STATISTICAL TECHNIQUES
CONTENTS
2.0 DEFINITIONS
3.0 FLOWCHART
5.0 REFERENCES
6.0 ATTACHMENTS
Copyright. This document is the property of PT Thiess Indonesia and all rights are
reserved in respect of it. This document may not be reproduced or disclosed in any manner
whatsoever, in whole or in part, without the prior written consent of PT Thiess Indonesia. PT
Thiess Indonesia expressly disclaims any responsibility for or liability arising from the use of this
document by any third party. Copies printed from the Thiess Management Systems are
UNCONTROLLED.
Revision Status
This procedure shall apply to a product or process identified by the Client or Project
Manager as requiring statistical techniques.
Note: This procedure is a guide only and where statistical techniques are deemed
necessary project specific Procedures shall be developed.
2.0 DEFINITIONS
Statistical Unit - one of a number of similar articles or parts each of
which may possess several different quality characteristics;
Arithmetic Mean - the mean or average ("" for a sample) is the sum of
all the observed values divided by the number of observed
values (n);
Standard Deviation - the standard deviation ("s" for a sample) is the square root of
the variance.
3.0 FLOWCHART
3.0 FLOWCHART
TCI-OPS-SP006-FC3.1/A1- TCI-OPS-SP006
STATISTICAL TECHNIQUE
Statistical Technique
PROJ
MGR
STATISTICAL TECHNIQUES
SPECIFIED IN CONTRACT?
PROJ
MGR
PROJ
MGR
SUBMIT PROJECT
CLIENT APPROVAL
PROCEDURE FOR CLIENT
REQUIRED?
APPROVAL
IMPLEMENT THE
PROCEDURE
i.) When specified in the contract or deemed necessary by the Project Manager, the
Quality Assurance Engineer (QAE) in conjunction with the Project Engineer shall
prepare project specific statistical techniques procedure.
ii.) The Project Manager shall, where specified in the contract, submit statistical
techniques procedures to the client for approval.
iii.) 4.1.3 The QAE shall use the following systematic process to determine how
statistical techniques will apply to a product/process and by what means data will be
presented and reported.
Determine the arithmetic mean for the sample and the standard deviation
and such other statistical aids as may be specified and/or are deemed
necessary to ensure adequate control of the process is being maintained.
Determine the method by which statistical data will be presented eg. control
chart, histogram etc.
iv.) Where statistical techniques are deemed necessary, the Project Manager shall
determine the frequency of reporting. The QAE shall prepare all such reports.
5.0 REFERENCES
Not applicable to this procedure.
6.0 ATTACHMENTS
Not applicable to this procedure.