MONITORING OF VARIANCE AT RECONCILLIATION

Sr. Net Mat. Theo. Rev.Theo.Req Actual


Name of Project Material Stage of work Unit Diff. Remarks
No. received Requirement uirement Consumption

a b b-a
Cement For All Buildings Bags 20330 29980.05 20295.00 -9685.05

Building A DEVELOPMENT Bags 30 30.00


EXTERNAL PAINTING Bags 351 351.00
EXTERNAL PLASTER Bags 3977.72 2547 -1430.72 Changed due to use of Tile Adhesive
FLOORING, SKIRTING & DADO Bags 2639.93 1301 -1338.93 Changed due to use of Tile Adhesive
GYPSM WORK Bags 20 20.00
INTERNAL PLASTER Bags 342.43 698 355.57
MASONARY Bags 1283.73 1965 681.27
PLUMBING & SANITATION Bags 56 56.00
WATERPROOFING Bags 1236.78 850 -386.78
TOTAL For A Building 9480.59 7818.00 -1662.59
Building B
DOOR FRAME (GRANITE / MARBLE) Bags 2 2.00
EXTERNAL PAINTING Bags 33 33.00
EXTERNAL PLASTER Bags 3500.80 2173 -1327.80
FLOORING, SKIRTING & DADO Bags 2427.89 703 -1724.89
INTERNAL PLASTER Bags 454.06 459 4.94
MASONARY Bags 1431.67 1342 -89.67
PLUMBING & SANITATION Bags 1 1.00
SOLING Bags 22 22.00
WATERPROOFING ( ATTACHED TOP / DRY TERRACE) Bags 1142.76 482 -660.76
TOTAL For B Building 8957.18 5217.00 -3740.18
Building C
EXTERNAL PAINTING Bags 131 131.00
EXTERNAL PLASTER Bags 3953.71 2502 -1451.71
FLOORING, SKIRTING & DADO Bags 2639.93 1040 -1599.93
INTERNAL PLASTER Bags 518.18 722 203.82
MASONARY Bags 1460.75 1790 329.25
PLUMBING & SANITATION Bags 1 1.00
WATERPROOFING Bags 1236.78 827 -409.78
TOTAL For C Building 9809.34 7013.00 -2796.34
Development
All Development Items Bags 1732.94 247.00 -1485.94
0.00
TOTAL For Development Works 1732.94 247.00 -1485.94

Crushed Sand For All Buildings CFt 83441 72083.54 83188.00 11104.46

Page 1
MONITORING OF VARIANCE AT RECONCILLIATION

Sr. Net Mat. Theo. Rev.Theo.Req Actual


Name of Project Material Stage of work Unit Diff. Remarks
No. received Requirement uirement Consumption

a b b-a

Building A MISCELLANEOUS CFt 178.62 -178.62


FLOORING / SKIRTING & DADO CFt 12946.40 8094.00 -4852.40
MASONARY CFt 9578.97 17047.00 7468.03
TOTAL For A Building 22703.99 25141.00 2437.01
Building B
MISCELLANEOUS CFt 242.15 -242.15
FLOORING / SKIRTING CFt 12103.19 9751.00 -2352.19
MASONARY CFt 10674.70 13650.00 2975.30
TOTAL For B Building 23020.04 23401.00 380.96
Building C
MISCELLANEOUS CFt 178.62 -178.62
FLOORING / SKIRTING CFt 12946.40 12557 -389.40
MASONARY CFt 10890.11 15625 4734.89
TOTAL For C Building 24015.13 28182.00 4166.87
Development
All Development Items CFt 2344.38 6464.00 4119.62
0.00
TOTAL For Development Works 2344.38 6464.00 4119.62

River Sand For All Buildings CFt 117775 100769.64 117775.00 17005.36

Building A 0.00
EXTERNAL PAINTING CFt 960.00 960.00
EXTERNAL PLASTER CFt 20578.21 21983.00 1404.79
FLOORING / SKIRTING CFt 3267.12 1647.00 -1620.12
INTERNAL PLASTER CFt 15905.48 7151.00 -8754.48
MASONARY CFt 267.00 267.00
WATERPROOFING ( ATTACHED TOP / DRY TERRACE) CFt 4898.12 3587.00 -1311.12
TOTAL For A Building 44648.93 35595.00 -9053.93
Building B
EXTERNAL PAINTING CFt 513 513.00
EXTERNAL PLASTER CFt 18047.09 22187 4139.91
FLOORING / SKIRTING CFt 435.96 1668 1232.04
INTERNAL PLASTER CFt 2647.82 5408 2760.18
MASONARY CFt 263 263.00
WATERPROOFING CFt 4548.68 7265.00 2716.32
TOTAL For B Building 25679.56 37304.00 11624.44

