MANHOLE
W el
LINE 5 SEWERAGE PIPE ∅200mm LINE 5
to
LEGEND
TOP MEDIAN LEVEL (CENTER LINE)
NO. NO. STATION MANHOLE
SEWERAGE PIPE ∅200mm
LINE 6 MANHOLE LINE 6 01 STA. 0+000.000
RIGHT
MHR.21-4-1
LEFT
MHL.21-4-1
02 STA. 0+025.920 MHR.21-4-2 MHL.21-4-2
03 STA. 0+075.920 MHR.21-4-3 MHL.21-4-3
04 STA. 0+125.920 MHR.21-4-4 MHL.21-4-4
05 STA. 0+175.920 MHR.21-4-5 MHL.21-4-5
06 STA. 0+225.920 MHR.21-4-6 MHL.21-4-6
07 STA. 0+275.920 MHR.21-4-7 MHL.21-4-7
08 STA. 0+315.930 MHR.21-4-8 MHL.21-4-8
09 STA. 0+375.920 MHR.21-4-9 MHL.21-4-9
10 STA. 0+425.920 MHR.21-4-10 MHL.21-4-10
11 STA. 0+475.920 MHR.21-4-11 MHL.21-4-11
12 STA. 0+525.920 MHR.21-4-12 MHL.21-4-12
13 STA. 0+575.920 MHR.21-4-13 MHL.21-4-13
14 STA. 0+625.920 MHR.21-4-14 MHL.21-4-14
15 STA. 0+675.920 MHR.21-4-15 MHL.21-4-15
16 STA. 0+710.360 MHR.21-4
5.0 TOP MEDIAN LEVEL (CENTER LINE) TOP MEDIAN LEVEL (CENTER LINE)
SEWERAGE LEVEL (T.O.P) SEWERAGE LEVEL (T.O.P)
4.0 EXISTING GROUND LEVEL EXISTING GROUND LEVEL
3.0 i : 0.00025
5 Cm
5M
MANHOLE
MANHOLE
MANHOLE
MANHOLE
MANHOLE
MANHOLE
MANHOLE
MANHOLE
MANHOLE
2.0
4
4
1.0
3
3
0.0
2
2
0.3 %
-1.0
1
1
PIPE ∅200mm
5 Cm 4 3 2 1 -2.0
50 M 40 30 20 10 0
SH = 1 : 1000 -3.0
SV = 1 : 100
-4.0
REFERENCE LEVEL : -5.00 CONSULTANT :
Dayang Sumbi 7
0+400
0+000
0+050
0+200
0+250
0+350
Bandung 40132, Indonesia
0+100
0+150
0+310
STATION NUMBER MHL 21-4-1 Phone : 62-22-2502533
Facsimilie : 62-22-2504177
e-mail : lapigtc@lapi.itb.ac.id
24.100
40.000
50.000
50.000
50.000
50.000
50.000
60.000
50.000
DISTANCE
KIK/INFRA/LAND PARCELS/Ph 1A-8 -
400.000
200.000
250.000
350.000
100.000
150.000
310.000
50.000
0.000
PROJECT TITLE :
-0.065
-0.003
-0.021
0.072
GROUND LEVEL (m)
0.164
0.172
0.316
0.105
CONSTRUCTION AND COMPLETION OF INFRASTRUCTURE FOR INDUSTRIAL,
COMMERCIAL AND STANDARD BUILT FACTORY LAND PARCELS
-0.618 2.949
-0.018 3.000
-0.168 2.987
-0.318 2.975
-0.468 2.962
-0.768 2.936
-0.948 2.925
-1.068 2.925
2.925
TOP MEDIAN LEVEL (CENTER LINE) (m) FOR PHASE 1A-8 AT KENDAL INDUSTRIAL PARK
-0.246
-0.546
-0.846
-0.396
-0.696
-0.996
-0.096
-1.146
-1.218
SEWERAGE LEVEL (T.O.P) (m)
0.054
DRAWING TITLE :
SEWERAGE LINE 5 & 6
LONG SECTION STA. 0+000 ~ 0+400
-
MHR.21-4-1 - MHR.21-4-10
EMPLOYER :
PT. KAWASAN INDUSTRI KENDAL
KENDAL JL. Kaliwungu Barat No. 29
INDUSTRIAL Sarirejo, Kendal 51372 - Semarang
PARK
Jawa Tengah - Indonesia
1 : 1000