October, 2006
Proforma for Research, Design & Development (RD&D) in Renewable Energy
Table of Contents
Sl.No. Item Page No
1. Annexure-I: Proforma for Submission of New R&D and Technology 3
Development Projects
2. Annexure-II: Proforma for sending Project Acknowledgement 12
Annexure-I
4. Project Summary:
5. Definition of the i) Definition of the problem
Problem and Project ii) Broad Objectives
Objectives iii) Specific objectives
III Status of Work being
done in other
Institutions/ Industries:
6. Status of Work being
done:
i) National
ii) International
iii) Patent search
Reports
iv) Expertise available
with PI/ GROUP/
Institution/ Industry
IV Implementing
Institution(s)/
Industry(s):
7. Name of implementing
institution(s)
8. Name of collaborating/
participating industry
9. Name of Principal
Investigator
10 Name of co-Principal
Investigator(s)
11. Address of implementing
institution(s): postal
address, phone, fax, e-
mail, website
12. Address of collaborating/
participating industry:
postal address, phone,
fax, e-mail, website
V. Implementation Period:
13. Proposed duration
i) Phase-I
ii) Phase-II
14. Financial Year
15. Date of Submission
16. Date of Receipt in MNRE
X Technology/ Know-how
Transfer (likely)
XI Project need and
Justification
31. Need
32. Justification
XII Project Assessment
33. Assessment by Experts
i)
ii)
iii)
iv)
v)
34. Technical Assessment by
MNES
35. Financial Assessment by
MNES
36. Overall
Recommendations
1. Project Tile:
2. Name & address of Principal Investigator & Implementing Institution:
3. Name & address of Collaborative Investigators and Institutions:
4. Project Objectives:
i) Broad Objectives
ii) Specific Objectives
5. Project Duration:
6. Project Cost:
i) Total Cost:
Sl. Item Amount
No. First Second Third Total
Year Year Year
1. Equipment
2. Man power
3. Consumables
4. Contingencies/ Other
Costs
5. Travel
6. Consultancy
7. Institutional Overhead
charges
Total:
1.
2.
3.
1. i) Quantity/ Number
2.
1.
2.
3.
1.
2.
3.
7. Cost sharing:
8. Status of work done on similar problem / topic by other groups:
iv) National
v) International
vi) Patent search reports ( if any)
9. Details of projects implemented/ under implementation/ under submission by the PI or
co-PI or the implementing institution(s) sponsored by MNRE for funding during the last
five years:
10. Justification of the proposed Project work in context of work being pursued by other
groups in the country:
11. Work methodology:
12. Details of proposed ‘Work Plan’ including rationale for the proposed targets to be
achieved vis-a-vis national and international achievements including details of prototype/
pilot scale plant and design of the product and drawing, process to be tested/ analyzed
and evaluated, etc.:
13. Year-wise Activities/ Milestones, time schedule and PERT Chart:
14. Expected Output:
a) Details of proposed Scientific out put:
i) Technical Documents:
ii) Research Papers
iii) Technology Transfer
iv) Training
v) Awareness Camps
b) Product/ process quantifiable performance output proposed:
i) Standard/ Specification development
ii) Efficiency Improvement
iii) Product Improvement
iv) Process Improvement
v) Power rating/ capacity enhancement
vi) Ease of operation and Maintenance
vii) Cost reduction
viii) Others
15. Potential Users and suggested Plan of action for utilization of expected Project Output:
16. Existing infrastructural facilities and equipment with the PI(s) and host institution(s)/
Industry:
4. Other Institute/
Industry
Government of India
Ministry of New and Renewable Energy
Block 14, CGO Complex, Lodi Road
New Delhi-110 003
(The Principal Investigator is requested to fill the project title and address)
Acknowledged with thanks the receipt of ______nos. of physical and ….. electronic copies of
your research proposal entitled:
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
Name:_____________________
Designation:_____________________
Date:____________
E-mail ID:
Annexure-III
Ministry of New and Renewable Energy
Project Title:
MNRE Reference:
- well planned
- Impractical
- Needs Revision ( Please
indicate areas for revision)
3. Proposed Budget / 20
(Pl. comment on each item)
Equipment
Consumables
Manpower
Travel
Contingency
Other project cost
Adequate
Insufficient
Relevant
Partial
Not relevant
7. Milestones along with /5
verifiable indicators
8. Detailed assessment of / 20
expert of the proposal and
the competence of PI
9. Recommendation of expert
Recommended as proposed /
Recommended with revision
( Please give details of
modifications required) /
Rejected
Place: Designation
Organization
Annexure-IV
1. Technology Area
3. Principal Investigator
5. Proposed duration
6. Objectives
7. Proposed Output including
Novelty/ Innovation and
Patent potential
8. Total Budget and item wise
break up (Rs.)
