I SITE PREPERATION
II EARTHWORKS
IV STRUCTURAL WORKS
V MASONRY WORKS
X PAINTING WORKS
XI ELECTRICAL WORKS
Two (2) Storey School Building Located at Brgy. Capoocan, Calbayog City
L.S. 5 Php -
L.S. 21 Php -
L.S. 1 Php -
F1 1.96 1.5
F2 5.29 1.5
F3 4.41 1.5
FTB-2 0.15 7
FTB-3 0.15 5
ST 16.75 2.4
TOTAL EXCAVATION WORK
B. GRAVEL BEDDING
F1 1.96 0.1
F2 5.29 0.1
F3 4.41 0.1
TOTAL
A. SOIL POISONING
F1 1.96 1.5
F2 5.29 1.5
F3 4.41 1.5
B1 0.24 4.5
B2 0.24 5
CB 1 0.1 0.4
G1-2 0.1 5
G2-2 0.1 5
G3-2 0.1 5
G4 0.1 2.5
G5 0.125 7
G6 0.1 7
G7 0.125 7
S1 15.75 0.125
S2 11.25 0.125
SC 1 0.16 0.4
CB 2 3.07 0.1
DC 0.05 0.1
RG 1 4.5
RG1-1 5
RG2 2.5
RG3 7
RG4 5
RG5 5
SB 1 1.31525 4.5
SB 2 1.31525 5
MAIN BARS
DIA. CUT LENGTH
Items
(mm) (m)
F1 20 1.4
F2 20
2.3
F3 20 2.1
B1
16 4.5
B1-2 16 5
B2
16 3.8
C1-1
20 4.1
C1-2
20 4.1
C2-1
25 4.1
C2-2
25 4.1
C3-1
25 4.1
C3-2
25 4.1
FTB-1
20 2.5
FTB-2 7
20
FTB-3 4.5
20
FTB3-1 5
20
G1-1
20 4.5
G1-2
20 5
G2-1
20 4.5
G2-2
20 5
G3-1
20 4.5
G3-2
20 5
G4
20 2.5
G5
20 7
G6
20 2.5
G7
20 7
S1-1 4.5
10
S1-2 3.5
10
S2-1 4.5
10
S2-2 2.5
10
S2-2 5
10
S2-3
10 2.5
S2-4
10 1.15
S2-5
SC 1
12 0.575
STB 1
10 0.575
STB 2 12 1.1
DC 1
12 0.275
Walls
Items
L (m) H (m)
W1 4.5 2.8
W2 4.5 2.8
` W3 4.5 2.8
W4 12.2 2.8
W5 7 2.6
W6 4.5 1.2
W7 5 1.2
W8 5.575 1
TOT
D1 0.9 2.4
D2 0.9 2.1
D3 0.8 2.1
D4 0.7 2.1
D5 0.6 1.6
W1 3.6 1.7
W2 1.6 1.7
W3 0.6 0.685
BB 4.88 0.42
TOTAL AREA
W1 4.5 2.8
W2 4.5 2.8
W3 4.5 2.8
W4 12.2 2.8
W5 7 2.6
W6 4.5 1.2
W7 5 1.2
W8 5.575 1
B1 0.25 0.4
B2 0.2 0.4
C1 0.4 0.4
C2 0.4 0.4
C3 0.4 0.4
C4 0.4 0.4
C5 0.4 0.4
C6 0.4 0.4
R 5.575 0.3
TOTAL ARE
FORMWORKS
Items
Area(sq.m) Quantity(pcs)
R 269.1 1
C 163.8 1
Walls
Items
L (m) H (m)
W1 4.5 2.8
W2 4.5 2.8
W3 4.5 2.8
W4 12.2 2.8
W5 7 2.6
W6 4.5 1.2
W7 5 1.2
W8 5.575 1
C2 1.1 2.8
C3 1.1 2.8
CB 1 0.125 0.4
G1-2 0.01 5
G2-2 0.01 5
G3-2 0.01 5
G4 0.02 2.5
G5 0.03 7
G6 0.05 7
G7 0.03 7
S1 3.5 4.5
S2 3.5 5
CB 2 0.1
DC 0.1
RG 1 4.5
RG1-1 5
RG2 2.5
RG3 7
RG4 5
RG5 5
SB 1 0.15 0.675
TOTAL ARE
1 LPA
2 LPB
3 SPARE
WATER PUMP 2HP
4
TOTAL
A. SEPTIC TANK
Items Area(sq.m) D(m)
16.75 2.4
ST
TOTAL
: Construction of Two (2) Storey School Building Located at Brgy. Capoocan, Calbayog City
2.94 8 23.52
7.935 8 63.48
6.615 8 52.92
0.375 8 3
1.05 8 8.4
0.675 18 12.15
0.75 4 3
0.528 1 0.528
1.032 1 1.032
