttcltd.org
equipment for tunneling and mining applications.
TERRATEC’s success is based on the experience and Products & Services
Techni-Metal Systems excellence of its engineering team, which includes Environmental Control Equipment and Supplies
Mining Equipment
Booth: 402 engineers with more than 40 years’ experience in the
Safety Products
We are a French specialist in manufacturing of Multi- design and manufacture of tunneling and mining ma-
chines. TERRATEC is fully managed by engineers pro- Tunnel Communication Systems and Equipment
service Vehicles for heavy load transportation for civil Ventilation Systems, Materials and Equipment
engineering jobsite. Thanks to our logistic optimization viding quick and efficient solutions to meet customer
study and to our MSVs’ multi-purpose frame adapted expectations. TERRATEC products are well-known in
the industry as Robust, Durable and Safe, that must Main Office
to any charge to be transported at the different phases 9115 Harris Corners Pkwy, Ste 310
of the jobsite, our customers optimize their investment. prevail in the design of any equipment in the extreme
conditions encountered underground. Charlotte, NC 28269 USA
Telephone: (704) 509-6747
Products & Services www.pbegrp.com
Concrete Mixing and Transportation Equipment Products & Services
Grouting Services, Equipment and Materials Conveyor Equipment and Systems
Microtunneling Equipment, Tools, and Supplies Earth Pressure Balance Machines
Shotcrete Equipment, Supplies, and Services Rock TBM’s
Tunnel Boring Equipment Shaft Drilling and Raiseboring Equipment
Tunnel Haulage Systems Tunnel Boring Equipment

SHOWGUIDE exhibitor listings as of April 17, 2018 T&UC ® 2018 NAT SHOWGUIDE 55
EXHIBITORS
NAT2018

it is required. Tioga’s equipment is known for its reli-


The Robbins Company ability in harsh conditions and ease of use. Visit us to
Main Office
475 W Georgia St, Ste #410
Booth: 317 discuss your next application. Vancouver, BC V6B 4M9 Canada
See our ad on page 53 Telephone: (604) 331-2512
The Robbins Company has led the tunneling industry Products & Services www.tre-altamira.com
for over 65 years with advanced, underground con- Ground Freezing
struction equipment. Robbins machines are custom- Ground Improvement Equipment and Services Branch Offices
ized to meet each project’s unique specifications, de- Ventilation Systems, Materials and Equipment TRE ALTAMIRA S.L.
livering optimal results in the most difficult conditions.
C/ Corsega, 381-387
Robbins is a total supply company with offerings that Main Office Barcelona, E-08037 Spain
range from machines and conveyors that overcome 4810 Lilac Dr N Telephone: +34 93 183 57 50
tunneling challenges in hard rock and soft ground to Minneapolis, MN 55429 USA Fax: +34 93 183 57 59
knowledgeable field service personnel. For a complete Telephone: (800) 218-4642 Email: sales.spain@tre-altamira.com
solution and unparalleled support on your next tunnel- Fax: (763) 525-9796
ing project, look no further than Robbins. www.tiogahvac.com TRE ALTAMIRA s.r.l.
Ripa di Porta - Ticinese, 79
Products & Services
Conveyor Equipment and Systems Tolsa Wyoming Bentonite Inc Milano, 20143 Italy
Telephone: +39 02 4343 121
Earth Pressure Balance Machines Booth: 547 Fax: +39 02 4343 1230
Microtunneling Equipment, Tools, and Supplies Experts in Global solutions for the industrial sector. Our
Email: sales.italy@tre-altamira.com
Rock TBM’s products are used in more than 250 different industrial
Slurry Services and Machines applications as civil engineering, oil&gas, construc-
Tunnel Boring Equipment tion and a long list of many others. Our raw materials TREVIICOS
extracted on three continents, the special processes Booth: 545
Main Office in our plants, along with extensive research in our TREVIICOS is a full service geotechnical and foundation
29100 Hall St laboratories and our experts technical support, are key contractor specializing in Dam Rehabilitation, Slurry
Solon, OH 44139 USA factors that help us to develop the broadest and most Walls, Cutoff Walls, Secant Piles, Caissons, Jet Grout-
Telephone: (440) 248-3303 distinct line of industrial products and additives in the ing, Deep & Shallow Mixing and Ground Improvement.
Fax: (440) 248-1702 clays sector. Our vast experience in underground construction al-
www.therobbinscompany.com lows us to find innovative and cost effective solutions
Products & Services to even the most challenging construction projects. We
Drilling Services and Equipment
Thompson Pipe Group - Geological, Geotechnical Services and Equipment
serve our clients nationwide from our headquarters
located in Charlestown, Massachusetts.
Flowtite Grouting Services, Equipment and Materials
Lubricants for TBM
Booth: 408 Shotcrete Equipment, Supplies, and Services
Products & Services
Tough Flowtite® FRP pipe is made using the continu- Construction - Contracting Services
Underground Excavation Services and Equipment Ground Improvement Equipment and Services
ous filament-winding process, allowing for additional
strength to meet your exact jacking, microtunnel- Grouting Services, Equipment and Materials
ing, or sliplining needs. The pipe can be customized
Main Office Jet Grouting Equipment and Services
12050 Bucknum Rd, # 3 Slurry Services and Machines
within a broad range of lengths, diameters, pressure
Casper, WY 86204 USA Underground Excavation Services and Equipment
grades and stiffness classes. Flow-Crete™ jacking
Telephone: (716) 913-3123
pipe is also available, which combines the strength of
Email: info@tolsa.com Main Office
reinforced concrete with the corrosion resistance and
www.tolsa.com/industrial/en 38 Third Ave, 3rd Fl
pressure capabilities of Flowtite® FRP. Flowtite® can
be specified for both pressure and gravity applications, Charlestown, MA 02129 USA
as well as for wastewater and hydroelectric penstock TRE ALTAMIRA Inc Telephone: (617) 241-4800
Fax: (617) 241-4801
projects and more.  Booth: 543 Email: info@treviicos.com
TRE ALTAMIRA is recognized as the global leader in
Products & Services www.treviicos.com
ground monitoring using SAR (Synthetic Aperture Ra-
Underground Utility Materials and Operations dar) satellite data providing detailed surface motion
information for engineering activities during tunneling Tsurumi Pump
Main Office
18585 Samuels Rd
operations. Using our proprietary SqueeSAR™ algo- Booth: 563
rithms the group analyses images, captured by radar
Zachary, LA 70791 USA satellites to measure ground deformation to millimeter
Telephone: (225) 658-6166
Products & Services
accuracy: detecting and monitoring ground subsid- Microtunneling Equipment, Tools, and Supplies
www.thompsonpipegroup.com ence, uplift, landslides, surface expression of faults, Mining Equipment
and for verifying the stability of individual structures. Pumps and Pumping Equipment
Tioga Air Heaters - Mobile Air TRE ALTAMIRA produces dynamic maps and a data-
base of surface deformation that provides a quantita-
Slurry Services and Machines
Booth: 560 tive understanding of ground response to natural and
See our ad on page 57 Main Office
anthropogenic activities. We have offices in Vancouver, 1625 Fullerton Ct
Tioga designs, manufactures, rents, and sells climate
Milan and Barcelona. Glendale Heights, IL 60139 USA
control and ventilation equipment to provide safe
working environments for employees and allow for op- Telephone: (630) 793-0127
Products & Services Fax: (630) 793-0146
erations to continue. Our portable heating equipment
Instrumentation Equipment and Services www.tsurumipump.com
is great for remote locations of areas where power and
fuel are a challenge. Tioga’s skid mounted equipment
are built with powerful blowers to quickly heat large
areas or push heated air greater distances to where