Page 2
MONITORING OF VARIANCE AT RECONCILLIATION

Sr. Net Mat. Theo. Rev.Theo.Req Actual


Name of Project Material Stage of work Unit Diff. Remarks
No. received Requirement uirement Consumption

a b b-a
Building C
EXTERNAL PLASTER CFt 20420.97 20919 498.03
FLOORING / SKIRTING CFt 435.96 341 -94.96
INTERNAL PLASTER CFt 3021.71 5133 2111.29
MASONARY CFt 384 384.00
WATERPROOFING ( ATTACHED TOP / DRY TERRACE) CFt 1323 1323.00
WATERPROOFING (FOR TOILET) CFt 4898.12 3390 -1508.12
TOTAL For C Building 28776.76 31490.00 2713.24
Development
CFt 1664.39 13386.00 11721.61
0.00
TOTAL For Development Works 1664.39 13386.00 11721.61

6" Bricks For All Buildings Nos. 1077882 1102463.21 1071988.00 -30475.21

Building A 0.00
Nos. 335818.29 317263.00 -18555.29
TOTAL For A Building 335818.29 317263.00 -18555.29
Building B
Nos. 374232.33 326122 -48110.33
TOTAL For B Building 374232.33 326122.00 -48110.33
Building C
Nos. 381784.29 356433 -25351.29
TOTAL For C Building 381784.29 356433.00 -25351.29
Development
Nos. 10628.30 72170.00 61541.70
TOTAL For Development Works 10628.30 72170.00 61541.70

Page 3
MONITORING OF VARIANCE AT RECONCILLIATION

Sr. Net Mat. Theo. Rev.Theo.Req Actual


Name of Project Material Stage of work Unit Diff. Remarks
No. received Requirement uirement Consumption

a b b-a
4" Bricks For All Buildings Nos. 134438 163078.46 130038.00 -33040.46

Building A 0.00
For Waterproofing (Bricks 230 x 110 x 80mm - 495 Nos. per cum) Nos. 38101.82 29750.00 -8351.82
TOTAL For A Building 38101.82 29750.00 -8351.82
Building B
For Waterproofing (Bricks 230 x 110 x 80mm - 495 Nos. per cum) Nos. 35948.23 32229 -3719.23
TOTAL For B Building 35948.23 32229.00 -3719.23
Building C
For Waterproofing (Bricks 230 x 110 x 80mm - 495 Nos. per cum) Nos. 38101.82 20989 -17112.82
TOTAL For C Building 38101.82 20989.00 -17112.82
Development
For Waterproofing (Bricks 230 x 110 x 80mm - 495 Nos. per cum) Nos. 50926.59 47070.00 -3856.59
TOTAL For Development Works 50926.59 47070.00 -3856.59

Ceramic Tiles For All Buildings SFt 179596 215435.67 177855.88 -37579.79

Building A 0.00
Ceramic Tiles for Dado & flooring SFt 73775.15 58907.70 -14867.45
TOTAL For A Building 73775.15 58907.70 -14867.45
Building B
Ceramic Tiles for Dado & flooring SFt 66060.61 54449.05 -11611.56
TOTAL For B Building 66060.61 54449.05 -11611.56
Building C
Ceramic Tiles for Dado & flooring SFt 73775.15 59132.57 -14642.58
TOTAL For C Building 73775.15 59132.57 -14642.58
Development
Ceramic Tiles for Dado & flooring 1824.75 5366.56 3541.81
TOTAL For Development Works 1824.75 5366.56 3541.81

