1.-INTRODUCTION.

During the functioning of any item of HV equipment, certain elements of the unit are live, others may be
subject to either continuous or occasional movement, and some components may reach relatively high
temperatures. As a consequence of these factors, use of the unit implies certain electrical, mechanical and/or
heat-related hazards.

With the intention of providing an adequate level of protection for both staff and plant equipment, the
development and construction of MESA products is guided by the principle of integral safety, based on the
SWITCH DISCONNECTOR following criteria:

- The elimination of hazards wherever possible.


TYPES :
S2D to 24kV - When this is not technically and/or economically viable, the fitting of adequate safety devices to the unit.

S3D to 38kV - The provision of information on possible risks for the purposes of establishing operating procedures
designed to avoid hazards, facilitate operating staff safety training programmes and promote the use of
proper protective clothing and similar equipment.
INTRUCTIONS MANUAL
Ensure therefore that only properly trained and/or supervised persons are allowed to work on or near the
equipment described in this manual (as stipulated by (EN 50110). All operating staff should be familiar with
the instructions and the safety precautions contained therein, along with any applicable general precautions
51107367M0 Rev. A0 based on current legislation (legislation covering accident prevention and safety at work, and any safety and
hygiene laws that may apply).

Please observe this point carefully, as the safe and correct functioning of this equipment depends not only on
its design, but also on general circumstances beyond the control and responsibility of the manufacturer - with
particular reference to:

- Observance of adequate transport and handling procedures between the factory and installation site.
INDEX:
- Intermediate storage in conditions that will not result in alteration to or deterioration of any of the functions
1. INTRODUCTION of the unit or its main components.

2. CHARACTERISTICS AND APPLICATIONS - Installation carried out according to the instructions given in this manual and the normal rules of correct
procedure.
3. HANDLING, TRANSPORT AND STORAGE
- Operating conditions corresponding to the design capabilities of the unit.
4. INSTALLATION
- Operation and use carried out strictly according to the instructions contained in the manual, accompanied
5. TORQUE SETTINGS by a clear understanding of the operating and safety principles involved.
6. SETTING INTO SERVICE - Adequate maintenance, carried out as required by the actual operating conditions.
7. MAINTENANCE

2 de 16
51107367M0 Rev. A0 10/2002

2.- CHARACTERISTICS AND APPLICATIONS In addition to the apparatus base, a series of options are available as follows:

2.1.-Description.
Mechanical interlocking
The aerial remote-controlled of the switch-disconnector S2D and S3D is used in public distribution network,
from 10 kV to 38 kV. They combine: It makes impossible any operation of the
switch-disconnector, generally, in reparing or
· three-phase switch-disconnector in SF6. maintenance operations.
· electrical and / or manual control.
· control unit, integrating a power source, electrical control management and the necessary remote control 1. Mechanical interlocking symbol 1
interfaces. 2. Operation lever

The set is prepared to be fixed onto the M. T. line support. It may be operated locally by using a hook stick
2
or remotely, using the control system in the unit.

Please, refer to fig.1 for a description of physical characteristics. Fig. 2

The apparatus base is composed of the switch set plus electrical control mounted on a chassis. Overvoltage protection
The standars regarding these switch-disconnector are referred to in section 2.2.2.
With the help of 6 arresters placed over the
equipment.
1. SF6 switch disconnector
2. Electrical and / or manual 1. Support frame 1
command 2. Surge arresters
3. M.V links to the line
4. Manual cross
5. Mechanical interlocking
6. Anchoring structure.
9 7. Support chassis
2
8. Surge arresters.
7 9. Voltage transformer
6 Fig. 3
3 Power supply

1 A voltage transformer is foresaw to supply with energy


4 to the control unit management, motorization and voltage
indication.
2
1. Support 2
8 2. Voltage transformer
5

Fig. 1 1

Fig. 4

3 de 16
51107367M0 Rev. A0 10/2002

Current measurement 2.1.1. Description of control unit (EASERGY T200P)

This function is realized by current sensors ensured in both switch sides, one homopolar and two phase If the control unit installed is the EASERGY T 200P, then, an small description of its elements is made. For
current sensors. The current sensors detect homopolar and phase default currents. more information you must consulte the control unit instruction manual.
The control unit elements are (figure 6):

2 1. A sunshide, in order to avoid the influence of high external temperatures.