56 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
HEATING & COOLING
SOLUTIONS A P P L I C A T I O N S
FOR INDUSTRIAL

Offering North America’s largest and


most reliable HVAC Rental Solutions for
Tunneling, Mining and other Industrial
Markets. Our solutions provide heat
in North America’s extreme cold
regions, cooling for tunnels, shafts and
processes, and ventilation to improve
work conditions and employee safety.

COOLING SOLUTIONS
• Air-Cooled Chillers
• Water-Cooled Chillers
• Cooling Towers
• Air Conditioners

HEATING SOLUTIONS
• Indirect-Fired Heaters
• Direct-Fired Heaters
• Portable, Self-Contained Heaters
• Air Handlers

MARKETS SERVED
• Tunneling
• Infrastructure
• Mining
• Shafts
• Our heat and cooling solutions are
used independently or in conjunction
with high velocity, high volume fans to
deliver a safe, well ventilated, climate
controlled work environment for your
employees and to ensure continuous
operation of your project.

(800) 218-4642 • www.TiogaAirHeaters.com • Email: salesinfo@TiogaAirHeaters.com


EXHIBITORS
NAT2018

tinents. Readers include consulting engineers, clients,


Tunnel Business Magazine contractors and manufacturers in 90 countries. Stay
Main Office
1613 132nd Ave E, Ste 200
(TBM) abreast of all developments in the tunnelling industry
by subscribing to T&T.
Sumner, WA 98390 USA
Booth: 100 Telephone: (253) 447-2399
TBM: Tunnel Business Magazine provides the North Fax: (253) 863-9376
Products & Services Email: info@vmt-us.com
American tunneling industry with a trade magazine
Educational www.vmt-us.com
focusing on North American topics, projects and news.
Publishers
From large diameter tunneling to microtunneling, Tun-
nel Business Magazine, published by Benjamin Media,
Main Office Williams Form Engineering
Inc., reports on the issues and topics important to the
North American tunneling contractor, engineer and
John Carpenter House
London, EC4Y 0BS United Kingdom
Corp
owner. Free subscriptions are available.
Telephone: +44 (0) 20 7406 6584 Booth: 657
Fax: +44 (0) 20 7936 6813 Williams Form Engineering Corporation has been pro-
Products & Services viding threaded steel bars and accessories for rock,
www.tunnelsonline.info
Educational soil and concrete anchors, post-tensioning systems,
Publishers and concrete forming hardware systems in the con-
TunnelTalk struction industry for over 90 years. Our rock and soil
Main Office Booth: 108 anchor product line includes our Spin-Lock mechani-
10050 Brecksville Rd Welcome to www.TunnelTalk.com - your gateway to cal rock anchors, polyester resin anchors, multiple cor-
Brecksville, OH 44141 USA tunneling on the web. Designed specifically as a web rosion protection anchors, soil nails, strand anchors,
Telephone: (330) 467-7588 publication, TunnelTalk brings industry news, views Manta Ray soil anchors, Geo-Drill Hollow-Bar anchors,
Fax: (330) 468-2289 and video reports directly to your internet device. A micro piles. For concrete anchoring we offer Spin-
www.tunnelingonline.com comprehensive editorial Archive is complimented by Lock anchors, undercut anchors, reusable anchors
our industry Directory, Diary Dates, Job Opportuni- and cast-in-place anchors. We also have a full line of
Tunneling Journal/Tunnelling ties, Equipment Sales and Procurement notices. Free
weekly e-Alerts drive traffic to the site and, for industry
All-Thread Rebar for tie backs, micro piles and post-
tensioning.
Journal advertisers, our readers are your next customers!
Booth: 106 Products & Services
Tunnelling Journal delivers unrivalled editorial quality Products & Services Concrete Reinforcement
that features contemporary, lively, cutting edge articles Educational Geological, Geotechnical Services and Equipment
with specific and unparalleled relevance to the tunnel- Publishers Ground Improvement Equipment and Services
ling contractor, consultant, client and machine manu- Steel Pipe
facturer. Published six times a year, the print copy is Main Office Tunnel Lining and Support Materials
partnered with a constantly updated website and a 21001 N Tatum Blvd, Ste 1630-274
fortnightly newsletter. We also publish Breakthrough Phoenix, AZ 85050 USA Main Office
magazine for the ITA Young Members, Australasian Telephone: (202) 470-3310 8165 Graphic Dr
Tunnelling Society Journal, and organisers of the Brit- Email: tunneltalk@tunneltalk.com Belmont, MI 49313 USA
ish Tunnelling Society Conference and the Cutting www.tunneltalk.com Telephone: (616) 866-0815
Edge Conference in partnership with SME. Visit our Email: williams@williamsform.com
www.williamsform.com
booth to pick up your complimentary copies of all our
magazines and meet the team.
VMT USA
Booth: 308
As a driving technological force for more than 20
Wisko America, Inc
Products & Services
Educational years, VMT has the experience, the capacities and the Booth: 332
know-how to develop innovative system and product Wisko America Inc. has been installing flexible mem-
Publishers
solutions that support construction companies all over brane in tunnels and underground structures since
the world to build tunnels and shafts of every size 1988 because the system works. With millions of
Main Office square feet of flexible membranes successfully in-
The Old Library , Webster House, Dudley Rd for ever more complex infrastructure projects: VMT’s
navigation systems for driving equipment, its produc- stalled all over North America, Hawaii and Puerto Rico
Tunbridge Wells, Kent TN1 1LE United Kingdom
tion and logistics management system for segment on over 90 projects, Wisko has a proven track record of
Telephone: +44 (0) 1892 522 585
production and further innovative system solutions providing dry underground structures to many clients
Fax: +44 (0) 1892 529 041
for safety, monitoring and data management play and contractors.
Email: gary@tunnellingjournal.com
www.tunnellingjournal.com key roles here. VMT products can be combined into
efficient, modern, networked solutions that ensure Products & Services
streamlined processes and seamless quality assur- Construction - Contracting Services
Tunnels & Tunnelling ance for every tunnel project. Tunnel Lining and Support Materials
Booth: 114
With more than 40 years of service to the tunnel- Products & Services Main Office
ling industry, and packed with information about the Geological, Geotechnical Services and Equipment 3935 Avion Park Ct, Ste A106
business its customers are in, Tunnels & Tunnelling Instrumentation Equipment and Services Chantilly, VA 20151 USA
International remains the leading underground con- Laser Guidance Systems Telephone: (703) 378-7858
struction magazine worldwide. Since 1999 T&T offers Precast Concrete Linings Fax: (703) 378-7568
T&T North America, a bi-monthly magazine dedicated Roadheaders Email: pamela.moran@wiskoamerica.com
to its customers’ regional market, and the official pub- Tunnel Communication Systems and Equipment www.wiskoamerica.com
lication of the Tunnelling Association of Canada (TAC).
Each edition of T&T informs tunnelling professionals on
every aspect of underground construction in five con-

