Committee Members
a Dr. Rana Iqtadar Shakoor
b Engr. Syed Hammad Nazeer
c Engr. Ehtisham ul Hasan
Signature: _____________________
Date: _______________________
Signature: _____________________
Date: _______________________
Signature: _____________________
Date: _______________________
Signature: _____________________
Date: _______________________
Signature: _____________________
Date: _______________________
Signature: _____________________
Date: _______________________
Signature: _____________________
Date: _______________________
Signature: _____________________
Date: _______________________
Signature: _____________________
Date: _______________________
Compilation of Result
Sr Project Work Assessment Weightage (%) 150632 150572 150686
Engr. Umer Farooq
Supervisor
PLO Mapping
Sr Project Work Assessment Weightage (%) 150632 150572 150686
PLO 01 Engineering Knowledge
1 Introduction and Background 50%
Introduction & background provided & Literature review relevant
2 50%
to the project
Total 0.00 0.00 0.00
PLO 02 Problem Analysis
3 Project Objective 60%
4 Problem statement clearly defined 40%
Total 0.00 0.00 0.00
PLO 03 Design of Solutions
6 Description of work completed 70%
7 Individual’s understanding and response to questions 30%
Total 0.00 0.00 0.00
PLO 04 Investigation
9 Quality of Project Report 50%
10 Relevant theory from discipline integrated into the presentation 50%
Total 0.00 0.00 0.00
PLO 06 Engineer & Society
Proposed Impact on Society & Economy (FYP-I only) (K.
11 20%
Proposed benefits of project on society & economy)
12 Proposed Impact on Society & Economy (FYP I only) 30%
Justification of project impact with facts, figures & graphs on
13 50%
Society & Economy, at least two brief slides and on Poster
Total 0.00 0.00 0.00
PLO 08 Ethics
14 Punctuality, Commitment and Initiative exhibited 50%
Plagiarism Report should not have a plagiarism of more than
15 50%
15%.
Total 0.00 0.00 0.00
PLO 09 Individual & Team Work
16 Total number of meetings held 30%
17 Response to assigned tasks and progress 20%
18 Mentioned his/her portion of the work done in FYP-III 20%
19 Behaving as a team member 30%
Total 0.00 0.00 0.00
PLO 10 Communication
20 Fonts, Type, Margins, Spacing, Figures etc. 10%
Slide format suitable (background, colors, not flashy or much
21 10%
animation)
22 Effective use of visual aids (graphs, charts, diagrams, figures) 20%
23 Presentation delivered in clean English language 20%
24 Presenter prepared, confident and calm 20%
25 Presenter explaining content and not reading slides 20%
Total 0.00 0.00 0.00
PLO 11 Proect Management
Submission of forms and maintaining project documentation (All
26 Bill of Material (BOM), Costing, are part of FYP-III report NRE 35%
cost of Project has been calculated)
27 Suitable flow of presentation; logical sequence of slides 20%