9. Cost sharing, if any
Annexure-V
Proforma for Sanction of R&D and Technology Development Project
File No.
Government of India
Ministry of New and Renewable Energy
Group/ Division
Dated
i) Project Title:
v) Time Schedule:
vi) Manpower:
Following are the details of the total estimated budget of the project:
a) MNRE share:
The MNRE share of the project cost will comprise of the following:
Total
The remaining cost of the project amounting to Rs….. will be met by the……
(x) Monitoring:
a) Specific:
b) General:
The general terms and conditions governing this sanction are attached at
Annexure- VI.
c) Execution of Bond:
d) Utilization certificates:
The utilization certificates and the audited statement of accounts in the MNES
format will be submitted by -------PI/ grantee organization.
2. Sanction of the President is also hereby accorded, under Rule 18 of the DFPR, 1978 for
the release of a sum of Rs. ------ (Rupees ------ only) to the -------- being the first release for the
implementation of the above project to…….(grantee organization).
3. An amount of Rs. -------- (Rupees -------- only) will be drawn by the Drawing &
Disbursing Officer, Ministry of New and Renewable Energy, from the Pay & Accounts Officer,
MNRE and disbursed to the -------- by ECS/ an Account Payee demand draft/ cheque.
4. The expenditure involved will be debitable to Demand No. 65, MNES, Major Head
`2810', Non-Conventional Sources of Energy -------- Research and Development, 01.00.31 -
Grant-in-aid during the financial year -------- (Plan).
5. This issues under the powers delegated to this Ministry and with the concurrence of IFD
vide their sanction No--------- dated -----------and in accordance with the administrative
approval and following common appraisal, approval and financial support procedure.
6. This sanction order has been noted at Serial No. ------ on Page No. ----- in the Register
of Grants for ……………… (division) …………. For ……………….. (year).
Yours faithfully,
(……………. )
Director/ PSO/ Under Secretary to the Govt. of India
Copy to:
1. Head of the Implementing Institution/ Industry).
2. PI of the Implementing Institution/ Industry).
3. Head of the Implementing co- Institution/ Industry).
4. Co- PI of the other Implementing Institution/ Industry).
5. Head, R&D division, MNRE.
6. Internal endorsements Advisers/ Directors/ Under Secretary.
7. Cash Section (2 copies).
8. FA/ Dir (F)/AO (IFD).
9. The Principal Director of Audit, (Science Department ) AGCR Building, I.P. Estate, New
Delhi-110002.
10. Regional Office, MNES.
11. Sanction folder.
(……………………… )
Director/ PSO/ Under Secretary to the Govt. of India
Annexure-VI
General Terms & Conditions of the Grant for R&D/ Technology Development Project
1. Approval of the R&D/ technology development project and the grant being released is
for the specific project sanctioned and should be exclusively spent on the project within the
approved time duration. The grantee organization is not permitted to seek or utilize funds from
any other organisation (government, semi-government, autonomous and private bodies) for this
research project, unless specifically approved for joint funding. Any un-spent balance out of the
amount sanctioned must be surrendered to the Government of India through a ECS/ crossed
Demand Draft drawn in favour of Drawing & Disbursing Officer, MNRE payable at New Delhi.
2. Full infrastructure facilities by way of accommodation, water, electricity, communication
etc. for smooth implementation of the project shall be given by the grantee organization(s) at
their cost.
3. For permanent, semi-permanent assets acquired solely or mainly out of the project grants,
an audited record in the form of a register in the prescribed format (Annexure-XIII) shall be
maintained by the grantee organization. The term “Assets” include (a) the immovable property
acquired out of the grant; and (b) movable property of capital nature where the value exceeds Rs.
50,000/-. The grantee organization is required to send to the MNRE a list of assets acquired from
the grant. The grant shall not be utilised for construction of any building unless specific
provision is made for that purpose.
4. Assets acquired in the project shall be shared proportionately between Government of
India and grantee organization(s) in accordance with the cost sharing pattern of the project. The
assets should not be disposed off or encumbered or utilized for purpose other than those for
which the grant had been sanctioned, without the prior permission of this Ministry.