40.2 1 40.2
EXCAVATION WORK
208.23
0.015 8 0.12
0.015 8 0.12
0.015 18 0.27
0.015 4 0.06
0.264 1 0.264
1.032 1 1.032
0.196 8 1.568
0.529 8 4.232
0.441 8 3.528
TOTAL
11.194
Volume Quantity Total Volume
(cu.m) (pcs) (cu.m)
Specifiaction
2.94 8 23.52
7.935 8 63.48
6.615 8 52.92
0.512 8 4.096
0.512 8 4.096
0.512 8 4.096
0.512 8 4.096
0.512 8 4.096
0.512 8 4.096
0.054 8 0.432
0.072 8 0.576
0.096 8 0.768
1.08 7 7.56
1.2 1 1.2
0.04 7 0.28
0.45 8 3.6
0.5 8 4
0.45 6 2.7
0.5 1 0.5
0.45 6 2.7
0.5 1 0.5
0.25 2 0.5
0.875 2 1.75
0.7 6 4.2
0.875 6 5.25
1.96875 12 23.625
1.40625 9 12.65625
0.064 12 0.768
0.252 2 0.504
0.168 2 0.336
0.307 1 0.307
0.528 1 0.528
1.032 1 1.032
0.005 4 0.02
18 0
2 0
5 0
3 0
2 0
2 0
5.918625 6 35.51175
6.57625 1 6.57625
CTURAL CONCRETE WORK
240.78825
BENDING
QUANTITY WEIGHT (kg)
(m)
0.2 7 2.469
0.2 11 2.469
0.2 10 2.469
0.2 5 1.580
0.2 5 1.580
0.2 4 1.580
0.2 2 2.469
0.2 2 2.469
0.2 3 3.858
0.2 5 3.858
0.2 2 3.858
0.2 3 3.858
0.2 5 2.469
0.2 5 2.469
0.2 5 2.469
0.2 10 2.469
0.2 8 2.469
0.2 8 2.469
0.2 9 2.469
0.2 9 2.469
0.2 9 2.469
0.2 9 2.469
0.2 8 2.469
0.2 12 2.469
0.2 8 2.469
0.2 14 2.469
0.2 27 0.617
0.2 27 0.617
0.2 27 0.617
0.2 27 0.617
0.2 27 0.617
0.2 27 0.617
0.2 10 0.617
0.2 10 0.889
0.2 10 0.617
0.2 10 0.889
0.2 10 0.889
TOTAL RSB WORKS
18.2 0 0
5.4 0 0
6 0 0
5.575 0 0
12 25.92
1 1.89
6 10.08
5 7.35
8 7.68
12 73.44
12 32.64
9 3.699
6 12.2976
A 174.9966
STRUCTURE Doors and Windows
18.2 0 0
5.4 0 0
6 0 0
5.575 0 0
0.1 0 0
0.08 0 0
0.16 0 0
0.16 0 0
0.16 0 0
0.16 0 0
0.16 0 0
0.16 0 0
8.73 0 0
2.54 0 0
23.49 0 0
1.6725
TOTAL AREA
Total Area(sq.m)
269.1
163.8
432.9
18.2 0 0
5.4 0 0
6 0 0
5.575 0 0
8.73 0 0
2.54 0 0
23.49 0 0
1.6725 0 0
3.08 0 0
3.08 0 0
3.08 0 0
0.045 0 0
0.05 0 0
0.4995 0 0
0.05 0 0
0.4995 0 0
0.05 0 0
0.4995 0 0
0.05 0 0
0.05 0 0
0.21 0 0
0.35 0 0
0.21 0 0
15.75 0 0
17.5 0 0
0.07875 0 0
0.0798 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0.10125 0 0
TOTAL AREA
CIRCUIT BREAKER
VA LOAD
VOLT POLE
8232 230 2
5939 230 2
3910 230 2
2760 230 2
40.2
bayog City
Cement Sand Gravel
(bag) (cu.m) (cu.m)
CF=9 SF=0.5 GF=1
36 2 4
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
1100.000 6 11 162.963
85.333 6 18 170.667
53.096 9 7 99.556
333.333 9 4 88.889
333.333 9 4 88.889
781.250 9 6 208.333