2. Rack 6U including all electronic modules, including the connection with MV
3. The place for the transmisión interface (radio, external MODEM,...)
4. Contact door.
5. Supply transformer and protection circuit breaker.
6. The battery for control unit for suppling in case of default of external supply.
7. A mobile tray for securing of:
Interface terminals with control gear
1 Transformer for voltage measurement.
Antenna connection.
Current sensor connections
Cable gland that allows cables entrance.
8. Anti-hooligans tray for internal elements protection.

3
1. Homopolar current sensors
2. Phase current sensor 2
4
Fig. 5
Characteristics: 5
Phase detection: 100 to 750 A, in steps of 50 A.
Earth detection: 25 to 160 A, in steps of 5 A, from 3 to 25 A and in steps of 1 A. 6

7
The default information is signed by a led situated inside the control unit and with a signer contact.

Opening automatism in current zero.


8
The automatism is configurated to open the switch after one, two, three or four defaults. This default will be
take into account if it continues during 50 ms a minimum.

This option is only possible if it has a control unit supplied with voltage transformer and a current sensor. Fig.6

4 de 16
51107367M0 Rev. A0 10/2002

2.2.-Technical characteristics. 2.2.2.-Standars.

2.2.1.- Electrical characteristics. CEI 60265-1 CEI 60694


CEI 60298 CEI 815
The main characteristics of the switches are as follows:
2.3.- Nameplate
In accordance with I.E.C norms
The equipment is identified by the nameplate on the switch where the serial number appears.
S2D S3D
Rated voltage 24kV 36kV
Insulation level
kV effective, 50Hz, 1 min. To earth 50 70
Across isolating distance 60 80
Impulse withstand voltage kV, To earth 125 170
1.2/50 ms Across isolating distance 145 195

Breaking capacity (A) Mainly active load current (cosj = 0,7) 400/630 630
(effective value) Closed-loop distribution circuit current 400/630 630
No-load transformer 10 20
Cable charging current 10 10 Fig. 7
Short circuit making current kA (peak value) 31,5 31,5
2.4.- Operating conditions
Rated short-time kA (effective value) – 1 second 12,5 12,5
kA (peak value) 31,5 31,5 S2D and switches are designed to provide long-term safe and reliable functioning, provided the instructions
in this manual are strictly observed and the devices are used as stipulated and according to the conditions
In compliance with ANSI norms listed in I.E.C.60694:
S3D
Maximum nominal rate voltage kV (type of tension assigned: 34.5 effective kV) 38kV - Max. temperature 50ºC; min. temperature: -25ºC (-50 for S3D)
Assigned tension supported with impulse withstand voltage kV, peak kV 150 - Altitude less than 1.000 m
Power frecuency, kV effective: 1 min in dry/10 s wet 70/60 - Other operating conditions by consultation
Rate current at 60 HZ, A 600
Instantaneous current and asymmetric rated short-time, effective kA 15 Any other use may affect the safe operation and correct performance of the unit, giving rise to potential
hazards for persons and plant equipment. It is therefore important to read thoroughly and understand the
Symmetrical current 1 s, effective kA 12,5
manual before attempting any installation work or operation of the unit. Ensure also that all staff employed
Symmetrical current 10 s, effective A 3500 to install or service the unit are properly trained.
Other features The operations described should be carried out in accordance with current safety legislation and under the
responsibility of a person qualified representing the user.
Operating temperature (C) maximum +50 +50 +50
minimum -25 -50 -50 MESA accepts no liability whatsoever for any consequences that may result from failure to observe the
Mechanical endurance (CA cycles)*. 5000 5000 5000 instructions contained in this manual, or from any unauthorised use of the unit. For safety reasons, you are
Level of protection Safety box IP67 IP67 IP67 strongly advised to consult us before carrying out any operation not included in the manual.
Control unit IP55 IP55 IP55
Motor reducer Maximum manoeuvring time (s) 7 8 8 As a result of improvements in materials technology, you may find that certain items on your unit
SF6 Gas 0,63 kg do not exactly match the information provided in this document. If this is the case, or if you have any other
query regarding the system, please contact us directly or via our commercial representatives or after-sales
Presión SF6 0,3 bar
service.
Table 1