5. On conclusion/ termination of a project, the Government of India will be free to sell or
otherwise dispose off its share of the assets, which are the property of the government. The
grantee organization shall render to the Government of India necessary facilities for arranging
the sale of these assets. The Government of India has the discretion to gift its share of assets to
the grantee organization or transfer them to any other organization if it is considered appropriate.
6. The grantee organization/ PI will furnish Progress Report of the work carried out under
the project on six monthly basis in the months of April and October during the project
implementation period in a prescribed format given at Annexure-VIII.
7. Officer(s) of MNRE and MNRE designated Scientist/ Specialist/ Expert Panel/
Committee may visit the organization periodically to review the progress of the work being
carried out and to suggest suitable measures to ensure realization of the objectives of the project.
During the implementation of the project the grantee organization will provide facilities to such
visitors in the form of accommodation, project site visits, etc.
8. On completion of the project 15 copies of a final consolidated ‘Project Completion
Report’ on the work done on the project will be submitted to the MNRE in the prescribed format
given at Annexure-XVII in physical as well as electronic forms.
9. The ‘Project Completion Report’ must include working engineering design and drawing,
prototype/ pilot plant specifications, including plan and section drawings, and list and quantity of
materials, etc.
10. At the time of seeking further installment of grant and closure/ termination of the project,
the grantee organization / PI has to furnish the following documents:
a) Utilization Certificate (U.C) for MNRE grant and ‘Statement of Expenditure’ (S.O.E.) for
the previous financial year (in original or copy if sent earlier) in enclosed formats given at
Annexure-IX, X and XI.
b) Latest authenticated ‘Statement of Expenditure’ including Committed Expenditure, for
the expenditure on the project including cost shared by any other organization since 1st April of
that financial year till the previous month; and
c) Annual Technical Progress Report, if not sent earlier.
11. Request for specific approval of the Ministry to carry forward the unutilized grant to the
next financial year for utilization for the same project, should be sent along with S.O.E & U.C.,
after completion of the financial year.
12. The Comptroller & Auditor General of India, at his discretion, shall have the right of
access to the books and accounts of the grantee organization maintained in respect of the grant
received from the Government of India.
13. The grantee organization will maintain separate accounts for the project in a Bank. If it is
found expedient to keep a part or whole of the grant in a bank account earning interest, the
interest thus earned should be reported to the MNRE and should be reflected in the ‘Statement of
Expenditure’. The interest thus earned will be treated as a credit to the Institute to be adjusted
towards further installment of grant.
14. The grantee organization will neither entrust the implementation of the work for which
the grant is sanctioned to another institution nor will it divert the grant receipts to other institute
as assistance. In case the grantee organization is not in a position to implement or complete the
project, it should, forthwith, refund to this Ministry the entire grant or the balance received by it
at the earliest.
15. All the personnel including Research personnel appointed under the project, for the full/
part duration of the project, are to be treated as project personnel on contract to the organization
and will be governed by the Administrative rules/ service conditions (for leave, TA/DA etc) of
the implementing Institute. They are not to be treated as employees of the Government of India
under any circumstances and the MNRE will have no liability, whatsoever, for the project
personnel after completion of the project duration.
16. For the expeditious implementation of the research project, the PI will take the assistance
of the grantee organization in the process of selection and appointment of staff and payment to
them in accordance with the guidelines given at Annexure-VII. Scale and emoluments for the
posts not covered in the said guidelines are to be governed by the norms prevalent in the grantee
organization or as decided in consultation with MNRE. Deviations from these guidelines,
generally, shall be considered only in consortium projects or projects taken up by an industry on
50:50 cost sharing basis.
17. The Ministry reserves the right to terminate the project at any stage if it is convinced that
the grant has not been properly utilized or sufficient progress has not been reported under the
project or sufficient efforts have not been devoted.
18. The project becomes operative with immediate effect or within a maximum of one month
from the date on which the ECS/ Draft/ Cheque is received by the implementing Institution. This
date should be intimated by the grantee authorities/ Principal Investigator to this Ministry.
19. The grantee organization shall associate a co-PI with the project, if not already part of the
project team. The co-PI shall function as PI in the absence of PI and should be totally in
knowledge of the activities of the project to avoid loss to the project in case PI leaves the
project / organization.