1302.083 9 7 243.056
520.833 9 4 138.889
781.250 9 6 208.333
537.037 6 11 162.963
800.000 6 20 296.296
213.333 6 15 222.222
240.000 6 17 251.852
240.000 6 17 251.852
114.568 6 8 118.519
744.691 6 9 133.333
1560.000 12 18 133.333
580.000 6 27 100.000
180.000 6 54 200.000
96.667 6 27 100.000
0 10 182 2275
0 10 54 675
0 1 6 75
0 2 11.15 139.375
5626.6
Quantity(pcs) Total Area (sq.m)
Area (sq.m)
4.32 12 99.36
0.411 2 24.378
11.07 12 18.36
6.72 2 54.88
0 10 182
0 10 54
0 1 6
0 2 11.15
0 8 0.8
0 2 0.16
0 16 2.56
0 16 2.56
0 16 2.56
0 16 2.56
0 16 2.56
0 16 2.56
0 2 17.46
0 2 5.08
0 2 46.98
1 1.6725
488.988
Quantity(pcs) Total Area (sq.m)
Area (sq.m)
4.32 12 99.36
0.411 2 24.378
11.07 12 18.36
6.72 2 54.88
0 10 182
0 10 54
0 1 6
0 2 11.15
0 2 17.46
0 2 5.08
0 2 46.98
0 1 1.6725
16 49.28
0
16 49.28
0
16 49.28
0
8 0.36
0
0.35
0 7
8 3.996
0
8 0.4
0
6 2.997
0
1 0.05
0
6 2.997
0
1 0.05
0
2 0.1
0
2 0.42
0
6 2.1
0
6 1.26
0
12 189
0
9 157.5
0
0.1575
0 2
0.1596
0 2
0
0 1
0
0 4
0
0 18
0
0 2
0
0 5
0
0 3
0
0 2
0
0 2
0.6075
0 6
1031.6651
CIRCUIT BREAKER
WIRE & CONDUIT SIZE
AT AF Kaic
40 50 10 ______________
15 4 0.3 60
15 2 0.6 165
15 3 0 105
12 2 0.7 108
2 1 0.6 36
2 2 0.6 14
15 2 0 60
15 2 0 60
15 2 0 90
15 2 0 105
15 2 0 60
15 2 0 90
15 2 0.2 165
15 1 0.1 330
24 2 0.7 240
6 1 0.6 120
12 2 0.7 96
2 1 0.6 30
12 2 0.7 108
2 1 0.6 34
12 2 0.7 108
2 1 0.6 34
2 2 0.2 16
2 1 0.1 26
13 2 0.2 117
13 1 0.1 364
24 2 0.7 648
24 3 0.3 432
12 2 0.7 324
12 2 0.2 324
2 1 0.6 108
2 2 0.2 54
2 7.5 8
2 7.5 8
2 7.5 8
2 7.5 8
2 7.5 8
49.1 4671
E & CONDUIT SIZE CKT LOAD DESCRIPTION
∅
E + 1-5.5mm YW (G) in 32 mm PVC 1 LIGHT OUTLETS 12-2/36W, FLF
5 FACP
SPARE
6
SPARE
7
SPARE
8
TOTAL
TOTAL WEIGHT
OF REBARS
4444.444
26888.889
13611.111
16128.000
6144.000
1393.778
5333.333
5333.333
18750.000
25520.833
8333.333
18750.000
26888.889
134444.444
62222.222
35555.556
19911.111
6666.667
25200.000
8562.963
25200.000
8562.963
1896.296
6259.259
15600.000
188740.741
113400.000
57600.000
56700.000
32400.000
21600.000
5400.000
148.148
213.333
148.148
213.333
213.333
1004378.46296296
CIRCUIT BREAKER
OAD DESCRIPTION VA LOAD
VOLT POLE AT AF Kaic
2-3.5mm^2 THHN WIRE STRANDED, 1-3.5mm TW(G) WIRE STANDARD 20 mm dia PVC
2-3.5mm^2 THHN WIRE STRANDED, 1-3.5mm TW(G) WIRE STANDARD 20 mm dia PVC