5 de 16
51107367M0 Rev. A0 10/2002

3.- HANDLING, TRANSPORT AND STORAGE IMPORTANT NOTE

3.1.- Delivery DO NOT USE THE CONNECTION-POINTS TO RAISE THE


APPARATUS. FOLLOW FIGURE 11
The S2D & S3D switches may be delivered in seafreight or standard packaging, depending on the final
destination. (packaging specifications by consultation).
Carriage is the responsibility of the customer unless otherwise specified. For this reason, the supplier accepts
no liability whatsoever for any situation that may arise while the delivery is in transit. Please contact the
insurer or carrier directly in the event of any problem.

Packaging instructions must be followed during handling.


Items supplied for export are covered by the international INCOTERMS rules.

Top panel

FRAGIL

Side panels

Fig. 8
Fig. 10 Fig. 11
3.2.- Lifting and transporting the unit

Please follow the instructions indicated on the crates:


The apparatus must be lifted in the packaging to the nearest possible point to the post. (figure 9) 3.3.- Checking at the arrival
A forklift truck or crane hoist is sufficient for moving and handling the unit.
Important: Please carry out a check immediately after delivery to ensure that the items supplied match the items listed in
the delivery note and order documentation.
Avoid any impacts or sudden movements that may damage components.
Do not leave the packing cases in any inadequate location such as on an unstable surface. You are advised to carry out a visual check to ensure that the units have not suffered any damage in transit.
Do not slide the units down sloping floor areas or stairways. If you find any damaged items, please contact the insurer and make the corresponding claim.

Before carrying out this inspection, please unpack the unit following the instructions given in section 3.4.
Now inspect the delivery to ensure that each item is correctly identified, and check the following items:
- The details shown on the nameplate should match the order specifications.
- All accessories included in the order should be present.

In the event of any anomaly, please make out a report in collaboration with the carrier.The report should
indicate the order number and give details of the damage and how it was caused.

All damage reports and compensation claims MUST be submitted to MESA within the guarantee period to
Fig. 9 claim for responsibilities.

6 de 16
51107367M0 Rev. A0 10/2002

3.4. Unpacking the unit. 3.5- Storage.

The unit should be unpacked with great care in order to avoid breakage or deformation of the conducting - The switch will be stored in its original packing.
components of the switch.
- It is not advisable to store the units in sealed seaworthy packing for more than a period of six months,
This should be carried out as follows: (standard) counted from the moment of dispatch from MESA.

1. The apparatus, with its packing, must be deposited as close as possible to the post and parallel to the - Protect from corrosive atmospheres such as chemical agents: cement dust, acid emissions, smoke, saline
line. The space between the post and the apparatus must be sufficient to allow operation of the lifting atmospheres, etc
equipment.
- Store all items in a dry, well-ventilated place.
2 Remove top and side panels from upper section, from transverse supports onwards. Loosen the screws
fixing apparatus to packaging. - Ensure that all components are stored carefully, stacked or grouped in a way corresponding to their
Once the packaging is open as indicated, release low tension cable leaving it tight so that the centre of installed locations.
gravity of the apparatus is not affected. Never let the switch rest on the ground, as this could damage the
connecting cables. - Items stored for a long period should be cleaned and lubricated, following the instructions given in the
maintenance section (section 7) of this document, before being used.

- Check battery status and cable set (apparent shock, good connection and in working order).

CAUTION:
- The battery must not be stored for more than 3 months without being recharged.
- To help conserve the battery, do not use a car-type battery charger; use the EASERY T200 P unit
itself to recharge batteries.

4.- INSTALLATION

4.1.- General conditions

The minimum conditions corresponding to the point of installation should conform to HV rules contained in
ITC 15 (applicable in Spain) or to the rules applicable in the destination country.

4.2.- Fitting the unit

4.2.1. Work under voltage

In case of doing works with current, it is necessary that the transformer receives simultaneously currents
over its terminals to avoid induced currents. These currents would damage the transformer. We advise you to
do the installation of the voltage transformer without current.