Page 4
MONITORING OF VARIANCE AT RECONCILLIATION

Sr. Net Mat. Theo. Rev.Theo.Req Actual


Name of Project Material Stage of work Unit Diff. Remarks
No. received Requirement uirement Consumption

a b b-a
Vitrified Tiles For All Buildings SFt 98380 112108.28 91979.72 -20128.56

Building A 0.00
Vitrified Tiles for Flooring & Skirting SFt 37142.47 32741.20 -4401.27
TOTAL For A Building 37142.47 32741.20 -4401.27
Building B
Vitrified Tiles for Flooring & Skirting SFt 37142.47 26752.88 -10389.59
TOTAL For B Building 37142.47 26752.88 -10389.59
Building C
Vitrified Tiles for Flooring & Skirting SFt 37142.47 32485.64 -4656.83
TOTAL For C Building 37142.47 32485.64 -4656.83
Development
Vitrified Tiles for Flooring & Skirting SFt 680.88 -680.88
TOTAL For Development Works 680.88 0.00 -680.88

Wooden Flooring For All Buildings SFt 0.00 0.00 0.00

Building A 0.00
Wooden Flooring SFt 0.00
TOTAL For A Building 0.00 0.00 0.00
Building B
Wooden Flooring SFt 0.00
TOTAL For B Building 0.00 0.00 0.00
Building C
Wooden Flooring SFt 0.00
TOTAL For C Building 0.00 0.00 0.00
Development
Wooden Flooring SFt 0.00
TOTAL For Development Works 0.00 0.00 0.00

Page 5
MONITORING OF VARIANCE AT RECONCILLIATION

Sr. Net Mat. Theo. Rev.Theo.Req Actual


Name of Project Material Stage of work Unit Diff. Remarks
No. received Requirement uirement Consumption

a b b-a
Door Shutters For All Buildings SFt 23097 24030.03 23699.42 -330.62

Building A 0.00
Flush door Shutter 35mm SFt 8319.39 8545.97 226.59
TOTAL For A Building 8319.39 8545.97 226.59
Building B
SFt 7176.48 7378.98 202.50
TOTAL For B Building 7176.48 7378.98 202.50
Building C
SFt 8319.39 7774.47 -544.92
TOTAL For C Building 8319.39 7774.47 -544.92
Development
SFt 214.78 -214.78
TOTAL For Development Works 214.78 0.00 -214.78

Waterproof Ply SFt 8800


5796.27 8800.00 3003.73
12mm For All Buildings

Building A 0.00
SFt 2025.11 5152.00 3126.89
TOTAL For A Building 2025.11 5152.00 3126.89
Building B
SFt 1746.04 2240 493.96
TOTAL For B Building 1746.04 2240.00 493.96
Building C
SFt 2025.11 1408 -617.11
TOTAL For C Building 2025.11 1408.00 -617.11
Development
0.00
TOTAL For Development Works 0.00 0.00 0.00

Page 6
MONITORING OF VARIANCE AT RECONCILLIATION

Sr. Net Mat. Theo. Rev.Theo.Req Actual


Name of Project Material Stage of work Unit Diff. Remarks
No. received Requirement uirement Consumption

a b b-a
Waterproof Ply 19mm For All Buildings SFt 9152 7227.66 8800.00 1572.34

Building A 0.00
SFt 2524.70 4384.00 1859.30
TOTAL For A Building 2524.70 4384.00 1859.30
Building B
SFt 2178.27 2624 445.73
TOTAL For B Building 2178.27 2624.00 445.73
Building C
SFt 2524.70 1792 -732.70
TOTAL For C Building 2524.70 1792.00 -732.70
Development
SFt 0.00
TOTAL For Development Works 0.00 0.00 0.00

Folding Doors For All Buildings Nos. 87 122.00 168.00 46.00

Building A 0.00
Nos. 44.00 57.00 13.00
TOTAL For A Building 44.00 57.00 13.00
Building B
Nos. 34.00 57.00 23.00
TOTAL For B Building 34.00 57.00 23.00
Building C
Nos. 44.00 54.00 10.00
TOTAL For C Building 44.00 54.00 10.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00

Page 7
MONITORING OF VARIANCE AT RECONCILLIATION

Sr. Net Mat. Theo. Rev.Theo.Req Actual


Name of Project Material Stage of work Unit Diff. Remarks
No. received Requirement uirement Consumption

a b b-a
Angle Cock For All Buildings Nos. 1126 1488.00 780.00 -708.00

Building A 0.00
Nos. 518.00 391.00 -127.00
TOTAL For A Building 518.00 391.00 -127.00
Building B
Nos. 452.00 136 -316.00
TOTAL For B Building 452.00 136.00 -316.00
Building C
Nos. 518.00 253 -265.00
TOTAL For C Building 518.00 253.00 -265.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00

