DOLPHIN PROJECT Contractor’s Job Code:

0-3356-20

UPSTREAM AND COMPRESSION


FACILITIES

Rev.IssuePurpose/Description of RevisionPreparedReviewedApprovedCompanyC0306DEC04Released for Construction (All motor


operated ball valves with the exception of 200-0MOV-0410-1&2)Y.NagaiA.NagasakiF.SakamotoC0431MAR05Released for
Const. (All motor operated gate & butterfly valves and 200-0MOV-0410-1 &
2)Y.NagaiA.NagasakiF.SakamotoC0511OCT05Added MOV’s (Butterfly) Tag No. 105-1/2/3/4MOV-0150 & 160-0VFM-0001/0002/0003/0004, and
Company Document No. RL0-0000-LDS-00001
revised as marked upY.NagaiA.NagasakiF.SakamotoC0614FEB06Indicated actuator orientation of Tag No. 160-0VFM-
0001/0002/0003/0004Y.NagaiA.NagasakiF.SakamotoZ0721JUL07AS BUILTD.NakaiA.NagasakiT.Kubo
Document Class. 2 Date

Contractor Document. No.


S-000-136G-001 <Z07>

Area: Multi Area Ras Laffan

Discipline: Piping

Document Type: Data Sheet

Commitment Number: UCB 15-01

Document Title:

Technical Data Sheets

for

Motor Operated Valves

© This document is the property of Dolphin Energy Limited. No part of this document may be reproduced or transmitted in any form or by any means, or
used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.

File Name:418006264.doc 1 of 36
DOLPHIN PROJECT Contractor’s Job Code:
0-3356-20

UPSTREAM AND COMPRESSION


FACILITIES

Rev.IssuePurpose/Description of RevisionPreparedReviewedApprovedCompanyC0306DEC04Released for Construction (All motor


operated ball valves with the exception of 200-0MOV-0410-1&2)Y.NagaiA.NagasakiF.SakamotoC0431MAR05Released for
Const. (All motor operated gate & butterfly valves and 200-0MOV-0410-1 &
2)Y.NagaiA.NagasakiF.SakamotoC0511OCT05Added MOV’s (Butterfly) Tag No. 105-1/2/3/4MOV-0150 & 160-0VFM-0001/0002/0003/0004, and
revised as marked upY.NagaiA.NagasakiF.SakamotoC0614FEB06Indicated actuator orientation of Tag No. 160-0VFM-
0001/0002/0003/0004Y.NagaiA.NagasakiF.SakamotoZ0721JUL07AS BUILTD.NakaiA.NagasakiT.Kubo
Date

AS BUILT

© This document is the property of Dolphin Energy Limited. No part of this document may be reproduced or transmitted in any form or by any means, or
used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.

File Name:418006264.doc 1 of 36
DOLPHIN PROJECT Company Doc. No.: RL0-0000-LDS-00001
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
Technical Data Sheets for MOVs Contractor Doc. No.: S-000-136G-001 <Z07>

REVISION HISTORY

REV DATE DESCRIPTION

R01 05APR04 1st Issue for Review

Released for Construction (NPS 26 & larger with class 900 & lower motor operated
C02 13SEP04 ball valves only)

C03 06DEC04 Released for Construction (All motor operated ball valves)

Released for Construction (All motor operated gate & butterfly valves and
C04 31MAR05 200-0MOV-0410-1 & 2). Change of control type for 101-1/2/3/4MOV-A, 101-
1/2/3/4MOV-B and 101-1/2/3/4MOV-C.

Added MOV’s (Butterfly) Tag No. 105-1/2/3/4MOV-0150 & 160-0VFM-


C05 11OCT05
0001/0002/0003/0004, and revised as marked up

C06 14FEB06 Indicated actuator orientation of Tag No. 160-0VFM-0001/0002/0003/0004

Z07 21JUL07 AS BUILT

Note:
When a data is revised, this is marked by revision No. in the revision column.

3 of 36