20. If the PI to whom a grant for a project has been sanctioned wishes to leave the grantee
organization where the project is sanctioned, the grantee organization/ PI will inform the same to
the Ministry and in consultation with MNRE, evolve steps to ensure successful completion of the
project through co-PI, before relieving the PI or appoint another Scientist as PI.
21. If the results of research are to be legally protected under IPR, the results should not be
published without action being taken to secure legal protection for the research results.
22. Investigator(s) wishing to publish technical/ scientific papers based on the research work
done under the project should acknowledge the assistance received from MNRE, indicating the
project sanction no. under which grant has been given to the grantee organization. The PI will
submit a copy of the paper to the Ministry as soon as it is published.
23. If the results of the work carried out under the grant require preparation of a technical
booklet/ guides/ software/ CD etc. in such cases the grantee organization will publish/ prepare
sufficient copies (number of copies to be decided in consultation with MNRE) and keep a
portion for their use/dissemination and submit the remaining copies to the Ministry for their use
and distribution.
24. If the result is in the form of a survey report / product performance evaluation or other
such activities which have commercial implications, the grantee organization will not publish the
results without specific written approval of this Ministry.
25. The grantee institution/ PI should provide a copy of the ‘Full Text Document’ of the
Patent/ PI within one month of its publication.
26. For projects identified to have a distinct potential for generating know-how, in the form
of product/ process, that could be protected through patenting, copyrights etc., the PI should
contact MNRE to obtain further details
27. Patents/ Intellectual Property protection shall be in the joint names of MNRE and grantee
organization(s) and scientists who have actually worked for the project shall be the inventor(s).
28. Royalty/ proceed on sale generated through the ‘Intellectual Property’ created by the
project shall be shared in accordance with the guidelines contained in the DST circular issued
with the concurrence of Ministry of Finance, Department of Expenditure vide their O.M.
No.33(5)PF-II99, dated 22nd February, 2000 or subsequent circulars which may be issued by
DST/ MOF on the subject (Annexure-XV) and guidelines given at sections (ix) and (x)
regarding IPR.
29. In case of any dispute the decision of Secretary, Ministry of New and Renewable Energy
shall be final.
13. Other achievements and Publications etc.:
Ph. D students working Technical Personnel trained: Research Publications arising
on the subject/ topic out of the present project:
covered under the
project
List of Publications from the Project Work (including title, author(s), journals & year(s)
3. Principal Investigator:
10. Unspent balance refunded, if any (please give details of ECS/ crossed Demand Draft etc.):
11. Amount to be carried forward to the next financial year (if applicable):
12. Certificate:
(a) Certified that out of Rs.______________ of grants-in-aid sanctioned during the year
_____________ in favour of _____________________________ under this Ministry/ Department
letter/ order no. ____________ dated ___ and Rs. ______________ on account of unspent balance of
the previous year, a sum of Rs. _____________ has been utilized for the purpose of
_______________________ for which it was sanctioned and that the balance of Rs. _________
remaining utilised at the end of the year has been surrendered to Government (vide ECS/ crossed
Demand Draft no. ________ dated ________) will be adjusted towards the grants-in-aid payable
during the next year i.e. ___________.
(b) Certified that I have satisfied that the conditions on which the grants-in-aid was sanctioned
have been fulfilled/ are being fulfilled and that I have exercised the following checks to see that the
amount was actually utilised for the purpose for which it was sanctioned:-
Principal Investigator:
Date: Signature:
Designation:
Date: Signature
Designation:
Seal
Annexure-XI
1. Equipment
2. Consumables
3. Manpower
4. Travel
5. Contingencies
6. Consultancy
7. Others, if any
8. Overhead
expenses
Total:
Name & Signature of the PI Name & Signature of the Competent financial/ audit authority
(Two Copies to be sent four months prior to the expiry of the approved duration of the Project)
8. Progress achieved so far (in relation to attainment of objectives and project output):
9. Objectives and output which are proposed to be achieved during the proposed extended
duration:
10. Reasons for delay and details of proposed actions and work plan to complete the unfinished
tasks:
11. If project budget revision is proposed (Yes/ No), If yes, please provide the following
information:
*No new manpower will be employed and no additional funds will be asked for the
overheads during the extended duration of the project’
* This should include only the cost of equipment, insurance and freight charges.
** Other expenses such as bank charges, agency commission etc. should be avoided through
appropriate negotiations. If unavoidable expenses are incurred, the same may be
indicated.