58 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
EXHIBITORS
NAT2018

Worldsensing Zed Tunnel Guidance Ltd


Booth: 617 Booth: 421
Make manual and cable readings an issue of the past: ZED manufactures and develops TBM guidance/navi-
connect tunnels to the Internet of Things (IoT) and gation systems. More recently, ZED offers a redesigned
remotely monitor how the structure behaves. Load- system for long/curved pipejacks and a configuration
sensing, the leading wireless monitoring system, is that places the total station on the TBM backup rather
deployed in several sections of the Purple Line Metro than the tunnel wall, intended for smaller diameter
Project in LA to enable the wireless monitoring of the TBM’s where space is at a premium, especially along
stability of the tunnel and the surrounding buildings. the backup walkway. The company provides compre-
Loadsensing is part of Worldsensing, a widely recog- hensive R&D services for electro-optical instrumen-
nized global IoT pioneer. The technology provider de- tation for a variety of uses, from applications in the
livers Operational Intelligence to traditional industries railway industry to vertical shaft alignment. Based in
and cities. With offices in Barcelona, London and Los the UK, ZED has an enthusiastic team who provide a
Angeles, Worldsensing is globally active with custom- seasoned and prompt reaction to customer require-
ers in over 50 countries. ments and technological advances applicable to their
products.
Products & Services
Instrumentation Equipment and Services Products & Services
Mining Equipment Instrumentation Equipment and Services
Tunnel Communication Systems and Equipment Laser Guidance Systems
Microtunneling Equipment, Tools, and Supplies
Main Office
C/ Viriat 47, 10th floor Main Office
Edificio Numancia 1 Unit 1 Russell House, Molesey Rd
Barcelona, Barcelona 8014 Spain Walton on Thames, Surrey KT12 3PJ United Kingdom
Telephone: +34 93 418 05 85 Telephone: +44 (0) 1932 251 440
www.worldsensing.com Fax: +44 (0) 1932 244 971
Email: Sales@zedtg.com
www.zedtg.com
WSP
Booth: 208
WSP is a leader in tunneling and underground con-
struction, from San Francisco to Stockholm. The firm
has participated in the design and construction of
New Listings
some of the longest, largest, deepest, and most com-
plicated tunnels in the world, including tunnels built in
hard rock, soft ground or mixed-face conditions, and Comtrol International
using mining, boring, jacking, cut-and-cover, and im- Booth: 459
mersed tunnel technology. Projects include the Second Description: Comtrol has built a reputation for manu-
Avenue Subway in New York City; the Stockholm City facturing and distributing the highest quality commu-
Line; the Eurasia tunnel in Istanbul; and San Francis- nication and control systems to work in harsh envi-
co’s Central Subway. WSP employs 42,000 profession- ronments. Our communication and control systems
als in 500 offices across 40 countries. include Cellular over leaky feeder, VHF, UHF, Tracking
and Gas Monitoring. Comtrol has invested decades of
Products & Services research to produce the best in class products that will
Consulting Engineers keep your operation safe when it matters the most.
Engineering Design and Services for Tunnels
Geological, Geotechnical Services and Equipment Products & Services
Control Systems
Main Office Environmental Control Equipment and Supplies
444 S Flower St, Ste 800 Geological, Geotechnical Services and Equipment
Los Angeles, CA 90071 USA Safety Products
Telephone: (212) 465-5215 Tunnel Communication Systems and Equipment
Email: Frank.Pepe@wsp.com Underground Utility Materials and Operations
www.wsp.com
Main Office
Xylem 500 Pennsylvania Ave
Irwin, PA 15642
Booth: 556 Phone (724) 864-3800
www.comtrol-corp.com
Main Office
22 Floodgate Rd
Bridgeport, NJ 8014 USA
Telephone: (856) 467-3636
www.xyleminc.com