Fig. 12

7 de 16
51107367M0 Rev. A0 10/2002

4.2.2.-Surge arresters assembly. 4.2.3.1-Connectors unpacking.

Surge arresters are supplied disassembled and they will be assembled in the zone indicated in figure 13. for The connectors will not unpack at once. Unpack one by one just before mounting in order to avoid dirt and
their assemble t is necessary the bolts supplied in their correct places. (You must compulsorily use a deterioration by bumps or scratches
dynamometric tool. Closing torque is 30 N/m.)

CAUTION: 4.2.3.2-Handling.
Before fixing the support frame for the switch-disconnector to the post, the supports for the surge arresters
MUST be assembled. In order to avoid dirt in connectors during their manipulation, the disposable gloves supplied in assembly kit
must be used.

4.2.3.3-Connectors and bushing cleaning.

Before connector assemble on the bushing, it is necessary the cleaning of connector and bushing in the
indicated zones (figures 15 y 16)
Closing torque
application ZONES TO BE CLEANED
ZONES TO BE CLEANED
METALLIC ZONE

Fig. 13

4.2.3.-Terminals assembly. Fig. 15 Fig. 16

MESA supplies connectors NO TOUCHABLES (figure 14)


4.2.3.3.1 Connector cleaning.

You must put on the gloves that the Kit provides. The paper have to be drenched with isopropilic alcohol.
The Kit supplies this liquid too. You must introduce the wet paper inside the connector. Spin it for cleaning
the zones signed (figure 15). If you do not reach only with paper, the Kit provides a wood tool.
CONTACT ZONES
CAUTION. You must pay more attention to cleaning. The semiconductor black gum remainders have to be
avoided in contact zones with connectors and bushings.

4.2.3.3.2 Bushing cleaning

You must clean the bushing in the zone indicated (figure 16) with the same wet paper.
M16 NUT

Fig. 14

8 de 16
51107367M0 Rev. A0 10/2002

4.2.3.4-Grease application. Put the nylon thread in the connector as it is indicated in figure 20. Then you must curl in clockwise pressing
with force until the top.
When cleaning is finished, spread a thin layer of grease (provided in the kit). 2/3 parts of tube will be
applicated on conical surface of bushing (figure 17) and 1/3 part in the indicated zone of connector (figure
18). Do not spread it in metal zones that it is indicated in figure 17.

GREASE ZONES
METALLIC ZONE
GREASE ZONES

Fig. 20 Fig. 21
Fig. 17 Fig. 18
4.2.3.6-Nylon thread extraction

4.2.3.5-NO TOUCHABLES connectors assembly above bushings The thread extraction will be make when assembly operation is finished. The connector must spin smoothly
in both senses for removing the marks in thread extraction. When the connector and bushing are joint, tighten
As it is indicated in 4.2.3.1. paragraph, they must be handling one by one. After spreading the grease, one the nuts M20 and the external nut with a dynamometric tool with a 70 Nm closing torque (figure 22).
drop of LOCTITE 480 (supplied in the kit) will be put in the ring of the bushing , 15 or 20 mm. from its
extrem CAUTION.
Connector and surge arresters assembly must be realized WITHOUT CURRENT

After check the connector closing torque , do not make another one upper than 20 Nm in hour hand
sense above connector or connections that will be joint with bolts to this connector.

Loctite

Fig. 19

Fig. 22

9 de 16
51107367M0 Rev. A0 10/2002

4.2.4.-Assembly 4.2.6.- Fixing the support bracket.

Take into account that the transformer have to be placed up stream because it have to be feeded although the The different drill-holes to be made for fixing the support bracket either onto wooden post, concrete or
switch-disconnector is open. metallic support are as follows:

4.2.5.- Location and structure The support must be placed parallel to line and in horizontal position (figure 24)

MESA is not responsible for layout considerations. line


The S2D and S3D disconnectors-switches can be mounted in an horizontal position, on a wooden, concrete
or metal post.
fixing supports according to figure 23.
line

line

Support

Fig. 24

Wooden, metallic or concrete :


Surge arrester
support frame Fixing by means of large enough asparragus in order to cross iron whatever thickness support was
right-left (figure 25).

