Initial Details:
Engine was running in normal condition at and previously all parameters found normal on Gas Genset.
Dismantling work:
After cool down time start dismantling work.
Removed Air intake duct
Removed Air intake housing, filters and its frame.
Remove ignition rails
Removed throttle elbow
Removed by pass valves
Removed After cooler core and its accessories
Removed exhaust manifold
Removed platforms
Removed all accessories of heads
Removed all heads
Removed starting motors
Removed hub
Removed breather Filters
Removed oil pump
Removed Spacer Plates
Decouple Alternator and removed coupling and fly wheel.
Remove Vibration Dampers
Removed all electrical connections of sensors and power cables
Preserved all holes
5
J/W pump, sent to work shop
3 4 1
3
4 4 1
4
5 4 1
5
6 4 1
6
throttle elbow.
xxx
9 4 1
9
shaft
10 4 1
10
assembly
11 4 1
11
Heads:
Cylinders heads sent to workshop for overhauling as per scope.
Installation work:
Liner replaced
Con rods inspected whereas con rod bearings are replaced.
Cylinder heads overhauled.
Alternator overhauled.
Jacket water pump overhauled
After cooler core cleaned by customer
Oil pump overhauled
Required Tools
Hydric pump with pipes
Hydric Jack M30 X 04 M33 X 2
Liner Remover and Installer Tool
Piston Holder and Teflon bar
Fly wheel remover and installer tool
Gear train special tool
Torque convertor
Torque wrench heavy duty