CONTENTS
1.0 PURPOSE & SCOPE
2.0 DEFINITIONS
3.0 FLOWCHART
5.0 REFERENCES
6.0 ATTACHMENTS
Revision Status
2.0 DEFINITIONS
Health & Safety Plan A documented management strategy for the total Health &
Safety Management of the Workplace. The plan should
contain management systems complemented by a separate
manual of safe work procedures specific to activities.
TCI-OPS-SP001
PREPARATION OF DEFINE AND DESCRIBE
PROJECT MANAGEMENT WORKPLACE
PLANS
TCI-OHS-SF078
ACTIVITY / PERFORM ACTIVITY /
HAZARD
ANALYSIS
HAZARD ANALYSIS
TCI-OHS-SF030
RISK COMPLETE 'RISK
MANAGEMENT MANAGEMENT FORM'
FORM
NO
ESTABLISH EMERGENCY
RESPONSE PROCEDURES
DESCRIBE REQUIREMENTS
FOR HAZARDOUS
SUBSTANCES
DEFINE REQUIRED
TRAINING
TCI-OHS-SP017
PREPARATION AND
CONTROL OF JOB SAFETY
ANALYSIS-SAFE WORK IDENTIFY AND DOCUMENT
INSTRUCTIONS
SAFE WORK INSTRUCTIONS
TCI-OPS-SP003
PROCESS CONTROL
ARE IS SUBCONTRACT A
SUBCONTRACTORS YES
MAJOR PACKAGE? NO
BEING USED?
NO YES
TCI-OPS-SP010 TCI-OHS-SP012
HEALTH, SAFETY & DESCRIBE METHODS UTILISE GUIDELINES FOR HEALTH & SAFETY
ENVIRONMENTAL OF AUDITING MAJOR SUBCONTRACTORS PLANNING
MANAGEMENT AUDIT
NEGOTIATE STANDARD
LEGEND SUBMIT TO FUNCTIONAL TCI-OHS-SF141
BETWEEN WM / BM / MINOR
MANAGER FOR APPROVAL
PROCEDURE REFERENCE SUBCONTRACTOR SUBCONTRACTOR
FORM REFERENCE
PLAN
Project Manager
Superintendent
Supervisors
Forepersons
Leading Hands
Emergency Team
Define any additional responsibility not already covered in the Health, Safety &
Environment Manual.
4.3 Site Layout, Facilities, Etc.
Attach a plan of the site clearly identifying the following locations:
Site offices
First Aid
Material storage
Notice Boards
4.4 Hazard Identification, Risk Assessment and Controls
(Refer to “Hazard Analysis and Risk Treatment”)
An activity/hazard analysis shall be performed in order to prioritise hazards through
determining the level of risk with each activity (refer to “Hazard Analysis and Risk
Treatment”). This process should be performed in consultation with all stakeholders.
"Risk Management Form" shall be completed which describes the types of foreseeable
hazards, the level of risk and planned controls necessary to safely manage specific
workplace activities.
Written safe work instructions, designed to reduce risk to an acceptable level, shall be
formulated for all moderate to high risk activities, which should address but not limited to
activities which present the following hazards:
Fall of earth
U.V. Radiation
Manual handling
Noise
Electricity
Mechanical Equipment
Heat/Cold
Vibration
Blasting
Traffic
PT Saptaindra Sejati Page 5 of 8
HEALTH & SAFETY PLANNING
Quality Management System
Signage
Training
4.6 Hazardous Substances/Explosives
Describe the requirements for storage, transport, handling, use and training, associated with
hazardous substances.
4.7 Health & Safety Committees
Describe the consultative functions and requirements for:
Task Training
PT Saptaindra Sejati Page 6 of 8
HEALTH & SAFETY PLANNING
Quality Management System
Skills Training/Assessment
Housekeeping/rubbish removal
Access provisions
Crane Operations
Working at heights
4.12 Format
The format of the Workplace Health, Safety & Environment plan is as required by the client
or as defined by the Workplace Manager. Reference to “Preparation of Project
Management (Quality) Plans” is recommended for use as a guideline to the H&S format.
An example of a H&S Plan can be viewed in the Operations Knowledge Database under
Type: Safety.
The Standard of Health, Safety & Environment Plan required for major subcontractor
packages is described in "Subcontractor’s Guidelines for the Development of a specific
Health, Safety & Environment Plan". To assist the subcontractor meet the required
standard the subcontractors safety pack should be used. Refer to the Operations
Knowledge Database under Type: Safety.
The standard of Health, Safety and Environment Plan for minor subcontract packages (less
than 5 persons) shall be negotiated between the Workplace Manager, the Business Unit
Safety Manager and the Subcontractor. As a guideline for content and format the “Minor
Subcontractor Plan” is recommended.
5.0 REFERENCES
- Risk Management Form
- Health, Safety & Environment Management Audit
- Risk Management
- Preparation and Control of JSEA -Safe Work
Instruction
- Preparation of Project Management Plans
- Process Control
- Minor Subcontractor Plan
6.0 ATTACHMENTS
- Subcontractor's Guidelines for the Development of a
Specific Health, Safety and Environmental Plan
CONTENTS
1. Introduction
2. Company Structure and General Information
3. Scope of Work
4. Staffing
5. Hazardous Substances
6. Electrical Equipment
7. Plant and Equipment
8. Risk Assessments and Safe Work Procedures
9. Health and Safety Management System
10. Environment Management Plan
11. Attachments
Roles and responsibilities for workplace health and safety (include all management
levels
Details of any existing safety and skills training program (Company inductions - skills
checking, safety training)
Give details of conditions in the work areas that may increase the difficulty of the work.
List things that are not normal for the type of work such as:
- Presence of the public
- Elevated work
- Work restriction (noise, work times, size of equipment)
Where required separate risk assessments and safe work practices will be required for
specialist procedures.
4.0 STAFFING
Existing legislation requires all employers to ensure that their employees have the skills and
training required to carry out their work safely. Thiess Contractors require assurance that
subcontractors have correctly skilled staff, suitable training programs and suitable
supervision for the scope of work they undertake.
Subcontractors are required to provide the following information:
Skills required
Identification number
Description of equipment
Details of repairs
Restrictions, if any
A weekly report to Thiess Contractors to be tabled at the health and safety meeting.
This report is to cover:
- Safe work procedure inspection checks
- Work related injury or illnesses
- Rehabilitation details for time lost injuries
- Any additional training carried out
- Improvements/changes to work methods
- Health and safety problems or issues identified during the week (all areas)
Details of company specific controls that will be in place including formal inspections
and audits
Air Emissions
Liquid Discharges
Solid Wastes
Hazardous Chemicals
Vibration
Noise
Site Rehabilitation/Clean Up
11.0 ATTACHMENTS
1. TCI-OHS-SF030 Risk Management Form
2. TCI-OHS-SF031 Job Safety Environment Analysis Form
3. Environmental Management Plan Formats
i) TCI-OHS-SF066 Air Emission
ii) TCI-OHS-SF067 Liquid Discharge
iii) TCI-OHS-SF068 Solid Wastes
iv) TCI-OHS-SF069 Hazardous Substances
v) TCI-OHS-SF070 Vibration
vi) TCI-OHS-SF071 Noise
vii) TCI-OHS-SF072 Flora & Fauna
viii) TCI-OHS-SF073 Rehabilitation
4. TCI-OHS-SF079 Activity/Hazard Analysis