Switch fixing support Voltaje transformer support


support
Fig. 23 fixing support

Fixing components not supplied for:

- fixing the switch-disconnector


- fixing the transformer
- fixing the control unit

Before fitting the frame to the structure, check that: Fixing support
a) The holes drilled in the structure correspond to the fixing support ones.
b) The attachment or supporting points are aligned and level.
c) If the switch-disconnector has surgeon arresters, their support have to place on switch-disconnector
Fig. 25
support before raise it.
Fixing by means of transversal bolts
Note: If the structure does not have these features, you are advised to carry out the appropriate modifications.

CAUTION: the minimum distance between active part and metallic support has to be respected.

10 de 16
51107367M0 Rev. A0 10/2002

If holes are made in some elements, take into account these points:
3 1 2 4
a) Forecast apparatus operating is not disabled.
b) The fixing guarantees a good support of the apparatus. 1. Raising points.
c) Clean the cutting burrs 2. Fixing section
d) Protect the holes: 3. Switch fixing support
4. Surge arresters
1st. A thick cape of codl galvanized painting with a base of zinc chromium-plated (96% powder of support frame.
zinc as minimum.)
2nd. When it is dry, apply a neutral varnish valid for outdoor.

ATTENTION: Do not hole the swith-disconnector tank or the electrical command enclosure.

Notes:
For a different assembly, please ask for information to MESA.

Please, pay attention to the closing torques as per table 2

Make the fitting with all bolts tight. Otherwise this fitting will not be correct. Never use a hammer for the
introduction of bolts. If it is necessary, modify the holes. Fig.26
4.3.- Lifting, levelling and alignment.

Wherever possible, lift the frames directly from their delivery packaging to the point of final installation on
the structure.

4.3.1.- Switch.

Assembly:
Follow unpacking instructions, point 3.4

Lift the switch with the aid of a hoist (figure 11), introducing the cables through an elevation point. (figure
26)
Raise the swith-disconnector until it was at same height of horizontal support (figure 27)

CAUTION:
If apparatus has the surge arresters option, its support (mark 4. figure 26) have to be assembly in the fixing
support before its raise.
Horizontal support of
fixing support

Fig. 27

11 de 16
51107367M0 Rev. A0 10/2002

Move the switch-disconnector horizontally , in order that it is always below the fixing support according to 4.3.2. Voltage transformer raise.
figure 28.
With help of a crane, raise transformer support and fix it in the post. Then, raise the voltaje transformer with
the sashes supplied. Do not raise it from its terminals.

When the apparatus is placed, screw it over the support frame according to figure 30, with the cooresponding
bolts
1. Voltage transformer
2. Support
3. Poste

3
Fig. 28
Fig. 30
As soon as its position is correct, place the fixing sections with the corresponding bolts and tighten switch-
disconnector fixing nuts with the corresponding closing torque. (figure 30)
4.3.3.- Surge arresters assembly.
Fixing bolts
In the case of the equipments supplied with surge arresters, they will be assembled after fixing the switch-
Fixing sections disconnector on the support frame.

CAUTION:
Assemble the surge arresters supports on the switch-disconnector support frame before fix it on the post.

1. surge arresters
support frame
2. Surge arresters

Fig. 29
Fig. 31

12 de 16
51107367M0 Rev. A0 10/2002

4.5.- Adjustment and final check 5.-TORQUE SETTINGS.

After installation - or servicing work of any type - carry out the following checks before connecting the Torque settings
power supply:

a) Installation should comply with all points indicated in the manual. TORQUE SETTINGS (kp.m)
DIMENSIONS
b) Check the operation of the switch. The switch is delivered in the OPEN position (“O” position Bolt: grade 5.6 Bolt (stainless steel): grade 8.8
indicator), and check that the indicator turns to “I” by carrying out a closing operation. M4 0.15 0.29
M5 0.3 0.6
M6 0.5 1
M8 1.25 2.5
M10 2.45 4.9
M12 4.2 8.6
M14 6.8 13.5
M16 10.5 21
M18 14.5 29
M20 20 41
M22 26.5 55
M24 34.5 71
M27 61 105
M30 68 145
Fig. 32
“O” OPEN Tabla 2

Position signer CONECTIONS

Fig. 33
“I” CLOSE
c) Check all nuts and bolts for tightness (attachment to structure, transmission units, etc.)
M20x1.5
d) Do not apply paint to any of the hinge points or articulations of the subassemblies, as this could cause
them to seize up partially and prevent operation.

e) Check the right operation of control and, in particular, verify its correct visual sign.

f) Operate switch to check for correct functioning.