2-3.5mm^2 THHN WIRE STRANDED, 1-3.5mm TW(G) WIRE STANDARD 20 mm dia PVC
2-3.5mm^2 THHN WIRE STRANDED, 1-3.5mm TW(G) WIRE STANDARD 20 mm dia PVC
2-3.5mm^2 THHN WIRE STRANDED, 1-3.5mm TW(G) WIRE STANDARD 20 mm dia PVC
____________________
____________________
240V, 10kAIC
CIRCUIT BREAKER
CKT LOAD DESCRIPTION VA LOAD
VOLT POLE
20 50 10 ____________________
20 50 10 ____________________
____________________
____________________
LIST OF A
PROJECT TITLE: TWO (2) S
PROJECT CATEGO
I
A Lay-out & Staking
B Excavation
II
C Gravel Bedding
G Slab on Grade
H Suspended Slab
I Columns
K Stairs
L FORMWORKS
N Slab on Grade
IV
O Suspended Slab
P Columns
R Stairs
S CONCRETING
U Slab on Grade
V Suspended Slab
W Columns
Y Stairs
Z 100 mm Wall
V
A1 150 mm Wall
B1 Doors
VI
C1 Windows
D1 Tile Works
VII
E1 Plastering
VIII
F1 Carpentry for Ceiling with Insulatio
K1 Masonry Painting
X L1 Wooden Painting
M1 Metal Painting
Q1 Lighting Fixtures
T1 Downsprout/Storm Drainage
W1 Septic Tank
X1 Catch Basin
IX A2 Clearing
LIST OF ACTIVITIES
JECT TITLE: TWO (2) STOREY SCHOOL BUILDING
ction of Two (2) Storey School Building Located at Brgy. Capoocan, Calbayog City
Excavation 7 A C
avel Bedding 3 B D
L POISONING 4 C K
ab on Grade 5 B B
spended Slab 3 B B
Columns 3 B B
Stairs 2 B B
ORMWORKS B B
ab on Grade 3 B B
spended Slab 3 B B
Columns 3 B B
Stairs 4 B B
ONCRETING B B
ab on Grade 5 B B
spended Slab 6 B B
Columns 4 B B
Stairs 4 B B
00 mm Wall 4 B B
50 mm Wall 4 B B
Doors 3 B B
Windows 3 B B
Tile Works 4 B B
Plastering 5 B B
nd Channel Beam 2 B B
(Ceiling Support) 3 B B
onry Painting 4 B B
oden Painting 4 B B
etal Painting 4 B B
Alarm System 1 B B
er Line Works 3 B B
out/Storm Drainage 3 B B
Waterline Works 3 B B
itary Fixtures 5 B B
Septic Tank 5 B B
Catch Basin 4 B B
otection System 3 B B
Clearing 7 B B
SUMMARY OF EQUIPMENT OPERATED RENTAL RAT
L01
Foreman
L02
Highly Skilled laborer
L03
Skilled Laborer
L04
Semi-Skilled Laborer
L05
Part-time Safety Practitioner
L06
First Aider
L07
Unskilled Laborer
M01
Portland Cement
M02
Sand
M03
Gravel
M04
Common Borrow
M05
Reinforcing Steel Bars, Grade 40
M06
#16 G.I. Tie Wire
M07
1/4" thick Ordinary Plywood
M08
1/4" thick Marine Plywood
M09
Coco Lumber
M10
Common Wire Nails, Assorted
M11
Concrete Nials, Assorted
M12
Finishing Nails
M13
4"thk. Concrete Hollow Blocks
M14
6"thk. Concrete Hollow Blocks
M15
Soil Poisoning (F3D50 Chemical)
M16
LC 150 x 65 x 20 x 2.0mm
M17
Structural Steel, Angle Bars
M18
MS Plates
M19
Welding Rod
M23 Anchor Bolt with Nut & Washer, 12mmØ x 50mm x 300mm
M24 Anchor Bolt with Nut & Washer, 10mmØ x 50mm x 200mm
M33 J-Bolts
M56 Acri-color
M85 Mirror
M120
Single Switch with Plate
M121 2-Gang Switch with Plate
HOURLY
DAILY RATE REMARKS
RATE
P 219.75 P 1,758.00
P 351.50 P 2,812.00
P 851.00 P 6,808.00
or P 149.00 P 1,192.00
e P 121.50 P 972.00
P 229.00 P 1,832.00
HOURLY
SONNEL DAILY RATE REMARKS
RATE
P 71.02 P 568.16
P 51.51 P 412.08
P 55.00 P 440.00
er P 39.73 P 317.84
CONSTRUCTION MATERIALS
HAULING
UNIT UNIT PRICE TOTAL PRICE REMARKS
COST
kg. P 41.00
pc. P 450.00
m. P 36.00 P 36.00
m. P 49.00 P 49.00
1 kg Assorted Nails
1 cu. m. Sand
1 cu. m. Gravel
1 pcs.
CHB
1 kg
White Cement Filler
1 bags
Tile Cement Motar
1 pcs.
0.4 x 0.4 Tiles
1 pcs.
0.25 x 0.25 Tiles
1 pcs. Corrugated G.I. Sheet (Gauge No. 26 x 3.6m)
1 pcs.
G.I. Flashing (Gauge No. 26 x 3.6m)
1 pcs.
G.I. Gutter (Gauge No. 26 x 3.6m)
1 pcs.
G.I. Ridge Roll (Gauge No. 26 x 3.6m)
1 kg Rivets
1 kg G.I. Washer
1 kg Lead Washer
1 pcs. Lavatory
1 pcs. Chandelier
1 pcs. ACU-Outlet
PhP 125.00
PhP 205.00
PhP 250.00
PhP 65.00
PhP 450.00
PhP 60.00
PhP 90.00
PhP 120.00
PhP 150.00
PhP 85.00
PhP 260.00
PhP 800.00
PhP 1,950.00
PhP 57.00
PhP 350.00
PhP 400.00
PhP 50.00
PhP 40.00
PhP 380.00
PhP 340.00
PhP 285.00
PhP 250.00
PhP 430.00
PhP 350.00
PhP 90.00
PhP 70.00
PhP 70.00
PhP 550.00
PhP 60.00
PhP 50.00
PhP 300.00
PhP 800.00
PhP 1,500.00
PhP 950.00
PhP 1,650.00
PhP 800.00
PhP 5,000.00
PhP 3,500.00
PhP 4,000.00
PhP 3,500.00
PhP 3,000.00
PhP 3,000.00
PhP 2,500.00
PhP 14,400.00
PhP 9,600.00
PhP 1,560.00
PhP 4,368.00
PhP 3,400.00
PhP 2,300.00
PhP 18,720.00
PhP 1,800.00
PhP 2,700.00
PhP 5,400.00
PhP 90.00
PhP 15.00
PhP 15.00
PhP 250.00
PhP 4,000.00
PhP 4,500.00
PhP 75.00
PhP 6,500.00
PhP 2,000.00
PhP 500.00
PhP 3,500.00
PhP 4,500.00
PhP 115.00
PhP 100.00
PhP 160.00
PhP 20.00
PhP 35.00
PhP 40.00
PhP 35.00
PhP 40.00
PhP 40.00
PhP 30.00
PhP 100.00
DETAILED ESTIMATE
PROJECT TITLE: TWO (2) STOREY SCHOOL BUILDING
PROJECT DESCRIPTION: Construction of Two (2) Storey School Building Located at Brgy
ESTIMATE
TOREY SCHOOL BUILDING