SHOWGUIDE exhibitor listings as of April 17, 2018 T&UC


® 2018 NAT SHOWGUIDE 59
PRODUCTS & SERVICES
NAT2018

Abrasion and Impact Resistant Consulting Engineers Dust and Fume Control
AECOM – Booth 500
Materials ASI Marine – Booth 522 Technology
JADCO Manufacturing Inc – Booth 555 BABENDERERDE ENGINEERS, LLC – Booth 216 ABC Industries, Inc – Booth 305
KOSTEEL CO, LTD – Booth 336 CDM Smith – Booth 429 BASF Corporation – Booth 401
COWI North America – Booth 329 Englo, Inc, DBA Engart, Inc – Booth 618
Matrix Design Group – Booth 301
Air Locks and Bulkheads Dr. Sauer & Partners Corp – Booth 410
Sandvik Mining and Rock Technology – Booth 628
ASI Marine – Booth 522 Everest Equipment Co – Booth 428
Gall Zeidler Consultants – Booth 427 Schauenburg Flexadux Corp – Booth 636
Ballard Marine Construction – Booth 513
Gomez International, Inc – Booth 523 Spendrup Fan Co – Booth 528
Tenbusch, Inc – Booth 516
Hager-Richter Geoscience, Inc – Booth 526

Computer Hardware and


Hatch – Booth 412 Earth Pressure Balance Ma-
HNTB Corp – Booth 223
Software McMillen Jacobs Associates – Booth 316 chines
Mott MacDonald – Booth 451 Akkerman – Booth 633
Amberg Technologies Ltd – Booth 653
MSP Structures Inc – Booth 605 ASI Marine – Booth 522
BABENDERERDE ENGINEERS, LLC – Booth 216
Mueser Rutledge Consulting Engineers – Booth 557 Ballard Marine Construction – Booth 513
GEOSLOPE International Ltd – Booth 553
Nexans AmerCable – Booth 622 CDM Smith – Booth 429
Matrix Design Group – Booth 301
Schnabel - SWS – Booth 624 Herrenknecht Tunnelling Systems USA, Inc –
Plaxis Americas LLC – Booth 419
Shannon & Wilson, Inc – Booth 206 Booth 217
Rocscience, Inc – Booth 310
Stantec – Booth 539 Lovsuns Tunneling Canada Ltd – Booth 411
SIXENSE – Booth 507
WSP – Booth 208 Terratec – Booth 530
The Robbins Company – Booth 317
Concrete Mixing and Consulting Environmental
Transportation Equipment Hager-Richter Geoscience, Inc – Booth 526 Educational
Advanced Concrete Technologies – Booth 225 Hatch – Booth 412 Northwest Laborers-Employers Training Trust –
Amix Systems Ltd – Booth 227 HNTB Corp – Booth 223 Booth 424
King Shotcrete Solutions – Booth 511 Ocean Advanced Research – Booth 338 Tunnel Business Magazine – Booth TBM – Booth 100
Mining Equipment Ltd – Booth 506 Schnabel - SWS – Booth 624 Tunneling Journal/Tunnelling Journal – Booth 106
Normet Americas, Inc – Booth 611 Shannon & Wilson, Inc – Booth 206 Tunnels & Tunnelling – Booth 114
Putzmeister – Booth 400 Stantec – Booth 539 TunnelTalk – Booth 108
Techni-Metal Systems – Booth 402
Control Systems Electrical - Generator-Motor,
Concrete Reinforcement Amberg Technologies Ltd – Booth 653
Wire-Cable
Bekaert Maccaferri Underground Solutions – Amix Systems Ltd – Booth 227
Line Power – Booth 616
Booth 318 Northern Light Technologies – Booth 518
Nexans AmerCable – Booth 622
David R. Klug & Associates, Inc – Booth 418
Elasto Plastic Concrete – Booth 612
Fibermesh – Booth 509
Conveyor Equipment and Engineering Design and
GCP Applied Technologies – Booth 404 Systems Services for Tunnels
King Shotcrete Solutions – Booth 511 Akkerman – Booth 633
KOSTEEL CO, LTD – Booth 336 AECOM – Booth 500
Simem Underground Solutions, Inc – Booth 417
Mighty Shield Industries Sdn Bhd – Booth 603 AIL Mining – Booth 510
Tenbusch, Inc – Booth 516
Normet Americas, Inc – Booth 611 BABENDERERDE ENGINEERS, LLC – Booth 216
Terratec – Booth 530
Sika Corporation – Booth 610 CDM Smith – Booth 429
The Robbins Company – Booth 317
Williams Form Engineering Corp – Booth 657 Dr. Sauer & Partners Corp – Booth 410
EC Applications - Tunnel Lining – Booth 302
Drilling Services and Gall Zeidler Consultants – Booth 427
Construction - Contracting Hager-Richter Geoscience, Inc – Booth 526
Equipment HNTB Corp – Booth 223
Services BAUER-Pileco Inc – Booth 546 JENNMAR Civil – Booth 607
Ballard Marine Construction – Booth 513 Cascade Drilling L.P. – Booth 425 KOSTEEL CO, LTD – Booth 336
Drill Tech Drilling & Shoring Inc – Booth 110 Crux Subsurface, Inc – Booth 406 McMillen Jacobs Associates – Booth 316
EC Applications - Tunnel Lining – Booth 302 Daigh Company, Inc – Booth 504 Mott MacDonald – Booth 451
Hayward Baker Inc – Booth 325 Derrick Equipment Co – Booth 608 MSP Structures Inc – Booth 605
McMillen Jacobs Associates – Booth 316 Drill Tech Drilling & Shoring Inc – Booth 110 Mueser Rutledge Consulting Engineers – Booth 557
Michels Corp – Booth 527 Malcolm Drilling Co Inc – Booth 619 Palmieri S.p.A. – Booth 112
Moretrench – Booth 326 Michels Corp – Booth 527 Parsons – Booth 529
Mueser Rutledge Consulting Engineers – Booth 557 Palmieri S.p.A. – Booth 112 Promat International NV – Booth 600
Promat International NV – Booth 600 Richard Goettle, Inc – Booth 601 R.S.T. Instruments Ltd – Booth 561
Renesco Inc – Booth 102 ROBODRILL – Booth 222 Renesco Inc – Booth 102
Richard Goettle, Inc – Booth 601 Ruen Drilling, Inc – Booth 304 Schnabel - SWS – Booth 624
Schnabel Foundation Co – Booth 541 Sandvik Mining and Rock Technology – Booth 628 Shannon & Wilson, Inc – Booth 206
Stantec – Booth 539 Schnabel Foundation Co – Booth 541 SIXENSE – Booth 507
The Lane Construction Corporation – Booth 623 Tolsa Wyoming Bentonite Inc – Booth 547 Stantec – Booth 539
TREVIICOS – Booth 545
WSP – Booth 208
Wisko America, Inc – Booth 332