15. Remarks
__________________________________
6. Monitoring Period:
1. In these instructions:
2. Scope: These instructions apply to those institutions receiving funds for research
projects from the Ministry of Science & Technology and Department of Ocean
Development.
5. Patent Facilitating Fund: The Institution shall set apart not less than 25% of such
earnings for crediting into a fund called “Patent Facilitating Fund”. This Fund shall
be utilised by the institution for updating the innovation, for filing new patent
applications, protecting their rights against infringements, for creating awareness and
building competency on IPR and related issues.
6. Information: The institutions shall submit information relating to the details of the
patent obtained, the benefits and earnings arising out of IPR and the turnover of the
products periodically to the Department/ Ministry which has provided funds.
7. Royalty-free licence: The Government shall have a royalty-free licence for the use of
the Intellectual Property for the purposes of the Government of India.
9. The instructions are issued with the concurrence of the Ministry of Finance,
Department of Expenditure vide their OM No 33(5) PF-II 99, dated 22 nd February,
2000.
Annexure-XVI
Part – A:
1. 1. Title of the Invention:
. i) Address
ii) Telephone
iii) Fax:
iv) E-mail:
Whether the invention is made out of MNRE-funded project (Yes/ No)
(i) if Yes:
b) Subject area :
(ii) if No:
5. Description of the invention (indicating prior art and the highlights of the
invention).
Part – B:
3. Existing state-of-art
4. Drawbacks in the existing state of art.
5. How these drawbacks have been overcome by your Invention
Part – C:
Declaration: I/ We hereby certify and declare that all the information provided in parts
A and B is true and correct to the best of my / our knowledge and belief.
Signature(s)
1.
2.
3.
15 nos. each of the physical (bound) and electronic (CD) copies of the Project
Completion Report (PCR) should be sent within one month of the completion or termination of
the project. The cover page should include the title of the project, file number, names and
addresses of the PI and grantee institution / organization.
9. Summary of the Project work, specially with respect to the project objectives and proposed
out put.
10. Detailed progress report giving relevant information on work carried out, experimental
work, detailed analysis of results indicating contributions made towards increasing the state
of knowledge in the subject:
11. S&T benefits accrued:
iii) List of Technical Documents prepared (a copy of the documents should be attached):
(Please enclose copies of year-wise audited UC and SoE as per MNRE format)
Total
Date:
(Principal Investigator)
i) Manuscripts should be neatly written/ printed (with single spacing) in the enclosed
format for direct reproduction by Xerox/ photo offset process. Any corrections should
be redone on a separate slip & then pasted neatly. Don’t erase or retype. Don’t cut/
cross.
ii) Matter should be first preferably typed on A4 size paper within the prescribed space
leaving the same margin as in the enclosed format and then retyped cleanly after
careful correction/ changes.
iii) Manuscript should not exceed five pages in any case and should be in the enclosed
format.
iv) Scanned photographs, diagrams, tables & graphs should be accommodated within the
space provided for the text for direct reproduction.
v) Designs & drawings of larger size also need to be scanned and electronic copy sent
along with the physical copy.
vi) Physical as well as electronic (CD) copy of the report need to be sent.
Annexure-XVIII
2. 2nd year
3. 3rd year
4. 4th year
5. 5th year
Grand Total
VI. Output:
7. Whether some or similar products are already manufactured in India. If so, by whom
and any special properties of your product as compared to the existing product:
a. Scale of investigation:
b. Quantity of product prepared:
c. Are you able to supply adequate quantity of the product as samples to
entrepreneurs:
d. Date of laboratory/ preliminary investigation with respect to operating conditions,
approximate consumption of raw materials and utilities, yields, manpower etc.:
10. Any work done on pilot plant work (for process development work only):
11. Additional equipment/ machinery required for pilot plant/ semi-commercial scale/
prototype, if any:
a. Has any prototype been prepared? If so, number of prototypes already made and
cost per unit.
b. Has the prototype been operated successfully?
c. How many more prototypes would be needed before production could be
established.
d. Have you a set of drawings for making prototypes?
e. What is the suggested number of pieces for production on a commercial scale?
f. Estimated requirement of capital, if known.
g. What is the estimated cost of the item, when produced on a commercial scale?
13. Have you located any entrepreneur(s)? If so, furnish their name(s) and address:
14. Safety and Pollution aspects:
15. Suggestion regarding terms for transfer of technology (a) Lump sum (b) Royalty: