Академический Документы
Профессиональный Документы
Культура Документы
Installation procedure
of
air conditioner
Window
&
Split
STOPS
Majority of COMPLAINTS
Gloves
Goggles
Safety Belts
Mask
Helmet
Training Package HCFC Phase-out RACSS – UNEP 2014
Types of Installation
Chapter 9
I. Window Mounting
A. Wooden frames
B. Section frames
a) Iron section
b) Aluminum section
A
v
o
i
d
O
b
s
t
a
c
l
Min 4 ft. to 6 ft space e
after condenser Training Package HCFC Phase-out RACSS – UNEP 2014
Preparation of the window
Chapter 9
INSIDE OUTSIDE
INSIDE OUTSIDE
1. Compressor functioning
2. Fan mounting
3. Motor
4. Blower
5. Alignment
6. Operation of control panel and remote
control
7. Cooling
8. Check current
Training Package HCFC Phase-out RACSS – UNEP 2014
Determine Split Air Conditioner Location
Chapter 9
– Fan Coil Unit (FCU) air-flow
1m or
more
Possible Troubles:
Malfunction by noise and Harmon's generate due to
the high voltage.
Training Package HCFC Phase-out RACSS – UNEP 2014
Determine Split Air Conditioner Location
Chapter 9
– Condensing Unit (CDU) air flow
Condenser location
Tubing should be
unrolled carefully to
avoid kinking the
pipes
Training Package HCFC Phase-out RACSS – UNEP 2014
Tubes cutting, swaging and Flaring
Chapter 9
P and S Trap
P - Trap
Invert Trap
Training Package HCFC Phase-out RACSS – UNEP 2014
Pressure test, Evacuation & Gas Charging
Chapter 9
Evacuation
Charging by Weight
Pressure
Test
Customer Education
Save Energy
&
Keep AC Healthy
Training Package HCFC Phase-out RACSS – UNEP 2014
Customer Education
Chapter 9