60 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
PRODUCTS & SERVICES

Schnabel Foundation Co – Booth 541


Environmental Control Tioga Air Heaters - Mobile Air – Booth 560 Jet Grouting Equipment and
Equipment and Supplies TREVIICOS – Booth 545
Williams Form Engineering Corp – Booth 657
Services
Agru America, Inc – Booth 300 Amix Systems Ltd – Booth 227
Matrix Design Group – Booth 301 Drill Tech Drilling & Shoring Inc – Booth 110
Northern Light Technologies – Booth 518 Grouting Services, Equipment Hayward Baker Inc – Booth 325
The PBE Group – Booth 502 Malcolm Drilling Co Inc – Booth 619
and Materials Moretrench – Booth 326
Aerix Industries – Booth 542 Nicholson Construction Co – Booth 505
Explosive Materials and Alchemy-Spetec – Booth 659 Schnabel Foundation Co – Booth 541
Services Amix Systems Ltd – Booth 227
Avanti International – Booth 455
Simem Underground Solutions, Inc – Booth 417
Daigh Company, Inc – Booth 504 TREVIICOS – Booth 545
ChemGrout, Inc – Booth 224
Crux Subsurface, Inc – Booth 406
Fabrication Materials DSI Tunneling LLC – Booth 517 Laser Guidance Systems
AIL Mining – Booth 510 Epiroc – Booth 501 Amberg Technologies Ltd – Booth 653
Algaher S.A. – Booth 559 GCP Applied Technologies – Booth 404 Poltinger Precision Systems GmbH – Booth 651
Tenbusch, Inc – Booth 516 Gomez International, Inc – Booth 523 VMT USA – Booth 308
Hayward Baker Inc – Booth 325 Zed Tunnel Guidance Ltd – Booth 421

