a b b-a
Cement For All Buildings Bags 20330 29980.05 20295.00 -9685.05
Crushed Sand For All Buildings CFt 83441 72083.54 83188.00 11104.46
Page 1
MONITORING OF VARIANCE AT RECONCILLIATION
a b b-a
River Sand For All Buildings CFt 117775 100769.64 117775.00 17005.36
Building A 0.00
EXTERNAL PAINTING CFt 960.00 960.00
EXTERNAL PLASTER CFt 20578.21 21983.00 1404.79
FLOORING / SKIRTING CFt 3267.12 1647.00 -1620.12
INTERNAL PLASTER CFt 15905.48 7151.00 -8754.48
MASONARY CFt 267.00 267.00
WATERPROOFING ( ATTACHED TOP / DRY TERRACE) CFt 4898.12 3587.00 -1311.12
TOTAL For A Building 44648.93 35595.00 -9053.93
Building B
EXTERNAL PAINTING CFt 513 513.00
EXTERNAL PLASTER CFt 18047.09 22187 4139.91
FLOORING / SKIRTING CFt 435.96 1668 1232.04
INTERNAL PLASTER CFt 2647.82 5408 2760.18
MASONARY CFt 263 263.00
WATERPROOFING CFt 4548.68 7265.00 2716.32
TOTAL For B Building 25679.56 37304.00 11624.44
Page 2
MONITORING OF VARIANCE AT RECONCILLIATION
a b b-a
Building C
EXTERNAL PLASTER CFt 20420.97 20919 498.03
FLOORING / SKIRTING CFt 435.96 341 -94.96
INTERNAL PLASTER CFt 3021.71 5133 2111.29
MASONARY CFt 384 384.00
WATERPROOFING ( ATTACHED TOP / DRY TERRACE) CFt 1323 1323.00
WATERPROOFING (FOR TOILET) CFt 4898.12 3390 -1508.12
TOTAL For C Building 28776.76 31490.00 2713.24
Development
CFt 1664.39 13386.00 11721.61
0.00
TOTAL For Development Works 1664.39 13386.00 11721.61
6" Bricks For All Buildings Nos. 1077882 1102463.21 1071988.00 -30475.21
Building A 0.00
Nos. 335818.29 317263.00 -18555.29
TOTAL For A Building 335818.29 317263.00 -18555.29
Building B
Nos. 374232.33 326122 -48110.33
TOTAL For B Building 374232.33 326122.00 -48110.33
Building C
Nos. 381784.29 356433 -25351.29
TOTAL For C Building 381784.29 356433.00 -25351.29
Development
Nos. 10628.30 72170.00 61541.70
TOTAL For Development Works 10628.30 72170.00 61541.70
Page 3
MONITORING OF VARIANCE AT RECONCILLIATION
a b b-a
4" Bricks For All Buildings Nos. 134438 163078.46 130038.00 -33040.46
Building A 0.00
For Waterproofing (Bricks 230 x 110 x 80mm - 495 Nos. per cum) Nos. 38101.82 29750.00 -8351.82
TOTAL For A Building 38101.82 29750.00 -8351.82
Building B
For Waterproofing (Bricks 230 x 110 x 80mm - 495 Nos. per cum) Nos. 35948.23 32229 -3719.23
TOTAL For B Building 35948.23 32229.00 -3719.23
Building C
For Waterproofing (Bricks 230 x 110 x 80mm - 495 Nos. per cum) Nos. 38101.82 20989 -17112.82
TOTAL For C Building 38101.82 20989.00 -17112.82
Development
For Waterproofing (Bricks 230 x 110 x 80mm - 495 Nos. per cum) Nos. 50926.59 47070.00 -3856.59
TOTAL For Development Works 50926.59 47070.00 -3856.59
Ceramic Tiles For All Buildings SFt 179596 215435.67 177855.88 -37579.79
Building A 0.00
Ceramic Tiles for Dado & flooring SFt 73775.15 58907.70 -14867.45
TOTAL For A Building 73775.15 58907.70 -14867.45
Building B
Ceramic Tiles for Dado & flooring SFt 66060.61 54449.05 -11611.56