Realize some manual operations (open-close), prove “O” open (figure 32) and “I” close (figure 33)
signs.
M12
h) Stainless steel tank needs a general cleaning with no abrasive cloth drenched in domestic detergent for
stainless steel. In this way dust, moisture, grease and others pollutants are removed and it makes tank
recovers its original qualities.

Fig. 35

13 de 16
51107367M0 Rev. A0 10/2002

Low voltage connections. 6.1.- Manual operation.

Opening and closing operations. Check the mechanical interlocking position (figure 36).

OPEN CLOSE

Fig. 35
6.-SETTING INTO SERVICE

Do not commence the setting into service of the unit without first carrying out all the checks listed in section
4.5 and ensuring that all the different systems involved are functioning perfectly.

1. Manual emergency operation


To open manually: Turn the cross anticlockwise from closed position.
To close manually: Turn the cross clockwise from opened position.

2. State of switch
Switch open: The position indicator below the control is “O”.
Switch closed: The position indicator below the control is “I”.

3. Operating safety
The mechanical interlock in closed position forbids any manual or electrical operation.(figure 37)

Fig. 37

14 de 16
51107367M0 Rev. A0 10/2002

6.2.- Mechanical interlocking. 7.1 Procedure.

By using a hookstick according to figure 37 (lock position) Components Operation


Nuts and bolts Check closing torques (See table 2)
Conductor parts and contacts Check contacts
Electrical command Check the correct operating by making some operations
Tank Cleaning with domestic detergent for stainless steel
Table 3
lock
Paint

Required
unlock Application characteristics Method of application Example

Cold galvanising paint - Sand down the surface.


Galvanised ferrous (96% min. of powdered - Clean with clean cloth and
components: zinc.). appropriate solvents. Cold galvanising
- To protect corroded - Apply two coats of paint paint :
areas. using a small brush. GALVAPACK
- To protect exposed Neutral varnish suitable - When the paint is dry, apply supplied by INELEC
areas. for outdoor use.. a coat of varnish
Fig. 37
7.- MAINTENANCE
Table 4
Ensure that all persons engaged to carry out installation are supplied with copies of the servicing guide
before starting work.
7.2.- Spares.
whole staff involved should, by the installation handover date, be familiar with the details of the unit -
particularly its operating procedures - and have a thorough knowledge of the specified safety precautions
The user should decide on the number of spare parts required.
applied in-house and those established in local legislation.
When ordering spares, please give as many details as possible:
Before carrying out maintenance work of any type, ensure that the affected section of the unit is shut down
and disconnected from the power supply, following these five steps:
- Nameplate
- Site of installation
1. Switch off and physically unplug the unit from all power sources, taking adequate steps to prevent any
- Type of installation
possibility of accidental reconnection.
- Any other relevant information
2. Secure or block, wherever possible, the movement of all cutting items and attach a warning notice to
the corresponding control unit(s).
Guarantee
3. Check to ensure that no part of the electrical system is still live.
4. Earth and short out all possible power sources in the area where the work is to be carried out.
Materials are guaranteed for a period of 12 months - counted from the date of setting into service - or 18
5. Attach appropriate warning signs to restrict access to the working area.
months from the date of delivery or handover on MESA’s part (with the guarantee expiring when either one
of these two periods finishes).
Check if the switch-disconnector is open in “O” position and if it is close, you must open it with the manual
The guarantee is limited to the supply, in the shortest time possible and without charge, of a part with the
lever.(figures 32 and 33)
same characteristics as the defective component.

15 de 16
Manufacturas Eléctricas, S.A.
Apartado,8 / P.O. Box 8
48100 MUNGUIA, ESPAÑA / SPAIN
Tel.: (+34) 94 615 91 00
Fax: (+34) 94 615 91 10
E-mail: mesa@schneiderelectric.es 51107367M0 Rev. A0
10/2002

Вам также может понравиться