Geological, Geotechnical JENNMAR Civil – Booth 607


King Shotcrete Solutions – Booth 511 Lighting Systems
Services and Equipment Malcolm Drilling Co Inc – Booth 619 Matrix Design Group – Booth 301
AECOM – Booth 500 Moretrench – Booth 326 Nightstick – Booth 629
Amberg Technologies Ltd – Booth 653 Nicholson Construction Co – Booth 505 Northern Light Technologies – Booth 518
Case Foundation - Bencor – Booth 323 R.S.T. Instruments Ltd – Booth 561
CDM Smith – Booth 429 Renesco Inc – Booth 102
Crux Subsurface, Inc – Booth 406 Richard Goettle, Inc – Booth 601 Lubricants for TBM
Epiroc – Booth 501 Richway Industries – Booth 416 American Chemical Technologies, Inc – Booth 604
Gall Zeidler Consultants – Booth 427 Schnabel Foundation Co – Booth 541 BASF Corporation – Booth 401
Geo-Instruments, Inc – Booth 327 Sika Corporation – Booth 610 DSI Tunneling LLC – Booth 517
Geocomp Corp/GeoTesting Express, Inc – Booth 312 Simem Underground Solutions, Inc – Booth 417 Richway Industries – Booth 416
Geokon, Inc – Booth 552 Surecrete Inc – Booth 226 Tolsa Wyoming Bentonite Inc – Booth 547
Hager-Richter Geoscience, Inc – Booth 526 Techni-Metal Systems – Booth 402
McMillen Jacobs Associates – Booth 316 Technical Tunnelling Components LTD (TTC) –
Booth 218
Microtunneling Equipment,
Measurand Inc – Booth 538
Mueser Rutledge Consulting Engineers – Booth 557 Tolsa Wyoming Bentonite Inc – Booth 547 Tools, and Supplies
Nicholson Construction Co – Booth 505 TREVIICOS – Booth 545 Akkerman – Booth 633
Plaxis Americas LLC – Booth 419 Algaher S.A. – Booth 559
ASI Marine – Booth 522
R.S.T. Instruments Ltd – Booth 561
Rocscience, Inc – Booth 310
Hoists and Headframes Ballard Marine Construction – Booth 513
Mining Equipment Ltd – Booth 506
Schnabel - SWS – Booth 624 BAUER-Pileco Inc – Booth 546
Shannon & Wilson, Inc – Booth 206 Brokk Inc – Booth 407
SIXENSE – Booth 507 Hydraulic Hammers and Drills Derrick Equipment Co – Booth 608
Stantec – Booth 539 BAUER-Pileco Inc – Booth 546 Herrenknecht Tunnelling Systems USA, Inc –
Tolsa Wyoming Bentonite Inc – Booth 547 Brokk Inc – Booth 407 Booth 217
VMT USA – Booth 308 Daigh Company, Inc – Booth 504 Lovsuns Tunneling Canada Ltd – Booth 411
Williams Form Engineering Corp – Booth 657 McDowell Equipment Ltd – Booth 405
WSP – Booth 208 Nightstick – Booth 629
Instrumentation Equipment Palmieri S.p.A. – Booth 112
Ground Freezing and Services Poltinger Precision Systems GmbH – Booth 651
BABENDERERDE ENGINEERS, LLC – Booth 216 Techni-Metal Systems – Booth 402
CDM Smith – Booth 429 The Robbins Company – Booth 317
Moretrench – Booth 326 Geo-Instruments, Inc – Booth 327
Geokon, Inc – Booth 552 Tsurumi Pump – Booth 563
Mueser Rutledge Consulting Engineers – Booth 557 Zed Tunnel Guidance Ltd – Booth 421
SoilFreeze Inc – Booth 116 Hager-Richter Geoscience, Inc – Booth 526
Tioga Air Heaters - Mobile Air – Booth 560 Measurand Inc – Booth 538
Northern Light Technologies – Booth 518 Mining Equipment
Poltinger Precision Systems GmbH – Booth 651 Antraquip Corp – Booth 311
Ground Improvement R.S.T. Instruments Ltd – Booth 561 BASF Corporation – Booth 401
Equipment and Services Rite Geosystems – Booth 209
Shannon & Wilson, Inc – Booth 206
Brookville Equipment Corp – Booth 430
Aerix Industries – Booth 542 Englo, Inc, DBA Engart, Inc – Booth 618
SIXENSE – Booth 507 JENNMAR Civil – Booth 607
Amix Systems Ltd – Booth 227
TRE ALTAMIRA Inc – Booth 543 King Shotcrete Solutions – Booth 511
BAUER-Pileco Inc – Booth 546
VMT USA – Booth 308 Line Power – Booth 616
Crux Subsurface, Inc – Booth 406
Worldsensing – Booth 617 McDowell Equipment Ltd – Booth 405
Hayward Baker Inc – Booth 325
Zed Tunnel Guidance Ltd – Booth 421 Messinger Bearings – Booth 606
Malcolm Drilling Co Inc – Booth 619
Moretrench – Booth 326 Mining Equipment Ltd – Booth 506
Mueser Rutledge Consulting Engineers – Booth 557 Putzmeister – Booth 400
NKT Photonics Inc – Booth 512 R.S.T. Instruments Ltd – Booth 561
Sandvik Mining and Rock Technology – Booth 628

SHOWGUIDE exhibitor listings as of April 17, 2018 T&UC ® 2018 NAT SHOWGUIDE 61
PRODUCTS & SERVICES
NAT2018

Shotcrete Technologies, Inc – Booth 423


Tenbusch, Inc – Booth 516 Rock Drills Shotcrete Equipment,
Brokk Inc – Booth 407
The PBE Group – Booth 502
Tsurumi Pump – Booth 563 DSI Tunneling LLC – Booth 517 Supplies, and Services
Epiroc – Booth 501 BASF Corporation – Booth 401
Worldsensing – Booth 617 GCP Applied Technologies – Booth 404
ROBODRILL – Booth 222
Sandvik Mining and Rock Technology – Booth 628 JENNMAR Civil – Booth 607
Mucking Systems King Shotcrete Solutions – Booth 511
Mining Equipment Ltd – Booth 506 KOSTEEL CO, LTD – Booth 336
Rock TBM’s Mapei Corp – Booth 307
Akkerman – Booth 633 McDowell Equipment Ltd – Booth 405
Non-Explosive Mechanical CDM Smith – Booth 429 Michels Corp – Booth 527
Excavation Herrenknecht Tunnelling Systems USA, Inc – Booth
217
Normet Americas, Inc – Booth 611
Putzmeister – Booth 400
Alpine Equipment – Booth 211
Lovsuns Tunneling Canada Ltd – Booth 411 Shotcrete Technologies, Inc – Booth 423
Daigh Company, Inc – Booth 504
Messinger Bearings – Booth 606 Sika Corporation – Booth 610
Drill Tech Drilling & Shoring Inc – Booth 110
Terratec – Booth 530 Surecrete Inc – Booth 226
Englo, Inc, DBA Engart, Inc – Booth 618
The Robbins Company – Booth 317 Techni-Metal Systems – Booth 402
Malcolm Drilling Co Inc – Booth 619
Tolsa Wyoming Bentonite Inc – Booth 547