GLASS COUNTER Nos. 272


WASH BASIN 368.00 260.00 -108.00
For All Buildings

Building A 0.00
Nos. 130.00 147.00 17.00
TOTAL For A Building 130.00 147.00 17.00
Building B
Nos. 108.00 69 -39.00
TOTAL For B Building 108.00 69.00 -39.00
Building C
Nos. 130.00 44 -86.00
TOTAL For C Building 130.00 44.00 -86.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00

Page 8
MONITORING OF VARIANCE AT RECONCILLIATION

Sr. Net Mat. Theo. Rev.Theo.Req Actual


Name of Project Material Stage of work Unit Diff. Remarks
No. received Requirement uirement Consumption

a b b-a
Two way Bib Cock For All Buildings Nos. 364 129.00 231.00 102.00

Building A 0.00
Nos. 43.00 113.00 70.00
TOTAL For A Building 43.00 113.00 70.00
Building B
Nos. 43.00 40.00 -3.00
TOTAL For B Building 43.00 40.00 -3.00
Building C
Nos. 43.00 78.00 35.00
TOTAL For C Building 43.00 78.00 35.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00

Bib Cock For All Buildings Nos. 296 129.00 86.00 -43.00

Building A 0.00
Nos. 43.00 43.00 0.00
TOTAL For A Building 43.00 43.00 0.00
Building B
Nos. 43.00 16.00 -27.00
TOTAL For B Building 43.00 16.00 -27.00
Building C
Nos. 43.00 27.00 -16.00
TOTAL For C Building 43.00 27.00 -16.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00

Page 9
MONITORING OF VARIANCE AT RECONCILLIATION

Sr. Net Mat. Theo. Rev.Theo.Req Actual


Name of Project Material Stage of work Unit Diff. Remarks
No. received Requirement uirement Consumption

a b b-a
Bath Tub For All Buildings Nos. 118 132.00 104.00 -28.00

Building A 0.00
Nos. 44.00 28.00 -16.00
TOTAL For A Building 44.00 28.00 -16.00
Building B
Nos. 44.00 40.00 -4.00
TOTAL For B Building 44.00 40.00 -4.00
Building C
Nos. 44.00 36.00 -8.00
TOTAL For C Building 44.00 36.00 -8.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00

Bottle Trap For All Buildings Nos. 356 475.00 241.00 -234.00

Building A 0.00
Nos. 173.00 122.00 -51.00
TOTAL For A Building 173.00 122.00 -51.00
Building B
Nos. 151.00 49.00 -102.00
TOTAL For B Building 151.00 49.00 -102.00
Building C
Nos. 151.00 70.00 -81.00
TOTAL For C Building 151.00 70.00 -81.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00

Page 10
MONITORING OF VARIANCE AT RECONCILLIATION

Sr. Net Mat. Theo. Rev.Theo.Req Actual


Name of Project Material Stage of work Unit Diff. Remarks
No. received Requirement uirement Consumption

a b b-a
Commode For All Buildings Nos. 357 368.00 348.00 -20.00

Building A 0.00
Nos. 130.00 122.00 -8.00
TOTAL For A Building 130.00 122.00 -8.00
Building B
Nos. 108.00 98.00 -10.00
TOTAL For B Building 108.00 98.00 -10.00
Building C
Nos. 130.00 128.00 -2.00
TOTAL For C Building 130.00 128.00 -2.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00

Flushing Tanks For All Buildings Nos. 435 0.00 344.00 344.00

Building A 0.00
Nos. 118.00 118.00
TOTAL For A Building 0.00 118.00 118.00
Building B
Nos. 98.00 98.00
TOTAL For B Building 0.00 98.00 98.00
Building C
Nos. 128.00 128.00
TOTAL For C Building 0.00 128.00 128.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00

Theoretical Quantites are worked out from approved drgs.


PREPARED BY CHECKED BY ACCEPTED
BY APPROVED BY

Respective ECC Engineers


FORWARDED TO
C.E. H.O.D. (ECC) SITE (P.E.) C.E.

Page 11