TOTAL For B Building 66060.61 54449.05 -11611.56
Building C
Ceramic Tiles for Dado & flooring SFt 73775.15 59132.57 -14642.58
TOTAL For C Building 73775.15 59132.57 -14642.58
Development
Ceramic Tiles for Dado & flooring 1824.75 5366.56 3541.81
TOTAL For Development Works 1824.75 5366.56 3541.81
Page 4
MONITORING OF VARIANCE AT RECONCILLIATION
a b b-a
Vitrified Tiles For All Buildings SFt 98380 112108.28 91979.72 -20128.56
Building A 0.00
Vitrified Tiles for Flooring & Skirting SFt 37142.47 32741.20 -4401.27
TOTAL For A Building 37142.47 32741.20 -4401.27
Building B
Vitrified Tiles for Flooring & Skirting SFt 37142.47 26752.88 -10389.59
TOTAL For B Building 37142.47 26752.88 -10389.59
Building C
Vitrified Tiles for Flooring & Skirting SFt 37142.47 32485.64 -4656.83
TOTAL For C Building 37142.47 32485.64 -4656.83
Development
Vitrified Tiles for Flooring & Skirting SFt 680.88 -680.88
TOTAL For Development Works 680.88 0.00 -680.88
Building A 0.00
Wooden Flooring SFt 0.00
TOTAL For A Building 0.00 0.00 0.00
Building B
Wooden Flooring SFt 0.00
TOTAL For B Building 0.00 0.00 0.00
Building C
Wooden Flooring SFt 0.00
TOTAL For C Building 0.00 0.00 0.00
Development
Wooden Flooring SFt 0.00
TOTAL For Development Works 0.00 0.00 0.00
Page 5
MONITORING OF VARIANCE AT RECONCILLIATION
a b b-a
Door Shutters For All Buildings SFt 23097 24030.03 23699.42 -330.62
Building A 0.00
Flush door Shutter 35mm SFt 8319.39 8545.97 226.59
TOTAL For A Building 8319.39 8545.97 226.59
Building B
SFt 7176.48 7378.98 202.50
TOTAL For B Building 7176.48 7378.98 202.50
Building C
SFt 8319.39 7774.47 -544.92
TOTAL For C Building 8319.39 7774.47 -544.92
Development
SFt 214.78 -214.78
TOTAL For Development Works 214.78 0.00 -214.78
Building A 0.00
SFt 2025.11 5152.00 3126.89
TOTAL For A Building 2025.11 5152.00 3126.89
Building B
SFt 1746.04 2240 493.96
TOTAL For B Building 1746.04 2240.00 493.96
Building C
SFt 2025.11 1408 -617.11
TOTAL For C Building 2025.11 1408.00 -617.11
Development
0.00
TOTAL For Development Works 0.00 0.00 0.00
Page 6
MONITORING OF VARIANCE AT RECONCILLIATION
a b b-a
Waterproof Ply 19mm For All Buildings SFt 9152 7227.66 8800.00 1572.34
Building A 0.00
SFt 2524.70 4384.00 1859.30
TOTAL For A Building 2524.70 4384.00 1859.30
Building B
SFt 2178.27 2624 445.73
TOTAL For B Building 2178.27 2624.00 445.73
Building C
SFt 2524.70 1792 -732.70
TOTAL For C Building 2524.70 1792.00 -732.70
Development
SFt 0.00
TOTAL For Development Works 0.00 0.00 0.00
Building A 0.00
Nos. 44.00 57.00 13.00
TOTAL For A Building 44.00 57.00 13.00
Building B
Nos. 34.00 57.00 23.00
TOTAL For B Building 34.00 57.00 23.00
Building C
Nos. 44.00 54.00 10.00
TOTAL For C Building 44.00 54.00 10.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00
Page 7
MONITORING OF VARIANCE AT RECONCILLIATION
a b b-a