Precast Concrete Linings Rotary Drum Cutters


Agru America, Inc – Booth 300
Alpine Equipment – Booth 211 Slurry Services and Machines
Antraquip Corp – Booth 311 Amix Systems Ltd – Booth 227
Algaher S.A. – Booth 559
Brokk Inc – Booth 407 BAUER-Pileco Inc – Booth 546
BASF Corporation – Booth 401
Case Foundation - Bencor – Booth 323
Bekaert Maccaferri Underground Solutions –
Booth 318 Safety Products Derrick Equipment Co – Booth 608
Michels Corp – Booth 527
Datwyler Sealing Technologies – Booth 214 ABC Ventilation Systems – Booth 322
The Robbins Company – Booth 317
David R. Klug & Associates, Inc – Booth 418 Matrix Design Group – Booth 301
TREVIICOS – Booth 545
EC Applications - Tunnel Lining – Booth 302 Nightstick – Booth 629
Tsurumi Pump – Booth 563
Everest Equipment Co – Booth 428 NKT Photonics Inc – Booth 512
GCP Applied Technologies – Booth 404 Ocean Advanced Research – Booth 338
KOSTEEL CO, LTD – Booth 336 Promat International NV – Booth 600 Soft Ground Shields
Mighty Shield Industries Sdn Bhd – Booth 603 Schauenburg Flexadux Corp – Booth 636 Herrenknecht Tunnelling Systems USA, Inc –
Schnabel - SWS – Booth 624 The PBE Group – Booth 502 Booth 217
Technical Tunnelling Components LTD (TTC) – Tenbusch, Inc – Booth 516
Booth 218
VMT USA – Booth 308 Scaling
Alpine Equipment – Booth 211 Soil Conditioning Equipment
Antraquip Corp – Booth 311
Publishers Brokk Inc – Booth 407 and Materials
Tunnel Business Magazine – Booth TBM – Booth 100 Normet Americas, Inc – Booth 611 Alpine Equipment – Booth 211
Tunneling Journal/Tunnelling Journal – Booth 106 Avanti International – Booth 455
Tunnels & Tunnelling – Booth 114 Mapei Corp – Booth 307
TunnelTalk – Booth 108 Segment Accessories NKT Photonics Inc – Booth 512
Algaher S.A. – Booth 559 Normet Americas, Inc – Booth 611
Datwyler Sealing Technologies – Booth 214 Simem Underground Solutions, Inc – Booth 417
Pumps and Pumping Nightstick – Booth 629
Technical Tunnelling Components LTD (TTC) –
Equipment Booth 218 Steel Pipe
Avanti International – Booth 455 AIL Mining – Booth 510
BAUER-Pileco Inc – Booth 546 JADCO Manufacturing Inc – Booth 555
Gomez International, Inc – Booth 523 Shaft Drilling and Raiseboring Naylor Pipe Co – Booth 213
Grindex Pumps – Booth 626
King Shotcrete Solutions – Booth 511 Equipment TBM Supply – Booth 524
Williams Form Engineering Corp – Booth 657
Putzmeister – Booth 400 Case Foundation - Bencor – Booth 323
Simem Underground Solutions, Inc – Booth 417 Epiroc – Booth 501
Tsurumi Pump – Booth 563 Herrenknecht Tunnelling Systems USA, Inc – Booth Survey Equipment and Lasers
217 Amberg Technologies Ltd – Booth 653
Malcolm Drilling Co Inc – Booth 619 NKT Photonics Inc – Booth 512
Rail Products Michels Corp – Booth 527 Poltinger Precision Systems GmbH – Booth 651
Algaher S.A. – Booth 559 Nicholson Construction Co – Booth 505
Brookville Equipment Corp – Booth 430 Palmieri S.p.A. – Booth 112
JENNMAR Civil – Booth 607 Renesco Inc – Booth 102 Tunnel Boring Equipment
Richard Goettle, Inc – Booth 601 Akkerman – Booth 633
Ballard Marine Construction – Booth 513
Roadheaders ROBODRILL – Booth 222
Terratec – Booth 530 Gomez International, Inc – Booth 523
Alpine Equipment – Booth 211 Herrenknecht Tunnelling Systems USA, Inc – Booth
Antraquip Corp – Booth 311 217
Poltinger Precision Systems GmbH – Booth 651 Lovsuns Tunneling Canada Ltd – Booth 411
Sandvik Mining and Rock Technology – Booth 628 Messinger Bearings – Booth 606
VMT USA – Booth 308 Palmieri S.p.A. – Booth 112
Poltinger Precision Systems GmbH – Booth 651

62 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
PRODUCTS & SERVICES

Richway Industries – Booth 416 Daigh Company, Inc – Booth 504


Sandvik Mining and Rock Technology – Booth 628 Drill Tech Drilling & Shoring Inc – Booth 110
Spendrup Fan Co – Booth 528 Englo, Inc, DBA Engart, Inc – Booth 618
Techni-Metal Systems – Booth 402 Epiroc – Booth 501
Tenbusch, Inc – Booth 516 Gomez International, Inc – Booth 523
Terratec – Booth 530 Mapei Corp – Booth 307
The Robbins Company – Booth 317 McDowell Equipment Ltd – Booth 405
McMillen Jacobs Associates – Booth 316
Michels Corp – Booth 527
Tunnel Communication Nightstick – Booth 629
Systems and Equipment Richway Industries – Booth 416
DSI Tunneling LLC – Booth 517 ROBODRILL – Booth 222
Innovative Wireless Technologies – Booth 643 Schnabel - SWS – Booth 624
Matrix Design Group – Booth 301 Schnabel Foundation Co – Booth 541
NKT Photonics Inc – Booth 512 The Lane Construction Corporation – Booth 623
Northern Light Technologies – Booth 518 Tolsa Wyoming Bentonite Inc – Booth 547
R.S.T. Instruments Ltd – Booth 561 TREVIICOS – Booth 545
The PBE Group – Booth 502
VMT USA – Booth 308
Worldsensing – Booth 617
Underground Locomotives and
Rail Haulage Equipment
Brookville Equipment Corp – Booth 430
Tunnel Haulage Systems Gomez International, Inc – Booth 523
Akkerman – Booth 633
McDowell Equipment Ltd – Booth 405
McDowell Equipment Ltd – Booth 405
Mining Equipment Ltd – Booth 506
Techni-Metal Systems – Booth 402 Underground Utility Materials
and Operations
Tunnel Lining and Support Avanti International – Booth 455
Line Power – Booth 616
Materials Nightstick – Booth 629
Agru America, Inc – Booth 300
NKT Photonics Inc – Booth 512
AIL Mining – Booth 510
Promat International NV – Booth 600
Algaher S.A. – Booth 559
TBM Supply – Booth 524
Antraquip Corp – Booth 311
Thompson Pipe Group - Flowtite – Booth 408
BASF Corporation – Booth 401
Bekaert Maccaferri Underground Solutions – Booth
318 Ventilation Systems, Materials
ConShield Technologies – Booth 118
CTS Cordes tubes & seals GmbH & Co KG – Booth and Equipment
422 ABC Industries, Inc – Booth 305
Datwyler Sealing Technologies – Booth 214 ABC Ventilation Systems – Booth 322
David R. Klug & Associates, Inc – Booth 418 AIL Mining – Booth 510
DSI Tunneling LLC – Booth 517 Englo, Inc, DBA Engart, Inc – Booth 618
EC Applications - Tunnel Lining – Booth 302 Epiroc – Booth 501
Elasto Plastic Concrete – Booth 612 Mining Equipment Ltd – Booth 506
Everest Equipment Co – Booth 428 Naylor Pipe Co – Booth 213
GCP Applied Technologies – Booth 404 Promat International NV – Booth 600
JENNMAR Civil – Booth 607 Schauenburg Flexadux Corp – Booth 636
Kern Tunneltechnik SA – Booth 457 Spendrup Fan Co – Booth 528
KOSTEEL CO, LTD – Booth 336 The PBE Group – Booth 502
Mighty Shield Industries Sdn Bhd – Booth 603 Tioga Air Heaters - Mobile Air – Booth 560
MSP Structures Inc – Booth 605
Normet Americas, Inc – Booth 611 Wastewater Management
Promat International NV – Booth 600
Renesco Inc – Booth 102 Products
Richway Industries – Booth 416 Agru America, Inc – Booth 300
Shotcrete Technologies, Inc – Booth 423 Avanti International – Booth 455
Technical Tunnelling Components LTD (TTC) – ConShield Technologies – Booth 118
Booth 218 Hobas Pipe USA – Booth 647
Williams Form Engineering Corp – Booth 657
Wisko America, Inc – Booth 332 Water Treatment Plant and
Underground Excavation Materials
Agru America, Inc – Booth 300
Services and Equipment Hobas Pipe USA – Booth 647
Alpine Equipment – Booth 211 Moretrench – Booth 326
Amberg Technologies Ltd – Booth 653
Brokk Inc – Booth 407

SHOWGUIDE exhibitor listings as of April 17, 2018 T&UC


® 2018 NAT SHOWGUIDE 63
AD INDEX
NAT2018

ABC Industries ......................................................................................... 8


Advanced Concrete Technologies ............................................................... 9
Antraquip Corporation ............................................................................. 11
Babenderede Engineers GmbH ................................................................ 12
BASF Corporation .................................................................................. 13
Brokk Inc .............................................................................................. 15
Brookville Equipment Corp ...................................................................... 16
Case Foundation Company ...................................................................... 17
CDM Smith ........................................................................................... 18
Crux Subsurface Inc ............................................................................... 19
Daigh Co Inc ......................................................................................... 20
David R. Klug & Associates Inc................................................................. 21
Derrick Equipment ................................................................................. 23
Dr. Sauer & Partners Corp ....................................................................... 22
DSI Tunneling LLC.................................................................................. 25
Elasto Plastic Concrete............................................................................ 27
Epiroc .................................................................................................. 29
Gall Zeidler Consultants ........................................................................... 24
Geokon ................................................................................................ 26
Grindex Pumps ...................................................................................... 28
Hayward Baker................................................................Outside Back Cover
Herrenknecht Tunneling Systems USA Inc..............................Inside Front Cover
HNTB Holdings Ltd ................................................................................ 31
Jennmar Corporation .............................................................................. 33
Lane Construction Corp .......................................................................... 35
MAPEI Corporation ................................................................................. 37
McMillen Jacobs Associates .................................................................... 36
Michels Corp ......................................................................................... 38
Mining Equipment Ltd ............................................................................. 39
Moretrench ........................................................................................... 41
Naylor Pipe Company ............................................................................. 40
Normet Americas Inc .............................................................................. 42
Northwest Laborers-Employers Training Trust Fund ...................................... 45
Parsons ................................................................................................ 47
Rock Splitting Technologies Inc ................................................................ 20
Ruen Drilling Inc..................................................................................... 46
Sandvik Mining and Rock Technology................................... Inside Back Cover
Schauenburg Flexadux Corp .................................................................... 48
Schnabel Engineering ............................................................................. 49
Shotcrete Technologies ........................................................................... 50
SoilFreeze Inc ........................................................................................ 51
Surecrete Inc......................................................................................... 52
The Robbins Company ........................................................................... 53
Tioga Air Heaters ................................................................................... 57

64 2018 NAT SHOWGUIDE T&UC ® SHOWGUIDE exhibitor listings as of April 17, 2018
VERSATILITY & VISIBILITY
THE ULTIMATE ALL-AROUNDER
With penetration rates up to 17 percent higher than its predecessors* and a new cabin that
increases visibility by 25 percent while minimizing noise levels, the fully-automated Sandvik DT922i
twin-boom jumbo is engineered to improve your tunneling operations. Developed for versatility,
Sandvik DT922i excavates cross sections up to 1345 ft², including face drilling, bolt-hole drilling
and long-hole drilling. An intelligent, state-of-the-art control system and Sandvik iSURE® excava-
tion management tool help ensure top tunneling quality. Booth 628
*Test results and calculations are to be considered as results reached under certain and controlled test conditions.
These test results and calculations should not be treated as specifications and Sandvik does not guarantee, warrant
or represent the outcome of test results or calculations in any or all circumstances.

ROCKTECHNOLOGY.SANDVIK 1-724-322-7740
DON’T
miss
OUT WASHINGTON MARRIOTT WARDMAN PARK

20 Tech Sessions
150 Exhibitors
1000 Attendees

Register today at
www.natconference.com

MARK YOUR CALENDAR


for these must-attend conferences:

Our Leading
TUNNELING and Underground
Construction CONFERENCES
Your Opportunity to CONNECT and GROW

Вам также может понравиться