Angle Cock For All Buildings Nos. 1126 1488.00 780.00 -708.00
Building A 0.00
Nos. 518.00 391.00 -127.00
TOTAL For A Building 518.00 391.00 -127.00
Building B
Nos. 452.00 136 -316.00
TOTAL For B Building 452.00 136.00 -316.00
Building C
Nos. 518.00 253 -265.00
TOTAL For C Building 518.00 253.00 -265.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00
Building A 0.00
Nos. 130.00 147.00 17.00
TOTAL For A Building 130.00 147.00 17.00
Building B
Nos. 108.00 69 -39.00
TOTAL For B Building 108.00 69.00 -39.00
Building C
Nos. 130.00 44 -86.00
TOTAL For C Building 130.00 44.00 -86.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00
Page 8
MONITORING OF VARIANCE AT RECONCILLIATION
a b b-a
Two way Bib Cock For All Buildings Nos. 364 129.00 231.00 102.00
Building A 0.00
Nos. 43.00 113.00 70.00
TOTAL For A Building 43.00 113.00 70.00
Building B
Nos. 43.00 40.00 -3.00
TOTAL For B Building 43.00 40.00 -3.00
Building C
Nos. 43.00 78.00 35.00
TOTAL For C Building 43.00 78.00 35.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00
Bib Cock For All Buildings Nos. 296 129.00 86.00 -43.00
Building A 0.00
Nos. 43.00 43.00 0.00
TOTAL For A Building 43.00 43.00 0.00
Building B
Nos. 43.00 16.00 -27.00
TOTAL For B Building 43.00 16.00 -27.00
Building C
Nos. 43.00 27.00 -16.00
TOTAL For C Building 43.00 27.00 -16.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00
Page 9
MONITORING OF VARIANCE AT RECONCILLIATION
a b b-a
Bath Tub For All Buildings Nos. 118 132.00 104.00 -28.00
Building A 0.00
Nos. 44.00 28.00 -16.00
TOTAL For A Building 44.00 28.00 -16.00
Building B
Nos. 44.00 40.00 -4.00
TOTAL For B Building 44.00 40.00 -4.00
Building C
Nos. 44.00 36.00 -8.00
TOTAL For C Building 44.00 36.00 -8.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00
Bottle Trap For All Buildings Nos. 356 475.00 241.00 -234.00
Building A 0.00
Nos. 173.00 122.00 -51.00
TOTAL For A Building 173.00 122.00 -51.00
Building B
Nos. 151.00 49.00 -102.00
TOTAL For B Building 151.00 49.00 -102.00
Building C
Nos. 151.00 70.00 -81.00
TOTAL For C Building 151.00 70.00 -81.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00
Page 10
MONITORING OF VARIANCE AT RECONCILLIATION
a b b-a
Commode For All Buildings Nos. 357 368.00 348.00 -20.00
Building A 0.00
Nos. 130.00 122.00 -8.00
TOTAL For A Building 130.00 122.00 -8.00
Building B
Nos. 108.00 98.00 -10.00
TOTAL For B Building 108.00 98.00 -10.00
Building C
Nos. 130.00 128.00 -2.00
TOTAL For C Building 130.00 128.00 -2.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00
Flushing Tanks For All Buildings Nos. 435 0.00 344.00 344.00
Building A 0.00
Nos. 118.00 118.00
TOTAL For A Building 0.00 118.00 118.00
Building B
Nos. 98.00 98.00
TOTAL For B Building 0.00 98.00 98.00
Building C
Nos. 128.00 128.00
TOTAL For C Building 0.00 128.00 128.00
Development
Nos. 0.00
TOTAL For Development Works 0.00 0.00 0.00
Page 11